Industrial Construction Integration Specialization P roject ---- Wakakura Resort Site location: 2-88 Wakakura Crescent, Devonport, North Shore Site Area: 28775m^2 Project Cost: 38.75 million Project scope: 4-stories main hotel Amenities tower Single level chalet Double level chalet Ancillary facility About TUA: Technique Utilize Alliance (TUA) is one of the leading Engineering design groups here in New Zealand, is pleased to be part of your project proposal development to design and build an urban resort including amenities in Auckland. Following your request TUA design and engineering group to provide you with a design specification it is a pleasant honour for you to have the trust for our team to provide you with the technical expertise for the project. Main Entry Secondary Entry Pedestrian entry Main Hotel Car Park Building Amenities Tower Single- level Chalet Double- level Chalet Pavilion Swimming Pool Volleyball & Children playground Basketball Court Tennis Court Ground car park Name: Position Specialization Fred KALKAUA Project Manager/ team leader Building Engineer Leibniz Principle Engineer Civil, Construction Anson Zheng Chief Architect Construction Engineer Max Zheng Site Engineer Construction Engineer / Quantity Surveyor Address: 42 Symonds Street, Auckland 1010 Phone: 0800 282 486 Mobile: 0224047428 Email: [email protected] Web site: www.techdesign.com Column axial (KN) Column BM(KN.m) Column SF(KN) Beam BM(KN.m) Beam SF(KN) 1.2G+1.5Q 4856.48 56.51 14.12 1122.65 751.59 1.0G + 0.4ψcQ + Eu 2453.16 353.92 145.61 776.07 444.29 Beam: 500x500mm, 8D32 Column: 500x700mm, 9D24 Slab: Shanlton Hollowcore 300 Elematic with depth of 300mm Structural Model TUA Team Profile Project Master Schedule Management plan: Work Breakdown Structure Work Management Structure Risk Management Resources Management Health & Safety Responsibility Metrix 3D Mode Exterior Interior Design Site Layout/Setup Site Facilities Construction Relative Facilities 1. Loading/Unloading facility 2. Wheel Washing Facility 3. Waste Management Facility 4. Transporter Carpark Management Relative Facilities 1. Site office & Meeting room 2. Security and Entry control facility Amenity facilities 1. Lunchroom and Rest Room 2. Sanitary Facility 3. Washing Facility with Locker 4. Carpark Site Layout Site Access Traffic Management GEO - Technical Design F loor Plans

Industrial Construction Exterior 3D Mode Integration … · 2020. 11. 10. · Industrial Construction Integration Specialization Project---- Wakakura Resort Site location: 2-88 Wakakura

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

  • Industrial Construction Integration Specialization Project

    ---- Wakakura Resort

    Site location: 2-88 Wakakura Crescent, Devonport, North ShoreSite Area: 28775m^2Project Cost: 38.75 millionProject scope:• 4-stories main hotel• Amenities tower• Single level chalet• Double level chalet• Ancillary facility

    About TUA:Technique Utilize Alliance (TUA) is one of the leading Engineering design groups here in New Zealand, is pleased to be part of your project proposal development to design and build an urban resort including amenities in Auckland. Following your request TUA design and engineering group to provide you with a design specification it is a pleasant honour for you to have the trust for our team to provide you with the technical expertise for the project.

    Main Entry

    SecondaryEntry

    Pedestrian entry

    Main Hotel

    Car ParkBuilding

    AmenitiesTower

    Single-levelChalet

    Double-levelChalet

    PavilionSwimmingPoolVolleyball& Children

    playground

    BasketballCourt

    TennisCourt

    Ground car park

    Name: Position SpecializationFred

    KALKAUAProject Manager/

    team leader Building Engineer

    Leibniz Principle Engineer Civil, Construction

    Anson Zheng Chief Architect Construction Engineer

    Max Zheng Site Engineer

    Construction Engineer / Quantity Surveyor

    Address: 42 Symonds Street, Auckland 1010Phone: 0800 282 486 Mobile: 0224047428Email: [email protected] site: www.techdesign.com

    Column axial (KN)

    Column BM(KN.m)

    Column SF(KN)

    Beam BM(KN.m) Beam SF(KN)

    1.2G+1.5Q 4856.48 56.51 14.12 1122.65 751.591.0G +

    0.4ψcQ + Eu 2453.16 353.92 145.61 776.07 444.29

    Beam: 500x500mm, 8D32Column: 500x700mm, 9D24Slab: Shanlton Hollowcore 300 Elematic with depth of 300mm

    Structural Model

    TUA Team Profile

    Project Master ScheduleManagement plan:• Work Breakdown

    Structure• Work Management

    Structure• Risk Management• Resources

    Management• Health & Safety• Responsibility Metrix

    3D Mode

    Exterior

    Interior Design

    Site Layout/SetupSite Facilities• Construction Relative Facilities

    1. Loading/Unloading facility2. Wheel Washing Facility 3. Waste Management Facility4. Transporter Carpark

    • Management Relative Facilities 1. Site office & Meeting room 2. Security and Entry control facility

    • Amenity facilities 1. Lunchroom and Rest Room2. Sanitary Facility 3. Washing Facility with Locker 4. Carpark

    • Site Layout • Site Access • Traffic Management

    GEO-Technical Design

    Floor Plans

    mailto:[email protected]://www.techdesign.com/

    幻灯片编号 1