2
SELF-PROPELLED SELF-ELEVATING ACCOMMODATION JACKUP BARGE Specifications provided in good faith but without guarantee and are subjected to change without prior notice. GMS SHAMAL 5601 LOA Beam Depth Draft Variable Load Deck Area 56 m 32 m 5.5 m 3.5 m 850 t 854 m² Generator Sets Emergency Generator Azimuth Thrusters Speed Kongsberg Dynamic Positioning 4 x 1200 kW 1 x 400 kW 2 FWD + 2 AFT 6 Knots DP2 Main Particulars Propulsion and Generators Single Cabins Two Berth Cabins Four Berth Cabins Total POB Hospital Offices Conference Room 4 27 23 150 Main Crane Auxiliary Crane Deck Strength 150 t @ 16 m 15 t @ 47 m 5 t / m² Deck Machinery Accommodation Jacking Units per leg Jacking Speed Effective lifting capacity per leg Pre-Load holding capacity per leg 12 0.8m / min 1080 t 1800 t Legs Leg length Max Water Depth Spudcans 4x Triangular Truss Design 75 m 55 m 30m² each Leg Design Jacking System Lifeboats 2 x 150 man D Value Aircraft 22.2 m S92 Helideck Safety Equipment Independent: Dynamic Positioning (DP2) allows the vessel to move under her own power with high accuracy positioning alongside a platform. Fast: The vessel can move faster than conventional jackups between locations due to higher transit speeds of six knots and by not requiring anchor deployment. Flexible: GMS is both builder and operator and can adapt/configure the vessel to clients’ requirements, with the vessel able to move easily between oil and gas operations to wind farm installation and maintenance contracts. Safe: Day-to-day work is free from the added hazards a moving vessel introduces. A safer working environment for large numbers of offshore workers. GMS Shamal is a self-propelled jackup barge that provides the stable platform for the delivery of a wide range of services throughout the total lifecycle of offshore oil, gas and renewable energy activities. Key advantages of GMS Shamal over conventional barges include: Comfortable: The four-legged design provides a stable platform for those living on board; the efficiency of a man well-rested in a stable bed is greater than someone trying to sleep on a moving vessel (for crew and non-seafarers). Convenient: Two gangways installed in combined operations provide an effective solution for top side maintenance on a smaller platform. Cost effective: The weather window for a conventional jackup barge to move in-field is an average of three days; GMS Shamal can do it in a few hours. No need for tug support/anchor handling. Fuel-efficient. www.gmsuae.com Gulf Marine Services Abu Dhabi 2015 Delivery Builders Operator Gulf Marine Services Class A1, Self-Elevating Unit + AMS + ACCU + DP2 Gulf Marine Services Middle East Mussafah Base P.O. Box 46046 Abu Dhabi, United Arab Emirates Ph: +971 2 5028888; Fax: +971 2 5553421 Email: [email protected] Europe 36 Abercrombie Court, Prospect Road Arnhall Business Park, Westhill, Scotland AB32 6FE, United Kingdom Ph: +44 (0) 1224 737200; Fax: +44 (0) 1224 737239 Email: [email protected] Malaysia Dialog Systems Ahmad Idzhar Ismail / Ramesh Rathakrishnan Dialog Tower, No. 15 Jalan PJU 7/5 Mutiara Damansara, 47810 Petaling Jaya, Selangor Darul Ehsan Ph : +603 7717 1111; Fax : +603 7722 3548 Email : [email protected] / [email protected]

Independent: Comfortable: GMS SHAMAL 5601 Fast: …€¦ · jackups between locations due to higher transit speeds ... GMS SHAMAL 5601 SELF-PROPELLED SELF-ELEVATING ACCOMMODATION

  • Upload
    vuthien

  • View
    262

  • Download
    10

Embed Size (px)

Citation preview

Page 1: Independent: Comfortable: GMS SHAMAL 5601 Fast: …€¦ · jackups between locations due to higher transit speeds ... GMS SHAMAL 5601 SELF-PROPELLED SELF-ELEVATING ACCOMMODATION

SELF-PROPELLED SELF-ELEVATING ACCOMMODATION JACKUP BARGE

Specifications provided in good faith but without guarantee and are subjected to change without prior notice.

GMS SHAMAL 5601

LOA Beam Depth Draft Variable Load Deck Area

56 m32 m5.5 m3.5 m850 t854 m²

Generator Sets Emergency Generator Azimuth Thrusters Speed Kongsberg Dynamic Positioning

4 x 1200 kW1 x 400 kW2 FWD + 2 AFT6 KnotsDP2

Main Particulars Propulsion and Generators

Single Cabins Two Berth CabinsFour Berth CabinsTotal POB Hospital OfficesConference Room

42723150

Main CraneAuxiliary Crane Deck Strength

150 t @ 16 m15 t @ 47 m5 t / m²

Deck MachineryAccommodation

Jacking Units per leg Jacking Speed Effective lifting capacity per leg Pre-Load holding capacity per leg

120.8m / min1080 t1800 t

LegsLeg length Max Water Depth Spudcans

4x Triangular Truss Design 75 m55 m30m² each

Leg DesignJacking System

Lifeboats 2 x 150 man D ValueAircraft

22.2 mS92

HelideckSafety Equipment

Independent: Dynamic Positioning (DP2) allows the vessel to move under her own power with high accuracy positioning alongside a platform.

Fast: The vessel can move faster than conventional jackups between locations due to higher transit speeds of six knots and by not requiring anchor deployment.

Flexible: GMS is both builder and operator and can adapt/configure the vessel to clients’ requirements, with the vessel able to move easily between oil and gas operations to wind farm installation and maintenance contracts.

Safe: Day-to-day work is free from the added hazards a moving vessel introduces. A safer working environment for large numbers of offshore workers.

GMS Shamal is a self-propelled jackup barge that provides the stable platform for the delivery of a wide range of services throughout the total lifecycle of offshore oil, gas and renewable energy activities.

Key advantages of GMS Shamal over conventional barges include:

Comfortable: The four-legged design provides a stable platform for those living on board; the efficiency of a man well-rested in a stable bed is greater than someone trying to sleep on a moving vessel (for crew and non-seafarers).

Convenient: Two gangways installed in combined operations provide an effective solution for top side maintenance on a smaller platform.

Cost effective: The weather window for a conventional jackup barge to move in-field is an average of three days; GMS Shamal can do it in a few hours. No need for tug support/anchor handling. Fuel-efficient.

• •

www.gmsuae.com

Gulf Marine Services Abu Dhabi

2015

Delivery

BuildersOperator

Gulf Marine Services

ClassA1, Self-Elevating Unit + AMS + ACCU + DP2

Gulf Marine Services

Middle East

Mussafah BaseP.O. Box 46046 Abu Dhabi, United Arab EmiratesPh: +971 2 5028888; Fax: +971 2 5553421Email: [email protected]

Europe

36 Abercrombie Court, Prospect RoadArnhall Business Park, Westhill, ScotlandAB32 6FE, United KingdomPh: +44 (0) 1224 737200; Fax: +44 (0) 1224 737239Email: [email protected]

Malaysia Dialog Systems Ahmad Idzhar Ismail / Ramesh RathakrishnanDialog Tower, No. 15 Jalan PJU 7/5Mutiara Damansara, 47810 Petaling Jaya, Selangor Darul EhsanPh : +603 7717 1111; Fax : +603 7722 3548Email : [email protected] / [email protected]

Page 2: Independent: Comfortable: GMS SHAMAL 5601 Fast: …€¦ · jackups between locations due to higher transit speeds ... GMS SHAMAL 5601 SELF-PROPELLED SELF-ELEVATING ACCOMMODATION

SELF-PROPELLED SELF-ELEVATING ACCOMMODATION JACKUP BARGEGMS SHAMAL 5601

Configuration with 250 people on board Configuration for well intervention

05

1015

2025

3035

4045

5055

6065

7075

8085

9095

100

105

110

115

115

C

LAUN

DRY

MEDI

CAL

TREA

TMEN

TCH

ANGE

ROOM

STOR

E

DECK

OFFI

CEGY

M

OFFI

CE

COFF

EERO

OM

OFFI

CE

HVAC

ROOM

EMER

GENC

YGE

NERA

TOR

ROOM

DECKSTORE

PIPE

S/CA

BLES

HP

U E

NG

INE

SK

ID12

' x 8

' x 9

'12

Ton

STORAGE TANK - 180 BBL20' x 8' x 8'16.6 Ton

STORAGE TANK - 180 BBL20' x 8' x 8'16.6 Ton

HP

U P

UM

P S

KID

9' x

8' x

9'

10 T

on

STORAGE TANK - 180 BBL20' x 8' x 8'16.6 Ton

BO

P S

TAC

K -

RA

MS

12' x

12'

20 T

on

BO

P S

TAC

K -

AN

NU

LAR

12' x

12'

11.3

Ton

MUD PUMP ENGINE12' x 8' x 10'

10 Ton

MUD PUMP8' x 8' x 10'

6 Ton

MUD PUMP ENGINE12' x 8' x 10'

10 Ton

MUD PUMP8' x 8' x 10'

6 Ton

80' L

ON

G C

AN

TILE

VE

R B

EA

M

80' L

ON

G C

AN

TILE

VE

R B

EA

M

1219

0

13716

MU

D G

AS

SE

PA

RA

TOR

18" x

80"

x 2

20"

2.5

Ton

BO

P C

ON

TRO

L U

NIT

13' x

6.6

7'10

Ton

SHAKERS160" x 63' x 47"

2 Ton

THR

EE

CO

MP

AR

TME

NT

FLU

IDC

OLL

EC

TIO

N T

AN

K -

100

BB

L20

' x 8

' x 7

'6.

78 T

on

13716 2284

32000

PLAN

ELEVATION

AFT VIEW

PLAN VIEW