What you need to know to get piped gas in New Delhi.
Citation preview
Notes:
Submit it along with any one of the following ownership proofs -4.1 Copy of electricity bill4.2 House tax receipt4.3 First 5 pages of the "Sales Deed"
REGISTRATION CHARGES
Mandatory Security DepositSubmit a duly filled in registration form along with an Interest free Security deposit of Rs 6000 (Refundable) to be paid through either cheque or DD in favor of Indraprastha Gas Ltd. Break up of security deposit is – A) Rs 5000 against installation and B) Rs 1000 against gas consumption
Charges for people residing in Government/CPWD/NDMC accomodation2.1 Submit a Demand Draft of Rs 1000 against refundable interest free Security depoist.2.2 Also submit the allotment letter provided by concerned department along with the photocopy of ID card.
Terms and Conditions
Connection installation
Installation Procedure1.1 Survey to assess feasibility of gas connection.1.2 Laying of MDPE after getting necessary permissions from the concerned civic authorities.1.3 Laying of vertical piping to provide connectivity to the registered customers1.4 Fitting and testing of GI/Copper pipe and meter.1.5 Conversion of LPG stove to PNG and activation of gas connection.
Installation Charges 2.1 Rs 6000 refundable security deposit submitted during registration includes up to 15 metres of GI/Copper Pipeline (excludes rubber pipe) as per PNGRB regulations.2.2 For excess service line requirementIn case GI/ Copper Pipeline exceeds 15 metres, Rs 350 per meter shall be charged for the extra pipe length.2.3 Extension & Modification chargesa) Second connection on the other floor shall be treated as a new connection.
b) Extension costing Rs 350 per meter can also be provided for gas geysers depending on the feasibility, subject to a minimum charge of Rs 500.
PAYABLE SERVICES & CHARGES :.
S.NO
ComplaintCategory
REVISED CHARGES (A+B+C+D)
Unit Services(A)
Material (Lastpurchasing cost
+ 15%administrative
charges)(B)
ApplicableVisit
charges(In Rs.)
(C )
InspectionManpower
andLiasioncharges
(D)
1Rubber tube Replacement (for length of 1.5 mtrs.)
No Rs. 184/-Contractor scope
(included inservices)
Nil Nil
2 NG Conversion No
Free Service-Upto 15 days ofRFC for 2 burner set. For extraburner set and after 15 days ofRFC -Rs. 58/- per burner.i.e.
(no. of burnersX57)
Contractor scope(included in
services)Rs. 150/- Nil
3 Flame Problem No
Free service - Upto 15 days offirst NG Conversion & NewStove conversion. After 15
days, Rs. 58/- per burner i.e.(no. of burners x 57)
Contractor scope(included in
services)Rs. 150/- Nil
4
New Stove Conversion (excl. supply of rubber hose) & Reconversionto LPG
No (no. of burners x 58)Contractor scope
(included inservices)
Rs. 150/- Nil
5
Temporary Disconnection (Personal Reason) - Non dismanting of GI/CU installation
No
(A) Rs. 58/- (only ApplianceRemoval & Plug) +
(B) Rent charges of Rs. 94/-per month is applicable,(Considering advance
papyment for x no. of monthsto be deposited i.e. 25% of(0.49 SCMD x 30 x No. of
months).After temporary
disconnection, materialshall be kept in custody of
IGL
Contractor scope(included in
services)NIl Nil
6
Temporary disconnection/Plugging of MDPE service linefor existing user
Mtr Rs. 1150 per mtrs.Fitting/End capcost per piece -
Rs. 80/-NIl Nil
7 Modification in PNG installation using existing material and additional material
No Considering Reflixing Lengthper running meters@ Rs. 334/-per mtr. OR Minimum charges
is Rs.600/- whichever ishigher.
Material Shall be kept in
Contractor scope(included in
services)
NIl Rs. 500(Inspectio
nmanpowerCharges)
custody of IGL, if balanceafter modification.
No If no modification is carriedout.
Nil Rs. 150/- Nil
8
Temporary Disconnection (Renovation)/Removal Charges for GI/CU pipeline
No
If inside kitchen -(A) Dismanting (GI Pipe -
3/4", 1/2" and Cu Pipe) - Rs.46/- per mtr. +
(B) Rs. 58/- for Appliancevalve with rubber tube
If kitchen, lateral & risercomplete -
(A) Dismanting (GI Pipe -3/4", 1/2" and Cu Pipe) - Rs.
46/- per mtr. + (B) Rs. 58/- for Appliance
valve with rubber tube
After temporaryconnection, material shallbe kept in custody of IGL.
Contractor scope(included in
services)
Rs. 500/-(Inspectio
nmanpowerCharges)
Nil
9
Re-installation (GI Pipe-3/4", 1/2" and Cu Pipe)/Restoration of installation
Mtrs Rs. 288/- per mtrsContractor scope
(included inservices)
NIl
Rs. 500/-as
inspectionmanpower
charge
10Permananent Disconnection
No
Govt./Institutional Flats/Private- Rs. 58/- (only Appliance
Removal & Plug)
After permanentconnection material shallbe kept in custody of IGL
Contractor scope(included in
services)Rs. 150/- Nil
No
(A) Dismanting (GI Pipe-3/4",1/2" and Cu Pipe) - Rs. 46/-
per mtrs +(B) Rs. 58/- for Appliance
valve +(C ) Rs. 58/- per Isolation
valve
After permanentconnection, material shallbe kept in custodyof IGL
Contractor scope(included in
services)NIl
Rs. 500/-per
connectionas
inspectioncharge
11
Geyser Point/Extra Point (Additional Point/Additional Piping)
Mtrs
GI Pipe/mtrs. (1/2")= Rs.276/-
GI Pipe/mtrs.(3/4")= Rs. 334/-Cu Pipe/mtrs= Rs. 253/-
Appliance valve (1/2")= Rs.230/-
Appliance valve(1/2")= Rs.
143/-Nil Nil
No If no modification is carriedout.
NA Rs. 150 Nil
12 Emergency Call - No Free Free Nil Nil
Leakage at 21 mbar - Rubber tube, GI Pipe & Copper tube, appliance valve & fittings etc.
13
Damage to Aboveground piping (Material & installation)
No
(A) 3000 (penalty charges) +(B) Modification Charges as
per Sl. No. 7 +(C ) Item-wise cost of material
(i.e.Meter/Regulator/MeterRegulator etc.) (whichever is replaced)
As per thematerial Nil Nil
14 Meter related issues (running fast) No Rs. 950 (if meter is not faulty) NA Nil Nil
15 Wrong meter reading No If Reading not wrong NA Rs. 150/- Nil
16 Special Meter Reading No Rs. 115/-Contractor scope
(included inservices)
Nil Nil
17 Meter not working No Free NA Nil Nil
18 NOC Issuance No Free NA Nil Nil
19 No Gas Supply No Free NA Nil Nil
20
Remeasurement of PNG installation/ExtraPipe (on customer request)
NoRs. 115/- (In case variation
observed)
Contractor scope(included in
services)Nil
Rs. 350 asmanpowerinspectioncharge (In
casevariationobserved)
21Temporary Disconnection (Defaulter)
NoShall be given by
Marketing department NA NA Nil
22 Restoration - Civil Work
No Free NA Nil Nil
23
Improper PNG Installation - GI & Copper (if customer complaining regardingimproper installation after RFC/NG)
No
After RFC & signing ofcustomer, Rates as per the
modification charges againstSl. No. 7 will be applicable
Contractor scope(included in
services)Nil Nil
24
MDPE Pipeline Laying/Shifting-20mm
Mtrs.
Rs. 368/mtrs Rs. 33/- permtrs.
Nil (A) Rs.500/- as
inspectioncharge +
(B) Rs.3000/- as
liasionchargesfor local
authorities
MDPE Pipeline Laying/Shifting-32mm
Mtrs. Rs. 380/mtrs Rs. 55/- per
mtrs. Nil
MDPE Pipeline Laying/Shifting-63mm
Mtrs.
Rs. 403/mtrs Rs. 206/- permtrs.
Nil
Transition Fittings shifting including construction of pedestal.
Nos. Rs. 2070/ No. Rs. 261/- perNo.
Nil
25 Damage tounderground
assets(PE pipeline
No (A) Penalty of damage onaccount of lapses in safety (Rs.
5000) +
Contractor scope(included in
services)
Nil Nil
damage/TFDamage(in case
damage done due tocustomer)
(B) Repair Charges - (Sl. No.24) +
(C) gas loss.
26Painting of GI Pipe (On customer request)
MR Rs. 29/- per meterContractor scope
(included inservices)
Nil
Rs. 200/-as
inspectioncharge
27Leakage Testing of Individual House (On Customer request)
No Rs. 345/- per CustomerContractor scope
(included inservices)
Nil
28Install/ Replace Meterbracket (On CustomerRequest)
No Rs. 58/- per meter bracketContractor scope
(included inservices)
Nil
29
Replace & Install Clamp-3/4" and 1/2" (On Customer request)
No Rs. 35/- per clampContractor scope
(included inservices)
Nil
30Replace & Install PVC clamp for Cu (On Customer request)
No Rs. 18/- per clampContractor scope
(included inservices)
Nil
31
Replacement of meter(If tempered/ external damaged by customer)
No Rs. 403/- Rs. 1200/- Nil Nil
32
Replacement of meter-Regualtor (If Tempered/ external damaged by customer)
No Rs. 575/- Rs. 692/- Nil Nil
33
Replace/ Install New Isolation/ Appliance valve (any extra point)
No
Applaince valve=Rs. 230/-each
Isolation valve= Rs. 230/-each
Appliancevalve(1/2")=Rs
. 143/-Isolation
valve(3/4")=Rs. 254/-
Nil Nil
34
NG Conversion + rubber tube for lengthof 1.5 mtrs. In case of 2nd time connection at Government flats on same address.
No Rs. 360Contractor scope
(included inservices)
Nil Nil
Note
1- For C&I connections, separate charges are applicable2- The rates of material and services may be changed subject to change of tenders.3- The rates of services (A) considered above are including taxes .i.e.@21%