20
Ad-753 214 PRELIMINARY DESIGN AND COST STUDY OF RECIRCULATING CHROMATE RINSE SYSTEM FOR AIRCRAFT CQRROSION; CONTROL I K. G. Clark, et al Naval Air Developm.ent Center Prepared for: Naval Air Systems Comrn .and' 2 November 1972 II DISTRIBUTED BY: National Technical Information Service U.S. DEPARTMENT OF COMMERCE 5285 Port Royal Road, Springfield '1a. 22151

II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

Embed Size (px)

Citation preview

Page 1: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

Ad-753 214

PRELIMINARY DESIGN AND COST STUDY OFRECIRCULATING CHROMATE RINSE SYSTEMFOR AIRCRAFT CQRROSION; CONTROL I

K. G. Clark, et al

Naval Air Developm.ent Center

Prepared for:

Naval Air Systems Comrn .and'

2 November 1972

II

DISTRIBUTED BY:

National Technical Information ServiceU. S. DEPARTMENT OF COMMERCE5285 Port Royal Road, Springfield '1a. 22151

Page 2: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

SI NAVAL AIRDEVELOPMENT

CENTERWARMINSTER PA 1Bf74

-L

REPORT NO. NADC-72183-VT 2 November 1972

PRELIMINARY DESICN AND COST STUDY OF RECIRCULATIN-,CHROM•TE RINSE SYSTEM FOR AIRCRAFT CORROSION CONTROL

DESIGN PHASE ONE

AIRTASK NO. A3405343/200B/2F00554401WORK UNIT 02

GSED P.O. 2-8013 of 22 SEP 71

Approved for public release; distribution unlimited.

LJ

.C-

IF

it)4 OF/

/ I

Page 3: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

A NOTICE

SDICT ENDORSEIMENT - The discussion or in,; tructions corcerning'Orh1arcal productt herein do not constitute an endorsement by the,ovenniaeat nor do they convey cr imply the license or right to usesuch products.

Page 4: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

UNCLASSIFIED-'S tir \ Cl' . 6110t 1

DOCUMENT CONTROL DATA. R&D

S.'.. V.*AI'II. AIR D ,EiLO -PM Ert ntEr 11r 141 Oi 1 Cll TY C I A4,TIT ICA IION

SNAVAL AIR DEVELOPMENT CENTER UNCLASSIFIEDAIR VEHICLE TECHNOLOGY DEPARTMENT P,,h 4,,,,,,WARMINSTER, PA. 18974

PRELIMINARY DESIGN AND COST STUDY OF RECIRCULATING CHROMATE RINSE SYSTEM FORAIRCRAFT CORROSION CONTROL

4 .' t ( I'l( IIVI NO TI 1, (T gI" [I , ..7 I .5l151 I l ,Ii o.I 1

DESIGN PHASE ONE.'to I '074$'t tirs IAs'. fan"s.Ic mdleI h111.l it-

K. G. CLARK , W. C. HALLOW

t .1t P ORI DIA Ilt 74. TOTAL N4O 01 PAOI 0 0o o - 5

2 November 1972 15 2Oi N 1 104.AC 1 0 o1 G 1-s I N C) 1N.i Oi1 CINA 10Q41s• o I 1 0 l1, I J II% k*l tstoh

1, ',o,, C r i,1o NADC-72183-VT

AIRTASK A3405343/200B/2F00554401Work Unit No. 02 o,1,.41 ,o , .,o,:, ,A ..... . ....... ,,.. so, , ni ... ,5.g ,,

GSED P.O. 2-8013 of 22 Sep 71

I 1IS1 ItL tION STAT"M+ NT

Approved for public release; distribution unlimited.

C NAVAL AIR SYSTEMS COMMANDDEPARTMENT OF THE NAVYWASHINGTON, D. C. 20360

Is Als' t- I.. C I

A preliminary design and cost study was made for a recirculating chromaterinse system.

I

FORM 1 PAi, I I UNCLASSIFIEDID 4 "1., 73

S9~~~~~~ nioT A-•,'(•h ' !z\(n,, n,,,t,

Page 5: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

UNCIASSIFIED•, ~~~Se, uraINCh.,•f-'to

U __4_i_ _____,,14 V, Y w R • SL IN K M A I N IN L IN K

__NOLE WT t4OLr WyT OLIL w

Water Rinse

AircraftI • Corrosion Control

Chromate Ivhibitor

Recirculating Rinse

[

, 1BACK UNCLSSIFIEDDDI ,o., 1473 Ac UlSSFE(PAGE 2) Security Chsifijation

Page 6: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

DEPARTMENT OF THE NAVY* NAVAL AIR DEVELOPMENT CENTER

WARMINSTER, PA. 18974

Air Vehicle Technology Department

REPORT NO.. NADC-72183-VT 2 November 1972

PRELIMINARY DESIGN AND COST STUDY OF RECIRCULATING CHROMATERINSE SYSTEM FOR AIRCRAFT CORROSION CONTROL

DESIGN PHASE ONEAIRTASK NO. A3405343/200B/2F00554401

WORK UNIT 02GSED P.O. 2-8013 of 22 SEP 71

A preliminary design and cost study was made for a recirculatingchromate rinse system.

REPORTED BY: •.CtLK. f. CLARK AMaintenance Materials Section

Materials Engineering Section

[- APPROVED BY: T-D. AG HeadMaterials Engineering Section

E. R. LAMSON, HeadMaterials Application Branch

F. S. WILLIAMS, SuperintendentAero Materials Laboratory

Approved for public release; distribution unlimited.

Page 7: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

NADC-71283-VT

EVALUATION AND DISCUSSION

INTRODUCTION

Aircraft rinse facilities are presently employed to create ashort rain storm effect that removes corrosive salt deposits fromaircraft operating in salt laden environments. While water rinsinghas been effective in reducing corrosion, the rate of attack can befurther reduced by introducing a small amount of corrosion inhibitor,such as potassium dichromate, into the rinse water. Traces of theinhibitor which form a molecular film on exposed corrodible surfaces

r should reduce not only surface attack but Paso galvanic corrosionin critical areas. A preliminary design and cost study for arecirculating chromate rinse was undertaken under AIRTASK A3405343/200B/2F0O524401, Work Unit No. 2 and GSED P.O. 2-8013 (22 Sep 1971).

The initial concept for introducing a corrosion inhibitor intoan aircraft rinse was to add the inhibitor directly to the rinsewater system. But since chromates are toxic to aquatic life, therinse effluent would need chromate removal treatment before beingdischarged to the storm sewers. Investigation of treatment plantswith large capacity chromate separators showed that chemicalprecipitation would be the most feasible approach for removal butthat operating and maintenance costs would be high. At that pointit was felt that these high costs could be avoided by separating thechromate rinse from the fresh water rinse. The aircraft would befirst rinsed with fresh water then at a seperate site, sprayed witha chromate rinse. Following the spraying of chromate solution, therinse would be collected and reused to reduce the cost of a largetreatment plant.

A preliminary design and cost study was undertaken for a recirculatingchromate rinse system.

DISCUSSION

The design of an aircraft rinse apparatus incorporating achromate rinse system is complicated by three factors: I) theeffectiveness of potassium dichromate as a corrosion inhibitor isdiminished i.s the salinity of the chromate rinse water increases,2) chromates and salts dissolved in the rinse water can be separatedbut only slowly and expensively with reverse osmosis or ion exchangetechniques, and 3) chromates are toxic to aquatic life and, therefore,cannot be discharged to the sewer system.

An aircraft rinse apparatus expanded to include chromatetreatment must make use of two separate spray systems, where thefirst system is a fresh water rinse and the second system recirculatesthe chromate rinse solution. This design requires that the firstfresh water rinse remove salt deposits to avoid contamination of the

Page 8: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

NADC-71283-VT

chromate rinse and that a suitable length of taxiway exist betweenthe two systems to avoid contamination of the fresh water rinseeffluent with chromates.

Design considerations include:

1. A high impact spray system to deliver a large volume ofwater in the short rinsing cycle.

2. A recirculating chromate rinse system where suspendedsolids and oils are removed from the system prior to respraying.

3. A small treatment facility capable of removing chromates from

the rinse prior to ultimate disposal via the sewers.

4. A highly automated system, with little maintenance or

manual operation required.

5. A rinse system capable of handling a wide range of aircraftfrom small helicopters to large fixed wing aircraft.

Process equipment required for such a water rinse - chromaterinse apparatus would include the following (see Figures 1, 2 and 3):

1. A centrifugal pump to power each spray system, rated at300 psi and 1000 gpm for the fresh water rinse and 300 psi and 500 gpm

for the recirculating chromate rinse.

2. One centrifugal pump rated at 100 gallons per minute at75 pounds per square inch for pumping chromate rinse water from thesettling tank through a filter and into the storage tank.

3. Two vertical cylindrical 20,000 gallon tanks functioning asa settling tank to remove solid particles and a storage tank for thefiltered chromate rinse.

4. One vertical cylindrical 5,000 gallon holding tank tocollect rain water run-off for make-up water or disposal via thewater purification unit.

5. Water purification unit capable of handling 400 gallons per

hour to purify rain water contaminated with chromates prior to disposalvia the sewer system.

6. One filter capable of handling 100 gallons per minute toremove suspended solids.

7. One deflector screen to knockdown chromate spray from theprop wash.

2

Page 9: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

SiiNADC-71283-VT

8. 210 spray nozzles delivering 10 gallons per minute at 300pounds per square inch to produce a dense, high impact spray.

RESULTS OF DESIGN STUDY

The entire rinse apparatus as represented in Figures 1, 2 and 3

is comprised of two systems: 1) a fresh water rinse to remove saltd:posits and 2) a recirculating rinse with dilute chromate inhibitorto deter future corrosion. While the salt laden water from the freshwater rinse is sent directly to the storm sewer as in previous designs,the chromate solution is retained, held to remove solids, filtered, andreused via a spray system similar to that of the fresh water system.

The cost of equipment, auxiliary materials, and labor for theentire apparatus, including the necessary taxiway and two pump housestotals $322000. This figure does not account for any indirect costs(freight, insurance, construction overhead), contingency funds, orcontractors fee.

The following table shows a breakdown of costs:

CHROMATE RINSE SYSTEM MATERAL LABOR TOTAL

Taxiway and drainage 48 520 36 040 84 560Process equipment 70 080 23 975 94 055Pump nouses 4 150 2 750 6 900

122 750 62 765 185 515

FRESH WATER RINSE SYSTEM MATERIAL LABOR TOTAL

Taxiway and drainage 48 520 36 040 84 560Process equipment 32 670 14 725 47 395Pump houses 2 650 1 750 4 400

83 840 52 515 136 355

TOTAL COST 130TH SYSTEMS 206 590 115 280 321 870

It is important to note that where a fresh water rinse facilityand sufficienL taxiway exists, a recirculating chromate rinse systemcan be installed for $101,000, which includes proce equipment andpump house.

CONCLUSIONS

Due in particular to the taxiway construction costs which amountto 53% of labor and material cost for the entire apparatus, this projectappears more expensive than had been initially anticipated. This design,however, is superior to the initial single rinse concept due to anticipateddecreased maintenance, decreased operating costs, and a more automatedsystem design.

3

~ - - - ~- - - --

Page 10: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

NADC-71283-VT

RECOMMENDATIONS

It is recommended that a prototype water rinse -- chromate rinseapparatus be constructed as outlined in this preliminary report andthat a monitoring project be undertaken to optimize ", final deisgn.

4I

I

qi

b i~ • -•i '• 'i:- a|II• ..• •' .... ... ........ • " • •" •.. ... •• -• .I.

Page 11: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

UL

Lcc

Lu p~.3

u to

o LU

ot....................

Page 12: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

U

-, I°"

" ii

t 'C'..

/ // .

1 / / I..,</ I / ,

/ /.

"" iA l ,.

J ',I f,'1/,, ' .- I,' o,,' , .S ' , / • "# ' , ,

/ I. , ,, ,,< .

,_• • • ,

\i.J 0,• , ,,#0,

c sI °I

Page 13: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

•I "-II,,

-I~ '..|.

, -', .;I , ,., .

.1.

\1I

4'I._ .. ;

1, /r ~..•-°..

0 I 0 ? Tq m I 4

Page 14: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

NADC-71283-VT

APPENDIX A

Cost Study fo" Complete WaterRinse Chromate Rinse Apparatus

A-1

tj

A-i

Page 15: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

T77: - - -- 7 --P ~ ~

NApC-71283-VT,

COST STUDY

I. Site Development. Taxiway .and drainage system, (cost informationobtained from reference (b))

A. Chromate Rinse S~stem.

No.*of Units Item Material 'Labor Total

34600 yd2 Excavation, fill 5320 1150 64701200 yd2 Limeroce• base 930 90 10207100 yd2 Stabilizer base 3330 3330 66607100 yd Flex'concrete 38100 30630 687301200 yd 2 Asphaltic concrete 840 840 1680

$48520 $36040 $84560

B. Water Rinse System.

Same as above Chromate Rinse System

II. Process and Auxilliary Equipment (Cost information obtainedfrom reference (a)). I

A. Chromate Rinse System.

1. Process equipment.

No. of units Item Material Cost

I Pump,centrifugal, 500 gpid, 6,87Q305 psi

1 Pump, centrifugal, 100 gpm, 1,500175 psi I

2 . Taik, cylindrical,, verticll, 11,250 120,000 gallon, carbon steel

1 Tank, cylindrical, vertical 2,1205000 gallon,' carbon steel

1 Water purification unit, 18,750400 gph: ,37

1 Filter assembly 3,7501 Deflector screen 5,000

105 Spray nozzles, 10 gpm @ 3,940300 psi

$53,200

Assume Labor cost a 30% of material cost

Materials 53,200Labor .15,960Total $69,160

A-2

,-

Page 16: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

NADC-71283-VT

2. Instrumentation

No. ofUnits Item Material Labor Total

4 Pressure gauges 250 100 3501 Flow meter 370 200 5701 Timer, treadle switch 220 100 3201 Rain Sensor 630 130 760

$1470 $530 $2000

3. Piping

No. of Units Item $/ft Installed Total

250 ft 10" cast iron 18.10 4525300 8" cast iron 15.00 450050 6" steel 6.70 335

140 4" steel 4.00 560240 3" steel 2.70 650140 2" steel 1.40 200

$10770Assuming 44% of Total Cost is Labor

Material Cost = $6030Labor Cost = $4740

4. Valves

No. ofUnits Item Material Labor Total

3 8" Gate, cast iron 1970 90 20601 3" Globe, steel 220 10 2303 6" Butterfly,

Solenoid operated 2100 140 2240$4290 $240 $4530

5. Fittings

No. of

Units Item Material Labor Total

2 3" Reducers, steel 10 50 601 8" Reducer, cast iron 35 50 855 10"-900 Elbows, cast 840 410 1250

iron10 8"-900 Elbows, cast 560 340 900

iron2 6V-900 Elbows, steel 45 83 1302 l0"-Tees, cast iron 330 165 4951 6"-Cross, steel 75 50 125

$1859 $1150 $3045

A-3

Page 17: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

/o

NADC-71283-VT

6. Electrical

No. ofUnits Item 1 Labor Total17 Light fixtures 1355 1355 2710400 ft Conduit 600 6001000 ft Cable, wire 1240 1240$395 $1355 $45--

7. Subtotals

Category Material Labor TotalProcess equipment 53200 15960 69160Instrumentation 1470 530 2000Piping 6030 4740 10770Valves 4290 240 4530Fittings 1895 1150 3045Electrical 3195 1355 4550

$70080 $237 $94055B. Water Rinse System

1. Process equipment

No. o f Units Item Material Cost1 Pump, centrigual, 1000 gpm, 305 psi 12100

105 Spray nozzles, 10 gpm @ 300 psi 3940$16040

Assume Labor cost = 30% of material costMaterials = 16040Labor = 4810

$20850

2. Instrumentation

No. of

Units Item Material Labor Total1 Timer, treadle switch 220 100 3202 Pressure gauges 125 50 175

4345 $150 $495

A-4

Page 18: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

NADC-71283-VT

3. Piping

No. of Units Item $/ft Installed Total

500 ft 10" cast iron 18.10 9050400 8" cast iron 15.00 600050 6" steel 6.70 335140 4" steel 4.00 560140 3" steel 2.70 380140 2" steel 1.40 200F $16525Assuming 44% of Total Cost is LaborMaterial Cost = $9255Labor Cost - $7270

4. Valves

No. ofUnits Item Material Labor Total

1 8" Gate, cast iron 660 30 6902 6" Gate, steel 930 50 9801 6" Butterfly, Solenoid 700 95 795operated

$2290 $175 -24655. Fittings

No. ofUnits Item Material Labor Total

2 3" Reducers, steel 10 50 601 8" Reducers, cast iron 35 50 855 10"-90° Elbows, cast 840 410 1250iron

2 6"-900 Elbows, steel 45 85 1303 lO"-Tees, cast iron 490 250 7401 6"-Tees, steel 40 70 1201 6 "-Cross, steel 75 50 125

$1545 $965 $2510

6. Electrical

No. ofUnits Item Material Labor Total

17 Light fixtures 1355 1355 2710400 ft Conduit 600 6001000 ft Cable, wire 1240 1240$3195 $1355 $4550

A-5

Page 19: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

NADC-71283-VT

7. Subtotals

Category Materials Labor Total

Process equipment 16040 4810 20850Instrumentation 345 150 495Piping 9255 7270 16525Valves 2290 175 2465Fittings 1545 965 2510Electrical 3195 1355 4550

$32673 $14725 $47395

iII. Process Buildings - Pump houses (Cost information obtained fromreference (a))

A. Chromate Rinse System

Material Labor Total

Pump house 12 ft by 20 ft 4150 2750 6900

B. Water Rinse System

Pump house 12 ft by 12 ft 2650 1750 4400$6800 $4500 $11300

IV. Total Cost of Water Rinse and Chromate Rinse Systems

A. Chromate Rinse System

Materials Lator Total

Site Development 48520 36040 84560Process equipment 70080 23975 94055Process buildings 4150 2750 6900

$122750 $62765 $185515

B. Water Rinse System

Site Development 48520 36040 84560Process equipment 32670 14725 47395Process buildings 2650 1750 4400

$83840 $52515 $136355

C. Total Cost$206590 $115280 $321870

A-6

Page 20: II DISTRIBUTED BY: National Technical Information Service ... · recirculating chromate rinse system for aircraft cqrrosion; ... work unit 02 gsed p.o. 2-8013 ... pump houses 2 650

NADC-71283-VT

I R E F E R E N C E S •

(a) Popper, Herbert, ed., Modern Cost Engineering Techniques, McGraw-Hill, Inc., New York 1970.

(b) Publi Works Contract N62467-69-C-0106, U.S. Naval Air Station,Jacksonville, Florida (Contract for wash and rinse racks).

A-