9
Info Day – 31/05/2010 Overview Peter Crawley European Commission DG RTD – H2 Surface Transport Rai l Road Water Sustainable Surface Transport - Call 2010

Info Day – 31/05/2010 Overview Peter Crawley European Commission DG RTD – H2 Surface Transport Rail Road Water Sustainable Surface Transport - Call 2010

Embed Size (px)

Citation preview

Page 1: Info Day – 31/05/2010 Overview Peter Crawley European Commission DG RTD – H2 Surface Transport Rail Road Water Sustainable Surface Transport - Call 2010

Info Day – 31/05/2010Overview

Peter CrawleyEuropean CommissionDG RTD – H2Surface Transport

Rail

Road

Wate

r

Sustainable Surface Transport - Call 2010

Page 2: Info Day – 31/05/2010 Overview Peter Crawley European Commission DG RTD – H2 Surface Transport Rail Road Water Sustainable Surface Transport - Call 2010

Purpose of Day

Facilitate negotiation and understand the negotiation process.

Presentations on technical and legal aspects .

Presentation on related FP7 IT tools

Opportunity for Q & A

Page 3: Info Day – 31/05/2010 Overview Peter Crawley European Commission DG RTD – H2 Surface Transport Rail Road Water Sustainable Surface Transport - Call 2010

Overview of the Evaluation ProcessOverview of the Evaluation Process

Full Proposal

Proposalforms

Evaluators

Eligibility

Evaluators Evaluators Final rankinglist

Step 3Panel

SubmissionStep 2

Consensus

Step 1Individual Evaluation

Proposals insuggestedpriority order

Rejection list

Finalisation

CriteriaCriteria Criteria

COMMISSION COMMISSION

Role of experts

Page 4: Info Day – 31/05/2010 Overview Peter Crawley European Commission DG RTD – H2 Surface Transport Rail Road Water Sustainable Surface Transport - Call 2010

Consensus report for each proposal.

Common consensus scores and comments are agreed with your fellow evaluators in Brussels.

For each proposal:

Proposal Xcopy 1

Proposal Xcopy 2

Proposal Xcopy 3

IERexpert 1

IER expert 2

IER expert 3

Consensus meeting

CR 3 experts

Completed Individual Evaluation

Each Expert has produced an:

Individual

Evaluation

Report

Page 5: Info Day – 31/05/2010 Overview Peter Crawley European Commission DG RTD – H2 Surface Transport Rail Road Water Sustainable Surface Transport - Call 2010

Panel reviews: ESR ‘s

Ranked lists (4)

For all proposals:

Final Panel Review meeting

CR ESR

ECExpert

Expert

Check: Consistency, wording, scores to comments etc.

Panel Review Report

Panel Endorses and signs review report.

Observers

Page 6: Info Day – 31/05/2010 Overview Peter Crawley European Commission DG RTD – H2 Surface Transport Rail Road Water Sustainable Surface Transport - Call 2010

Results:

ESR Quick Information

Prog Com

Results &

Negotiation mandate

ISC

Applicant

NCP

NegoLetter

? Redress

Com

Decision

Redress Committee

Reject Letter

We are Here !

Page 7: Info Day – 31/05/2010 Overview Peter Crawley European Commission DG RTD – H2 Surface Transport Rail Road Water Sustainable Surface Transport - Call 2010

Some Statistics.

Topic Group Total number of proposals

Proposals ineligible

Proposals failed

evaluation threshold

Proposals above

threshold

Expected To

Negotiate

1 Rail Freight 29 4 16 9 8

2 Eco Inno 23 2 7 14 9

3 Green Car 49 10 28 17 16

4 Gaps 20 0 16 4 3

Total 121 8 67 44 36

Page 8: Info Day – 31/05/2010 Overview Peter Crawley European Commission DG RTD – H2 Surface Transport Rail Road Water Sustainable Surface Transport - Call 2010

Where do we stand?

Preparation of proposal

Signature of GA

Preparation of GA

Call

Evaluation

ProceduresISC, Programme Committee

Negotiation

ProceduresProgramme Committee, budget

Grant Agreement

30/08/200914/01/2010

15/02/201023/04/2010

Mid June 201029/10/2010

1-2 months

1-2 months

Page 9: Info Day – 31/05/2010 Overview Peter Crawley European Commission DG RTD – H2 Surface Transport Rail Road Water Sustainable Surface Transport - Call 2010

Thank you for your attention