15
24/05/2012 24/05/2012 Ron Settles MPI-Munich Ron Settles MPI-Munich ILD TPC DBD ILD TPC DBD talk at Kyushu May 24 2012 talk at Kyushu May 24 2012 1 ILD TPC DBD plans ILD TPC DBD plans ILD @ Kyushu ILD @ Kyushu 24 May 2012 24 May 2012

ILD TPC DBD plans ILD @ Kyushu 24 May 2012

  • Upload
    jetta

  • View
    24

  • Download
    0

Embed Size (px)

DESCRIPTION

ILD TPC DBD plans ILD @ Kyushu 24 May 2012. The DBD TPC outline at the LCTPC collaboration meeting in Desy March 27. (+ everybody ≡ the LCTPC collaboration incl. Jochen Kaminski. His talk on the status and this one on the DBD will overlap a bit… ). - PowerPoint PPT Presentation

Citation preview

Page 1: ILD TPC DBD plans  ILD @ Kyushu  24 May 2012

24/05/201224/05/2012 Ron Settles MPI-Munich Ron Settles MPI-Munich ILD TPC DBD talk at Kyushu May 24 2ILD TPC DBD talk at Kyushu May 24 2012012

11

ILD TPC DBD plans ILD TPC DBD plans ILD @ Kyushu ILD @ Kyushu 24 May 201224 May 2012

Page 2: ILD TPC DBD plans  ILD @ Kyushu  24 May 2012

24/05/201224/05/2012 Ron Settles MPI-Munich Ron Settles MPI-Munich ILD TPC DBD talk at Kyushu May 24 2ILD TPC DBD talk at Kyushu May 24 2012012

22

The DBD TPC outline at the LCTPC collaboration The DBD TPC outline at the LCTPC collaboration meeting in Desy March 27meeting in Desy March 27

(+ everybody ≡ the LCTPC collaboration incl. Jochen Kaminski. His talk on the status and this one on the DBD will overlap a bit…)

Page 3: ILD TPC DBD plans  ILD @ Kyushu  24 May 2012

24/05/201224/05/2012 Ron Settles MPI-Munich Ron Settles MPI-Munich ILD TPC DBD talk at Kyushu May 24 2ILD TPC DBD talk at Kyushu May 24 2012012

33

The DBD TPC outline at the LCTPC collaboration The DBD TPC outline at the LCTPC collaboration meeting in Desy March 27meeting in Desy March 27

.

. .

Page 4: ILD TPC DBD plans  ILD @ Kyushu  24 May 2012

24/05/201224/05/2012 Ron Settles MPI-Munich Ron Settles MPI-Munich ILD TPC DBD talk at Kyushu May 24 2ILD TPC DBD talk at Kyushu May 24 2012012

44

The DBD TPC outline after the DBD “editors’ webex The DBD TPC outline after the DBD “editors’ webex meeting” on April 2meeting” on April 2

Page 5: ILD TPC DBD plans  ILD @ Kyushu  24 May 2012

24/05/201224/05/2012 Ron Settles MPI-Munich Ron Settles MPI-Munich ILD TPC DBD talk at Kyushu May 24 2ILD TPC DBD talk at Kyushu May 24 2012012

55

The DBD TPC outline after the DBD “editors’ webex The DBD TPC outline after the DBD “editors’ webex meeting” on April 2meeting” on April 2

So, this means a slight rearrangement of the topics.

I will show you some recent ideas for the contents,section by section (will be brief).

Figures are examples (place holders) for the final ones we decide on later.

Also, only parts of the text have been formulated:ongoing work, e.g., no references yet.

(1st version-> end June;“complete” DBD -> 20120928)

Page 6: ILD TPC DBD plans  ILD @ Kyushu  24 May 2012

24/05/201224/05/2012 Ron Settles MPI-Munich Ron Settles MPI-Munich ILD TPC DBD talk at Kyushu May 24 2ILD TPC DBD talk at Kyushu May 24 2012012

66

1. Overview

Design

Performance

Page 7: ILD TPC DBD plans  ILD @ Kyushu  24 May 2012

24/05/201224/05/2012 Ron Settles MPI-Munich Ron Settles MPI-Munich ILD TPC DBD talk at Kyushu May 24 2ILD TPC DBD talk at Kyushu May 24 2012012

77

1. Overview

Design

Performance

.

Page 8: ILD TPC DBD plans  ILD @ Kyushu  24 May 2012

24/05/201224/05/2012 Ron Settles MPI-Munich Ron Settles MPI-Munich ILD TPC DBD talk at Kyushu May 24 2ILD TPC DBD talk at Kyushu May 24 2012012

88

1. Overview

Design

Performance

Page 9: ILD TPC DBD plans  ILD @ Kyushu  24 May 2012

24/05/201224/05/2012 Ron Settles MPI-Munich Ron Settles MPI-Munich ILD TPC DBD talk at Kyushu May 24 2ILD TPC DBD talk at Kyushu May 24 2012012

99

2. Implementation a)

≡ `realization’

.

.

Page 10: ILD TPC DBD plans  ILD @ Kyushu  24 May 2012

24/05/201224/05/2012 Ron Settles MPI-Munich Ron Settles MPI-Munich ILD TPC DBD talk at Kyushu May 24 2ILD TPC DBD talk at Kyushu May 24 2012012

1010

2. Implementation b)

…we need a better gating or background figure…

.

.

Page 11: ILD TPC DBD plans  ILD @ Kyushu  24 May 2012

24/05/201224/05/2012 Ron Settles MPI-Munich Ron Settles MPI-Munich ILD TPC DBD talk at Kyushu May 24 2ILD TPC DBD talk at Kyushu May 24 2012012

1111

3. R&D ProgressMeasurementsAchievements

.

Page 12: ILD TPC DBD plans  ILD @ Kyushu  24 May 2012

24/05/201224/05/2012 Ron Settles MPI-Munich Ron Settles MPI-Munich ILD TPC DBD talk at Kyushu May 24 2ILD TPC DBD talk at Kyushu May 24 2012012

1212

3. R&D ProgressMeasurementsAchievements.

Page 13: ILD TPC DBD plans  ILD @ Kyushu  24 May 2012

24/05/201224/05/2012 Ron Settles MPI-Munich Ron Settles MPI-Munich ILD TPC DBD talk at Kyushu May 24 2ILD TPC DBD talk at Kyushu May 24 2012012

1313

4. Calibration and

alignment

Page 14: ILD TPC DBD plans  ILD @ Kyushu  24 May 2012

24/05/201224/05/2012 Ron Settles MPI-Munich Ron Settles MPI-Munich ILD TPC DBD talk at Kyushu May 24 2ILD TPC DBD talk at Kyushu May 24 2012012

1414

5. Future work

Page 15: ILD TPC DBD plans  ILD @ Kyushu  24 May 2012

24/05/201224/05/2012 Ron Settles MPI-Munich Ron Settles MPI-Munich ILD TPC DBD talk at Kyushu May 24 2ILD TPC DBD talk at Kyushu May 24 2012012

1515

Conclusions?

• No conclusions

• Comments welcome

• As are suggestions for figures