22
STEEL PLANT Start Completion Location Client Capacity PT.KRAKATAU POSCO Coke Plant No.1 Project Jul. 2011 Nov.2013 Cilegon in Indonesia PT.KRAKATA U POSCO 1,321,000 T/Y The Installation of new coke oven plant at PT.KRAKATAU POSCO Steel works in Cilegon, Indonesia, comprising 2 batteries with 42 coke oven per each battery. - Coke Oven Battery (84 Ovens) - Gas Treatment Plant : P.G.C: 22,000N㎥/Hr 5sets(0ne stand-by) COG Blower: 100,000 N㎥/Hr 2sets(0ne stand-by) - Moving machine : Charging car(2EA), Coke transfer car(2EA) Pusher car(2EA), Locomotive(2EA) - Coal preparation & Coke trasportation : Coal capacity(450T/Hr) : Coke capacity(350T/Hr, 300T/Hr) PT.KRAKATAU POSCO Blast furnace No.1 Project Jul. 2011 Dec.2013 Cilegon in Indonesia PT.KRAKATA U POSCO 3,000,000 T/Y (8,650 T/D) The capacity of plant is 3 million tons of hot metal in annual. This project has been performed to increase the steel making production capacity of PT.KRAKATAU POSCO Company in Cilegon, Indonesia. - Inner Volume : 3,800㎥ - Method of Furnace Proper Cooling : Cooling Plate + Cast Iron Stave Cooler - Application of Automatic System for Casthouse & EIC Intergrated Control System PT.KRAKATAU POSCO Sinter Plant No.1 Project Jul. 2011 Nov.2013 Cilegon in Indonesia PT.KRAKATA U POSCO 12,870 T/D The capacity of plant is 4.7 million tons of Sintered Ore in annual. This project was ordered by PT.Krakatau POSCO and POSCO E&C made consortium with PT.KE (PT.Krakatau Engineering) which is the POSCO E&C's first project in Indonesia. - Effective Suction Area : 450㎡ - Material handling, Sinter Machine & Cooler, Screening & Crushing, Utility & Auxiliary facilities - Application of Automatic System & EIC Integrated Control System - Environmentally friend equipment and energy saving equipment PT.KRAKATAU POSCO Steel making No.1 Project Jul. 2011 Dec. 2013 Cilegon in Indonesia PT.KRAKATA U POSCO 3,156,000 T- S/year (Converter : 300 T/Heat) Capacity: 3,156,000 T-S/year (Converter : 300 T/Heat) Summary: A project to newly construct KR(2sets), converter(1set), LF(1set), RH(1set) facilities for the purpose of integrated steel mill at Cilegon in Indonesia. ○ Main facility 1. KR Facility (De-S) : 300 T/ch x 2 set - KR Facility, Transfer car, etc. 2. Converter : 300 T/ch x 1 set - Converter, Gas cooler, Waste gas treatment facility, O2 Lance Facility 3. LF facility : 300 T/ch x 1 set - Heating Facilities, Bubbling Facilities, Alloy Facilities 4. RH facility: 300 T/ch x 1 set (Duplex Type) - Ladle Lifting System, Vacuum Vessel, TOB(Multi-Fuction Burner), Vacuum Pump 3. Auxiliary facility - Ladle, Relining facility, Compressor, Power Receiving&Sending station, Transformer,etc. PT.KRAKATAU POSCO Continous caster facility No.1 Project Jul. 2011 Dec. 2013 Cilegon in Indonesia PT.KRAKATA U POSCO 8,750 T/D A project for continous caster plant of integrated steel mill at Cilegon which production capactiy is 3,000,000 tons/year. - Thickness : 230mm cold - Width : 1100 mm to 2300 mm cold - Speed : max. 2.1 m/min (LC) PT.KRAKATAU POSCO Plate mill Plant No.1 Project Jul. 2011 Dec. 2013 Cilegon in Indonesia PT.KRAKATA U POSCO 1,500,000T/Y Consortium with Mitsubishi Corporation, PT.KE and PT.PEI. EP Project for Plate Mill Plant in Indonesia PT.KRAKATAU POSCO Steel works. Project Indonesia Integrated Steel Mill

Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

  • Upload
    doandan

  • View
    220

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Start Completion Location Client Capacity

PT.KRAKATAU POSCOCoke Plant No.1 Project

Jul. 2011 Nov.2013Cilegon inIndonesia

PT.KRAKATAU POSCO

1,321,000 T/Y

The Installation of new coke oven plant at PT.KRAKATAU POSCO Steel works in Cilegon, Indonesia,comprising 2 batteries with 42 coke oven per each battery. - Coke Oven Battery (84 Ovens) - Gas Treatment Plant : P.G.C: 22,000N㎥/Hr 5sets(0ne stand-by) COG Blower: 100,000 N㎥/Hr 2sets(0ne stand-by)- Moving machine : Charging car(2EA), Coke transfer car(2EA) Pusher car(2EA), Locomotive(2EA)- Coal preparation & Coke trasportation : Coal capacity(450T/Hr) : Coke capacity(350T/Hr, 300T/Hr)

PT.KRAKATAU POSCOBlast furnace No.1 Project

Jul. 2011 Dec.2013Cilegon inIndonesia

PT.KRAKATAU POSCO

3,000,000 T/Y(8,650 T/D)

The capacity of plant is 3 million tons of hot metal in annual. This project has been performedto increase the steel making production capacity of PT.KRAKATAU POSCO Company inCilegon, Indonesia.

- Inner Volume : 3,800㎥ - Method of Furnace Proper Cooling : Cooling Plate + Cast Iron Stave Cooler - Application of Automatic System for Casthouse & EIC Intergrated Control System

PT.KRAKATAU POSCO SinterPlant No.1 Project

Jul. 2011 Nov.2013Cilegon inIndonesia

PT.KRAKATAU POSCO

12,870 T/D

The capacity of plant is 4.7 million tons of Sintered Ore in annual. This project was ordered byPT.Krakatau POSCO and POSCO E&C made consortium with PT.KE (PT.Krakatau Engineering)which is the POSCO E&C's first project in Indonesia.

- Effective Suction Area : 450㎡ - Material handling, Sinter Machine & Cooler, Screening & Crushing, Utility & Auxiliary facilities - Application of Automatic System & EIC Integrated Control System - Environmentally friend equipment and energy saving equipment

PT.KRAKATAU POSCOSteel making No.1 Project

Jul. 2011 Dec. 2013Cilegon inIndonesia

PT.KRAKATAU POSCO

3,156,000 T-S/year

(Converter :300 T/Heat)

Capacity: 3,156,000 T-S/year (Converter : 300 T/Heat)Summary: A project to newly construct KR(2sets), converter(1set), LF(1set), RH(1set) facilitiesfor the purpose of integrated steel mill at Cilegon in Indonesia.

○ Main facility 1. KR Facility (De-S) : 300 T/ch x 2 set - KR Facility, Transfer car, etc. 2. Converter : 300 T/ch x 1 set - Converter, Gas cooler, Waste gas treatment facility, O2 Lance Facility 3. LF facility : 300 T/ch x 1 set - Heating Facilities, Bubbling Facilities, Alloy Facilities 4. RH facility: 300 T/ch x 1 set (Duplex Type) - Ladle Lifting System, Vacuum Vessel, TOB(Multi-Fuction Burner), Vacuum Pump 3. Auxiliary facility - Ladle, Relining facility, Compressor, Power Receiving&Sending station, Transformer,etc.

PT.KRAKATAU POSCO Continouscaster facility No.1 Project

Jul. 2011 Dec. 2013Cilegon inIndonesia

PT.KRAKATAU POSCO

8,750 T/D

A project for continous caster plant of integrated steel mill at Cilegon which productioncapactiy is 3,000,000 tons/year.

- Thickness : 230mm cold - Width : 1100 mm to 2300 mm cold - Speed : max. 2.1 m/min (LC)

PT.KRAKATAU POSCOPlate mill Plant No.1 Project

Jul. 2011 Dec. 2013Cilegon inIndonesia

PT.KRAKATAU POSCO

1,500,000T/Y

Consortium with Mitsubishi Corporation, PT.KE and PT.PEI.EP Project for Plate Mill Plant in Indonesia PT.KRAKATAU POSCO Steel works.

Project

Indonesia Integrated Steel Mill

Page 2: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Brazil CSP Steel Plant

Start Completion Location Client Capacity

CSPRaw material handing facilityNo.1 Project

Jan. 2012 May. 2015BRAZIL CEARA

STATE Pecem AREA

CSP(Companhia

Siderurica doPecem)

3,000,000 T/Y

CSP RMHF (Companhia Siderurica do Pecem) PJT is to provide coke, iron ore and sub-materials into newly installed CSP Steelworks. It includes material yard, stacker/reclaimer, beltconveyor, environmental facilties, EIC equipments and etc. - Yard: 800M * 6 Sets - Belt conveyor: 51 Lines - Stacker & Reclaimer: 9 Sets - C.F.W & Vibrating feeder: 1 Lot - Dust collector : 1 Lot

CSPSinter Plant No.1 Project

Sep. 2012 Jul. 2015In Pecem in the

State ofCeara,Brazil

CSP 12,920T/D

The capacity of plant is 4.7 million tons of Sintered Ore in annual. This project was ordered byCSP and POSCO E&C made contract solely which is the POSCO E&C's first project in Brazil - Effective Suction Area : 400㎡ - Material handling, Sinter Machine & Cooler, Screening & Crushing, Utility & Auxiliary facilities - Application of Automatic System & EIC Integrated Control System - Environmentally friend equipment and energy saving equipment

CSPCoke Plant No.1 Project

Jan. 2012 Aug. 2015In Pecem in theState of Ceara,

BrazilCSP 1,319,475 T/Y

The Installation of new coke oven plant in Pecem in the state of Ceara, Brazil, comprising 2 batteries with 50coke oven per each battery.

- Coke Oven Battery (100 Ovens)- Gas Treatment Plant : P.G.C: 44,000N㎥/Hr 3sets(0ne stand-by) COG Blower: 100,000 N㎥/Hr 2sets(0ne stand-by)- Moving machine : Charging car(2EA), Coke transfer car(2EA) Pusher car(2EA), Locomotive(2EA)- Coal preparation & Coke trasportation : Coal capacity(450T/Hr) : Coke capacity(350T/Hr, 300T/Hr)

CSPBlast furnace No.1 Project

Jul. 2012 Aug. 2015 , Brazile CSP3,000,000 T/Y(8,650 T/D)

The capacity of plant is 3 million tons of hot metal in annual. This project has been performedto increase the steel making production capacity of CSP in Brazile.

- Inner Volume : 3,800㎥ - Method of Furnace Proper Cooling : Cooling Plate + Cast Iron Stave Cooler - Application of Automatic System for Casthouse & EIC Intergrated Control System

CSPSteel making No.1 Project

Sep. 2012 Aug. 2015Pecem

Ceara, BrazilCSP

3.0 millionT/Y

A project to newly construct KR(2sets), Converter(2sets), Ladle furnace(1set) and RH(1set)facilities in CSP Steel Plant to meet the productivity of annual capacity of 3.0 million tons Slab.

○ Main facility - KR 2sets, Converter 2sets, Ladle furnace 1set, Duplex RH 1set - Heat Size: 300ton/heat - Dry type Electrostatic Precipitator - Hot metal charing crane(450/80ton) etc,.

CSP2-Strand Slab Caster No.1 Project

Jul. 2012 Aug. 2015Brazil CSPSteelworks

CSP3.0 million

T/Y

A project to construct a new Slab caster for high quality and productivity of plates and hotcoils. - Caster : 1Machine x 2 Strand - Slab Specification . Thickness x Width : 220/250/300 mmx (1,100~2,300mm) . Length : 4,800mm~12,500mm . Weight : Max.40Tontion - Casting Speed : Max.1.8m/min

Project

Page 3: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Iron making > Blast Furnace

Start Completion Location Client Capacity

India IISCO Project Oct. 2007 Mar. 2010

IISCO atBurnpur,

West Bengal,India

IISCOSteel Company

(India)8,000 T/D

The capacity of plant is 2.50 million tons of hot metal in annual. This project is odered byIISCO Steel Co. (SAIL Co.) and won by POSCO E&C consortium with NCC(NafarjunaConstruction Company) which is the POSCO E&C's first project in India.

- Inner Volume : 4,150㎥ - Construction Periods : 30 Months - Method of Furnace Proper Cooling : Copper Stave + Cast Iron Stave Cooler - Application of Automatic System for Casthouse & EIC Intergrated Control System

Iran TAVAZON Project Jun. 2002 Dec. 2008ESCo. at

Shahrekord,Esfahan, Iran

EsfahanSteel Company

(Iran)3,836 T/D

The capacity of plant is 1.40 million tons of hot metal in annual. This project has beenperformed to increase the steel making production capacity of Esfahan Steel Company in Iranfrom 2.60 million tons to 4.00 million tons. And this is the POSCO E&C's first overseas projectthrough competitive bid.

- Inner Volume : 2,020㎥ - Method of Furnace Proper Cooling : Copper Stave + Cast Iron Stave Cooler - Application of Automatic System for Casthouse & EIC Intergrated Control System

The 2nd Relining Project of No.3Blast Furnace

Dec. 2004 May 2006 POSCO 10,100 T/D

The capacity of plant is 3.51 million tons of hot metal in annual. And to shorten the shut downperiods, POSCO E&C applied the Method of Construction, "Large Block Ring ConstructionMethod", as 3 Layers 3 Blocks of furnace proper shell. The shut down periods is 58 days.

- Inner Volume : 3,795㎥ → 4,350㎥ - Shut Down Periods : 58 Days - Method of Construction : Large Block Ring Method - Method of Furnace Proper Cooling : Copper Stave + Cast Iron Stave Cooler - Application of Bischoff Scrubber (Gas Cleaning Plant) - Application of Automatic System for Casthouse & EIC Intergrated Control System

The 2nd Relining Project of No.2Blast Furnace

Apr. 1995 Jul. 1997 POSCO 5,200 T/D

This Project was successfully executed by POSCO E&C's own technology which is includingthe Field Service, Panning, Design, Procurement, Erection Work and Performance Guarantee.

- Inner Volume : 2,550㎥ - Shut Down Periods : 101 Days - Method of Furnace Proper Cooling : All Stave Cooler - Application of Sinter Two Fraction Charging System - Application of Casthouse Floor Flatness - Innovation of Casthouse Dust Collector

The 1st Relining Project of No.3Blast Furnace

Jul. 2006 Nov. 2007 POSCO 10,670 T/D

The capacity of plant is 3.71 million tons of hot metal in annual. To follow the world trends ofenlarge of Blast Furnace inner volume, POSCO E&C has expanded the inner volume up to 21%as 4,600 cubic meters. And this project is the shortest relining periods which is 55 days in theworld.

- Inner Volume : 3,800㎥ → 4,600㎥ - Shut Down Periods : 55 Days (New World Record) - Method of Construction : 8 Layers 8 Blocks - Method of Furnace Proper Cooling : Copper Stave + Cast Iron Stave Cooler - EIC Intergrated Control System

The 1st Relining Project of No.2Blast Furnace

Feb. 2003 May 2005 POSCO 10,100 T/D

The capacity of plant is 3.51 million tons of hot metal in annual. To shorten the shut downperiods, Large Block Construction Method (8 Layers 8 Blocks) and 1000 tons Crawler Cranehad been used, as a result that, the shut down periods had been shortened up to 14 days. Andthis project was successfully executed by POSCO E&C's own technology.

- Inner Volume : 3,800㎥ → 4,350㎥ - Shut Down Periods : 66 Days - Method of Construction : 8 Layers 8 Blocks - Method of Furnace Proper Cooling : Copper Stave + Cast Iron Stave Cooler - EIC Intergrated Control System - Re-building of Furnace Top & Auxiliaries

The 1st Relining Project of No.1Blast Furnace

May 2000 Jun. 2002 POSCO 9,160 T/D

The capacity of plant is 3.07 million tons of hot metal in annual. To ensure the lifetime ofFurnace Proper, the cooler of stave type had been applied. And to reduce the production cost,the capacity of Pulverized Coal Injection System had been increased.

- Inner Volume : 3,800㎥ → 3,950㎥ - Shut Down Periods : 91 Days - Method of Construction : 14 Layers 29 Blocks - Method of Furnace Proper Cooling : Copper Stave + Cast Iron Stave Cooler - EIC Integrated Control System - PCI Indivisual Flow Control System

The 2st Relining Project of No.1Blast Furnace

May. 2011 Jun. 2013 POSCO 15,300T/D

The capacity of plant is 5.47 million tons of hot metal in annual. this project about reline oldpart and enlargement of inner volume to increase production capacity.it's first relining project to enlarge inner volume to 6,000㎥ that is the biggist blast furnace inthe world

- Inner Volume : 3,800㎥ → 6,000㎥ - Shut Down Periods : 119Days - Method of Construction : 8 Layers 8 Blocks - Method of Furnace Proper Cooling : Copper Stave + Cast Iron Stave Cooler - EIC Intergrated Control System

The New Construction Project ofNo.5 Blast Furnace

Sep. 1996 Mar. 1999 POSCO 8,400 T/D

The capacity of plant is 2.91 million tons of hot metal in annual. And the cooling method ofstave type and the high efficiency refractories had been applied to ensure the lifetime offurnace shell as 20 years and more.

- Inner Volume : 4,020㎥ - Construction Periods : 22 Months - New Construction of Furnace Proper and Subsidiary Facilities - Method of Furnace Proper Cooling : All Stave Cooler - Application of Casthouse Floor Flatness & Slag Granulation System - Application of External Combustion Type Hot Stoves

POSCO Gwangyang Steelworks

POSCO Pohang Steelworks

PohangSteelworks

Project

GwangyangSteelworks

Page 4: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Iron making > Finex

Start Completion Location Client Capacity

FINEX, Pohang Steelworks Jan. 2004 Apr. 2007 POSCO1,500,000 T/Y( 4,110 T/D )

FINEX process is a smelting-reduction technology based on direct use of fine iron ore andnon-coking coal. In the FINEX process fine iron ore is preheated and reduced to fine DRI in afour stage fluidized bed reator system with reduction gas produced from melter gasifier. Thefine DRI is compacted and then charged in form of HCI (Hot Compacted Iron) into the meltergasifier to produce hot metal. The charged HCI is reduced to metallic iron and melted. Theheat needed for the metallurgical reduction and melting is supplied by coal gasification withoxygen.

FINEX process is an environmental friendly process that uses low-cost fine iron ore and coal.POSCO E&C successfully supplied and constructed commercial facilities with an annualcapacity of 1.5 million tons, the first in the world, and launched normal operation successfullyof the facility in Dec., 2007.

3 FINEX, Pohang Steelworks June. 2011 Dec. 2013 POSCO2,000,000 T/Y( 5,480 T/D )

FINEX process is a smelting-reduction technology based on direct use of fine iron ore andnon-coking coal. In the FINEX process fine iron ore is preheated and reduced to fine DRI in athree stage fluidized bed reator system with reduction gas produced from melter gasifier. Thefine DRI is compacted and then charged in form of HCI (Hot Compacted Iron) into the meltergasifier to produce hot metal. The charged HCI is reduced to metallic iron and melted. Theheat needed for the metallurgical reduction and melting is supplied by coal gasification withoxygen.

FINEX process is an environmental friendly process that uses low-cost fine iron ore and coal.POSCO E&C successfully supplied and constructed commercial facilities with an annualcapacity of 2.0 million tons, the first in the world.

FINEX DEMO PLANT Jan. 2001 May 2003 POSCO600,000 T/Y( 1,644T/D )

FINEX Demo Plant is a process which produces hot metal 0.6 million tons per year based ondirect use of fine iron ore and non-coking coal without sinter and coke plant.

POSCO Pohang Steelworks

Project

PohangSteelworks

Page 5: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Iron making > Sintering

Start Completion Location Client Capacity

Australia BSL Project Feb. 2007 Apr. 2009BSL, Portkembla,Australia

BSL(Blue Scope

Steel)18,000 T/D

BSL project was performed to replace worn out equipment in accordance with increasingproductivity(+1,100,000T/Y, 20%UP) and longterm operation in BSL No. 3 Sinter plantAustralia (5,500,000 T/Y).

- Effective suction area: 420㎡ → 480㎡ - Production: 15,000 T/D → 18,000 T/D - Productivity: 40.5 T/D/㎡ - Availability: 93 %

No. 3 Sintering Plant Revamping Nov. 2004 May 2006Pohang

SteelworksPOSCO 17,500 T/D

Pohang No. 3 Sintering Plant Revamping project was performed to increase productivity ofsinter ore (+1,440,000T/Y, 31.1% UP) in accordance with enlargement of Pohang No. 3 BlastFurnace and change of worn out equipments through longterm operation..

- Effective suction area: 400㎡ → 504㎡ . Sintering machine Pallet width extension: 4m → 4.5m . Sintering machine lenth extension: 100m → 112 m - Production: 12,700 T/D → 17,500 T/D - Bed Height: 660m → 760 m - Shutdown: 52 Days

No. 2 Sintering Plant Revamping Jun. 2006 Dec. 2007 POSCO 18,000 T/D

Gwangyang No. 2 Sintering plant revamping project was performed to increase productivity forstable supply of sinter ore after enlargement Gwangyang No. 3 Blast Furnace and replace wornout equipments through longterm operation.

- Effective suction area: 450㎡ - Production: 15,200 T/D → 18,000 T/D - Productivity: 34T/D/㎡ → 40 T/D/㎡ - Availability: 98.4 % → 99 % - Bed Height: 850 mm → 1,000 mm - Shut down period: 36 Days

No. 2&4 Sintering PlantRevamping(Pallet width extesion)

Mar. 2003 May 2004 POSCO

15,200T/D(No.2)

16,100T/D(No.4)

Gwangyang No. 2 & No.4 Sintering plant revamping project was performed to increaseeffective suction area and revamp related equipments for increasing sinter ore production.

- Effective suction area: Gwangyang No. 2 Sintering Plant 400㎡ → 450㎡ Gwangyang No. 4 Sintering Plant 424㎡ → 477㎡ - Productivity: 37T/D/㎡ → 38T/D/㎡ - Bed Height: 880mm - Shutdown: Gwangyang No. 2 Sintering Plant 26 Days Gwangyang No. 4 Sintering Plant 30 Days

No. 1&3 Sintering PlantRevamping(Pallet width extension)

Apr. 2001 Aug. 2002 POSCO 15,300 T/D

This project was performed to increase effective suction ares of Gwangyang No. 1 & No.3sintering plant and revamp related equipment for increasing sinter ore production inaccordance with operation of Gwangyang No. 5 blast furnace.

- Effective suction area: 400 ㎡ → 450 ㎡ . Sintering machine pallet width extension: 4 m → 4.5 m . Cooler width extension: 4 m → 4.6 m - Production: 13,180 T/D → 15,300 T/D - Bed Height: 880 mm - Ingnition furnace revamping: Reflection side burner → Multi slit burner - Shutdown: 28 Days

POSCO Pohang Steelworks

POSCO Gwangyang Steelworks

Project

GwangyangSteelworks

Page 6: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Iron making > Raw material handling

Start Completion Location Client Capacity

FINEX Raw Material HandlingFacility

Oct. 2004 Dec. 2006Pohang

SteelworksPOSCO

4.4 millionT/Y

This RMHF(Raw Material Handling Facility) is to provide coke, iron ore and sub-materials intonewly installed FINEX(1.5 millions T/Y) in Pohang Steelworks. It includes material yard,stacker/reclaimer, belt conveyor, crushing and screening equipments and etc.

- YARD: 400/720M * 4 SETS - BELT CONVEYOR: 10 KM - STSCKER & RECLAIMER: 8 SETS - CRUSHING & SCREENING FACILITY: 1 LOT - WATER TREATMENT FACILITY: 1LOT

2nd phase Reclamation work ofIncheon International Airport

Jan. 2004 Nov. 2010Incheon

InternationalAirport

IIAC(Incheon

InternationalAirport Corp.)

4,000 T/H

This project is a part of reclaiming work for 2nd phase construction of Incheon InternationalAirport such as 3rd runway and IBC(International Business Center). POSCO E&C provides andoperates carrying equipments for landfill such as belt conveyor, dump hopper and etc.

- BELT CONVEYOR: 8 KM - DUMP HOPPER: 1 LOT - DUST COLLECTOR: 1 LOT

CTS Raw Material HandlingFacility

Nov. 2003 Oct. 2005GwangyangSteelworks

POSCO/POSCO

Terminal3 million T/Y

This project had planned to increase the storage capacity of CTS as much as 3millions T/Y inGwangyang Steelworks. Also, CTS is intermediary business, it carries in materials such as coal,steel, Mn, store them in the yard then take them local site as well as abroad.

- YARD: 400M * 2 SETS - BELT CONVEYOR: 8 KM - STSCKER & RECLAIMER: 3 SETS - CRUSHING & SCREENING FACILITY: 1 LOT - WATER TREATMENT FACILITY: 1LOT

Venezuela POSVEN Project Jun. 1997 Jun. 1999

MatanzasIndustrial

Complex, Bolívar, Venezuela

POSVEN CA1.5 million

T/Y

This project is DRI production facility with a method of HYL process. Produced DRI iscompressed by briquetting machine then changed into HBI.

- Supply Scope : Drawings, Equipments and Test run

Brazil KOBRASCOPELLETIZING PLANT

Feb. 1996 Nov. 1998Tubarao,

Vitoria, BrazilCVRD 4 million T/Y

This project had planned to construct palletizing plant capable of 4 millions T/Y which wasJ/V businesses between POSCO and CVRD of Brazil on a fifty–fifty basis mainly to stableprovide of pellet into newly installed 5th Blast Furnace in Gwangyang Steelworks. POSCOE&C fully participated in detailed drawings and equipment supply like Pellectizing Disc andetc.

Project

Page 7: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Iron making > Lime Calcination

Start Completion Location Client Capacity

FINEX Lime calcination facility Sep. 2005 Sep. 2006 POSCO300 Ton/Day

x 1 lot

This project successfully built new facilities capable of annual 100,000 tons of CaO, addressingthe shortage problem and responding to the plan to build new FINEX plant and boostproduction of crude steel in the mid and long term.

- Type of Kiln: Rotary Kiln 300 Ton/Day x 1 Lot - Capacity: 103,500 Ton/Year - Grain Size: 10mm ~ 40mm - Operation Ratio: 94.5%

Revamping of No.1&2 LimeCalcination facility

Sep. 2001 Jul. 2004 POSCO300 Ton/Day

x 2 lot

A project to replace aged calcination furnaces I & II and the auxiliary systems, and to integratethe operation room for the purpose of achieving a good balance between the supply andconsumption of lime in accordance with medium and long term investment plans covering theconstruction of No.3 stainless steel plant at Pohang Steelworks.

- Type of Kiln: Fine Lime Shaft Kiln 300Ton/Day X 2 Lot - Capacity: 207,000 Ton/Year - Grain Size: 10mm ~ 40mm or 40mm ~ 80mm - Operation Ratio: 94.5%

Lime Calcination for crude steelincrease plan

Oct. 1997 Mar. 1999GwangyangSteelworks

POSCO300 Ton/Day

x 2 lot

This project had planned to construct 2sets of shaft kiln and other facilities to stable supply ofadditional requirement of quicklime according to increase plan of crude steel in GwangyangSteelworks.

- Type of Kiln: Fine Lime Shaft Kiln 300Ton/Day X 2 Lot - Capacity: 198,000 Ton/Year - Grain Size: 10~40mm or 40~80mm - Operation Ratio: 90.4%

POSCO Pohang Steelworks

POSCO Gwangyang Steelworks

Project

PohangSteelworks

Page 8: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Iron making > Coke oven

Start Completion Location Client Capacity

Extension of the Coke PlantStage 5

Oct. 2005 Nov. 2007Pohang

SteelworksPOSCO 620,000 T/Y

A new 5A coke oven battery was planned to meet the demand for the improvement ofproductivity in blast furnace.5A battery was located next to existing 5B battery and its coke productivity is the same as 5Bbattery. - Coke Oven Battery 1set (75 Ovens) - Gas Refinery Plant . P.G.C 22,000 N㎥/Hr 1set . COG Blower 60,000 N㎥/Hr 1set

Desulfurization Plant for GasRefinery Plant

Mar. 2005 Jan. 2007GwangyangSteelworks

POSCO 6,800 N㎥/H

The desulfurization plant was planned to prevent SOx emission in the air during the scheduledmaintenance period(40 days/year). Also, the installation of desulfurization plant helps theimprovement of environmental condition and prevents the surface quality defection of rollingmill product. POSCO E&C executed basic & detail engineering, equipment supply, supervisionand commissioning.

- Catalytic Oven Reactor: 6,800 N㎥/Hr *1set - Claus Reactor: 6,800 N㎥/Hr *1set - HP & LP Cooler: 40/3.5 bar *1set - Sulfur Con. & Seprator: 6,800 N㎥/Hr *1set - Sufur Storage System: 135㎥ *1set

CDQ for the Coke Plant Stage 4 Dec. 2003 Aug. 2005GwangyangSteelworks

POSCO180 T/H

(Dry Coke)

The traditional wet coke quenching system had been used in stage 5 coke plant. CDQ(CokeDry Quenching) was adopted instead of existing wet quenching system. CDQ improved theenergy recovery and the quality of coke for blast furnace which has been aiming at highproductivity.

- Turbine Generator: 29.7 MW - Waste gas Boiler : 105 T/H - Bucket Crane: 67.5 Ton - Deminerlized water facility : 65 T/H - Cooling Water System : 1,400㎡/H * 6sets - Dedusting unit : 1,520 N㎥/min

POSCO Pohang Steelworks

POSCO Gwangyang Steelworks

Project

Page 9: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Steel making > Oxygen converter

Start Completion Location Client Capacity

Pohang New steelmaking plant Dec. 2007 Apr. 2010 POSCO 4.6 milion T/Y

A project to increase annual production capacity to 4.65 million tons by improvingcompatibility, cost saving, and the quality of the converter furnace operation via theintroduction of facilities with the same capacity as those of No.2 steelmaking plant for thepurpose of enhancing the competitiveness of the small No.1 steelmaking plant at PohangSteelworks.

- De-P converter 1 set, De-C converter 1 set - Heat Size: Max. 345 ton - Boiler system for waste heat, Hot metal charging crane - Bag filter precipitator

De-P Converter for No.2Steelmaking plant

Feb. 2005 Mar. 2007 POSCO 4.5 milion T/Y

A project to construct a De-P converter in No.2 steelmaking plant for the purpose ofestablishing a system for high quality steel (electro plated steel plates and API) and costsaving to meet the productivity of annual capacity of 1.5 million tons FINEX Plant.

- Heat Size: Max. 300 ton - Boiler system for waste heat, Hot metal charging crane - Bag filter precipitator

Revamping of No.1 Steelmakingplant (2nd step)

May 1996 Dec. 1997 POSCO 2.5 milion T/Y

A project to improve the capacity of aged No.1 steelmaking plant by revamping the convertershell, trunnion ring, tiliting equipment and other converter facility.

○ Converter capacity : 110ton (Inner volume : 81㎥)○ Main facility - Converter shell and converter tilting equipment - Cooling facility for converter shell - Converter trunnion ring - Combined blowing technology adopting, localization of Converter bearing block, Material conversion of Converter shell and trunnion ring (SGV 42-CR)

Converter of SMP for GwangyangPlate Mill Project

Feb. 2008 Apr. 2010 POSCO2.43 million

T-S/Y

Capacity: 2,430,000 T-S/year (Converter : 280 T/ch)Summary: A project to newly construct KR(2sets) & converter(1set) facilities for the purposeof producing high grade steel plate(TMCP,API)

○ Main facility 1. KR Facility (De-S) : 250 T/ch x 2 set - KR Facility, Transfer car, Pouring pit, etc. 2. Converter : 280 T/ch x 1 set - Converter, Gas cooler, Waste gas treatment facility, O2 Lance Facility 3. Auxiliary facility - Ladle, Relining facility, Water supply equipment, Compressor, Power Receiving&Sending station, Transformer,etc.

De-P converter of No.2 steelmaking plant

Jun. 2006 Dec. 2007 POSCO4.5 million

T-S/Y

A project to newly construct KR(3sets) & converter(1set) facilities for the purpose ofestablishing a system for the mass production of strategic products.

○ Reduction of construction period : 19 months → 16.5 months ○ Main facility - Converter vessel, KR Facility, Gas cooler - Electrostatic Precipitator, Water supply equipment, Utility facility - Flux charing equipment, Main Lance, Transfer car

N2 Splash Slag Coating of No.2steel making plant

May 2000 Mar. 2001 POSCO8.5 million

T/Y

After converter tapping, this facility add coating materials, such as magnesia, dolomite, to slagin converter and uniformly attach them to refractory bricks by blowing high pressure N2 gasthrough lance.This facility allows stable maintenance of converter and long life time of refractory bricks. Asa result, it is expected to reduce expenses.

○ Main facility - N₂Compressor / N₂Piping / N₂Holder - Control System ○ Applied technology: Automatic control of N2 pressure, flow rate & operation technique of N2 coating

POSCO Pohang Steelworks

Project

PohangSteelworks

GwangyangSteelworks

POSCO Gwangyang Steelworks

Page 10: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Steel making > Mini mill

Start Completion Location Client Capacity

Asia Special Steel Project Dec. 2007 May. 2009HIBIKINADA,

Industrialcomplex, Japan

Asia SpecialSteel

Co.,Ltd.

Ingot 120,000T/Y

POSTEEL and KOTOBUKI made a joint venture company to meet increasing demand of Ingotproduct. This project comprised Electric arc melting plant and Ingot plant. ○ Work scope : Engineering, Procurement and installation ○ Key equipment : Ingot Facility, Over head crane, De-dusting facility, Water treatment facility etc,.

ARCO Project Apr. 1997 Mar. 2001Egypt Sadat

City

Arab Companyfor Special

Steel

Special Steel1.4 million

T/Y

ARCO project is to build the largest stainless steel plant in middle-east area. - SMP (Electric Arc Furnace, Refining furnace, Vacuum Decarburirzation facility, Continuous casting) - RMP (Heating furnace, Roughing Mill, Billet, Shearing machine, Finishing Mill, fininshing line) - Others (Power receiving and distribution facility, Oxygen plant, Water treament, Dedusting faclity)

STS No.3 Steel melt shop Jul. 2001 Apr. 2003 POSCO 600,000 T/Y

POSCOE&C supplied 600,000 ton per year stainless product facilities including Plant building,Equipment foundation, Steel structrue manufacturing & erection, Equipment installation.

○ Work scope: Procurement and Construction

STS Expansion Dec. 1994 Aug. 1996 POSCO 840,000 T/YThis stainless steel plant has one of the largest production capacity in the world.

○ Work Scope: Engineering, Procurement and Construction

NO.1 Mini-Mill Jan. 1995 Oct. 1996GwangyangSteelworks

POSCO1.8 million

T/Y

This Project is to build facilities to produce slim sheet of hot roll mill product under 1.8mmthickness sheet and 1,800,000ton per year.

- Electric Arc Furnace : 130ton x 2 - LF x 2 - VTD x 2 - Continuous casting: 1MC x 1 Str x 2 - Heat Holding Furnace(12M) 1 Reduction Unit(4 Hi - 2 Stand) 1 - Hot Roll Mill plant : 4Hi 5Stand(27,000 KW) 1 - Total Distance of equipment : 185m

CEM(Compact Endless Casting & Rolling Mill)

Nov. 2007 June. 2009GwangyangSteelworks

POSCO1.8 million

T/Y

This Project is to revamp the existing steel making plant , and to replace the two(2) lines ofcaster and intermediate facilities with one(1) line of high speed caster and modernizedintermediate facilities so as to be connected with the existing rolling mill directly in 2 phases.

- Electric Arc Furnace : 130ton x 2 - LF x 2 - VTD x 2 - High Speed Continuous caster: 1MC x 1 Str (casting speed: 8 mpm) - Reduction Unit(4 Hi - 3 Stand) 1 - Mandrel Furnace 1 - Hot Roll Mill plant : 4Hi 5Stand(27,000 KW) 1 - Total Distance of equipment : 185m

PohangSteelworks

POSCO Gwangyang Steelworks

Project

POSCO Pohang Steelworks

Page 11: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Steel making > Ladle refining

Start Completion Location Client Capacity

New Steel-Making Plant RH Dec. 2007 Apr. 2010 POSCO35 CH/D

(330 T/ch)

Duplex-RH facility (POSCO E&C patent application) is supplied for production enlargement of existing No.1steel-making plant(110T/Ch)

- 2Booster/2Ejector/2Condenser/3WRP - 2 Vessel / 2 Ladle Transfer Car - Multi-function burner - Dust tank system

No.3 RH for No.2 Steelmakingplant

Aug. 2006 Jul. 2007 POSCORH: 35 CH/D(330 T/ch)

Duplex-RH facility (POSCO E&C patent application) improved in the capabilities of production & vacuumtreatment is supplied.

- 3Booster/2Ejector/2Condenser/3WRP - 2 Vessel / 2 Ladle Transfer Car - Multi-function burner

Revamping of No.2 RH for No.1Steelmaking plant

Apr. 2005 Feb. 2006 POSCO25CH/Day(110 T/ch)

○ Revamping of obsolete facilities - Capacity enlargement in vacuum vessels / vacuum pumps - Modernization of Alloy equipment - Modernization of Relining & Preheating equipment - Modenization of Transger car & Bubbling equipment

○ Key facilities - 2Booster/2Ejector/2Condenser/3WRP - Vessel Transfer Car Type - Introduction of Multi-function Burner

CHIS for No.2 Steelmaking plant Jul. 2004 Dec. 2004 POSCO2.1 million

T/Y

○ Key facilities - Snorkel Rotating & Lifting equipment - O₂& PI Lance equipment - Snorkel Transfer Car - Alloy equipment & Wire feeder - PLC control system○ Process effects in CHIS(Chemical Heating in Snorkel) - O2 pick-up prevention in alloy charging - Increase in Alloy comsumption for Slag Free molten-steel - Operation time reduction with rapid heating speed(ave.15℃/min) - Electrical Arc

Revamping of No.1 RH / VTD forNo.2 Steelmaking plant

May 2002 Dec. 2002 POSCORH: 25 CH/DVTD: 3 CH/D

(330 T/ch)

○ PHD(POSCOENC Hybrid Degasser) - Revamping of the old-fashioned RH Facility - Create VTD Degassing facility (Heat size : 320ton/heat) - Diversity and state-of-the-art of Production steel grade○ Main facilities - 3Booster / 2Ejector / 2Condenser / 3WRP - RH/VTD + 1 Vacuum Pump System - Adopted Swiching Duct (POSCO E&C Patent)

LF for No.1 Steelmaking plant Apr. 2000 Dec. 2001 POSCO105 T/H x 20

CH

The project that creation of LF (Ladle Furnace) 1 set for the production system of POSCOPohang No.1 Steel making plant strategy product - Arcing Equipment - Alloy addition equipment - Powder Injection facility - Transfer cars - Utility facility, Hoist, etc.

LF for No.2 Steelmaking plant May 1995 Dec. 1997 POSCO330 T/H x 20

CH

The project that creation of LF (Ladle Furnace) 1 set for the production system of POSCOPohang No.2 Steel making plant strategy product - Arcing Equipment - Alloy addition equipment - Powder Injection facility - Transfer cars - Utility facility - System - Hoists, etc

Project

POSCO Pohang Steelworks

PohangSteelworks

Page 12: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Steel making > Ladle refining

Start Completion Location Client Capacity

No.3 RH for NO.1 steel makingplant

Apr. 2008 Aug. 2009 POSCORH: 33 CH/D(275 T/ch)

A project to consruct a Duplex-RH facility to treat the amount of De-gas as increasing amountof hot metal for new steel making plant in Kwang-Yang and eleminate the Neck-operation forexisted NO.1 steel making plant in Kwang-Yang.

- Heavy vacuum: 2 Booster / 2 Ejector / 2 Condenser / 4 WRP - 3 Hot-off take / 3 Upper-Vessel / 4 Lower-vessel - Multi-function burner

RH-VTD for Increasingproductivity of plate

Feb. 2008 Apr. 2010 POSCORH/VTD:30 CH/D

(280 T/ch)

A project to construct a RH-VTD facility as constructing a new plate mill producing luxuryplates(TMCP,ASP) 2 million ton annually.

- Heavy vacuum: 2 Booster / 2 Ejector/ 2 Condenser / 6 WRP - 2 Vessel / 1 Ladle Transfer Car - Multi-function burner

No.2 RH-TOB for No.2 steelmaking plant

Aug. 1998 Jun. 2000 POSCO2.54 million

T/Y

A revamping project of vaccum facility and EIC facility to renovate aged facility such asvaccum vessels and pump and produce stratgic steel like a plate of car

- Heat Size (325 T/H ) - Vacuum Unit (Booster 2, Ejector 3, Water Ring Pump 3)

No.2 RH-POSB for No.2 steelmaking plant

Aug. 1998 Feb. 1999 POSCO2.3 million

T/Y

POSCO E&C renovated aged facilities such as vacuum vessels and pumps to increase theirexhaust capacity and decarbonization capability, and established a system for the productionof ultra-low-carbon steel for steel sheets for automobiles.

- Heat Size(275 T/H) - Vacuum Unit(Booster 2, Ejector 3, Water Rng Pump 3)

No.2 RH-POSB for No.1 steelmaking plant

May-98 Nov. 1998 POSCO2.3 million

T/Y

POSCO E&C renovated aged facilities such as vacuum vessels and pumps to increase theirexhaust capacity and decarbonization capability, and established a system for the productionof ultra-low-carbon steel for steel sheets for automobiles.

- Heat Size(275 T/H) - Vacuum Unit(Booster 3, Ejector 3, Water Rng Pump 3)

No.1 RH-TOB for No.2 steelmaking plant

Feb. 1998 Jul. 1998 POSCO2.3 million

T/Y

POSCO E&C renovated aged facilities such as vacuum vessels and pumps to increase theirexhaust capacity and decarbonization capability, and established a system for the productionof ultra-low-carbon steel for steel sheets for automobiles.

- Heat Size(275 T/H) - Vacuum Unit(Booster 2, Ejector 3)

LF for No.1 Steelmaking plant Apr. 1997 Jun. 1998 POSCO275 T/H x 20

CH

A project to construct Ladle Furnace to establish a production system for main products ofGwangwang No.1 steel making work.

- Heating system - Flux and Ferro-alloy handling system - Power Injection system - Transfer car - Utility supply system - System - Hoist

No.1 RH-TOB for No.1Steelmaking plant

Nov. 1996 Sep. 1997 POSCO2.3 million

T/Y

A project to establish a production system of high quality steel by the economical andoptimum vacuum facility that is considering limited flow rate of cooling water and steam ofthe existing facilities.

- Heat Size(275 T/H) - Vacuum Unit(Booster 2, Ejector 3, Water Rring Pump 3)

POSCO Gwangyang Steelworks

Project

GwangyangSteelworks

Page 13: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Continuous casting

Start Completion Location Client Capacity

No.2 Bloom for No.1 Continuouscasting plant

May 2006 Feb. 2008 POSCO1.1 million

T/Y

A project to construct a new bloom caster for high grade wire rods in the existing No.1 slabyard. - Bloom size: 400 x 500mm

Revamping of No.4 machine forNo.3 Continuous casting plant

Mar. 2005 May 2006 POSCO3.4 million

T/Y

A revamping project to replace an existing continuous caster of casting bow type with acontinuous caster of segment type for an improvement in productivity. - Slab Size: 250t x (740 ~ 1,650)mm

poStrip(Strip Caster) Jun. 2004 Jun. 2006 POSCO 0.6 millionT/Y

A project to construct a poStrip Demo Plant for technical development of strip casting process.POSCO E&C carried out all basic design except Mill line by its own abillity. - Casting speed : 27.8 ~133 mpm - Casting thickness : 2.0 ~4.0 mm - Coil thickness : 1.6 ~4.0 mm - Coil width : 1040 ~1304 mm

Revamping of No.1 machine forNo.2 Continuous casting plant

Aug. 2003 May 2005 POSCO2.8 million

T/Y

A revamping project to rebuild an existing continuous caster into an exclusive platecontinuous caster for an improvement in productivity. - Slab Size: 220,300t x (1,600~2,200) mm - Casting Speed: max. 2.0m/min

Pilot continuous caster Dec. 2001 Mar. 2003 POSCO 0.6 millionT/Y

A project to construct a continuous caster including design and supply of equipment with agovernment task. POSCO E&C carried out all basic design including casting platform, mold andsegment by its own abillity. - Casting thickness : 100 mm ~ 140 mm - Casting width : 600 mm ~ 1000 mm - Casting speed : Max. 5 mpm

No.1 Bloom for No.1 Continuouscasting plant

Dec. 2000 Nov. 2002 POSCO0.8 million

T/Y

A project to construct a new bloom caster for high grade wire rods and an improvement ofproductivity in the No.1 continuous casting plant. - Bloom Size: 300 x 400mm

Revamping of No.2 machine forNo.1 Continuous casting plant

Apr. 2008 Aug. 2009 POSCO3.2 million

T/Y

A revamping project to rebuild an existing continuous caster into a vertical bending typecaster for the demand of automotive steel - Casting speed: 2.1m/min

2 Strand slab caster for Plate millCCP3 / CCM1

Jan. 2008 May-10 POSCO3.2 million

T/Y

A project to construct a new plate caster for an improvement in productivity.

- Thickness: 250mm, 300mm - Width: 1,400mm ~ 2,400mm - Length: 5,500mm ~ 12,000mm - Weight: Max. 45ton

Revamping of No.3 machine forNo.2 Continuous casting plant

Jun. 2006 Nov. 2007 POSCO3.5 million

T/Y

A revamping project to rebuild an exsting bending type caster into a vertical bending type andhigh speed caster for an improvement in productivity.POSCO E&C applied a new technology which is a secondary cooling water nozzle for highspeed control, a width adjustable mold equipment and an automative robot.

- Slab Size: 250t x (820 ~ 1600)mm - Casting Speed: Max. 2.7m/min

Revamping of No.4 machine forNo.2 Continuous casting plant

Jan. 2004 Jul. 2005 POSCO 2 million T/Y

A revamping project to rebuild an exsting bending type caster into a vertical bending typecaster for an improvement in cold rolled steel quality.

- Slab size: 250t X (820~2000)mm - Casting Speed: Max. 2.2m/min

Scarfing machine for No.1 & No.2Continuous casting plant

Mar. 2003 Feb. 2006 POSCO1 million T/Y

x 2M/C

A project to establish a four side scarfing machine and a grinding machine for an improvementof quality in the No.1 &No.2 continuous casting plant.

- 4 side scarfing machine - Grinding machine - Crack detecting equipment - A dust collector

Revamping of No.3 machine forNo.1 Continuous casting plant

Dec. 2001 Jul. 2003 POSCO1.8 million

T/Y

A revamping project to rebuild an exsiting bending type caster into a vertical bending typecaster for an improvement in cold rolled steel quality. It is applied a new soft reductiontechnology which is operated during the casting.

- Slab Size: 250t x (820~2000)mm - casting Speed: Max. 1.8m/min

No.4 machine for No.1 Continuouscasting plant

Dec. 1995 Sep. 1997 POSCO2.25 million

T/Y

A project to construct a vertical bending type caster(1M/C x 2Strand) for an improvement inproductivity and cold rolled steel quality.

- Slab Size: 230t X (800∼1,600)W - Casting Speed: Max. 2.2m/min

POSCO Pohang Steelworks

GwangyangSteelworks

POSCO Gwangyang Steelworks

Project

GwangyangSteelworks

PohangSteelworks

Page 14: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Hot rolling

Start Completion Location Client Capacity

Zhangjiagang Pohang StainlessSteel(ZPSS) Hot strip mill in China

May 2004 Sep. 2006Zhangjiagang

CityJiangsu, China

ZPSS(Zhangjigang-

PohangStainless

Steel)

800,000 T/Y

A project to construct new hot strip mill for stainless steel with an annual capacity of 800,000tons in order to supply stainless steel products in China domestic market. ○ Main facilities : Reheating furnace,Roughing mill,Steckel Mill, Down coiler, Utility facilities ○ Product Capacity : 800,000 t/y stainless steel hot rolled coil ○ Engineering, Equipment supply, Erection, Commissioning, Supervision

Modernization of Coil Conveyorfor No.2 Hot strip mill

Mar. 2006 Apr. 2006 POSCO 4,900,000 T/Y

This project is to revamp coil conveyor system o to modernize eye vertical type into eyehorizontal type. ○ Main facilities: Car for moving, chain conveyor, Inspection line ○ Engineering, Equipment supply, Erection, Commissioning, Supervision

High Density Cooling System ofNo.2 Hot strip mill

Mar. 2006 Apr. 2006 POSCO 4,900,000 T/Y

This project is to install the high density cooling system for uniform rapid cooling of all strip. ○ Main facilities : Runout table, High density cooling system, Water treatment facilities ○ Engineering, Equipment supply, Erection, Commissioning, Supervision

Revamping of the Billet Mill Jan.2001 May 2005 POSCO 760,000 T/YWith The increasing Demand and the High Quality of the product from the POSCO ○ Main facilities: Reheating furnace adopted RCB ○ Engineering, Equipment supply, Erection, Commissioning, Supervision

Increasing the unit productweight of No.1 hot strip mill

Jul. 2001 Apr. 2003 POSCO 3,240,000 T/Y

This project is to supply the facilities for increasing the production capacity(2,710,000 T/Y →3,240,000 T/Y) by increasing the unit product weight, and for improving the quality ofstainless steel product. ○ Main facilities: Slab depiling system, Coil conveyor, Hot skinpass mill, Water treatment facility ○ Engineering, Equipment supply, Erection, Commissioning, Supervision

Modernization of No.1 hot stripmill

May 1996 Jul. 1997 POSCO 2,400,000 T/Y

This project is to supply the facilities for modernization of No.1 hot strip mill in order toimprove good profile and high quality of product. ○ Main facilities: Crop shear, Finishing scale breaker ○ Engineering, Equipment supply, Erection, Commissioning, Supervision

High Density Cooling System ofNo.3 Hot strip mill

Oct. 2007 Nov. 2007 POSCO 4,810,000 T/Y

This project is to install the high density cooling system for uniform rapid cooling of all strip. ○ Main facilities: Runout table, High density cooling system, Laminar cooling system, Water treatment facilities ○ Engineering, Equipment supply, Erection, Commissioning, Supervision

Revamping of Hot dividing line ofNo.2 Hot strip mill

Mar. 2007 May 2007 POSCO 5,000,000 T/Y

This project is to revamp the existing hot dividing line for transforming 2-hi mill into 4-himill. ○ Main facilities: 4-hi skinpass mill, Roll changing system, Coil car ○ Engineering, Equipment supply, Erection, Commissioning, Supervision

High Density Cooling System ofNo.1 Hot strip mill

Apr. 2007 Apr. 2007 POSCO 4,800,000 T/Y

This project is to install the high density cooling system for uniform rapid cooling of all strip. ○ Main facilities: Runout table, High density cooling system, Laminar cooling system ○ Engineering, Equipment supply, Erection, Commissioning, Supervision

High Density Cooling System ofNo.2 Hot strip mill

Feb. 2007 Feb. 2007 POSCO 5,000,000 T/Y

This project is to install the high density cooling system for uniform rapid cooling of all strip. ○ Main facilities: Runout table, High density cooling system, Laminar cooling system ○ Engineering, Equipment supply, Erection, Commissioning, Supervision

New Preheating Furnace of No.3Hot strip mill

Jun. 2005 Nov. 2007 POSCO 250 T/Hr

This project is to supply the preheating furnace and the entry & delivery equipment for newinstallation of preheating furnace. ○ Main facilities: Preheating furnace, Charger&extarctor, entry&delivery roller table ○ Engineering, Equipment supply, Erection, Commissioning, Supervision

Modernization of Coil Conveyorfor No.3 Hot strip mill

Oct. 2004 Mar. 2005 POSCO 4,810,000 T/Y

This project is to revamp coil conveyor system in order to modernize eye vertical type into eyehorizontal type. ○ Main facilities: Car for moving coils, chain conveyor, Inspection line ○ Engineering, Equipment supply, Erection, Commissioning, Supervision

Modernization for No.2 Hot stripmill

Sep. 2000 Jul. 2002 POSCO 3,000,000 T/Y

This project is to supply the facilities for modernization of No.2 hot strip mill. ○ Main Facilities : Reheating furnace, Hot skinpass line, Runout table, Entry & delivery equipment of furnace, Coil conveyor ○ Engineering, Equipment supply, Erection, Commissioning, Supervision

No.4 Hot Strip Mill Dec. 2010 Jul. 2014 POSCO 3,500,000 T/Y

This Project will be designed to produce hot strip and hot coil in high efficiency.The annual production of Hot Strip Mill will be 3,500,000ton on slab base. ○ Main facilities: Reheating Furnace, Roughing Mill, Finishing Mii, Down Coiler Finishing line Equipments ○ Scope: Engineering, Equipment Supply,Erection,Commissioning,Supervision

POSCO Pohang Steelworks

Project

GwangyangSteelworks

PohangSteelworks

POSCO Gwangyang Steelworks

Page 15: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Hot rolling > Plate

Start Completion Location Client Capacity

ACC & DQ Revamping for No.2Plate Mill

Aug. 2007 Jan. 2008 POSCO 238 mT/YRevamping existing Cooling Facility into MULPIC System to improve product quality. ○ Scope: Design, Supply, Construction, S/V

Facilities covering Extreme HeavyPlate for No.2 Plate Mill

Sep. 2006 Jan. 2008 POSCO 238 mT/YRevamping existing Facilities to cover Production Increase and Extreme Heavy Plates. ○ Scope: Design, Supply, Construction, S/V ○ Main Facilities: Reheating Furnace, Cooling Bed

Heat Treatment Furnace for No.3Plate Mill

Sep. 2006 Aug. 2007 POSCO 20 mT/Y

Installing Heat Treatment Furnace and Side Shifter on Mill Line to produce 20 mT/Y HeatTreated Plates and to improve Productivity of Accelerated Cooling Plates. ○ Scope: Design, Supply, Construction, S/V ○ Main Facilities: Heat Treatment Furnace, Roller Table, Sider Shifter

No.2 Plate Mill Revamping Mar. 2004 Jul. 2005 POSCO 224 mT/YRevamping existing Facilities to produce High Quality Plates and to maintain Stable Operation. ○ Scope: Design, Supply, Construction, S/V ○ Main Facilities: ACC & DQ Facility, Cooling Bed, Finishing Line Facilities

No.2 Heat Treatment FurnaceExtension for No.2 Plate Mill

Oct. 2000 Feb. 2001 POSCO 43 mT/YExtending existing No.2 Heat Treatment Furnace to increase Productivity. ○ Scope: Design, Supply, Construction, S/V

No.3 Plate Mill Dec. 1995 Sep. 1997 POSCO 106 mT/YPlate Mill producing 106 mT/Y Plates ○ Scope: Design, Supply, Construction, S/V ○ Main Facilities: Reheating Furnace, Finishing Line Facilities

Gwangyang Plate Mill Apr. 2008 Jul. 2010GwangyangSteelworks

POSCO 200 mT/Y

Plate Mill producing 200 mT/Y Plates ○ Scope: Design, Supply, Construction, S/V ○ Main Facilities : Reheating Furnace, ACC & DQ Facilities, Cooling Bed, Roller Table, Power Supply, Water Treatment Facilities

Project

POSCO Pohang Steelworks

PohangSteelworks

POSCO Gwangyang Steelworks

Page 16: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Hot rolling > Wire rod

Start Completion Location Client Capacity

The Revamping of the No.3Wire Rod Mill

Oct. 2000 Nov. 2001Pohang

SteelworksPOSCO 820,000 T/Y

Relating to revamping project designed to improve quality of wire rod products and increaseproduction. ○ Supply Facility : water cooling system, reformed tub and lubliction equipment of the RSM(Reducing and Sizing Mill) ○ Engineering, Equipment supply, Erection, Commissioning, Supervision

Vietnam VPS Apr. 1994 Sep. 1995Vietnam Hai-Phong(Anhai)

City

VPS(POSCO-VSC)

200,000 T/YPOSCO E&C carried out the spply of the equipment, costruction, test run and supervision ofthe VPS mill totally that was found and joint ventured by POSCO and VSC for the producingthe wire rod & rebar.

Project

Page 17: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Cold rolling

Start Completion Location Client Capacity

DALIAN-PCSC CGL Revamping Jun. 2009 Oct. 2010 Dalian, ChinaDalian POSCO

C&C200,000 T/Y

Continuous Galvanizing Line with annually production capacity of 200,000 tons. ○ Scope of work: EP ○ Product: GI, GL for construction, home appliance & automobile ○ LINE SPEED(mpm): Enty / Process / Exit: 220 / 170 / 220 ○ Raw Material - F/H: 0.2 ~ 1.6 mm(t) x 700 ~ 1,250 mm(w)

POSCO-Guangdong ACL May 2008 Nov. 2009Shunde, Foshan,

Guangdong,China

POSCO-Guangdong

150,000 T/Y

Annealing Coating Line with annually production capacity of 150,000 tons. ○ Scope of work: EP ○ Product: LNO, MNO, HNO ○ LINE SPEED(mpm): Entry / Process / Exit: 120 / 90 / 120 ○ Raw Material - 0.5mm(t) x 1,000mm ~ 1,200mm(w)

PROSPERITY CCL Feb. 2008 Jun. 2009Kaohsiung,

Taiwan

ProsperityTieh

EnterpriseCo.,Ltd.

120,000 T/Y

Color Coating Line with annually production capacity of 120,000 tons. ○ Scope of work: EP ○ Product: PCM coil for home appliance, building exterior & Laminated coil ○ LINE SPEED(mpm): Enty / Process / Exit: 140 / 100 / 140 ○ Raw Material - Aluminium: 0.5 ∼ 1.0mm(t) x 600mm ∼ 1,350mm(w) - GI/CR: 0.2∼1.0mmt x 600mm ∼ 1,350mm(w)

PROSPERITY PGL Sep. 2007 Jun. 2009Kaohsiung,

Taiwan

ProsperityTieh

EnterpriseCo.,Ltd.

500,000 T/Y

Pickling & Galvanizing Line with annually production capacity of 500,000 tons. ○ Scope of work: EP ○ Product: GI, GL for construction industry application ○ LINE SPEED(mpm): Enty / Process / Exit: 100 / 70 / 100 ○ Raw Material - HR: 0.8 ∼ 4.5mm(t) x 500mm ∼ 1,560mm(w) - CR: 0.8∼2.3mm(t) x 500mm ∼ 1,560mm(w)

POSCO Mexico CGL Oct. 2007 Jun. 2009Altamira,Mexico

POSCO Mexico 400,000 T/Y

Continuous Galvanizing Line (including RCL, CPL & Utility) with annually production capacityof 400,000 tons. ○ Scope of work: EPC ○ Product: GI, GA for outer pannel of automobile ○ LINE SPEED(mpm) : Entry / Process / Exit: 300 / 180 / 300 ○ Raw Material: 0.4mm ~ 2.0mm(t) x 800mm ~ 1,900mm(w)

POSCO Vietnam CAL Aug. 2007 Sep. 2009Phu My

Industrial Zone,Vietnam

POSCOVietnam

700,000 T/Y

Continuous Annealing Line with annually production capacity of 700,000 tons. ○ Scope of work: EPC ○ Product: CR for automotive outer & inner pannel ○ LINE SPEED(mpm): Enty / Process / Exit: 600 / 400 / 600 ○ Raw Material: 0.35∼1.6mm(t) x 700mm ∼ 1,570mm(w)

Chung Hung steel (CHS) RCL Sep. 2006 May 2008Kaohsiung,

Taiwan Chung Hung

Steel Co.350,000 T/Y

Recoiling Line with a annually production capacity of 350,000 tons. ○ Scope of work: EP ○ LINE SPEED(mpm): Max. 500 ○ Raw Material: CR 0.15 ∼ 2.0mm(t) x 800mm ∼ 1,250mm(w)

Kao Hsing Chang (KHC) RCL Feb. 2006 Mar. 2007Kaohsiung,

Taiwan

Kao HsingChang Iron &

Steel Co.360,000 T/Y

Recoiling Line with a annually production capacity of 360,000 tons. ○ Scope of work: EP ○ LINE SPEED(mpm) : Max. 500 ○ Raw Material - CR: 0.16 ∼ 2.0mm(t) x 800mm ∼ 1,250mm(w) - FH: 0.16 ∼ 1.6mm(t) x 800mm ∼ 1,250mm(w)

Project

Overseas Projects

Page 18: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Cold rolling

Start Completion Location Client Capacity

HADEED CCL Apr. 2005 Aug. 2007Al-Jubail, Saudi

Arabia

Saudi Iron &Steel Company

(HADEED)120,000 T/Y

Color Coating Line (including RCL, CPL & Utility) with annually production capacity of 120,000tons. ○ Scope of work: EPC Turnkey ○ Product: PCM coil for home appliance, building exterior & Laminated coil ○ LINE SPEED(mpm): Entry / Process / Exit: 160 / 120 / 180 ○ Raw Material - Aluminium: 0.5 ∼ 1.6mm(t) x 500mm ∼ 1,400mm(w) - GI/CR: 0.2∼1.6mmt x 500mm ∼ 1,400mm(w)

ZPSS HAPL Dec. 2004 Oct. 2006Zhangjiagang,

ChinaZPSS 690,000 T/Y

Stainless HAPL with annually production capacity of 690,000 tons. ○ Scope of work: EP ○ Product: STS HR ○ LINE SPEED(mpm) : Entry / Process / Exit: 160 / 100 / 160 ○ Raw Material: 2.1 ~ 6.1mm(t) x 800 ~ 1,350mm(w)

PROSPERITY CGL Feb. 2004 Sep. 2005Kaohsiung,

Taiwan

ProsperityTieh

EnterpriseCo.,Ltd.

200,000 T/Y

Continuous Galvanizing Line with annually production capacity of 200,000 tons. ○ Scope of work: EP ○ Product: GI ○ LINE SPEED(mpm) : Entry / Process / Exit: 220 / 170 / 220 ○ Raw Material - CR, HR: 0.2mm ~ 1.2mm(t) x 600mm ~ 1,250mm(w)

SINO LEADING TECH CGL Oct. 2003 Jun. 2005 Sangsu in ChinaSino Leading

Tech.250,000 T/Y

x 2 line

Two(2) nos. of Continuous Galvanizing Line with annually production capacity of 250,000 tonseach. ○ Scope of work: EP without S/V ○ Product: GI ,GL ○ LINE SPEED(mpm) : Entry / Process / Exit: 235/180/235 ○ Raw Material : 0.2 ~ 1.6mmT, 600 ~ 1,300 mmW

GENERAL TRADE CGL Jul. 2003 Jul. 2005Thai Binh,Vietnam

Thai BinhGeneral Trade

Company50,000 T/Y

Continuous Galvanizing Line with annually production capacity of 50,000 tons. ○ Scope of work: EP ○ Product: GI ○ LINE SPEED(mpm) : Entry / Process / Exit: 70 / 50 / 70 ○ Raw Material - CR: 0.2mm ~ 1.6mm(t) x 600mm ~ 1,300mm(w)

GENERAL TRADE CCL Jul. 2003 Jul. 2005Thai Binh,Vietnam

Thai BinhGeneral Trade

Company30,000 T/Y

Color Coating Line with annually production capacity of 30,000 tons. ○ Scope of work: EP ○ Product: PCM Coil ○ LINE SPEED(mpm) : Entry / Process / Exit: 50 / 30 / 50 ○ Raw Material: - GI/EGI/CR: 0.2∼1.0mm(t) x 600mm ∼ 1,250mm(w)

PCCS CGL Revamping Jul. 2003 Mar. 2004 Dalian, China

DalianPOSCO-CFMCoated Steel

Co., Ltd.

150,000 T/Y

Continuous Galvanizing Line with annually production capacity of 150,000 tons. ○ Scope of work: EP ○ Product: GI for PCM coil, building exterior & automobile ○ LINE SPEED(mpm) : Entry / Process / Exit: 150/120/150 ○ Raw Material: 0.2 ~ 1.6mm Thick, 720 ~ 1,250 mm W

QPSS Stainless CRM Jan. 2003 Dec. 2004 Qingdao, China QPSS 150,000 T/Y

Stainless CRM (including ZRM, SPM, APL, CBL, TLL, STL) with annually production capacity of150,000 tons. ○ Scope of work: EP ○ Product: Stainless ○ LINE SPEED(mpm) : Entry / Process / Exit: 150 / 150 / 150 ○ Raw Material: 0.25 ~ 3.0mm(t) x 600 ~ 1,300mm(w) for STL

KISCO CGL Jan. 2003 Jun. 2004 Unnan, ChinaKUNMING

IRON & STEEL150,000 T/Y

Continuous Galvanizing Line with annually production capacity of 100,000 tons. ○ Scope of work: EP ○ Product: GI for building construction and electric appliance products ○ LINE SPEED(mpm) : Entry / Process / Exit: 180 / 120 / 180 ○ Raw Material - F.H: 0.25mm ~ 2.0mm(t) x 750mm ~ 1,550mm(w)

KISCO CCL Jan. 2003 Apr. 2004 Unnan, ChinaKUNMING

IRON & STEEL100,000 T/Y

Color Coating Line with annually production capacity of 100,000 tons. ○ Scope of work: EP ○ Product: PCM Coil for Building exterior ○ LINE SPEED(mpm) : Entry / Process / Exit: 120 / 80 / 120 ○ Raw Material - GI, GL, CR: 0.25 ~ 1.6mm(t) x 750 ~ 1,550mm(w)

Project

Page 19: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Cold rolling

Start Completion Location Client Capacity

NAKISCO CCL Jan. 2003 Feb. 2004BinhDuong,

VietnamNAKISCO 20,000 T/Y

Color Coating Line with annually production capacity of 20,000 tons. ○ Scope of work: EP ○ Product: PCM Coil ○ LINE SPEED(mpm) : Entry / Process / Exit: 50 / 30 / 50 ○ Raw Material: - GI/EGI/CR: 0.2∼1.0mm(t) x 600mm ∼ 1,250mm(w)

NAKISCO CGL Jan. 2003 Feb. 2004BinhDuong,

VietnamNAKISCO 30,000 T/Y

Continuous Galvanizing Line with annually production capacity of 30,000 tons. ○ Scope of work: EP ○ Product: GI ○ LINE SPEED(mpm) : Entry / Process / Exit: 50 / 30 / 50 ○ Raw Material - CR: 0.2mm ~ 1.6mm(t) x 600mm ~ 1,300mm(w)

HANDAN NO.1, 2 CCL Dec. 2002 Jul. 2005 Handan, ChinaHANDAN

IRON & STEELGroup

100,000 T/Yx 2 line

Two(2) nos. of Color Coating Line with annually production capacity of 100,000 tons each. ○ Scope of work: EP ○ Product: PCM Coil for Building exterior, home appliance & Printed coils ○ LINE SPEED(mpm) : Entry / Process / Exit: 140 / 100 / 140 ○ Raw Material - GI, EGI, GF, GL: 0.25 ~ 1.5mm(t) x 900 ~ 1,350mm(w)

PCCS No.2 CCL Feb. 2002 Mar. 2003 Dalian, China

DalianPOSCO-CFMCoated Steel

Co., Ltd.

100,000 T/Y

Color Coating Line with annually production capacity of 100,000 tons. ○ Scope of work: EP ○ Product: CCI For architecture and home appliance,Polyester,Si-polyester,PVDF ○ LINE SPEED(mpm) : Entry / Process / Exit: 120/80/120 ○ Raw Material: 0.2 ~ 1.4 mmThick, 600 ~ 1,250 mm Width

ZPSS NO.2 STS Dec. 2001 Dec. 2003Zhangjiagang,

ChinaZPSS 150,000 T/Y

Stainless CRM with annually production capacity of 150,000 tons. ○ Scope of work: EP ○ Product: Cold Stainless Steel 300 & 400 series ○ LINE SPEED(mpm) : Entry / Process / Exit: 90 / 160 / 90 ○ Raw Material: 0.3 ~ 3.0mm(t) x 1,000 ~ 1,300mm(w)

SHUNPO MCL Oct. 2001 Feb. 2003 Shunde, China

ShundePOSCO CoatedSteel Co. Ltd.

(ShunPo)

NO: 100,000T/Y

Color : 50,000T/Y

Multi Coating Line with annually production capacity of 100,000 tons. ○ Scope of work: EP ○ Product: NO ○ LINE SPEED(mpm) : Entry / Process / Exit: 160 / 120 / 160 ○ Raw Material: F.H NO Coil 0.35 ~ 0.65mm(t) x 600 ~ 1,270mm(w)

POSVINA CCL Apr. 2001 Jun. 2002Hochiminh,

VietnamPOSVINA 22,000 T/Y

Color Coating Line with annually production capacity of 22,000 tons. ○ Scope of work: E+P ○ Product: PCM coil ○ LINE SPEED(mpm) : Entry / Process / Exit: 50/30/50 ○ Raw Material: CR, GI, EGI coil

HAIER CCL Oct. 2000 Sep. 2001 Hefei, ChinaHAIER Co.,

LTD.70,000 T/Y

Color Coating Line with annually production capacity of 70,000 tons. ○ Scope of work: EP ○ Product: PCM Coil for Building exterior, home appliance ○ LINE SPEED(mpm) : Entry / Process / Exit: 80/60/80 ○ Raw Material: 0.25 ~ 1.2 mmT, 600 ~ 1,320mm W

PCCS No.1 CCL Aug. 1997 Nov. 1998 Dalian, China

DalianPOSCO-CFMCoated Steel

Co., Ltd.

50,000 T/Y

Color Coating Line with annually production capacity of 50,000 tons. ○ Scope of work: EP ○ Product: PCM Coil for Building exterior, home appliance ○ LINE SPEED(mpm) : Entry / Process / Exit: 80/60/80 ○ Raw Material: 0.2 ~ 1.2 mmT , 600 ~ 1,250 mmW

ZPSS No.1 STS Apr. 1997 Jan. 1999Zhangjiagang,

ChinaZPSS 150,000 T/Y

Stainless CRM with annually production capacity of 150,000 tons. ○ Scope of work: EP ○ Product: Cold Stainless Steel 300 & 400 series ○ LINE SPEED(mpm) : Entry / Process / Exit: 90 / 160 / 90 ○ Raw Material: 0.3 ~ 3.0mm(t) x 1,000 ~ 1,300mm(w)

ZPSS CGL Sep. 1996 May 1998Zhangjiagang,

ChinaZPSS 100,000 T/Y

Continuous Galvanizing Line with annually production capacity of 100,000 tons. ○ Scope of work: EP ○ Product: GI ○ LINE SPEED(mpm) : Entry / Process / Exit: 150 / 120 / 150 ○ Raw Material: 0.2 ~ 1.6mm(t) x 720 ~ 1,250mm(w)

Project

Page 20: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Cold rolling

Start Completion Location Client Capacity

No.3 HCL For Silicon Steel Plant Dec. 2007 Aug. 2009 POSCO 85,000 T/Y

HCL with annually production capacity of 85,000 tons. ○ Scope of work: EPC ○ Product: GO(silicon steel) ○ LINE SPEED(mpm) : Entry / Process / Exit: 170 / 110 / 170 ○ Raw Material: 0.15mm ~ 0.5mm(t) x 960mm ~ 1,270mm(w)

No.3 COF For Silicon Steel Plant Dec. 2007 Aug. 2009 POSCO 100,000 T/Y

COF with annually production capacity of 100,000 tons. ○ Scope of work: EP+C ○ Product: Grain oriented electromagentic steel ○ LINE SPEED(mpm) : Entry / Process / Exit: ○ Raw Material - Annealed steel:0.15mm~0.35mm(t)x800mm~1,270mm(w)

No.3 DCNL For Silicon Steel Plant Dec. 2007 Aug. 2009 POSCO 100,000 T/Y

DCNL with annually production capacity of 100,000 tons. ○ Scope of work: EP+C ○ Product: GO ○ LINE SPEED(mpm) : Entry / Process / Exit: 180 / 120 / 180 ○ Raw Material: 0.15 ~ 0.65mm(t) ~ 960 ~ 1,270mm(w)

No.3 APL For Silicon Steel Plant Sep. 2007 Aug. 2009 POSCO 352,000 T/Y

No.3APL with a annually production capacity of about 352,000tons. ○ Scope of work: EP+C ○ Product: Non Grain Oriented Hyper NO,HN0,HGO,CGO ○ LINE SPEED(mpm): Entry / Process / Exit: 120 / 75 / 120 ○ Raw Material - FH 1.5 ~ 3.0mm(t) x 950mm ~ 1320mm(W)

STS APF Aug. 2007 May 2009 POSCO 400,000 T/Y

APF with annually production capacity of 400,000 tons. ○ Scope of work: EP+C ○ Product: Cold Stainless Steel 300 & 400 series ○ LINE SPEED(mpm) : Entry / Process / Exit: 210 / 150 / 210 ○ Raw Material: 0.3 ~ 3.0mm(t) x 1,000 ~ 1,350mm(w)

No.2 HCL For Silicon Steel Plant Oct. 2005 Jun. 2006 POSCO 160,000 T/Y

HCL with annually production capacity of 160,000 tons. ○ Scope of work: EPC ○ Product: GO(silicon steel) ○ LINE SPEED(mpm) : Entry / Process / Exit: 230/170/230 ○ Raw Material: 0.15mm ~ 0.5mm(t) x 550mm ~ 1,270mm(w)

No.2 COF For Silicon Steel Plant Oct. 2005 Jun. 2006 POSCO 80,000 T/Y

COF with annually production capacity of 80,000 tons. ○ Scope of work: EP+C ○ Product: Grain oriented electromagentic steel ○ LINE SPEED(mpm) : Entry / Process / Exit: ○ Raw Material: Annealed steel:0.2mm~0.35mm(t)x800mm~1,270mm(w)

Modernization of No.2 DCNL ForSilicon Steel Plant

Oct. 2005 Jun. 2006 POSCO 80,000 T/Y

DCNL with annually production capacity of 80,000 tons. ○ Scope of work: EP+C ○ Product: Annealed steel ○ LINE SPEED(mpm) : Entry:180mpm / Process:120mpm / Exit:180mpm ○ Raw Material: cold rolled steel

No.3 ACL For Silicon Steel Plant May 2005 Jul. 2006 POSCO 362,000 T/Y

Annealing and Coating Line with a annually production capacity of about 361,732tons. ○ Scope of work: EP+C ○ Product: Non Grain Oriented MNO & HNO ○ LINE SPEED(mpm): Entry / Process / Exit: 320 / 250 / 320 ○ Raw Material: FH 0.15mm ~ 0.7mm(t) x 914mm ~ 1,270mm(w)

No.2 APL For Silicon Steel Plant Nov. 2003 Jun. 2005 POSCO 250,000 T/Y

No.2APL with a annually production capacity of about 250,000tons. ○ Scope of work: EP+C ○ Product: HGO,CGO,NO ○ LINE SPEED(mpm): Entry / Process / Exit: 60 / 45 / 60 ○ Raw Material: 1.5 ~ 3.0mm(t) x 550mm ~ 1300mm(W)

No.1 COF For Silicon Steel Plant Sep. 2003 Dec. 2004 POSCO 75,000 T/Y

COF with annually production capacity of 75,000 tons. ○ Scope of work: EP+C ○ Product: Grain oriented electromagentic steel ○ LINE SPEED(mpm) : Entry / Process / Exit: ○ Raw Material: Annealed steel 0.2mm~0.35mm(t)x800mm~1,270mm(w)

Project

PohangSteelworks

POSCO Pohang Steelworks

Page 21: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Cold rolling

Start Completion Location Client Capacity

1CAL of No.1 Cold Rolling Mill May 2002 Mar. 2005 POSCO 300,000 T/Y

Continuous Anealing Line of BP with a annually production capacity of 300,000 tons. ○ Scope of work: EP+C ○ Product: Black Plate ○ LINE SPEED(mpm): Entry / Process / Exit: 750 / 600 / 850 ○ Raw Material: FH 0.15mm ~ 0.6mm(t) x 600mm ~ 1,070mm(w)

3CAL of No.2 Cold Rolling Mill Nov. 2001 May 2003 POSCO 700,000 T/Y

Continuous Anealing Line with a annually production capacity of 700,000 tons. ○ Scope of work:EP + C ○ Product: Cold rolled anealed steel ○ LINE SPEED(mpm) : Entry:600mpm / Process:450mpm / Exit:640mpm ○ Raw Material: Cold rolled steel 0.2mm~2.0mm(t)x600mm~1,650mm(w)

STS No.3 H-APL May 2001 May 2003 POSCO 500,000 T/Y

H-APL with annually production capacity of 500,000 tons. ○ Scope of work: EP + C ○ Product: STS HR ○ LINE SPEED(mpm) : Entry / Process / Exit: 130 / 80 / 130 ○ Raw Material: 1.5 ~ 5.0mm(t) x 600 ~ 1,350mm(w)

Modernization of No.1 ColdRolling Mill

Mar. 1997 Jul. 1999 POSCO 1,100,000 T/Y

Enhancement of annually production capacity from 900,000 tons to 1,100,000 tons ○ Scope of work: EP + C ○ Product: Full hard ○ LINE SPEED(mpm) : Entry :650mpm/ Process:260mpm / Exit:350mpm ○ Raw Material: Hot coil 2.0mm~4.5mm(t) x600~1,300mm(w)

No.1 ACL Revamping For SiliconSteel Plant

Nov. 1996 Jun. 1998 POSCO 100,000 T/Y

Annealing and Coating Line with annually production capacity of 100,000 tons. ○ Scope of work: EP + C ○ Product: Non Oriented Silicon steel LNO,MNO,HNO ○ LINE SPEED(mpm) : Entry 100 / Process 80 / Exit: 100 ○ Raw Material: F/H NO Coil: 0.2 ∼ 0.65mm(t) x 600mm ∼ 1,270mm(w)

No.2 ACL For Silicon Steel Plant Aug. 1996 Sep. 1998 POSCO 220,000 T/Y

Annealing and Coating Line with annually production capacity of 220,000 tons. ○ Scope of work: EP+ C ○ Product: Non Oriented Silicon steel LNO,MNO ○ LINE SPEED(mpm) : Entry 250/ Process 170/ Exit: 250 ○ Raw Material: F/H NO Coil: 0.2 ∼ 0.65mm(t) x 600mm ∼ 1,270mm(w)

NO.7 CGL Feb. 2008 Mar. 2011 POSCO 500,000 T/Y

Continuous Galvanizing Line with annually production capacity of 500,000 tons. ○ Scope of work: EP+C ○ Product: GA for automobile ○ LINE SPEED(mpm) : Entry / Process / Exit: 350 / 180(220) / 350 ○ Raw Material: 0.4 ~ 2.3mm(t) x 800 ~ 1,900mm(w)

NO.2 CGL Revamping Nov. 2006 Dec. 2007 POSCO 430,000 T/Y

Continuous Galvanizing Line with annually production capacity of 430,000 tons. ○ Scope of work: EP+C ○ Product: GA for automobile ○ LINE SPEED(mpm) : Entry / Process / Exit: 350 / 250 / 350 ○ Raw Material: 0.4 ~ 2.3mm(t) x 720 ~ 1,900mm(w)

NO.1 CGL Revamping Oct. 2005 Jun. 2006 POSCO 450,000 T/Y

Continuous Galvanizing Line with annually production capacity of 450,000 tons. ○ Scope of work: EP+C ○ Product: GI ○ LINE SPEED(mpm) : Entry / Process / Exit: 350 / 250 / 350 ○ Raw Material: 0.4 ~ 2.3mm(t) x 800 ~ 1,860mm(w)

NO.6 CGL Jun. 2004 Jun. 2006 POSCO 400,000 T/Y

Continuous Galvanizing Line (including Utility) with annually production capacity of 400,000tons. ○ Scope of work: EPC ○ Product: GI, GA for outer pannel of automobile ○ LINE SPEED(mpm) : Entry / Process / Exit: 300 / 180 / 300 ○ Raw Material: 0.4mm ~ 2.0mm(t) x 800mm ~ 1,900mm(w)

MCL Jan. 2003 Aug. 2005 POSCO 250,000 T/Y

Multi Coating Line with annually production capacity of 250,000 tons. ○ Scope of work: EP+C ○ Product: GI, GA Coating ○ LINE SPEED(mpm) : Entry / Process / Exit: 250 / 140 / 250 ○ Raw Material: 0.45 ~ 3.25mm(t) x 800 ~ 1,860mm(w)

NO.5 CGL Jul. 2003 Oct. 2005 POSCO 450,000 T/Y

Continuous Galvanizing Line (including CPL & Utility) with annually production capacity of450,000 tons. ○ Scope of work: EPC ○ Product: GI, GA for outer pannel of automobile ○ LINE SPEED(mpm) : Entry / Process / Exit: 300 / 180 / 300 ○ Raw Material: 0.4mm ~ 3.2mm(t) x 800mm ~ 1,900mm(w)

No.4 Cold Rolling Fingerprint-Resistant Facility

Dec. 1999 May 2000 POSCO 100,000 T/Y

Fingerprint-Resistant Facility with annually production capacity of 100,000 tons. ○ Scope of work: EP+C ○ Product: Anti Finger printed coil for Home appliance ○ LINE SPEED(mpm) : Entry / Process / Exit: 300/180/300 ○ Raw Material: 0.4 ~ 2.0 mmT , 700 ~ 1,570 mmW

NO.4 CGL May 1998 Jun. 2000 POSCO 400,000 T/Y

Continuous Galvanizing Line (CPL & Utility) with annually production capacity of 450,000 tons. ○ Scope of work: EPC ○ Product: GI, GA for outer pannel of automobile ○ LINE SPEED(mpm) : Entry / Process / Exit: 350 / 250 / 350 ○ Raw Material: 0.4mm ~ 2.3mm(t) x 800mm ~ 1,900mm(w)

No.4 Cold Rolling Mill (PL/TCM) Sep. 1995 Aug. 1997 POSCO 1,800,000 T/Y

Cold Roll Mill with annually production capacity of 1.8 million tons. (1.5 million tons of ColdRolling Coil & 300,000 tons of Electrically Zinc-Galvanized Plate) ○ Scope of work: EP+C ○ Product: HR ○ LINE SPEED(mpm) : Entry / Process / Exit: 350 / 250 / 1,800 ○ Raw Material: 2.3 ~ 5.0mm(t) x 1860mm(w)

EGL of No.4 Cold Rolling Plant Jul. 1995 Aug. 1997 POSCO 300,000 T/Y

EGL with annually production capacity of 300,000 tons. ○ Scope of work: EP+C ○ Product: EI, ○ LINE SPEED(mpm) : Entry / Process / Exit: 300/180/300 ○ Raw Material: 0.4 ~ 2.0 mmT , 700 ~ 1,570 mmW

PohangSteelworks

POSCO Gwangyang Steelworks

Project

GwangyangSteelworks

Page 22: Indonesia Integrated Steel Mill - · PDF fileIndonesia Integrated Steel Mill. ... stacker/reclaimer, belt ... The capacity of plant is 5.47 million tons of hot metal in annual. this

STEEL PLANT

Cold rolling

Start Completion Location Client Capacity

Union Steel NO.5 CGL Dec. 2007 Jun. 2009 Busan, Korea Union Steel 370,000 T/Y

Continuous Galvanizing Line with annually production capacity of 370,000 tons. ○ Scope of work: EP ○ Product: GI, GA ○ LINE SPEED(mpm) : Entry / Process / Exit: 360 / 240 / 360 ○ Raw Material: F.H 0.25 ~ 2.5mm(t) x 800 ~ 1,600mm(w)

Magnesium Production Plant Sep. 2006 Jul. 2007Suncheon,

KoreaPOSCO 3,000 T/Y

The Magnesium Production Plant with nominal annual capacity of 3,000 tons per yearMagnesium Coil & Sheet. ○ Scope of work: EP+C ○ Product: Magnesium Coil & Sheet ○ LINE SPEED(mpm) : Entry / Process / Exit: ○ Raw Material: 0.4 ~ 3.0mm(t) x 630mm(w) for STL

POCOS NO.2 CCL Revamping Mar. 2005 Dec. 2005 Pohang, Korea POCOS 150,000 T/Y

Color Coating Line with annually production capacity of 150,000tons. ○ Scope of work: EPC turnkey ○ Product: CCI for architecture and Home appliance ○ LINE SPEED(mpm) : Entry / Process / Exit: 160/120/160 ○ Raw Material: 0.3 ~ 1.2 mmT, 600 ~ 1,320 mmW

POCOS NO.1 CGL Revamping Feb. 2005 Aug. 2006 Pohang, Korea POCOS 300,000 T/Y

Continuous Galvanizing Line with annually production capacity of 300,000 tons. ○ Scope of work: EP+C ○ Product: GI, GL ○ LINE SPEED(mpm) : Entry / Process / Exit: 220 / 150 / 220 ○ Raw Material: 0.3 ~ 2.3mm(t) x 600 ~ 1,270mm(w)

POCOS NO.2 CGL Sep. 2002 Dec. 2004 Pohang, Korea POCOS 300,000 T/Y

Continuous Galvanizing Line with annually production capacity of 300,000 tons. ○ Scope of work: EP+C ○ Product: GI, GL ○ LINE SPEED(mpm) : Entry / Process / Exit: 350 / 200 / 350 ○ Raw Material: F.H 0.2 ~ 2.3mm(t) x 700 ~ 1,300mm(w)

POCOS NO.1 CCL Revamping Jul. 1998 Jun. 1999 Pohang, Korea POCOS 120,000 T/Y

Color Coating Line with annually production capacity of 120,000 tons. ○ Scope of work: EPC Turnkey ○ Product: CCI for architecture and Home appliance ○ LINE SPEED(mpm) : Entry / Process / Exit: 160/120/180 ○ Raw Material: 0.3 ~ 1.6mmT , 600 ~ 1,320mmW

Dong-Kuk Industries HGL Aug. 1996 Nov. 1997 Pohang, KoreaDong-KukIndustries

150,000 T/YThis production facility adopts the continuous galvanizing line (CGL) treatment after thepickling process of hot-rolled coil, and produces construction materials.

Other Domestic Projects

Project