Implementation of 3rd Energy Package: latest developments in Lithuania

1

Kęstutis ŽilėnasMinistry of Energy, Lithuania

11th Baltic Electricity Market Mini-ForumJurmala, Latvia, 1st October, 2010

Page 2: Implementation of 3 rd Energy Package: latest developments in Lithuania 1 Kęstutis Žilėnas Ministry of Energy, Lithuania 11 th Baltic Electricity Market

3rd Energy Package Directives (1/4)

Adopted by the European Parliament and the Council: 13 July, 2009

Deadline to transpose Directives to the national law: 3 March, 2011

Deadline for implementation: 3 March, 2012

Precondition to:

succeed with strategic energy infrastructure;

ensure functioning EU internal market.

Page 3: Implementation of 3 rd Energy Package: latest developments in Lithuania 1 Kęstutis Žilėnas Ministry of Energy, Lithuania 11 th Baltic Electricity Market

3rd Energy Package Directives (2/4)

Lithuania’s choice: first alternative – ownership unbundling

4-th May, 2010 – Framework concept for amendment of the Law on Electricity;

19-th May, 2010 – Framework concept for amendment of the Law on Natural Gas;

both Framework concepts: foresee implementation of the Energy package Directives according to the first alternative, namely the ownership unbundling of the respective transmission systems;

set the guidelines how the amendments to the laws should be drafted, foresees basic principles and sections of the future laws.

Page 4: Implementation of 3 rd Energy Package: latest developments in Lithuania 1 Kęstutis Žilėnas Ministry of Energy, Lithuania 11 th Baltic Electricity Market

3rd Energy Package Directives (3/4)

Most important principles of the implementation process:

a high level of public participation in the ongoing drafting process;

the Government and the Ministry seek a close and effective cooperation with the stake holders to:

achieve the optimal working solutions for the sector; strictly abide to the EU law;

the main stake holders in the respective sectors are invited to participate in the working groups on the drafting of the laws;

Ministry seeks to timely finish all the preparatory steps so that the Parliament would be submitted the drafts in this autumn at the latest.

 

Page 5: Implementation of 3 rd Energy Package: latest developments in Lithuania 1 Kęstutis Žilėnas Ministry of Energy, Lithuania 11 th Baltic Electricity Market

3rd Energy Package Directives (4/4)

Current and Future Steps:

Drafting legislation: preparation the draft laws [June – August 2010];

Public consultation: public consultation rounds shall take place [August – September 2010]; Adoption of proposals and submission to the Parliament: draft proposals are going to be adopted by Government and submitted to the Parliament [September – October 2010];

  Adoption of legislative proposals and secondary legislation: is estimated [for the end of 2010 – beginning of 2011]; and in any case so that the national provisions would enter into force within the period prescribed by the directive.

 

Page 6: Implementation of 3 rd Energy Package: latest developments in Lithuania 1 Kęstutis Žilėnas Ministry of Energy, Lithuania 11 th Baltic Electricity Market

Strengthening of the Regulatory Authority

Establishment of the Infrastructure Regulatory Authority (IRA)

Merger of 3 regulatory institutions into the IRA should ensure: independent and strong regulatory authority; uniform regulatory principles among energy sectors; stable regulatory environment for the investments; effective protection of the consumer rights.

Framework concept for IRA [28 April, 2010];

Draft of the necessary Laws have been prepared by the Ministry and approved by the Government [22 September, 2010];

Adoption of legislative proposals by the Parliament [by the end of 2010].

Page 7: Implementation of 3 rd Energy Package: latest developments in Lithuania 1 Kęstutis Žilėnas Ministry of Energy, Lithuania 11 th Baltic Electricity Market

Vision – 2020

Interconnected, integrated and competitive electricity market with steadily increasing and relevant generation from renewable and nuclear;

Functioning regional natural gas market with diversified supply;

 

Page 8: Implementation of 3 rd Energy Package: latest developments in Lithuania 1 Kęstutis Žilėnas Ministry of Energy, Lithuania 11 th Baltic Electricity Market

Thank You for Your attention!