7
http://www.emc2000.co.kr Report No.: 12EMC-RT-0458 EMC compliance Ltd. Page: 1 of 7 480-5, Shin-Dong, Yeongtong-Gu, Suwon-Si, Kyunggi-Do, 443-390, Korea 82 31 336 9919 (Main) 82 31 336 4767 (Fax) TEST REPORT Report Ref. No. 12EMC-RT-0458 Date of issue 2012-08-30 Applicant ○ Name SAMSUNG TECHWIN CO., LTD. ○ Address 42, Sungju-dong, Changwon-si, Kyungsangnam-do, 641-716 REPUBLIC OF KOREA Factory ○ Name SAMSUNG TECHWIN CO., LTD. ○ Address 42, Sungju-dong, Changwon-si, Kyungsangnam-do, 641-716 REPUBLIC OF KOREA Equipment ○ Product CCTV CAMERA ○ Model SCP-2370RHN, SCP-2370RHP, SNP-6200RHN, SNP-6200RHP Standard IEC 62262 and IEC 60068-2-75 Technician Kwang Ho, Lee Approved Jae Kyu, Lee

Impact hammer test SCP-2370RH - SECPRAL

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Impact hammer test SCP-2370RH - SECPRAL

http://www.emc2000.co.krReport No.: 12EMC-RT-0458

EMC compliance Ltd. Page: 1 of 7

480-5, Shin-Dong, Yeongtong-Gu, Suwon-Si, Kyunggi-Do, 443-390, Korea82 31 336 9919 (Main) 82 31 336 4767 (Fax)

TEST REPORT

Report Ref. No. 12EMC-RT-0458

Date of issue 2012-08-30

Applicant

○ Name SAMSUNG TECHWIN CO., LTD.

○ Address 42, Sungju-dong, Changwon-si, Kyungsangnam-do, 641-716

REPUBLIC OF KOREA

Factory

○ Name SAMSUNG TECHWIN CO., LTD.

○ Address 42, Sungju-dong, Changwon-si, Kyungsangnam-do, 641-716

REPUBLIC OF KOREA

Equipment

○ Product CCTV CAMERA

○ Model SCP-2370RHN, SCP-2370RHP, SNP-6200RHN, SNP-6200RHP

Standard IEC 62262 and IEC 60068-2-75

Technician Kwang Ho, Lee

Approved Jae Kyu, Lee

Page 2: Impact hammer test SCP-2370RH - SECPRAL

http://www.emc2000.co.krReport No.: 12EMC-RT-0458

EMC compliance Ltd. Page: 2 of 7

480-5, Shin-Dong, Yeongtong-Gu, Suwon-Si, Kyunggi-Do, 443-390, Korea82 31 336 9919 (Main) 82 31 336 4767 (Fax)

1. Reference Documents

IEC 62262 and IEC 60068-2-75Degrees of protection provided by enclosure for electrical equipment against externalmechanical impacts (IK code)

2. Test Performed

Degree of protection provided by enclosure for external impacts IK10

3. General Test Conditions

Tamb: 26 ℃ R.H: 43 %

4. Test Conditions

According to standard IEC 62262 and IEC 60068-2-75The verification of IK10 has been done positioning the enclosure on a rigid support.5 impacts have been applied on each surface in sight with the enclosure.For the test used Pendulum Hammer

IK10 (Characteristrics of impact test):

Energy: 20 JouleMass: 5 kgHigh Δ h: 400 mm

5. Drop Zones:

The areas that were focused upon for this impact test are as follows:

Page 3: Impact hammer test SCP-2370RH - SECPRAL

http://www.emc2000.co.krReport No.: 12EMC-RT-0458

EMC compliance Ltd. Page: 3 of 7

480-5, Shin-Dong, Yeongtong-Gu, Suwon-Si, Kyunggi-Do, 443-390, Korea82 31 336 9919 (Main) 82 31 336 4767 (Fax)

6. Test Results

Drop Zone: Enclosure (Shield-sun)

Drop # Orientation / Results Pass / Fail

Drop 1 Normal to surface of Shield-sun, Broken Pass

Drop 2Normal to surface of Shield-sun, about 90°circumferentially from previous drop, Screw cover open

Pass

Drop 3Normal to surface of Shield-sun, about 90°circumferentially from previous drop, Scuff

Pass

Drop 4Normal to surface of Shield-sun, about 90°circumferentially from previous drop, Scuff

Pass

Drop 5Normal to surface of Shield-sun, about 90°circumferentially from previous drop, Scuff

Pass

Drop Zone: Enclosure (Head and Cover-dome in)

Drop # Orientation / Results Pass / Fail

Drop 1 Vertical drop onto center of lens, Scuff Pass

Drop 2 Normal to surface of Head cover, Scuff Pass

Drop 3Normal to surface of Head cover, about 90°circumferentially from previous drop, Scuff

Pass

Drop 4Normal to surface of Head cover, about 90°circumferentially from previous drop, Scuff

Pass

Drop 5 Normal to surface of Cover-dome in, Scuff Pass

Page 4: Impact hammer test SCP-2370RH - SECPRAL

http://www.emc2000.co.krReport No.: 12EMC-RT-0458

EMC compliance Ltd. Page: 4 of 7

480-5, Shin-Dong, Yeongtong-Gu, Suwon-Si, Kyunggi-Do, 443-390, Korea82 31 336 9919 (Main) 82 31 336 4767 (Fax)

7. Images

Page 5: Impact hammer test SCP-2370RH - SECPRAL

http://www.emc2000.co.krReport No.: 12EMC-RT-0458

EMC compliance Ltd. Page: 5 of 7

480-5, Shin-Dong, Yeongtong-Gu, Suwon-Si, Kyunggi-Do, 443-390, Korea82 31 336 9919 (Main) 82 31 336 4767 (Fax)

Page 6: Impact hammer test SCP-2370RH - SECPRAL

http://www.emc2000.co.krReport No.: 12EMC-RT-0458

EMC compliance Ltd. Page: 6 of 7

480-5, Shin-Dong, Yeongtong-Gu, Suwon-Si, Kyunggi-Do, 443-390, Korea82 31 336 9919 (Main) 82 31 336 4767 (Fax)

Page 7: Impact hammer test SCP-2370RH - SECPRAL

http://www.emc2000.co.krReport No.: 12EMC-RT-0458

EMC compliance Ltd. Page: 7 of 7

480-5, Shin-Dong, Yeongtong-Gu, Suwon-Si, Kyunggi-Do, 443-390, Korea82 31 336 9919 (Main) 82 31 336 4767 (Fax)

Conclusion:

After testing according to the procedure set forth by IEC 62262, the SCP-2370RHN,SCP-2370RHP, SNP-6200RHN and SNP-6200RHP was found to meet the criteria required foran IK10 specification.