14
We were 3 Months late on orders when I took over, and 1 day late when I left. We only had two scissor lift tables We were working directly on

Improvements at Infinitidecor

Embed Size (px)

Citation preview

Page 1: Improvements at Infinitidecor

We were 3 Months late on orders when I took over, and 1 day late when I left.

We only had two scissor lift tables

We were working directly on the floor

Page 2: Improvements at Infinitidecor

We made 2’X3’X4’ boxes to level what we were working on, and productivity went up

Page 3: Improvements at Infinitidecor
Page 4: Improvements at Infinitidecor

We removed from the work centers, the stagnant raw materials to create more working floor space, and productivity went up

Page 5: Improvements at Infinitidecor
Page 6: Improvements at Infinitidecor

We included a plastic sheet to have a flat-&-smooth surface for the printed film to look right

Page 7: Improvements at Infinitidecor

We started using this acrylic coating to recover the glossy surface in areas we have worked on

Page 8: Improvements at Infinitidecor

We started using this primer in glossy surfaces to get the smooth finish on the paint coating

Page 9: Improvements at Infinitidecor

We implemented the 5S discipline to make sure we only have the right materials for the job-at-hand

Page 10: Improvements at Infinitidecor

We reduced to zero the solid-surface scrapped products when we started using the right joint adhesive.

Page 11: Improvements at Infinitidecor
Page 12: Improvements at Infinitidecor

We reduced to zero other scrapped products when we started using the right tools

Page 13: Improvements at Infinitidecor