20
Setting up a STEMI PCI Programme in the UK: Implications for the cath lab workforce Rob Henderson Trent Cardiac Centre Nottingham Chair, BCS Working Group on Non-Medical Cath Lab Staffing NO CONFLICT OF INTEREST TO DECLARE

Implications for the Cath Lab workforce

  • Upload
    simon23

  • View
    519

  • Download
    8

Embed Size (px)

DESCRIPTION

 

Citation preview

Setting up a STEMI PCI Programme in the UK:

Implications for the cath lab workforce

Setting up a STEMI PCI Programme in the UK:

Implications for the cath lab workforce

Rob HendersonTrent Cardiac Centre

Nottingham

Chair, BCS Working Group onNon-Medical Cath Lab Staffing

Rob HendersonTrent Cardiac Centre

Nottingham

Chair, BCS Working Group onNon-Medical Cath Lab Staffing

NO CONFLICT OF INTEREST TO DECLARE

Estimating the need for Primary PCI Europe and UK

Estimating the need for Primary PCI Europe and UK

0

200

400

600

800

Krako

w

Denm

ark

Czech

Bohem

ia

Wes

t Mids

Yorks

hire

Lond

on

Prim

ary

PC

I p

mp

0

200

400

600

800

Krako

w

Denm

ark

Czech

Bohem

ia

Wes

t Mids

Yorks

hire

Lond

on

Prim

ary

PC

I p

mp

UK population 60 million, at 500 pmp = 30,000 PPCI per annumUK population 60 million, at 500 pmp = 30,000 PPCI per annum

2004 data: Ludman 2004 data: Ludman

92780

1438

30000

62780

0

20000

40000

60000

80000

100000

2004 Future

All PCI

Primary PCI

92780

1438

30000

62780

0

20000

40000

60000

80000

100000

2004 Future

All PCI

Primary PCI

2.3 %2.3 %

2004 data: Ludman 2004 data: Ludman

32 %32 %

1050 pmp1050 pmp 1546 pmp1546 pmp

UK Growth needed for primary PCI (assuming no increase in other types of PCI)

UK Growth needed for primary PCI (assuming no increase in other types of PCI)

Consultant Cardiac Workforce requirements in the UK

Consultant Cardiac Workforce requirements in the UK

To provide To provide 15001500

PCI pmpPCI pmp

To provide To provide 2200-3000 2200-3000 PCI pmpPCI pmp

To provide To provide cardiology cardiology

serviceservice

Consultants pmpConsultants pmp 3.2*3.2* 4.8-8.8*4.8-8.8* 52.7-84.252.7-84.2

Consultants for UKConsultants for UK 196*196* 288-528*288-528* 3162-50523162-5052

David Hackett, BCS Working Group 2005

*Assumes consultants dedicated to PCI; assumes UK population 60 million424 consultants did PCI in 2004 (BCIS) – but majority not dedicated to PCI

710 cardiologists (663 wte) in 2004 (DOH)630 cardiologists in 2003 (RCP)

Non-Medical Cardiac Workforce requirements in the UK

Non-Medical Cardiac Workforce requirements in the UK

To provide To provide 15001500

PCI pmpPCI pmp

To provide To provide 2200-3000 2200-3000 PCI pmpPCI pmp

To provide To provide invasive invasive

cardiology cardiology serviceservice

To provide To provide cardiology cardiology

serviceservice

Non-medical Non-medical clinicians pmpclinicians pmp 7.5*7.5* 11-15*11-15* 50.4-61.050.4-61.0 168-211?168-211?

Non-medical Non-medical clinicians for UKclinicians for UK 450*450* 660-900*660-900* 3024-36603024-3660 10080-12660?10080-12660?

David Hackett, BCS Working Group 2005

*Assumes Nurses, Physiologists, Radiographers dedicated to PCI workAssumes UK population 60 millionInformation about available staff very limited

Available non-medical clinical staff?Available non-medical clinical staff?

RegisteredRegistered Working?Working? Working in Working in cardiology?cardiology?

Working in Working in cath labs?cath labs?

Nursing*Nursing*

(March 2005)(March 2005)

672 897 672 897 registered registered with NMCwith NMC

623 846 623 846 adult general adult general

nursingnursing?? ??

Cardiac Cardiac Physiology**Physiology** ~3500~3500

~1800-2000 ~1800-2000 SCST SCST

membersmembers

~2000-~2000-35003500 ??

Radiography***Radiography***23 39723 397

registeredregistered with HPCwith HPC

16 329 16 329 SOR members SOR members

in NHSin NHS

190190

(1.2%)(1.2%)??

*Nursing & Midwifery Council website – includes staff working overseas **Jackie Howard, Catriona MacGregor – excludes cardiographers*** Audrey Patterson – 1563 SOR members work outside NHS

Estimated UK catheter laboratory vacancies

Estimated UK catheter laboratory vacancies

NursingNursing PhysiologyPhysiology RadiographyRadiography

14 labs14 labs 22 1313 3.53.5

Vacancies Vacancies per labper lab 0.140.14 0.930.93 0.250.25

Extrapolated Extrapolated to 160 labs*to 160 labs* 2222 149149 4040

Preliminary data – includes diagnostic and PCI labsBCS Non-medical Cath Lab Staffing Working Group survey 2005*BCIS 2004

Catheter laboratory workTraditional roles in the UKCatheter laboratory workTraditional roles in the UK

Cardiologist and traineeDo procedure

Cardiologist and traineeDo procedure

Nurses (1-2)Puts patient on table

Draws up drugsOpens equipment

Nurses (1-2)Puts patient on table

Draws up drugsOpens equipmentPhysiologist (1-2)

Sets up & monitors pressure line & ECG

Physiologist (1-2)Sets up & monitors

pressure line & ECG

Radiographer (1)Turns on machine and

controls C arm

Radiographer (1)Turns on machine and

controls C arm

(Perfusionist – IABP)

Catheter laboratory staffing for PCI in the UK

Catheter laboratory staffing for PCI in the UK

4.0 3.84.6

1 1

11 1

1

Any PCI PPCI in hours PPCI out of hours

SpR

Consultant

Non-medical

4.0 3.84.6

1 1

11 1

1

Any PCI PPCI in hours PPCI out of hours

SpR

Consultant

Non-medical

BCS Non-medical Cath Lab staffing Working Group survey 2005Preliminary data from 6 PCI centres

6.0 5.86.6

Catheter laboratory staffing for PCICatheter laboratory staffing for PCI

UK UKNumber PCINumber PCI 12001200 600600 40004000 430430 29002900 900900

CardiologistCardiologist 11 11 11 11 11 11

Trainee/SpRTrainee/SpR 11 00 11 00 11 11

NursingNursing 11 22 22 22 22 22

PhysiologyPhysiology 11 22 11 00 11 22

RadiographyRadiography 00 00 00 00 11 11

TotalTotal 4*4* 55 55 3**3** 66 77

*and a cleaner **and a porter

Catheter laboratory staffing for PCICatheter laboratory staffing for PCI

111111111111CardiologistCardiologist

3**3**

00

00

22

00

430430

66

11

11

22

11

29002900

UK

7755554*4*TotalTotal

11000000RadiographyRadiography

22112211PhysiologyPhysiology

22222211NursingNursing

11110011Trainee/SpRTrainee/SpR

9009004000400060060012001200Number PCINumber PCI

UK

*and a cleaner **and a porter

Catheter Laboratory Multi-skilling

Catheter Laboratory Multi-skilling

• Cardiac Cath Lab practitioner project

– London South Bank University

• Middlesbrough generic worker training

– In house programme

• Nottingham nurse radiography training

– In house programme

• Need national coordination and funding

• Cardiac Cath Lab practitioner project

– London South Bank University

• Middlesbrough generic worker training

– In house programme

• Nottingham nurse radiography training

– In house programme

• Need national coordination and funding

ConclusionsConclusions

• A national primary PCI service will need additional medical and non-medical staff capacity - but there are currently significant staff shortages

• More trainees and multi-skilling will help but may not solve the problem entirely

• If primary PCI is to be rolled out across the UK we need multidisciplinary, flexible, and innovative solutions to medical & non-medical workforce problems

• There is an urgent need for robust information about non-medical catheter laboratory staffing to facilitate future planning

• A national primary PCI service will need additional medical and non-medical staff capacity - but there are currently significant staff shortages

• More trainees and multi-skilling will help but may not solve the problem entirely

• If primary PCI is to be rolled out across the UK we need multidisciplinary, flexible, and innovative solutions to medical & non-medical workforce problems

• There is an urgent need for robust information about non-medical catheter laboratory staffing to facilitate future planning

BCS non-medical catheter laboratory staffing survey 2006

BCS non-medical catheter laboratory staffing survey 2006

All cath lab managers

….please, Please, PLEASE……

complete the survey formand return to BCS

All cath lab managers

….please, Please, PLEASE……

complete the survey formand return to BCS

Physiology staff vacanciesSCST survey November 2003

Physiology staff vacanciesSCST survey November 2003

1812

3020

320

533

6241040

0

1000

2000

3000

4000

Trained staff Support staff Trained staff Support staff

Post vacant

Post filled

1812

3020

320

533

6241040

0

1000

2000

3000

4000

Trained staff Support staff Trained staff Support staff

Post vacant

Post filled

60% response Extrapolated to 100%

15%

8%

2005 London survey estimated physiology vacancy rate at 23% (79 wte)

Catheter Laboratory Multi-skilling

Catheter Laboratory Multi-skilling

• Multiple projects across UK

• Often driven by local need

• Cost of training and release from work

• Need transferable qualification

• Multiple projects across UK

• Often driven by local need

• Cost of training and release from work

• Need transferable qualification

National guidelines and staffingNational guidelines and staffing

• BCIS/BCS recommendations 2005

– ‘….dedicated multidisciplinary team…’

– ‘….multi-skilling should be encouraged…’

– No statement on appropriate staffing levels

• ESC PCI guideline 2005

– No statement on staffing

• ACC/AHA PCI guideline 2005 & STEMI guideline 2004

– No statement on staffing

• BCIS/BCS recommendations 2005

– ‘….dedicated multidisciplinary team…’

– ‘….multi-skilling should be encouraged…’

– No statement on appropriate staffing levels

• ESC PCI guideline 2005

– No statement on staffing

• ACC/AHA PCI guideline 2005 & STEMI guideline 2004

– No statement on staffing

Estimating the need for Primary PCIEstimating the need for Primary PCI

58 NHS PCI units 58 NHS PCI units (2004)(2004)

STEMI in STEMI in EnglandEngland

(MINAP)(MINAP)

All MI in UKAll MI in UK

(Dawkins)(Dawkins)

3700037000 137000137000

3052530525

(75% PCI)(75% PCI)

3425034250

(25% PCI)(25% PCI)

PCI / unit / dayPCI / unit / day 1.41.4 1.61.6

Modified from David Hackett, BCS Working Group 2003

Primary PCI in the UK 2004-2005Primary PCI in the UK 2004-2005

1628

7

13

0

10

20

30

40

50

2004 2005

24h 7day service

Working hours

1628

7

13

0

10

20

30

40

50

2004 2005

24h 7day service

Working hours

2004 data: Ludman

In 2004 51 centres did 3447 PCI for STEMI (1438 PPCI)Data from 55 of 58 NHS centres

In 2004 51 centres did 3447 PCI for STEMI (1438 PPCI)Data from 55 of 58 NHS centres

Number of centres doing routine primary PCI

Catheter laboratory staff trainingCatheter laboratory staff training

StaffStaff RegistrationRegistration TrainingTraining

NursingNursing NMCNMC 3 yr degree course 3 yr degree course &1-2 yr experience&1-2 yr experience

PhysiologyPhysiology HPCHPC(from 2005)(from 2005)

4 yr degree course4 yr degree course

RadiographyRadiography HPCHPC 3 yr degree course 3 yr degree course & 1-2 yr experience& 1-2 yr experience

HPC - Health Professions council

NMC - Nursing & Midwifery Council