    10-Years Solid Waste Management Plan 97

    Chapter VIII

    Implementation Strategy

    8.1 Iligan City Solid Waste Management System Implementation Strategies:

    Solid Waste Management System Framework: The proposed Iligan City Solid

    Waste Management System is shown in Figure 8.1, 8.1a, 1.b, 1.c -Schematic Diagram of

    the Iligan City Solid Waste Management System;

    1. A Central MRCF shall be constructed to handle the solid waste for the

    following sources:

    a) Barangay Material Recovery Facility residuals

    b) The mixed/special solid waste from the city markets /institutional

    sources; and

    c) The mixed solid waste from households, which are beyond the

    capacity of the individual Barangay MRFs to process.

    2. Each of the 29 coastal barangays shall put up their own barangay MRF, or in

    clusters - to handle segregation, recycling, composting and others. Residuals

    shall be handled by the Central MRCF

    3. All commercial (markets) and institutional sources (hospitals, schools, etc.)

    mixed solid/special waste shall be handled by the Central MRCF. Hazardous

    waste shall have a designated disposal area to be built and operated by each

    hospital, with the City to put up a Special and Hazardous Waste Facility

    with central autoclaving system (for small hospitals). Hospitals may also opt

    to put up their privately operated MRFs in their property for medical wastes

    -subject to the EIS requirements

    4. Excess solid waste generated from households (that cant be absorbed by

    Barangay MRF), and for those Barangay still without MRFs shall be

    processed at the Central MRCF.

  • 8/14/2019 Implementation Strategy- Logistics

    2/9

    10-Years Solid Waste Management Plan

    5. The collection/hauling of solid waste shall be done by both the Barangay MRF

    within their area of responsibility, and/or by the City Government through the

    Public Services Division in the case of the Central MRCF.

    8.2 The solid waste management system with its various project plan component is

    briefly described below:

    A. INFORMATION and EDUCATION CAMPAIGN

    1. Information and education campaign (IEC) plan on the CMRCF including the pilot

    material recovery facility proposed to be located at Barangay Del Carmen.

    2. IEC for a total segregation on the household level Sorting at Source at Barangay

    Level (see Annex 8.a ESTABLISHMENT OF MRF SYSTEM relevant to IEC).

    3. Info on alternative composting at home.

    4. Info on managing recyclable or non-biodegradable waste with regards to

    alternative technology available.

    B. TECHNICAL / ENGINEERING

    Basic Engineering Activities

    1. Feasibility study including site selection

    2. Financial sourcing (in-house for the equities/collaterals, and out-sourced funds

    mostly from the banks)

    3. The Initial Environmental Examination Checklist (IEE) and other permitting

    requirements such as Environmental Compliance Certificate (ECC), Authority

    to Construct, Notice to Proceed (NTP), and other.

    4. Preparation of the Santiago Open Dumpsite Closure Plan

    5. Upgrading of the Iligan City Solid Waste Management Plan, and its approval

    by the National Solid Waste Management Commission

    Detailed Engineering

    1. Detailed plans, estimates, tender documents, specifications, and program of

    works for all the project packages/modules (civil works and others)

    98

  • 8/14/2019 Implementation Strategy- Logistics

    3/9

    10-Years Solid Waste Management Plan

    Construction

    1. Bidding activities (for civil work, equipment and supply, and others)

    2. Civil works implementation of all project packages/modules

    3. Public Services Division (PSD) equipment upgrading and procurement (for

    CMRCF operation and solid waste hauling/collection operation)

    4. Closure of the Barangay Santiago Controlled Dumpsite Facility (CDF)

    C. POLICY / ENFORCEMENT: Operation and Maintenance

    1. Institutionalization of the solid waste management system (creation of the

    ICSWMB-TWC, Central MRCF management team, tipping fees, etc)

    2. Legal requirements including appropriation ordinances and others

    3. Transitory provisions (maintenance and operating supplies, budget, security,

    safety, etc)

    4. Policy review related to the City solid waste management ordinance,

    enforcement and implementation

    5. Operation and maintenance manuals including operation systems and

    procedures, closure plans mitigation measures, abandonment plans and others.

    6. Long-term maintenance of the Barangay Santiago closed dumpsite.

    7. Institutionalization and capability building of the Barangay Solid Waste

    Management Committees for the establishment of Material Recovery Facility.

    D. ENTREPRENEURSHIP

    1. Market development plan for the recycled waste products, compost and others

    2. Marketing development implementation.

    3. Training of operations/maintenance/marketing personnel.

    99

  • 8/14/2019 Implementation Strategy- Logistics

    4/9

    10-Years Solid Waste Management Plan

    8.3 Description of the Solid waste management System:

    Briefly summarized in table VIII.1 which needs logistics requirement andbudgetary support (shown in detailed table 11.1 of chapter 11).

    Table VIII.1 ICSWM System Implementation StrategyFramework Methodology Strategies Success Indicator

    I. Plan Preparation

    1. Creation and

    empowerment of ESWMBoard and their

    respective Committee

    -Enactment of Legislative

    Ordinance

    - Appointment of

    accountable qualifiedpersonnel

    - Continuous

    Participatory ofresource mobilization

    and

    institutionalization

    for the ESWM Plan

    -Effective and efficient

    Project implementation- In attendance

    Administrative functio

    & Monitoring ofESWM Project plan

    2.PermittingRequirements for new

    land site disposal Facility

    Comply DENR requirementfor the Project Site

    -Resolve socialacceptability

    -Feasibility study of

    the project

    - IEE Clearance

    -Approved resolutionof Social acceptance

    -Submitted/complied

    Project Study

    - Noticed to Proceed

    3.Loan for lotAcquisition Legal institution andDocumentation, financial

    -Consensus of MOAfrom Mayor/SP/Bank

    -Approved MOA-Issuance of

    appropriation order

    (9M)

    4.Financial Loan forInfrastructure

    Legal institution andDocumentation

    -Sourcing of finance

    Submit supportingDocuments

    -Approved /confirm ofMOA by Mayor/SP an

    Transmittal of MOA toBank

    -Issuance of

    appropriation order(P200M)

    Framework Methodology Strategies Success Indicator

    II. Project Plan ActivitiesA. Lot Acquisition Documentation for

    expropriation: legal Procedures

    -Court proceeding

    (notices,appearance)-Amiable Settlement

    -Relocation of

    Affected families-Titling of land

    -Approved Brgy.

    Clearance & Courtproceeding

    -Settled & Relocated

    - Approved City GovtOwnership

    B. Infrastructure -Engineering-Procurement of Supply &

    Materials

    -POW / DetailedEngineering

    -Bidding out the

    -Accomplished SiteDevelopment Plan

    -Technically sound

    100

  • 8/14/2019 Implementation Strategy- Logistics

    5/9

    10-Years Solid Waste Management Plan

    Infrastructure

    -Construction Works determination of

    design & needs-Contract or Admin.

    For Building/ road

    construction

    -Accountableorganizational

    management

    Decision on the

    Equipments- Installed MRCF

    including Special

    Waste Facilities, acces

    Road, Street lightning,Equipments, nursery,

    Demo-farm and others

    C. Closure of Existing

    Dumpsite

    Rehabilitation Development /

    Up-grade the dumpsite

    -Conversion of open

    dumpsite into Control

    fill site-Comply DENR-IRR

    minimum

    requirement forcontrolled dump prior

    its closure plan

    -Allocate funds forclosure plan of

    dumpsite

    -Livelihood Devt.

    -Complete and

    maintain soil cover of

    dumpsite-Installed drainage

    canal, vegetation

    -Access roadmaintenance, etc.

    -Medical assistance

    -Organized cooperative

    D. MRCF Operations &

    Maintenance

    -Resolve ESWM

    Organizational Management

    structure- Enactment of City Ordinance

    in Proper handling of Solid

    waste

    -Accord an ordinance

    of good

    environmentalgovernance:

    Transparency,

    Accountability,Participation of

    Concerned Agency- Research &development for

    Organic fertilizer

    product & Recycling

    processes

    -Acceptable &

    accountable Leaders in

    SW management-Institutionalization

    -

    Individuals/CommunitParticipatory Activity

    - Start up MRCFOperation:Enforcement of Law

    Segregation, Recycling

    Composting

    D.1 Collection System -Consistent w/ the law,

    procedure & ordinance

    -Info on collection

    schedule-Collection of

    segregated waste

    -Collection of mixed

    waste-Encourage Curb site

    Collection

    -Stakeholders

    participation ofsegregated waste

    collection

    -Practiced 3Rs:

    Reduce, Re-use,recycle

    -Collection route fleet

    continue

    D.2 Transport -Review & decide the required

    specification, capacity, Cost ofequipment procure

    -SW assessment on

    Transport vehicle-Recommend

    compress truck for

    - Procured new

    mobilize transportcompress truck for

    collection transfer

    101

  • 8/14/2019 Implementation Strategy- Logistics

    6/9

    10-Years Solid Waste Management Plan

    sanitary collection

    Framework Methodology Strategies Success Indicator

    D.3 Processing &Disposal site: MRCF

    - Installation of MRCFtechnology, equipments

    including S/HW facilities

    - MSW Disposal area &Recovery Processing

    -Research studyDevelopment on

    waste recycling

    products/Markets-No Open Dumping

    -SW assessment

    -Approved Noticed toproceed

    -Operational System

    - Implementationscheme

    Framework Methodology Strategies Success Indicator

    III. Institutionalization &

    Capability Building

    1. Policy/ Ordinance

    Formulation

    Review & analyze the

    existing / modifiable

    Ordinance On SWM

    -List of Ordinance to

    be enacted &

    recommendedProvision

    -Resolve / Accord city

    Ordinance on SWM

    -Policy enforcement &

    support

    2. Information andEducation Campaign

    -Information of baseline data-Aggressive and continuous

    info

    -City ordinance info-Monitoring

    Program (IEC)

    -Formulateappropriate media;

    Posters, Radio,

    contest, publication-Provide incentives

    -Contest

    -Funding Option-Diversion SW

    -No segregation No

    collection

    -Actual solid waste isknown and reduced by

    25%

    -Organized BSWMC toinitiate SWMP

    -Operated MRF

    -CommunityParticipation

    3.Livelihood/Marketing -Development of marketableProducts for the operation and

    maintenance

    -Research study ofsupply / Demand

    -Organizedcooperative

    -Accountable practicesof MRCF products

    -Available market D >S

    4.Capability Building -Organization and education ofeconomics aid

    -Clean production program

    -Community Improvement-Brgy. Initiatives

    - Training, assist andworkshop for

    recyclable production

    and householdcomposting

    alternative

    -Increased investmentof recyclable

    manufacturing process

    - Product output- Install BMRF

    5. Incentive Program -Clean and Green program

    contest-Incentive for the enforcer of

    SW

    -Financing Barangay

    contest-Awards

    -Operational activity

    6.Monitoring Program -Develop criteria for

    discussion and results analysison SWM

    -Indicates the result

    output/ analysis-Make an alternative

    methods

    - Follow up

    recommendation

    102

  • 8/14/2019 Implementation Strategy- Logistics

    7/9

    10-Years Solid Waste Management Plan

    Framework Methodology Strategies Success Indicator

    7. Pilot MRF -POW: detailed Engrng.

    -Site dev.

    -Budget Operation

    -Establishment of

    BMRF

    -Process recyclableand/or compost

    - Constructed and

    implemented SWM

    system

    8. Organizational /Management

    - Accord policy and Ordinanceof management structure

    -Resourcemobilization

    -Enactment of

    legislative ordnance

    - Continuousinstitutional

    strengthening

    9. Financial -Sourcing of Funds allocation - Loan / Finance -Approve project loan

    requirement

    103

  • 8/14/2019 Implementation Strategy- Logistics

    8/9

    10-Years Solid Waste Management Plan

    Annex 8.a: ESTABLISHMENT OF MRF SYSTEM relevant to Information,

    Education Campaign

    Total Segregation Approach

    A. Household Level Segregation

    Sorting at Source

    1. Provide easy segregation

    System at source

    2. Used color-coded

    Bins

    3. System should be understood by

    CHILD to ensure that ADULTS also

    Understand.

    B. Segregation Collection1. First Stage:

    Purok / Zone Level

    2. Second Stage:Brgy. Collector

    C. Segregation

    Destination

    Composting at Home

    104

    BIODEGTADABLE SACK

    SORTER FORRECYCLABLE

    RESIDUAL

    GARBAGE

    BO

    T

    E

    L

    A

    T

    A

    P

    L

    A

    S

    T

    I

    C

    P

    A

    P

    E

    L

    R

    E

    S

    I

    D

    U

    AL

    S

    COMPOST

    CompostingCenter:

    BMRF/

    CMRCF

    Redemption center:

    Buyback Center,Junk Store, and

    CMRCF/BMRF

    OPERATION

    ResidualManagement

    Area: CMRCF

    Alternative

    Technology

    CMRCF: COLLECTORTRUCK/

    BMRF: COLLECTOR TRUCK

  • 8/14/2019 Implementation Strategy- Logistics

    9/9

    10-Years Solid Waste Management Plan

    Compostable Waste Need Not Leave The Home

    Practical Ways Of Managing Biodegradable Waste:

    1. Backyard Composting Pits Libingan ng mga Basura2. Tower Tires

    3. Bottomless Composter

    4. Composting In Clay Pots

    5. Hanging Container Composting

    6. Vermi Composting

    Purok / Zone Collection at Barangay level:

    1. Daily alternative collection of segregated compostable Waste (Food waste

    Materials) by the BIO-MAN driving with Trisicad and having a collection feeof P 1.00.

    2. Opt to bring and/or collect the segregated waste to strategic BMRF.

    Managing Of Recyclable Or Non-Biodegradable Waste

    Alternative Technology

    AVAILABLE

    Description: Residual Waste Management

    Paper Recycling : Utilized paper, newsprint, Mixed Paper

    PET recycling : Mineral Water bottles: Revenue for MRFPlastic Waste Recycling : Plastic Waste process into Slab as construction

    materials (CHB): CMRCF

    HDPE Recycling;

    Technology available

    : Gallons container of Plastic (High Density

    Poly Ethylene: HDPE) can be Shredded &made into new plastic product

    Poly Styrene Recycling : Styrofoam recycling

    Tin Can Resizing : Forming Big cans to small cansGlass recycling : Broken glass reforming, re-used

    Laminates Recycling : Sachets process into pail form

    Tetra pack recycling : Forming into Composite; baling (CMRCF)Cartoon Recycling : Re-using

    Doy Pack Recycling : Fun champak into usable products like bags

    Rubber Tire Recycling : Forming into re-usable item as flower pot, etc.