Information Technology

Work-Based ProjectSeptember 2003

Page 2: Information Technology Work-Based Project September 2003

Session ObjectivesTo give you a brief introduction to the style and content of the Work-Based Project Module, so that you understand what is required of you, and what sorts of things you need to undertake.To provide you with the information you will need in order to carry out preliminary tasks effectively

Page 3: Information Technology Work-Based Project September 2003

What exactly is the Work-Based Project?

This is a module accredited by Liverpool Hope in which you undertake tasks largely decided by you either within or for an organisation.There is a great deal of flexibility in what you can do, how you do it, and when you do it within the semester.

Page 4: Information Technology Work-Based Project September 2003

What sorts of things are intended?

The idea behind WBP is that you are carrying out a sizeable project over which you have a large measure of control, rather than just undertaking ‘work experience’.This project should be challenging and worthwhile.

Page 5: Information Technology Work-Based Project September 2003

For example?modifying or creating a web-sitecreating a marketing ‘multimedia’ packageundertaking market researchanalysing or presenting datamodifying or creating a databasedelivering IT or other trainingautomating accounts/stock control

Page 6: Information Technology Work-Based Project September 2003

What is the purpose of it?

The main purpose is to allow you to apply skills learnt during your time at Hope in a real-world context.An important subsidiary purpose is that this experience will help you develop as an autonomous learner.

Page 7: Information Technology Work-Based Project September 2003

How much work is involved?

Exactly the same as on any other 15-credit module, 150 hours of student learning.In this case you are expected to spend about 10 days (approx 70-80 hours) in the workplace, 40 hours of which will be doing the project.The other time is for research and write-up.

Page 8: Information Technology Work-Based Project September 2003

Are there any lectures or seminars?

There are two lectures: this one (introduction), and one more at the end of the semester (reporting).You will also be entitled to four separate individual half-hour tutorial sessions with your project supervisor.In addition you will be given a ‘reporting’ slot for your project.

Page 9: Information Technology Work-Based Project September 2003

The Virtual Learning Environment

An important element on this module is the Virtual Learning Environment (VLE)This is an on-line learning system, which allows you to manage your own learning, to download documents and to communicate with your supervisor and other students.

Page 10: Information Technology Work-Based Project September 2003

How will I know what to do?

You have been given a brief version of the module handbook. You will need to read this carefully.The full version is on the VLE. You can log in under your student name (password = your student ID) at:

http://172.16.0.195/ levelh_login.html

Page 11: Information Technology Work-Based Project September 2003

Do I have to find my own placement?

The short answer is ‘yes’. As stated earlier, an important aspect of the module is autonomy, and part of this is that you find the placement.There are three ways suggested:

‘Cold Calling’ to organisations you would wish to work with or work for.Business BridgeUsing your part-time job.

There are some additional possible placements held in reserve.

Page 12: Information Technology Work-Based Project September 2003

How do I introduce myself to an employer?

On the VLE is a letter of introduction from Liverpool Hope.You need to make an electronic copy of this letter, amend it with your details, and print it off.

Page 13: Information Technology Work-Based Project September 2003

What sort of things can I do in the workplace?

This is really up to you. You are free to negotiate, within certain constraints, any project which fits certain basic Academic Criteria.

Page 14: Information Technology Work-Based Project September 2003

What are the criteria for the project?

It should take around 40 hours to complete.It must be academically challenging.You must either be learning or applying new skills.It must require the use of ICT.It must have value and be relevant to the organisation.

Page 15: Information Technology Work-Based Project September 2003

How do I find out who my project supervisor is?

The BIM Notice Board just outside the IBITE school office have lists of students and their supervisor.It is up to you to initiate contact with your supervisor.

Page 16: Information Technology Work-Based Project September 2003

What happens in the tutorials?

The content and structure of each of the six tutorials is clearly-defined.You will find all the details on the VLE.You will need to prepare for the tutorials in advance.

Page 17: Information Technology Work-Based Project September 2003

Who decides on my project?

You do!

However, you must negotiate the project with your employer, and discuss it in depth with your project supervisor.

The end result of this process will be a Negotiated Learning Agreement which specifies what you are doing and what the outcomes will be.

Page 18: Information Technology Work-Based Project September 2003

What exactly is a ‘Negotiated Learning

Agreement’?It is a document which describes what you intend to do, and where and when you intend to do it.It will contain project outcomes and learning outcomes. It will contain agreed percentages and deadlines for submission.It will be discussed and agreed with your project supervisor, and your employer.

Page 19: Information Technology Work-Based Project September 2003

How do I complete my Negotiated Learning Agreement (NLA)?

You can get an electronic copy from the VLE.There is also a set of guidelines on the VLE explaining precisely how to fill in the NLA.This is the first major task of the module. You will be expected to have a draft of this ready to be discussed at the first full meeting with your tutor, either next week or the week after.

Page 20: Information Technology Work-Based Project September 2003

What else am I expected to submit for Assessment?

There are four elements of AssessmentNegotiated Learning Agreement (10%)Project Action Planning (20%)Portfolio of Practical Work (30%)Project Reporting (40%)

Page 21: Information Technology Work-Based Project September 2003

When are the deadlines for these Assessments?

You must submit to the School Office:A Negotiated Learning Agreement in the first few weeks of the semester. An Initial Action Plan shortly afterwardsA Project File at the end of the semester

You will be called for a viva or presentation during the examination period.

Page 22: Information Technology Work-Based Project September 2003

How do I keep on track?The VLE will contain advice on a week-by-week basis, telling you what you should be doing and when.However, this makes the assumption that you are undertaking your work-based project as a one-day per week placement over 10 weeks.

Page 23: Information Technology Work-Based Project September 2003

When do I need to start?There is a suggested programme in the handbook, which suggests that:

This week you should be making contact with a possible employer and your tutor.Next week you should be putting together a learning contract.The week after, you should be putting together and submitting an action plan.

These are the earliest dates by which you could reasonably be expected to do these things. However, if you have not got under way by the end of next week, you will probably disadvantage yourself.

Page 24: Information Technology Work-Based Project September 2003

What do I do now?Firstly, get on to the VLE and read the information.Secondly. make contact with your tutor to say ‘hello’, and to make your first real appointment.Thirdly, start thinking about possible placements and projects.Finally, download and examine the NLA, and begin to complete it.

Page 25: Information Technology Work-Based Project September 2003

Where can I find more Information?

If you don’t know what to do, consult1. The Module Handbook (brief version)2. The VLE: http://172.16.0.195/levelh_login.html

3. The BIM/IBITE Notice Boards4. Your Project Supervisor5. Tony Fleet (NB... as a last resort!)