29
Implementation of Environmental Based Community Development for Business Sustainability Da Nang, Vietnam November 19, 2015 by: Yhenda Permana Director&COO of Badak LNG

Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

Implementation of Environmental Based Community Development for

Business Sustainability

Da Nang, Vietnam

November 19, 2015

by:

Yhenda Permana

Director&COO of Badak LNG

Page 2: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

SHEQ Moments

Beras Basah Island next to LNG Ship Lane

Page 3: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

Badak LNG

Badak LNGHead - Office Wisma Nusantara 9th FloorJl MH Thamrin No 59,Jakarta 10350, Indonesia

Plant Site - Bontang Bontang 75324 East Kalimantan,Indonesia

Tangguh LNG

DS LNG Project

Masela LNG

BADAK LNG PLANT SITE LOCATION

3

Page 4: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

BOARD OF COMPOSITION

Plant Capacity

SHAREHOLDERS

GAS PRODUCERS

Established in 1974 Non profit company Government owns the assets

Liquefy gas from EastKal PSCs At cost

10%

15%

20%

55%

3%

16%

81%

4

Page 5: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

MAHAKAM BLOCK

OPERATED BY :

OPERATED BY :

16%

3%

OPERATED BY :

81%

MAIN GAS PRODUCERS 2015

5

Page 6: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

GAS WELL TRANSPORTATION FACILITY

END USER

PIP

E LI

NE

LIQUEFACTION FACILITY

RECEIVING TERMINAL

LOADING DOCK

POWER PLANT

CITY GAS

GAS

GAS

LNG BUSINESS CHAIN

6

Page 7: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

No. Trains : 8 (22.5 MTPA LNG) Loading Dock : 3 ( 3 LNG, 2 LPG) Feed Gas Supply : 3,700 MMSCFD with 4 Pipe lines (2@36”; 2@42”) Badak LNG Area : 2,010 HA (220 Ha for Plant)

Badak LNG Plant in Bontang, Indonesia

7

Page 8: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

LNG CONTRACTS

CIF (Cost, Insurance and Freight) & FOB (Free On Board) Contracts.

All Contracts & Shipping activities are managed by PERTAMINA LNG Sales Operation / JMG (JointManagement Group).

INTERNATIONAL 471,04 8.741

DOMESTIC 4,47 79

TOTAL 475,51 8.820

BUYERSTOTAL

CARGOES

TOTAL

(MM TON)

OBLIGATION 2015

Mix Cargo : 201

Standard Cargo : 185.86

REALIZATION 2015

Mix Cargo : 176

Standard Cargo : 161.80

THE FIRST LNG SHIPMENT:

AUG 9th, 1977

Page 9: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

DESTINATIONTOTAL

(MM TON)TOTAL

CARGOES

December 1988 – (Up to) November 2015

DOMESTIC 3.47 109

T O T A L 1713 447

INTERNATIONAL 13.66 338

Schedule2015

10 Cargoes

Page 10: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

10

Achievements

ISRS8 Level 82011-2014

PROPER Gold2011-2014

Page 11: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

11

Achievements - Benchmarking

Benchmarking by Phillip Townsend

Associates Inc. in 2014

among 14 LNG Plant which represents

>80% LNG production in the world

SAFETY HEALTH & ENVIRONMENT

RELIABILITY

MAINTENANCE COST

PERSONNEL

Zero Lost Time Injuries (LTIs) since 2006

Maximum Sustainable Capacity

Lowest Maintenance Cost

Lowest Personnel cost

1st

1st

1st

1st

Lowest Energy Loss

ENERGY LOSS11

Benchmarking by Maximark &

Associates in 2015

among 20 LNG Business in the world

WATER RECYCLE

HAZARDOUS WASTE PRODUCTION

ENERGY EFFICIENCY

2nd Highest Water Recycle Rate per

Production Rate

Lowest Hazardous Waste Production Rate per Production Rate

5th Highest Total Energy Saving per Production Rate

1st

2nd

5th

1st

Page 12: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

12

Opportunities

LNG ShippingSea is a great potency in LNG transportation

LNG Receiving TerminalSea also has great potential along the growing of LNG Business such as LNG receiving terminal

Page 13: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

13

Business Risks

Seawater UtilizationLNG Transportation •

Seawater as Cooling water •

Community• Mangrove Conservation• Grouper Cages• Coral Reefs Transplantation• Culture Change

Page 14: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

14

Badak LNG’s stake in Coastal Development

In Badak LNG’s Opinion, there are 3 area based on its necessity:

Conservation Area

Operational Area

Community Development Area

Page 15: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

15

Internal Factor - Operational Area

Sea water utilization needs specific requirements to support operational activities (Organism and Temperature)

Page 16: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

16

Internal Factor - Conservation Area

That’s why

Conservation Area is needed To provide a living ecosystem for marine organism

Page 17: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

17

Top 3 Partnership

PublicThrough Community Development we can conserve and keep coastal area clean and green

GovernmentCooperates with Fishery and Marine Dept. to define Conservation Area, Operational Area, and ComDev Area.

CollegeCooperates with experts in University regarding coastal conservation and CommDev

Page 18: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

18

External Factor –Community Development Area

Support Both Operational and Conservation Area

Culture Change through Community Development

Page 19: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

19

Mitigation Actions for Sustainablity

Internal Well-designed Shipping Lane Control of Effluent to Seawater

External Mangrove Conservation Coral Reef Transplantation Community Development to support

marine and coastal ecosystem

Page 20: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

20

Mangrove Conservation

Mangrove before community development to conserve the mangrove

Some of Mangrove Area was damaged due to bad habit of people around the area

Page 21: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

21

ComDev: Mangrove Conservation 400.000 mangrove plantation since 2011

Badak LNG has conserved more than 45 ha so far

But now they can utilize almost all of mangrove parts

Page 22: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

1Mangrove

Nursery

7Mangrove

Eco-Tourism

6Natural

Dyes

Replication of Mangrove Resources

Mangrove Nursery Mangrove Natural Dyes

20122010 2014 2015

Mangrove EcoTourism

2Mangrove

Syrup

3Mangrove

Sweets

5Mangrove Amplang(Crackers)

Mangrove Diversification

4Mangrove

Dodol(Taffy cake)

Mangrove

Conservation

Page 23: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

23

Coral Reef Conservation

Until 2007, the Fishermen used to catch the fishes by using explosion, it can damage the coral ecosystem,

Page 24: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

24

Grouper Cultivation

But now, They were taught to cultivate the grouper instead.

Even they become the supporter in coral reef conservation

Page 25: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

25

Bio-Reef Technology

Bio-Reef Tech is one of the most popular coral conservation method.

So far, Badak LNG already planted 400 units since 2013

Page 26: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

26

Coral Reef Check Monitoring Program

Coral Reef Check Monitoring Program was done to get information related to Coral Reef ecosytem.

Reef Check Result in Buoy Putih

Bontang Sea Area Buoy #21

Page 27: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

27

Coastal Award 2014

Badak LNG was awarded by Ministry of Marines Affairs and Fisheries in 2014, Republic of Indonesia due to its effort in Coastal Development

Page 28: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

28

“Through Implementation of Environmental Based Community Development we build a synergy between Company, Government, and Community to conserve and sustain Sea Ecosystem and Resources.”

Page 29: Implementation of Environmental Based Community ...eascongress.pemsea.org/sites/default/files/file_attach/PPT-BE-03-Permana.pdf · Environmental Based Community Development for Business

Copyright © 2013 PT Badak NGL. All Rights Reserved.

Thank you