20
IGNACIO GALAN VINUESA Topography Technical Engineer

Ignacio Galán Vinuesa Background

Embed Size (px)

Citation preview

Page 1: Ignacio Galán Vinuesa Background

IGNACIO GALAN VINUESA

Topography Technical Engineer

Page 2: Ignacio Galán Vinuesa Background

Survey Party Chief

Survey Party Chief responsible for structures

Chief surveyor: measurements, roadways design, crews management

AutoCAD, Bentley Microstation and InRoads

AREAS OF EXPERTISE

Page 3: Ignacio Galán Vinuesa Background

CONSTRUCTION BACKGROUND

Page 4: Ignacio Galán Vinuesa Background

M50 DUBLIN MOTORWAYConstruction Company : Construction Consortium Sacyr-FCC-Hegarty

Budget : 250,000,000 eurosLocation : Dublin (IRELAND)

Page 5: Ignacio Galán Vinuesa Background

Upgraded the existing M-50 urban motorway in Dublin over a stretch of 24 km by widening the road with one new lane in each direction, and adapted and improved existing junctions

Page 6: Ignacio Galán Vinuesa Background

Works as Chief Surveyor; responsible for measurements, designed junctions and intersections, organized and supervised Land Surveyor crews

Page 7: Ignacio Galán Vinuesa Background
Page 8: Ignacio Galán Vinuesa Background

TALAVERA DE LA REINA BELTWAYConstruction Company : Construction Consortium Sacyr-Aglomancha-Barcenas

Budget : 90,000,000 eurosLocation : Talavera de la Reina, Toledo (SPAIN)

Page 9: Ignacio Galán Vinuesa Background

The project included building of a cablestayed bridge with a 318 meters span and a 190 meters high inclined mast crossing the widest point of the river in a single suspended stretch. The bridge was coupled with twin access viaducts, each 204 meters long

Page 10: Ignacio Galán Vinuesa Background

Responsible for checking the building of steel nucleus of pylon (190 meters high) with 3D program and Microstation and placement in site construction. Survey Party Chief to other works

Page 11: Ignacio Galán Vinuesa Background

AVE(HIGH-SPEED-RAILWAY) LLEIDA-MARTORELL SUBSECTION IConstruction Company : OHLBudget : 150,000,000 euros

Location : Lleida, Cataluña (SPAIN)

Page 12: Ignacio Galán Vinuesa Background

22 km High-Speed Railway construction. The project included the building of a 2,900 meters long viaduct, combining two methods of construction, sliding formwork and pushed viaduct, and another 380 meters viaduct

Page 13: Ignacio Galán Vinuesa Background

Survey Party Chief responsible for structures and other site works

Page 14: Ignacio Galán Vinuesa Background

M50-R3-M203 MAIN ROAD JUNCTIONSConstruction Company : Construction Consortium Sacyr-FCC-Dragados

Location : Madrid (SPAIN)

Page 15: Ignacio Galán Vinuesa Background

Survey Party Chief responsible for structures and other site works

Page 16: Ignacio Galán Vinuesa Background

MANY DEVELOPMENT AREAS, CAR LOGISTICS CENTER AND RAILWAY SIDING, PARKING AND PREVIOUS STUDIES AND WORKS TO DEVELOPMENTS

Los Berrocales Urban DevelopmentConstructor : Sacyr (8,300,000 square meters)

Budget : 84,000,000 eurosLocation : Madrid (SPAIN)

Page 17: Ignacio Galán Vinuesa Background

Los Tempranales Urban DevelopmentConstructor : Sacyr (1,150,000 square meters)

Budget : 42,000,000 eurosLocation : San Sebastian de los Reyes, Madrid (SPAIN)

Page 18: Ignacio Galán Vinuesa Background

Casablancas Industrial Park DevelopmentConstructor : Sacyr (1,500,000 square meters)

Budget : 32,000,000 eurosLocation : Torrejon de Ardoz, Madrid (SPAIN)

Page 19: Ignacio Galán Vinuesa Background

Car Logistics Center and Railway SidingConstructor : Sacyr (500,000 square meters)

Location : Ciempozuelos, Madrid (SPAIN)

Page 20: Ignacio Galán Vinuesa Background

Ignacio Galán VinuesaTopography Technical Engineer (Universidad de Salamanca)

308 - 11 Evergreen Place

R3L 2T9 Winnipeg, Canada

Mobile : 001 204 952 2800

Email : [email protected]

LinkedIn