    THE BUILDING TEAM

    Building is essentially a team effort in which each member has an important role to

    play. The organization structure of a typical team and the role of each member is

    defined below.

    Building owner

    The client; the person who commission the work and directly or indirectly employs

    everybody.

    Architect (Professional consultant)

    Engaged by the building owner as his agent to design, advise and ensure that theproject is kept within cost and complies with the design.

    Engineers (Professional consultant)

    Specialists such as a civil/electrical/mechanical engineers employed to work with the

    architect on that particular aspect of the design.

  • 8/13/2019 Ina105.Introduction Building Team

    3/25

    Quantity Surveyor (Professional consultant)

    Engaged to prepare bills of quantities, check tenders, prepare interim valuations and

    advise architect on the cost variations.

    Clerk of Site

    Employed on large contract as the architects on-site representatives. He has only

    liaison powers and cannot issue instructions on his own behalf; he can only offer

    advise

    Main Contractor/Contractor

    Employed by the building owner, on the architects advice, to carry out theconstructional works. He takes his instructions from the architect.

    Sub-Contractor

    Appointed to assist main contractor, on the architects advice, to carry out the

    constructional works.

    INTRODUCTIONINA105/151

  • 8/13/2019 Ina105.Introduction Building Team

    4/25

    Interior Designer (Professional consultant)

    Engaged to do special interior design works if required.

    Landscape Architect (Professional consultant)

    Engaged to do special landscape design works if required

    Contracts manager

    Liaises between the office and the site and has overall responsibility for the site

    operations..

    Surveyor (Professional consultant)

    Employed by the contractor to check and assist the quantity surveyor in the

    preparation of interim valuations and final accounts, He may also measure work done

    for bonus and sub-contractor payments.

    INTRODUCTIONINA105/151

  • 8/13/2019 Ina105.Introduction Building Team

    5/25

  • 8/13/2019 Ina105.Introduction Building Team

    6/25

    Buildingowner

    Architect

    Main Contractor Clerk of work Quantity

    Surveyor

    Engineers Interior

    Designer

    Landscape

    Architect

    Contracts

    ManagerSurveyor Estimator Buyer Administrator

    General

    Foreman

    Operatives

    Costing

    Account

    Office staff

    THE BUILDING TEAM

    (Big projects)

    Sub-Contractor

    INTRODUCTIONINA105/151

  • 8/13/2019 Ina105.Introduction Building Team

    7/25

    Buildingowner

    Architect

    Contractor Quantity

    Surveyor

    Engineers

    Contracts

    ManagerEstimator Administrator

    Workers Costing

    Account

    Office staff

    THE BUILDING TEAM

    (Small projects)

    INTRODUCTIONINA105/151

  • 8/13/2019 Ina105.Introduction Building Team

    8/25

  • 8/13/2019 Ina105.Introduction Building Team

    9/25

    2. The Constructing Stage

    Construction works begin after the appointment of contractors.

    1. Site Investigation

    2. Site Clearance

    3. Establishing Datum Level And Setting Out The Building4. Excavation And Foundation Works

    5. Building Structure Construction

    6. Floor Construction

    7. Wall Construction

    8. Window Frame Installation

    9. Roof Construction10. Wall Plastering

    11. Ceiling Construction

    12. Floor finishes Installation

    13. Doors and Windows Installation

    14. Drain Construction

    15. Fence Construction

    16. Site Clearance

    INTRODUCTIONINA105/151

  • 8/13/2019 Ina105.Introduction Building Team

    10/25

    THE CONSTRUCTING STAGE

    1. Site InvestigationInvestigate on site and soil condition.

    A soil investigation includes the following aims:

    a. define the soil type

    b. find the groundwater level

    c. check for tree roots

    d. take soil samples for tests in a laboratory

    e. carry out some in-situ tests

    f. test for contamination.

    2. Clearing the siteThis may involve the demolition of existing buildings,

    the grubbing out of bushes and trees and the removal

    of soil to reduce level.

    INTRODUCTIONINA105/151

    Site clearing

  • 8/13/2019 Ina105.Introduction Building Team

    11/25

    THE CONSTRUCTING STAGE

    3. Establishing datum level and setting out the building

    To establish level and base line from which the whole building can be set out.

    INTRODUCTIONINA105/151

    Setting/establishing base line Leveling work

  • 8/13/2019 Ina105.Introduction Building Team

    12/25

    THE CONSTRUCTING STAGE

    4. Excavations and foundation works

    Before a foundation can be laid it is necessary to excavate a trench of the required

    depth and width. Foundation is the base on which a building rests and its purpose is

    to safely transfer the load of a building to a suitable subsoil.

    INTRODUCTIONINA105/151

    Excavating a trench Concreting the foundations

    The pad foundation

  • 8/13/2019 Ina105.Introduction Building Team

    13/25

    THE CONSTRUCTING STAGE

    5. The construction of building structure (beams and columns)

    Sometimes called as building skeleton. The structures will bear all life and dead loads

    and transfer it to the building foundations.

    INTRODUCTIONINA105/151

    Concreting the ground floor beams Concreting the columnsConcreting the floor/roof beams

  • 8/13/2019 Ina105.Introduction Building Team

    14/25

    THE CONSTRUCTING STAGE

    6.The construction of floors

    Flat level of the building that support life load and dead load.

    INTRODUCTIONINA105/151

    Concreting the floor Leveling the concrete floor

  • 8/13/2019 Ina105.Introduction Building Team

    15/25

    THE CONSTRUCTING STAGES

    7. The construction of walls and installation of door frames

    The building side covering.

    INTRODUCTIONINA105/151

    Brick laying works

  • 8/13/2019 Ina105.Introduction Building Team

    16/25

    THE CONSTRUCTING STAGES

    8. Install window frames

    INTRODUCTIONINA105/151

    Installing the window frame Installing the window frame

    The window frame

  • 8/13/2019 Ina105.Introduction Building Team

    17/25

    THE CONSTRUCTING STAGES

    9. The construction of roofs

    The building top coverings

    INTRODUCTIONINA105/151

    Constructing the roof joists Installing the roof tiles

    Installing insulation & battens

    Installing roof trusses

  • 8/13/2019 Ina105.Introduction Building Team

    18/25

    THE CONSTRUCTING STAGES

    10. Wall plastering

    INTRODUCTIONINA105/151

    Wall plastering worksRefining wall plastering works

  • 8/13/2019 Ina105.Introduction Building Team

    19/25

    THE CONSTRUCTING STAGE

    11. The construction of ceilings

    INTRODUCTIONINA105/151

    Constructing the asbestos ceilingConstructing the plaster ceiling

  • 8/13/2019 Ina105.Introduction Building Team

    20/25

    THE CONSTRUCTING STAGE

    12. The installation of floor finishes

    Installation of floor tiles/granites/marbles etc.

    INTRODUCTIONINA105/151

    Installing the floor tiles Installing the floor skirting

    Cutting the tiles

  • 8/13/2019 Ina105.Introduction Building Team

    21/25

    THE CONSTRUCTING STAGE

    13.The installation of doors and windowsThe building openings

    14.The construction of drain

    Drain at the buildings perimeter

    15. The construction of fences

    Building boundary fences

    INTRODUCTIONINA105/151

  • 8/13/2019 Ina105.Introduction Building Team

    22/25

    THE CONSTRUCTING STAGE

    16. Site clearance

    Clearing all rubbish on site before handover

    THE BUILDING COMPONENTS

    1. Foundations and building structures

    2. Floors

    4. Walls

    5. Roofs

    6. Ceilings7. Staircases and escalator

    8. Openings (door & window

    INTRODUCTIONINA105/151

  • 8/13/2019 Ina105.Introduction Building Team

    23/25

    Superstructure

    Substructure

    Ground floor level

    Building basement

    Building floor

    levels

    Building superstructure and substructure

    INTRODUCTIONINA105/151

    Building foundation

  • 8/13/2019 Ina105.Introduction Building Team

    24/25

    References:

    1. Ivor H. Seeley (1995):Build ing Technolog y. Fif th edit ion. MacMillan.

    2. Roland Ashcroft (1992):Construct ionFor Inter ior Designers. Second Edit ion. Longman.

    3. Roger Greeno (1998):Adv anced Constru ct ion Techno logy.

    4. R. Chudley (1996): Construc t ion Techno logy. Longman

    INTRODUCTIONINA105/151

  • 8/13/2019 Ina105.Introduction Building Team

    25/25

    THE END

    INTRODUCTIONINA105/151