10-Years Solid Waste Management Plan 97
Chapter VIII
Implementation Strategy
8.1 Iligan City Solid Waste Management System Implementation Strategies:
Solid Waste Management System Framework: The proposed Iligan City Solid
Waste Management System is shown in Figure 8.1, 8.1a, 1.b, 1.c -Schematic Diagram of
the Iligan City Solid Waste Management System;
1. A Central MRCF shall be constructed to handle the solid waste for the
following sources:
a) Barangay Material Recovery Facility residuals
b) The mixed/special solid waste from the city markets /institutional
sources; and
c) The mixed solid waste from households, which are beyond the
capacity of the individual Barangay MRFs to process.
2. Each of the 29 coastal barangays shall put up their own barangay MRF, or in
clusters - to handle segregation, recycling, composting and others. Residuals
shall be handled by the Central MRCF
3. All commercial (markets) and institutional sources (hospitals, schools, etc.)
mixed solid/special waste shall be handled by the Central MRCF. Hazardous
waste shall have a designated disposal area to be built and operated by each
hospital, with the City to put up a Special and Hazardous Waste Facility
with central autoclaving system (for small hospitals). Hospitals may also opt
to put up their privately operated MRFs in their property for medical wastes
-subject to the EIS requirements
4. Excess solid waste generated from households (that cant be absorbed by
Barangay MRF), and for those Barangay still without MRFs shall be
processed at the Central MRCF.
8/14/2019 Implementation Strategy- Logistics
2/9
10-Years Solid Waste Management Plan
5. The collection/hauling of solid waste shall be done by both the Barangay MRF
within their area of responsibility, and/or by the City Government through the
Public Services Division in the case of the Central MRCF.
8.2 The solid waste management system with its various project plan component is
briefly described below:
A. INFORMATION and EDUCATION CAMPAIGN
1. Information and education campaign (IEC) plan on the CMRCF including the pilot
material recovery facility proposed to be located at Barangay Del Carmen.
2. IEC for a total segregation on the household level Sorting at Source at Barangay
Level (see Annex 8.a ESTABLISHMENT OF MRF SYSTEM relevant to IEC).
3. Info on alternative composting at home.
4. Info on managing recyclable or non-biodegradable waste with regards to
alternative technology available.
B. TECHNICAL / ENGINEERING
Basic Engineering Activities
1. Feasibility study including site selection
2. Financial sourcing (in-house for the equities/collaterals, and out-sourced funds
mostly from the banks)
3. The Initial Environmental Examination Checklist (IEE) and other permitting
requirements such as Environmental Compliance Certificate (ECC), Authority
to Construct, Notice to Proceed (NTP), and other.
4. Preparation of the Santiago Open Dumpsite Closure Plan
5. Upgrading of the Iligan City Solid Waste Management Plan, and its approval
by the National Solid Waste Management Commission
Detailed Engineering
1. Detailed plans, estimates, tender documents, specifications, and program of
works for all the project packages/modules (civil works and others)
98
8/14/2019 Implementation Strategy- Logistics
3/9
10-Years Solid Waste Management Plan
Construction
1. Bidding activities (for civil work, equipment and supply, and others)
2. Civil works implementation of all project packages/modules
3. Public Services Division (PSD) equipment upgrading and procurement (for
CMRCF operation and solid waste hauling/collection operation)
4. Closure of the Barangay Santiago Controlled Dumpsite Facility (CDF)
C. POLICY / ENFORCEMENT: Operation and Maintenance
1. Institutionalization of the solid waste management system (creation of the
ICSWMB-TWC, Central MRCF management team, tipping fees, etc)
2. Legal requirements including appropriation ordinances and others
3. Transitory provisions (maintenance and operating supplies, budget, security,
safety, etc)
4. Policy review related to the City solid waste management ordinance,
enforcement and implementation
5. Operation and maintenance manuals including operation systems and
procedures, closure plans mitigation measures, abandonment plans and others.
6. Long-term maintenance of the Barangay Santiago closed dumpsite.
7. Institutionalization and capability building of the Barangay Solid Waste
Management Committees for the establishment of Material Recovery Facility.
D. ENTREPRENEURSHIP
1. Market development plan for the recycled waste products, compost and others
2. Marketing development implementation.
3. Training of operations/maintenance/marketing personnel.
99
8/14/2019 Implementation Strategy- Logistics
4/9
10-Years Solid Waste Management Plan
8.3 Description of the Solid waste management System:
Briefly summarized in table VIII.1 which needs logistics requirement andbudgetary support (shown in detailed table 11.1 of chapter 11).
Table VIII.1 ICSWM System Implementation StrategyFramework Methodology Strategies Success Indicator
I. Plan Preparation
1. Creation and
empowerment of ESWMBoard and their
respective Committee
-Enactment of Legislative
Ordinance
- Appointment of
accountable qualifiedpersonnel
- Continuous
Participatory ofresource mobilization
and
institutionalization
for the ESWM Plan
-Effective and efficient
Project implementation- In attendance
Administrative functio
& Monitoring ofESWM Project plan
2.PermittingRequirements for new
land site disposal Facility
Comply DENR requirementfor the Project Site
-Resolve socialacceptability
-Feasibility study of
the project
- IEE Clearance
-Approved resolutionof Social acceptance
-Submitted/complied
Project Study
- Noticed to Proceed
3.Loan for lotAcquisition Legal institution andDocumentation, financial
-Consensus of MOAfrom Mayor/SP/Bank
-Approved MOA-Issuance of
appropriation order
(9M)
4.Financial Loan forInfrastructure
Legal institution andDocumentation
-Sourcing of finance
Submit supportingDocuments
-Approved /confirm ofMOA by Mayor/SP an
Transmittal of MOA toBank
-Issuance of
appropriation order(P200M)
Framework Methodology Strategies Success Indicator
II. Project Plan ActivitiesA. Lot Acquisition Documentation for
expropriation: legal Procedures
-Court proceeding
(notices,appearance)-Amiable Settlement
-Relocation of
Affected families-Titling of land
-Approved Brgy.
Clearance & Courtproceeding
-Settled & Relocated
- Approved City GovtOwnership
B. Infrastructure -Engineering-Procurement of Supply &
Materials
-POW / DetailedEngineering
-Bidding out the
-Accomplished SiteDevelopment Plan
-Technically sound
100
8/14/2019 Implementation Strategy- Logistics
5/9
10-Years Solid Waste Management Plan
Infrastructure
-Construction Works determination of
design & needs-Contract or Admin.
For Building/ road
construction
-Accountableorganizational
management
Decision on the
Equipments- Installed MRCF
including Special
Waste Facilities, acces
Road, Street lightning,Equipments, nursery,
Demo-farm and others
C. Closure of Existing
Dumpsite
Rehabilitation Development /
Up-grade the dumpsite
-Conversion of open
dumpsite into Control
fill site-Comply DENR-IRR
minimum
requirement forcontrolled dump prior
its closure plan
-Allocate funds forclosure plan of
dumpsite
-Livelihood Devt.
-Complete and
maintain soil cover of
dumpsite-Installed drainage
canal, vegetation
-Access roadmaintenance, etc.
-Medical assistance
-Organized cooperative
D. MRCF Operations &
Maintenance
-Resolve ESWM
Organizational Management
structure- Enactment of City Ordinance
in Proper handling of Solid
waste
-Accord an ordinance
of good
environmentalgovernance:
Transparency,
Accountability,Participation of
Concerned Agency- Research &development for
Organic fertilizer
product & Recycling
processes
-Acceptable &
accountable Leaders in
SW management-Institutionalization
-
Individuals/CommunitParticipatory Activity
- Start up MRCFOperation:Enforcement of Law
Segregation, Recycling
Composting
D.1 Collection System -Consistent w/ the law,
procedure & ordinance
-Info on collection
schedule-Collection of
segregated waste
-Collection of mixed
waste-Encourage Curb site
Collection
-Stakeholders
participation ofsegregated waste
collection
-Practiced 3Rs:
Reduce, Re-use,recycle
-Collection route fleet
continue
D.2 Transport -Review & decide the required
specification, capacity, Cost ofequipment procure
-SW assessment on
Transport vehicle-Recommend
compress truck for
- Procured new
mobilize transportcompress truck for
collection transfer
101
8/14/2019 Implementation Strategy- Logistics
6/9
10-Years Solid Waste Management Plan
sanitary collection
Framework Methodology Strategies Success Indicator
D.3 Processing &Disposal site: MRCF
- Installation of MRCFtechnology, equipments
including S/HW facilities
- MSW Disposal area &Recovery Processing
-Research studyDevelopment on
waste recycling
products/Markets-No Open Dumping
-SW assessment
-Approved Noticed toproceed
-Operational System
- Implementationscheme
Framework Methodology Strategies Success Indicator
III. Institutionalization &
Capability Building
1. Policy/ Ordinance
Formulation
Review & analyze the
existing / modifiable
Ordinance On SWM
-List of Ordinance to
be enacted &
recommendedProvision
-Resolve / Accord city
Ordinance on SWM
-Policy enforcement &
support
2. Information andEducation Campaign
-Information of baseline data-Aggressive and continuous
info
-City ordinance info-Monitoring
Program (IEC)
-Formulateappropriate media;
Posters, Radio,
contest, publication-Provide incentives
-Contest
-Funding Option-Diversion SW
-No segregation No
collection
-Actual solid waste isknown and reduced by
25%
-Organized BSWMC toinitiate SWMP
-Operated MRF
-CommunityParticipation
3.Livelihood/Marketing -Development of marketableProducts for the operation and
maintenance
-Research study ofsupply / Demand
-Organizedcooperative
-Accountable practicesof MRCF products
-Available market D >S
4.Capability Building -Organization and education ofeconomics aid
-Clean production program
-Community Improvement-Brgy. Initiatives
- Training, assist andworkshop for
recyclable production
and householdcomposting
alternative
-Increased investmentof recyclable
manufacturing process
- Product output- Install BMRF
5. Incentive Program -Clean and Green program
contest-Incentive for the enforcer of
SW
-Financing Barangay
contest-Awards
-Operational activity
6.Monitoring Program -Develop criteria for
discussion and results analysison SWM
-Indicates the result
output/ analysis-Make an alternative
methods
- Follow up
recommendation
102
8/14/2019 Implementation Strategy- Logistics
7/9
10-Years Solid Waste Management Plan
Framework Methodology Strategies Success Indicator
7. Pilot MRF -POW: detailed Engrng.
-Site dev.
-Budget Operation
-Establishment of
BMRF
-Process recyclableand/or compost
- Constructed and
implemented SWM
system
8. Organizational /Management
- Accord policy and Ordinanceof management structure
-Resourcemobilization
-Enactment of
legislative ordnance
- Continuousinstitutional
strengthening
9. Financial -Sourcing of Funds allocation - Loan / Finance -Approve project loan
requirement
103
8/14/2019 Implementation Strategy- Logistics
8/9
10-Years Solid Waste Management Plan
Annex 8.a: ESTABLISHMENT OF MRF SYSTEM relevant to Information,
Education Campaign
Total Segregation Approach
A. Household Level Segregation
Sorting at Source
1. Provide easy segregation
System at source
2. Used color-coded
Bins
3. System should be understood by
CHILD to ensure that ADULTS also
Understand.
B. Segregation Collection1. First Stage:
Purok / Zone Level
2. Second Stage:Brgy. Collector
C. Segregation
Destination
Composting at Home
104
BIODEGTADABLE SACK
SORTER FORRECYCLABLE
RESIDUAL
GARBAGE
BO
T
E
L
A
T
A
P
L
A
S
T
I
C
P
A
P
E
L
R
E
S
I
D
U
AL
S
COMPOST
CompostingCenter:
BMRF/
CMRCF
Redemption center:
Buyback Center,Junk Store, and
CMRCF/BMRF
OPERATION
ResidualManagement
Area: CMRCF
Alternative
Technology
CMRCF: COLLECTORTRUCK/
BMRF: COLLECTOR TRUCK
8/14/2019 Implementation Strategy- Logistics
9/9
10-Years Solid Waste Management Plan
Compostable Waste Need Not Leave The Home
Practical Ways Of Managing Biodegradable Waste:
1. Backyard Composting Pits Libingan ng mga Basura2. Tower Tires
3. Bottomless Composter
4. Composting In Clay Pots
5. Hanging Container Composting
6. Vermi Composting
Purok / Zone Collection at Barangay level:
1. Daily alternative collection of segregated compostable Waste (Food waste
Materials) by the BIO-MAN driving with Trisicad and having a collection feeof P 1.00.
2. Opt to bring and/or collect the segregated waste to strategic BMRF.
Managing Of Recyclable Or Non-Biodegradable Waste
Alternative Technology
AVAILABLE
Description: Residual Waste Management
Paper Recycling : Utilized paper, newsprint, Mixed Paper
PET recycling : Mineral Water bottles: Revenue for MRFPlastic Waste Recycling : Plastic Waste process into Slab as construction
materials (CHB): CMRCF
HDPE Recycling;
Technology available
: Gallons container of Plastic (High Density
Poly Ethylene: HDPE) can be Shredded &made into new plastic product
Poly Styrene Recycling : Styrofoam recycling
Tin Can Resizing : Forming Big cans to small cansGlass recycling : Broken glass reforming, re-used
Laminates Recycling : Sachets process into pail form
Tetra pack recycling : Forming into Composite; baling (CMRCF)Cartoon Recycling : Re-using
Doy Pack Recycling : Fun champak into usable products like bags
Rubber Tire Recycling : Forming into re-usable item as flower pot, etc.
105