Implementation Trip for

Date of TAC Presentation: April 14th, 2009

Project Location: El Chaguite, Yoro District, HondurasProject Risk Level: 2

Northeastern University’s Student Chapter

Implementation Trip Tentative Travel Dates: June 11th – June 26th, 2009

1Project: El Chaguite Water System

Page 2: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

El Tecuan

Project: El Chaguite Water System 2

Page 3: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Los Planes

Project: El Chaguite Water System 3

Page 4: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

El Chaguite

Project: El Chaguite Water System 4

Page 5: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

El ChaguitePopulation: 333 people

Project: El Chaguite Water System 5

Page 6: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Project Schedule

Project: El Chaguite Water System 6

Dates of Travel Purpose Description

December 2007 Los Planes Implementation & El Chaguite Assessment

Complete Transmission Main in Los Planes, Visit El Chaguite

April – May 2008 El Chaguite Assess. Water Quality, Hydraulic Investigations, Existing System Inspections, Topographic Survey, Health Survey

December 14- December 29, 2008

El Chaguite Phase 1 Implementation

Construct Transmission Main/ Distribution System

June 11-June 26 (proposed)

El Chaguite Phase 2 Implementation

Storage Tank/ Inspect Distribution System

Page 7: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Objectives of El Chaguite Implementation Trip

Project: El Chaguite Water System 7

• Inspect the installed distribution system

• Construct a 6,500 gallon water storage tank.

• Provide El Chaguite a water system that is

more reliable and has the capacity to meet the growing demand for water.

• Teach the villagers about conservation and sanitation.

Page 8: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

El Chaguite

Project: El Chaguite Water System 8

Page 9: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Design Process

Project: El Chaguite Water System 9

• Excel water flow model• WaterGEMS flow model• Multi-phase implementation

• Phase 1 (COMPLETE)– Construct Transmission Main– Instruct villagers on

construction of distribution system

– Build break pressure tank (float-valve tank)

• Phase 2– Water storage tank– Inspect village-constructed

distribution system

Page 10: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Tank Design

• Demand

• Sizing

• Sources

• Assumptions

• Tank Walls

• Foundation

• Roof

Project: El Chaguite Water System 10

Page 11: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Current and Future Conditions

Project: El Chaguite Water System 11

Chaguite now: Chaguite in 25 years:

60 homes 87 homes

333 people 483 people

68 students 99 students

Conditions now: Conditions in 25 years

Total Average Available Flow (GPD)

22,349Total Average Available Flow (GPD)

22,349

Total Average Demand for People (GPD)

8,797Total Average Demand for People (GPD)

12,755

Total Average Demand for Irrigation (GPD)

3,000Total Average Demand for Irrigation (GPD)

4,350

Total Demand (GPD) 11,797 Total Demand (GPD) 17,105

Page 12: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Overall Feasibility

Project: El Chaguite Water System 12

• Water Source : 15.52 gpm (22,348 gallons/day)

• 25 year projected demand: 12,755 gpd

+4,350 gpd (Irrigation use)

17,105 gpd• Diurnal Demand Cycle

• Conclusion: Feasible with water storage tank

Page 13: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Sizing

Project: El Chaguite Water System 13

Page 14: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Sizing

Project: El Chaguite Water System 14

Page 15: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Sources

Project: El Chaguite Water System 15

This design is based on:

Circular Storage Tanks and Silos by A. Ghali

Design of Concrete Structures by A. Nilson et. al.

Concrete Slabs Analysis and Design by R. J. Cope & L. A. Clark

Reinforced Concrete Slabs by R. Park & W. Gamble

See reference tables for formulas and assumed constants

Page 16: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Assumptions

Project: El Chaguite Water System 16

Page 17: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Tank Design

Page 18: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Tank Wall

No. 3 rebarevery 3rd brick layer

No. 4 rebar @ 18" O.C.

2" mortar thickness

Page 19: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Tank Foundation

No. 3 rebar @ 12" O.C.in both directions

3" up from compacted soil

No. 4 Rebar @ 12" O.C.in both directions7" up from compacted soil

Overflow drains to stream

Page 20: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Foundation – Wall Interface

Rounded Corner

24" Contact Lap Splice

24" Contact Lap Splice

No. 4 Rebar BetweenBrick Layers

No. 3 Rebar in Foundation

In BetweenBricks in Wall

Page 21: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Tank Roof

No. 3 rebar @ 6" O.C.in both directions

No. 3 rebar diagonalaround access hatch

3 - No. 3 rebararound access hatch

Page 22: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Tank Inlet and Outlet

TO HOUSE 17AND DOWNTOWN

TO HOUSE 11 ANDNORTH OF VILLAGE

45° ELBOW (2)

2" UNION (TYP. OF 4)

2" GATE VALVE (2)

OUTLET SCREENS (2)

BRICK AND MORTARVALVE BOX

2" UNION

2" GATE VALVE

45° ELBOW

RISER PIPE2 - 90° BENDS

BRICK AND MORTARVALVE BOX

TANK FOUNDATION

OUTSIDE OFTANK WALL

TOP OF INLET PIPEONE BRICK LAYERFROM ROOF

Page 23: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Trip Schedule

Project: El Chaguite Water System 23

Jun-11Fly to San Pedro SulaGet Supplies Order MaterialsVisit Rigo

Jun-12Buy GroceriesOrder Rest of SuppliesResearch Pumps for Carrizalito Project

Jun-13Drive To RosarioMeet with Village and Present DesignLay out Tank Site

Jun-14Dig Tank SiteTransport Bricks, Cement, Rebar, etc.

Jun-15 Train Villagers our process for concreteJun-16 Layout casting of FoundationJun-17 Cast Foundation

Jun-18Inspect Distribution System - Day 1Install Services - Day 1

Jun-19Start Walls of TankInspect Distribution System - Day 2Install Services - Day 2

Jun-20Visit Los PlanesVisit El Tecuan

Jun-21Survey CarrizalitoTake a trip to Yoro

Jun-22Cut GI pipe for tankVisit El Rosario School

Jun-23 Visit El Chaguite SchoolJun-24 Final Meeting With El ChaguiteJun-25 Drive to San Pedro SulaJun-26 Fly back to Boston

Page 24: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Budget

Project: El Chaguite Water System 24

El Chaguite Phase 2 Estimated Budget

Travel

Airfare $ 4,800

Exit Fees $ 210

Truck Rental $ 1,300

Gas $ 120

GroundHotel $ 300

Food $ 600

Labor

Guides $ 240

Laundress $ 100

Cooks $ 240

Materials

PVC Fittings/Valves $ 180

GI Pipes & Fittings $ 281

Tools $ 164

Tank Materials $ 1,365

Contingency $ 928

Total $ 10,827

Page 25: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Sustainability• Extra materials supplied for maintenance and replacement.

• Locals will be educated on water conservation and proper system maintenance.

• Water Board willcollect usage tax to fund future repairs.

• Simple design and construction

Project: El Chaguite Water System 25

Page 26: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Community Involvement

Project: El Chaguite Water System 26

• How has the community been involved in this project?– During the site assessment we inquired about the community’s wishes and took

their input into consideration during the design process. Letters have been sent to the villagers for approval of the design.

• Was a second, follow-up assessment conducted once the initial designs were completed?

– No, there was no follow-up assessment, but this trip will serve as a follow-up assessment before designing the second phase of the implementation of the system.

• How did everyone agree on this design?– We discussed the tentative initial plan with the villagers and formed our design

based upon these original discussions.

• How many people will this project impact?– This project will impact the quality of life for approximately 350 people.

• Has the NGO been helpful?– ACTS, the NGO in the area, has been extremely helpful in the progression of this

project. Since they already have a traveling infrastructure set up in the area, it has been much easier than expected to secure safe places to stay, guides to the area, and reliable sources of information. In addition, the wealth of knowledge that the group has about the history of El Rosario and the surrounding area has been beneficial in understanding the culture and social dynamics of El Chaguite.

Page 27: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Community Ownership & Education

Project: El Chaguite Water System 27

• What kind of help will the community be providing?– Labor (digging trench, laying pipe, mixing cement, transporting

materials).– We will coordinate a schedule of construction with El Chaguite’s

Water Board.

• Who will own the project once it’s completed? – El Chaguite will own the water system upon completion of the

project. The El Chaguite Water Board will manage the communally used infrastructure.

Page 28: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Community Ownership & Education

Project: El Chaguite Water System 28

• Who will be overseeing maintenance once the team leaves and how will repairs be paid for?– El Chaguite’s Water Board will be overseeing the maintenance

of the system. We will leave extra materials with the villagers to take care of any immediate necessary repairs. Hopefully, with improved health, the villagers will be able to establish community funds and pay for repairs further in the future.

• What education will be provided to the community?– The community will be educated on the maintenance of the

system, and we also plan to provide information about health and sanitation. In order for this to be a successful effort we will be working with the community Water Board and local organizations to ensure that the people understand the situation and are well informed about health and sanitation issues.

Page 29: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Questions?

Project: El Chaguite Water System 29

Thank you for your attention. This slide

concludes our formal presentation.

The following slides provide additional

information which may be useful.

Page 30: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Project Background

Project: El Chaguite Water System 30

• The need for EWB-NEU’s previous project, Los Planes water supply project was realized by EWB-NEU and ACTS, a non-profit organization that has been working in the area for over 15 years.

• ACTS has been working on improving the quality of life in the area by implementing medicinal and educational programs in the village of El Rosario as well as several of the surrounding villages.

• EWB-NEU has completed two projects in the area working with the villages of El Tecuan and Los Planes. During this time EWB-NEU realized the need for a similar project in El Chaguite.

• EWB-NEU was approved for an assessment trip that occurred in December 2007. During the assessment all the data that was necessary to design the system was collected

• Due to the shear size of the village, amount of work and materials needed, the design will need to be implemented over at least two phases.

• The following presentation outlines the final design for the El Chaguite water project, design alternatives, logistics of travel, and budget for Phase One.

Page 31: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

El Chaguite Existing System

31Project: El Chaguite Water System

Page 32: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

32Project: El Chaguite Water System

Page 33: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Existing Conditions

Project: El Chaguite Water System 33

• Sufficient, clean water source• Limited service• Unusable distribution system• Damaged main line• Diverse topography• Hurricane damage• Fire damage

Page 34: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Alternatives Considered

Project: El Chaguite Water System 34

North Water Storage Tank East Water Storage Tank

Page 35: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Trip Logistics

Project: El Chaguite Water System 35

Page 36: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Building Materials

Project: El Chaguite Water System 36

Page 37: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Equipment

Project: El Chaguite Water System 37

Survey Equipment:Topography MapsRented GPS UnitRod, Level, and Total Station200’ Tape Measures

Water Testing Equipment:Hach 5-in-1 Test StripsColiscan Easygels1mL Droppers Sterile Petri DishesWater Tap Pressure Gauge

Tools for GI pipes:GI Pipe CutterGI ReamerTree Vice

Other Equipment:2-Way Battery-Operated RadiosLocal Road MapsFirst Aid kitsDigital Camera

* All of the Equipment has been checked to clear Honduras’ Customs

Page 38: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Accommodations

Project: El Chaguite Water System 38

Dates, transportation, and lodging• Fly out of Boston on June 11, 2009. Pick up rental truck at the airport in San Pedro Sula and drive to the Hotel

Ejecutivo in the city.• Leave San Pedro Sula the next day, after securing materials, food and water. Travel 3.5 hours to the village of El

Rosario (location of the bunk house and ACTS clinic)• From June 11 to June 26 – travel between El Rosario, and surrounding villages, focusing our implementation

efforts on El Chaguite. Also travel to El Tecuan, La Reinada and Los Planes to check status of past projects.• Travel back to San Pedro Sula on December 28 and spend another night in the Hotel Ejecutivo in San Pedro

Sula. • Return Rental trucks and fly out of San Pedro Sula on December 29

Contact Information of accommodations• For the first and last nights the team we will be staying at the Hotel Ejecutivo in San Pedro Sula ( 011-504-552-

4289)• During the rest of the trip the team will be staying in a bunk house in El Rosario which is next to the health clinic.

There will be no way of directly contacting the team by phone during this phase of the project, however two households in this village have phones. (Santiago 011-504-608-6942, and Rosa Castro 011-504-608-7219)

Sources of food and water for the team• The first morning in San Pedro Sula, the team will shop for groceries. The team will also purchase all bottled

water needed for the trip. When in the villages the team will buy more, locally grown, food from the villagers, such as corn and beans. Food will be prepared by cooks in the bunk house.

State whether the team be visiting surrounding areas.• The majority of time will be spent in El Chaguite implementing the first phase of the project. For a few days

during the trip, the team will visit villages that EWB-NEU has worked with in the past, including El Tecuan, Los Planes and La Reinada.

Page 39: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Safety & Emergency Plan

Project: El Chaguite Water System 39

Safety PlanEl Rosario and the surrounding villages are rural and the crime rate is very low. When crimes do happen it is very rare that they involve foreigners. The team will always be traveling in groups and two individuals from the village will be accompanying and guiding the group. There is a medical clinic in El Rosario with a well stocked pharmacy that ACTS has worked with for years. The bunk house will serve as a meeting place and the trucks will be available for emergency transportation.

Emergency Plan & Exit StrategySOS evacuation insurance was strongly suggested by the ACTS group in case of emergency. Political unrest is rare in Honduras. The country is considered one of the most politically stable countries in Central America. In case of emergency the team will exercise good judgment and use advice from the local guides to leave the country in the best way possible.

Are there any State Department Warnings for this country?As of March 19, 2009 there are no State Department Warnings for this country (information retrieved from US Department of State website)

Are there any other safety concerns for traveling at this time? Heavy rain and hurricanes have hit this area in the past. In case of extreme weather the team will stay off the roads and use best judgment with counsel from the locals

Page 40: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Project Contact Information

Project: El Chaguite Water System 40

Daniel P. Saulnier, P.E. (email withheld)

(phone # withheld)Professional Mentor

Prof. Ferdi Hellweger, Sc.D.(email withheld)

(phone # withheld)Faculty Advisor

Rajesh Punjabi(email withheld)

(phone # withheld)Project Lead

Lucas Johnson(email withheld)

(phone # withheld)Chapter President

Dean J. Seibert, M.D., ACTS(email withheld)

(phone # withheld)Health Point Person

Patti Barahona(email withheld)

(phone # withheld)NGO/Community Contact

Project Team: • 16 Students working on project• 1 professional mentor and 1 professor working on project• Rajesh Punjabi, Mike Sanders, Ryan Mahoney, Lucas Johnson, Peter Privitera,

John Martin, Jennifer Chin, Ann Polaneczky, Ethan LaRochelle, Amanda Horton, Laurel Rowse, Andy Baummer, Megan Fritz, Christian Mantilla, John Monachelli, Noah Garguilo, Dan Saulnier, Ferdi Hellweger

Page 41: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Project Team and Travel Team

Project: El Chaguite Water System 41

• Chapter Traveling: Northeastern University

• On-the ground Contact Phone # for the travel team Patti Baharona – (phone # withheld)

• Nearest US Consulate Contact info:– Embajada de los Estados Unidos de América, Avenida La Paz, Tegucigalpa

M.D.C., Honduras Tel. (504) 236-9320 / 238-5114 Fax. (504) 236-9037

• Nearest Hospital Contact Info: San Pedro Sula– Phone: 011-504-558-1580

• Travel Team: – 5 Students Traveling– 1 Professionals Traveling

Page 42: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Hours

Project: El Chaguite Water System 42

Number of WeeksHours per Week (avg) Total Hours

Project Lead:40 6 240

Daniel P. Saulnier

Student Lead:40 6 240

Rajesh Punjabi

Student Members 40 30 1200

Faculty 40 1 40

Total     1720

Page 43: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Administrative Data

Project: El Chaguite Water System 43

Page 44: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Final Checklist before Travel

Project: El Chaguite Water System 44

The goal of the review process is to make sure that your team has a successful implementation trip

1) Submit this presentation to the project management staff and TAC liaison at [email protected]. Turn in WITH the following:

– Volunteer Waiver Form (#605) for each person traveling. Please submit all at one time.

2) Prior to the TAC meeting: The Project Management Staff and the liaison will review this presentation with the project lead, mentor and other relevant team members via a conference call prior to its presentation at the TAC meeting.

3) Before final travel, your team should have the following checklists signed off by the persons listed below, and get a final OK from the EWB-USA Project Staff:

– Travel Readiness Checklist (#601): to project staff– Personal Health Checklist (#603): to team’s health point person (to be taken on the trip)– Detailed Field Equipment Checklist: to mentor or project lead– Provided this presentation & emergency contact information to each and every member of the

team– Have each person review the Travel Tips Presentation (#602)

4) The Project team will be responsible for following up on TAC Comments and submitting changes/revisions to the project staff

5) The Project team MUST notify the project staff of any changes to travel dates or travel teams. Additional team members MUST send in Waivers (#605) prior to travel.

Page 45: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Project Lead Sign-Off

Project: El Chaguite Water System 45

• I, Daniel P. Saulnier, P.E., as the Professional Mentor of this project, have reviewed the technical and logistical contents of this project, and approve of the proposed design. I will also comply with TAC recommended changes and make suggested changes before traveling on the implementation trip.

• Daniel P. Saulnier April 14, 2009 [signed]

Page 46: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Project: El Chaguite Water System 46

Page 47: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Project: El Chaguite Water System 47

Page 48: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Project: El Chaguite Water System 48

Page 49: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Data Collection

Project: El Chaguite Water System 49

• GPS Survey• Total Station Survey• Interviews

• Water quality testing– Total coliforms– VOCs– Metals

Page 50: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Trench Detail

Project: El Chaguite Water System 50

Page 51: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Trench Examples

Project: El Chaguite Water System 51

Page 52: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Tank Design

Project: El Chaguite Water System 52

Chaguite now: Growth projected by Thomas D. Jordan, Jr. Chaguite in 25 years: 60homes 45%      87homes  

333people 482.85people  68students 98.6students  

Projected Water Usage - Method 1Methodology based on "A Handbook of Gravity-Flow Water Systems" by Thomas D. Jordan, Jr. (p. 27-29)

45litre/day/person10litre/day/student at school

Current need: Need in 25 years:15665litres/day 22714litres/day

4138gallons/day 6000gallons/day

Projected Water Usage - Method 2Water usage according to "Health Aspects of Plumbing" (chapter 2)

published by the World Health Organization and the World Plumbing Council:

Minimum: 20litre/day/person (drinking, food preparation, basic hygiene)Moderate: 50litre/day/person (minimum plus laundry and bathing)Optimal: 100litre/day/person (moderate plus considerable comfort and well-being)

Current need:       Need in 25 years:      Minimum: 6660litre/day 1759gallon/day Minimum: 9657litre/day 2551gallon/dayModerate: 16650litre/day 4398gallon/day Moderate: 24143litre/day 6378gallon/dayOptimal: 33300litre/day 8797gallon/day Optimal: 48285litre/day 12755gallon/day

Additional Water for Irrigation of Personal Gardens189lpd/household for irrigation (source: Mike Sanders, Idaho Farmers Extension Report)

50gpd/household for irrigation (source: Mike Sanders, Idaho Farmers Extension Report)

Current need: Need in 25 years:11356liters/day 16467liters/day

3000gallons/day 4350gallons/day

ConclusionUse largest flow estimate (Method 2, Optimal water usage) for Tank Calculations, plus irrigation

Page 53: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Project: El Chaguite Water System 53

Walls: Horizontal Rebar

Page 54: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Test Wall for Cracking

Page 55: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Foundation Design

Page 56: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Roof Analysis

Page 57: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Roof Design

Page 58: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Project: El Chaguite Water System 58

Walls: Bending Moment

Page 59: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Project: El Chaguite Water System 59

Walls: Vertical Rebar

Page 60: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Demand

Project: El Chaguite Water System 60

Page 61: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Distribution System Model

Project: El Chaguite Water System 61

Page 62: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Transmission Main

Project: El Chaguite Water System 62

SourceProposed Tank Site

Existing Tank Site

Page 63: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Transmission Main

Project: El Chaguite Water System 63

Page 64: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Float Valve Tank

Project: El Chaguite Water System 64

Page 65: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Implementation Metrics

Project: El Chaguite Water System 65

Technical:

• Give a detailed description of the future monitoring of the impacts of your project

– Once the project is completed, the continuation of the monitoring of the system will be carried out by the community water board.

– We will initiate an education campaign to provide necessary water safety and sanitation information.

– Our chapter will remain in contact with the community to ensure that things are going smoothly, to provide any support that becomes necessary, and to ensure that the water availability issue has been fully addressed.

• What are the future plans for visiting and following up with any problems that might arise?

– We plan to implement this project in two phases, so the implementation trip for the second phase will also serve as a follow-up to the first phase.

– Since EWB-NEU plans on remaining active in the area around El Chaguite in the future, the group will check up on the village on any trips to the area. In addition, ACTS has a constant presence in El Rosario and the surrounding villages and can act as a liaison between El Chaguite and EWB-NEU.

Page 66: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Implementation Metrics(Health)

Project: El Chaguite Water System 66

Health:

• Give a detailed description of the baseline health assessment

– In January 2008 a standard EWB 509 Health Assessment Form was completed for the community of El Chaguite by one of the village elders on behalf of EWB-NEU. It is the intent of EWB-NEU to distribute additional forms for completion by other villagers during the implementation trip. The additional responses will allow for a cross-section of the community and provide greater insight into the village health situation.

– Our team conducted a health assessment of the village of El Chaguite. Interviews were made house by house to determine the public health status of the residents. All comments were recorded along with the number of people in each household, gender, and age

Page 67: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Implementation Metrics(Health)

Project: El Chaguite Water System 67

Health (continued)

• What health metrics were identified to measure the effect of this project on the community?

– We, or ACTS, will conduct another health survey after implementation to see if the number of cases of illnesses decreases after we improve the water availability in the village. We will be conducting water usage education and hope to improve basic sanitation practices in the village, such as encouraging hand washing. Through communication with ACTS in the future we can ask if spread of illnesses has decreased.

• What are the current health data findings? – The most common illnesses are malnutrition, headaches, common cold, diarrhea and fever.– Most of the illnesses listed are caused and/or spread more easily by the lack of clean and

reliable water in the village.

• What additional data is needed? – We may conduct more in depth water quality tests during the implementation trip to see if

water quality should be the focus of a future project in El Chaguite

Page 68: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Assessment for Future Project Phases

Project: El Chaguite Water System 68

• Will this trip be used as a site assessment for future projects? – This trip will be used as an assessment for the second phase of this project.

Because of the scale of the project, we have decided to implement it in two phases. The second phase will focus on the reservoir tank, completion of the distribution system and setting up taps at all of the houses.

• What are the community’s main concerns?– The main concern is to obtain a reliable source of water. We hope to increase

serviceability with a new transmission main. After the first trip, the main concern will be getting water to each house.

• Site Assessment Data Needs: – Verify location for reservoir tank.

• This information will be obtained by collecting GPS and survey data of potential locations and doing soil stability analysis.

– Determine locations for all of the taps to be installed. • This information will be obtained by collecting GPS data of the village and

working with the families to determine where the taps will go.

Page 69: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Assessment for Future Project Phases: Methodology

Project: El Chaguite Water System 69

• Describe the potential impacts to the physical environment that the project may cause.

– This project will affect the plant and animal life in the direct surroundings of the source box, float valve tank, reservoir tank, and water tap. We will attempt to make this effect as positive as possible.

• Describe what training your team has undergone/will undergo for this project.

– The team has knowledge in surveying and water systems, and will use the information gathered for the first phase of the design to help prepare for the project. In addition, the group has been educated by ACTS in regards to the cultural issues that exist in the area.

Page 70: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Project: El Chaguite Water System 70

Assessment for Future Project Phases: Metrics

Technical:• What metrics will be used to determine the technical success of this project?

– This project will be successful if the village has full access to clean drinking water. The success will be measured as follows. Water pressures were measured at many places in the existing system. The proposed design strives for a minimum pressure of 20 pounds per square inch (psi) and a maximum pressure of 80 psi. Tap pressures within this range will be considered successful.

– The quality of the water is also important to the success of the system. Water tests were conducted by the EWB-NEU travel team in December 2008. For a successful implementation, all the taps in the community should test negative for contaminants. Each of these tests will be conducted at representative locations throughout the distribution network.

Economic:• What additional metrics will be used to measure the effect of the next phase of this

project on the community?– This project will significantly increase the health and quality of life for the people of El

Chaguite, primarily the families who were not served by the original system.– The villagers will have the opportunity to invest their energy into different things which can

only bring about a bright future forr thecommunity. – Moreover, the health problems in El Chaguite will reduce. Having a plentiful supply of clean

water for drinking, cooking and bathing will undoubtedly improve the health of these people.

Page 71: Implementation Trip for Date of TAC Presentation: April 14 th, 2009 Project Location: El Chaguite, Yoro District, Honduras Project Risk Level: 2 Northeastern

Project: El Chaguite Water System 71

Assessment for Future Project Phases: Metrics

Health:• What additional metrics will be used to measure the effect of the next phase of this

project on the community? – A health assessment has already been performed for the village of El Chaguite so we will

not need to collect another one at this time. After the project has been implemented, we may conduct a follow-up health survey to determine the effects of our system.

• What data is needed and from where will your team collect the data?– We have already gathered the necessary health information for this project.