INITIAL ENVIRONMENT ASSESSMENT REPORT (IEAR) El 065 FOR VOL. 3 SEONI-WARDHA-AKOLA-A URANGABAD TRANSMISSION SYSTEM - . e43 Zil k - - a-i? -lt r,*Jt; ,~~~~~~~ ~ 7f ~ pf -i~~~~ § ENVIRONMENT AND SOCIAL MANAGEMENT i ESMDIIEAR/SEONI-A,BADIO1 NOV'04 '-i Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

INITIAL ENVIRONMENT ASSESSMENT REPORT

(IEAR) El 065FOR VOL. 3

SEONI-WARDHA-AKOLA-A URANGABADTRANSMISSION SYSTEM

- .

e43 Zil k

- - a-i? -lt r,*Jt;

,~~~~~~~ ~

7f ~ pf

-i~~~~ §

ENVIRONMENT AND SOCIAL MANAGEMENT

i ESMDIIEAR/SEONI-A,BADIO1 NOV'04

'-i

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

CONTENTS

Page#

SECTION I: PROJECT DESCRIPTION 1-2

- BACKGROUND 1

- BENEFITS OF THE PROJECT 1

- SCOPE OF WORK 2

SECTION II: BASE LINE DATA 3-7

- MAHARASHTRA 3-ECOLOGICAL RESOURCES 4

- -HUMAN AND ECONOMIC DEVELOPMENT 5

- MADHYA PRADESH 5-ECOLOGICAL RESOURCES 6-HUMAN AND ECONOMIC DEVELOPMENT 7

SECTION III: POLICY, LEGAL & REGULATORY FRAMEWORK 8-12

- ENVIRONMENTAL 8

- SOCIAL 10

SECTION IV: POWERGRID APPROACH FOR ROUTE SELECTION 13-17

- ROUTE SELECTION 13

- STUDY OF ALTERNATIVES 13

- ROUTE ALIGNMENT OF 765 KV SEONI-WARDHA LINE 14- ROUTE ALIGNMENT OF 400 KV WARDHA-AKOLA LINE 15- ROUTE ALIGNMENT OF 400 KV AKOLA-AURANGABAD LINE 16

SECTION V: SCREENING OF POTENTIAL IMPACT,EVALUATION & MANAGEMENT 18-27

- IMPACT DUE TO PROJECT LOCATION 18- ENVIRONMENTAL PROBLEM DUE TO DESIGN 21- ENVIRONMENTAL PROBLEMS DURING CONSTRUCTION 22- ENVIRONMENTAL PROBLEMS RESULTING FROM OPERATION 23- CRITICAL ENVIRONMENTA REVIEW CRITERIA 24- PUBLIC CONSULTATION 25

- CONCLUSION 27

SECTION VI: MONITORING & ORGANISATIONAL SUPPORT STRUCTURE 28-45

- ENVIRONMENTAL MONITORING IN POWERGRID 28

- ENVIRONMENT REVIEW 29

- ENVIRONMENT MANAGEMENT PLAN 30-45

ENCLOSURES:Annexure-1 to 5Map-@-5Plate-1-2Figure - 1

NI

Page 3: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

SECTION l: PROJECT DESCRIPTION(Sooni-Wardha-Akola-Aurangabad Transmission System

1.0 BACKGROUND:

Seoni in central part of Western Region is planned to be developed as apooling station where surplus power imported from Eastern Region and powergenerated at Sipat complex shall be pooled. As this pooling station is locatedin Madhya Pradesh, for reliable dispersal of power beyond Seoni towardsvarious load centres in eastern and western part of Maharashtra, a highcapacity transmission corridor between Seoni and Maharashtra, in parallelwith existing 400 kV transmission lines in Maharashtra need to beestablished.

1.1 BENEFITS OF THE PROJECT:

The objective of the project is to provide adequate transmission arrangementto enable Maharashtra to draw power with reliability from pooling point incentral part of Western Region, where power imported from Eastern Regionand generated at Sipat complex shall be pooled.

1.2 PROJECT DESCRIPTION

Wardha (Nagpur area) is one of the major load centres in eastern part ofMaharashtra. At present, power to Wardha is being dispersed through 220kVlines, which shall not be adequate to meet the future demand. Therefore, tomeet the present as well as long-term power requirement of the area withreliability and security, establishment of a new 400/220kV substation atWardha has become necessary. Further, this substation is to be upgraded to765 kV level in future when injection of power at Seoni from Eastern Regionwould increase and more power transfer would be required to Maharashtra.Accordingly, interconnection of this substation with power pooling station atSeoni through 765kV S/C Seoni - Wardha (initially to be operated at 400kV)line has been proposed.

For further dispersal of power towards central part of Maharashtra,establishment of 400 kV D/C Wardha-Akola and Akola-Aurangabad lines isalso needed. These lines would enable development of a paralleltransmission corridor for delivery of power with reliability and security frompooling station located in Madhya Pradesh towards eastern/ central part ofMaharashtra.

Project Highlightsa) Project Name Seoni-Wardha-Akola-Aurangabad

Transmission Systemb) Location Madhya Pradesh and Maharashtrac) Beneficiary States Constituents of Western Region

d) Project Cost US $ 164.34 million (including IDC)

1

Page 4: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Scope of work

Transmission Lines

i. Seoni - Wardha 765kV S/C - 275 kms.

ii. Wardha - Akola 400kV D/C - 184 kms.

iii. Akola - Aurangabad 400kV D/C - 265 kms.

Substations:

i. Extension of existing 765/400 KV substation at Seoniii. Extension of existing 400/220 KV at Akola and Aurangabad of MSEB

iii. Construction of new 400/220 KV at Wardha

A power map showing the transmission grid of Western Region highlightingthe above scope of works is placed as Annexure-1.

-~~~~~~~~~~~~~~~~~~~~~~~~~

Page 5: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

I SECTION II: BASE LINE DATA

2.0 The project is located mainly in the State of Maharashtra in India except oneline(Seoni-Wardha) part of which is falling in Madhya Pradesh. The basic details ofthe area under project are given below:

2.1 MAHARASHTRA:

Maharashtra, with an area of 30.77 million ha, is the third largest state of the country,constituting 9.36% of the total geographic area. It lies between latitude 150 35' and220 02' N and longitude 720 36' and 800 54' E.

Physiographically, the state can be divided into five regions viz Deccan Plateau,Central Highland, Eastern Chotanagpur Plateau, Eastern Ghat and Coastal plain.Except around Mumbai, and along the eastern limits, the State of Maharashtrapresents a monotonously uniform, flat-topped skyline. This topography of the state isthe outcome of its geological structure. The state area, barring the extreme easternVidarbha region, parts of Kolhapur and Sindhudurg, is practically co-terminus withthe Deccan Traps. The land use pattern is shown in Table 2.1.

Table-2.1 Land use PatternLand use Area in '000 ha Percentage

Geographical area 30,771Total reporting area 30,758 100Forests 5274 17.15Not available for cultivation 2960 9.62Permanent pasture and grazing land 1357 4.41Land under misc. tree crops and groves 226 0.74Culturable wasteland 890 2.89Fallow land other than current fallow 1126 3.66Current fallow 1049 3.41Net Area sown 17,876 58.12

Climate: The state enjoys a tropical monsoon climate; the hot scorching summerfrom March onwards yields to the rainy monsoon in early June. The rich green coverof the monsoon season persists during the mild winter that follows through anunpleasant October transition, but turns into a dusty, barren brown as the summersets in again

Rainfall: The average annual rainfall varies between 160-200 cms. However,seasonal rains from the western sea-clouds are very heavy and the rainfall is over400 cm. on the Sahyadrian crests. The Konkan on the windward side is alsoendowed with heavy rainfall, declining northwards. East of the Sahyadri, the rainfalldiminishes to a meagre 70 cm. in the western plateau districts, with Solapur-Ahmednagar lying in the heart of the dry zone.

Temperature: The average annual temperature varies from 25-35 0C.

3

Page 6: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Soil: The soils of Maharashtra are residual, derived from the underlying basalts. Inthe semi-dry plateau, the regur (black-cotton soil) is clayey, rich in iron, but poor innitrogen and organic matter; it is moisture-retentive. The higher plateau areas havePather soils, which contain more gravel. In the rainy Konkan, and the SahyadriRange, the same basalts give rise to the brick-red laterite soil.

Mineral Resources: The mineral-bearing zones of Maharashtra lie beyond the areaof the basalts in eastern Vidarbha, southern Kolhapur and the Sindhudurg area. TheChandrapur, Gadchirali, Bhandara and Nagpur Districts form the main mineral belt,with coal and manganese as the major minerals and iron ore and limestone aspotential wealth. The Ratnagiri coast contains sizeable deposits of illimenite.

Water Resources: Water is the most precious natural resource of the state, greatlyin the demand, and most unevenly distributed. The major rivers like the Krishna,Bhima, Godavari, Tapi-Purna and Wardha-Wainganga through its Fluvial action hasfurther aided in the compartmentalisation of the state into broad, open river valleys,alternating with plateau interfluves

Ecological Resources: The recorded forest area is 6.38 million ha, constituting20.75% of the geographic area of the state. Reserved Forest constitutes 76%,Protected Forest 14% and Un-classed Forest 10%. However, total forest coverrecorded in the state is 47,482 Sq. Km comprising of 30,894 Sq. Km dense forestand 16,588 Sq. Km of open or degraded forest thereby covering a area of 15.4% ofState geographical area (Map-1). There are six forest types in the state, viz TropicalSemi Evergreen, Tropical Moist Deciduous, Tropical Dry Deciduous, and TropicalThorn, Subtropical Broadleaved hill and Littoral and Swamp forests. A total of 1.53million ha of forests constituting about 5% of geographic area, is under protectedarea network. There are 5 National Parks and 33 Wildlife sanctuaries. There aretwo tiger reserves namely Melghat and Tadoba. Ujni, located in the Sholapurdistrict, with an area of 35,700 ha is a wetland of national importance.

The lines of proposed transmission system shall pass through mainly seven districtof this state having forest cover ranging from 1.32 % to 25.69%. It may be notedfrom the table below that the forest cover in the said districts are generallyopen/degraded type except in Aurangabad and Nagpur district where it is mixture ofdense and open forest. All precaution in routing of line through forest area tominimize ecological disturbance to highly wooded area has been appliedsuccessfully. Details of forest cover of these districts are as follows:

In Sq.Km

District Geographic Dense Open Total % Forestarea forest forest cover

Akola 5,390 204 157 361 6.70Amravati 12,210 2,193 944 3,137 25.69

Aurangabad 10,107 148 341 489 4.84

Buidana 9,661 233 386 619 6.41Jalna 7,718 85 17 102 1.32Nagpur 9,892 1,412 550 1,962 19.83Wardha 6,309 592 254 846 13.41

4

Page 7: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Human and Economic Development:

About 70 per cent of the people in Maharashtra depend on agriculture. Agriculturecontributes more than 22% of the state's income. Maharashtra is the largestproducer of a number of items such as Alphonso mangoes, Thomson seedlessgrapes, Cavendish bananas, soft seeded pomegranates, sugar, cotton, oilseeds andcashew. Important cash crops are cotton, sugar cane, groundnut and tobacco.Although the state accounts for 9.2% of the total population of the country, it sharesabout 11% of industrial units, over 17% of labour, about 16% of investment and 23%of the value of industrial output.

Maharashtra's major industries are chemicals and allied products, textiles, electricaland non-electrical machinery and petroleum and allied products. Other importantindustries are pharmaceuticals, engineering goods, machine tools, steel and ironcastings and plastic ware.

The development of offshore oil fields at Mumbai High and the nearby basins havecontributed greatly for the industrial development of the state.

MADHYA PRADESH:

PHYSIOGRAPHY: Madhya Pradesh as its name implies, lies in the heart of India.ltconsists of a geographical area of 3,08,300 sq. km which constitutes 9.38% of theland area of the country & bordering the states - Uttar Pradesh, Chhattisgarh,Maharashtra, Guparat and Rajasthan. It lies between lat.210 04'&260 52'N andlong.740 02' & 82 49' E.

Climate: The climatic condition is generally Sub-Tropical wet and dry. MP state hasthree main seasons:

* Winter (November through February);* Summer (March through May); and* Monsoon season (June through September).

Temperature: During the winter average temperatures range from 100 to 270 C.Summers are hot, with an average temperature of 29° C and a high temperature thatat times reaches 480 C. During the monsoon season temperatures average 190 to300 C.

Rainfall: Annual rainfall tends to decrease from south to north and from east towest. The average rainfall in the different regions of the state ranges from 450 to900 mm. The annual mean total rainfall recorded at Ujjain is 934.1 mm (1960 -1980 data period) with almost 45 rainy days. The heaviest rainfall in 24 hours hasbeen recorded as 239 mm at Ujjain.

Wind: The mean wind speed at Ujjain is 10 km/hr though the wind speeds arenormally recorded to exist between 4 km/hr to 20 km/hr.

Soil: Red, Yellow and black soils are generally available in the state.

5

Page 8: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Mineral Resources: Madhya Pradesh is one of the major mineral producing statesof the country. It has large deposits of a variety of minerals. Important among themare bauxite, copper, manganese, coal, dolomite and limestone.

Water Resources: The important rivers of the state are Chambal, the Betwa, theSone and the Narmada.

ECOLOGICAL RESOURCES: The forest cover of the state based on the satellitedata is 77,265 Sq. km. which constitutes 25.07% of the geographic area (Map-2).Out of these dense forest accounts for 44,384 sq.km. having crown density ofmore than 40% and open or degraded forest of 32,881 sq.km. having crowndensity ranging between 10-40%. By legal status Reserve Forest constitutes61.69%, Protected Forest 37.36% and unclassified Forest 0.95%. The forests arethe main source of supply of fodder and fuel and subsistence for the poorestsections of the people and tribal population in the interior under-developed areas ofthe state. There are four forest types:

Tropical Moist DeciduousTropical Dry DeciduousTropical Thorn andSub Tropical Broadleaved Hill Forests.

Forests are largely distributed in central, southern and eastern parts of the undividedstate of Madhya Pradesh. Northern and western parts of the state are deficient inforest vegetation. Teak and Sal are the two most important forest formations of thestate, covering 18.0% and 16.7% forest area, respectively while miscellaneousforests cover 65.3%. Madhya Pradesh forest reserves are logged for Teak, Sal,Bamboo and Salai. These forests catered to the needs of the people and cattle forgenerations, largely because they contained good cropping species. However,population explosion and developmental needs have exerted a steadily increasingdemand on the ever-diminishing extent of forests. Over-exploitation resulted inreduction of area under forests. The maximum forest cover is recorded in the districtSheopur having 56.75% of forest cover and minimum in the Ujjain district having only0.61%. There are 11 National Parks (NP) and 32 Wild Life Sanctuaries in the state.However, the Kanha tiger reserve in Jabalpur district is the most important NationalPark of the state.

The one line (765 KV Seoni-Wardha) of proposed transmission system shall passthrough mainly two district of this state having forest cover ranging from 35 % to 38%. It may be noted from the table below that in these districts the forest cover is agood mixture of both dense and open/degraded forest nature this warrant extraprecaution in routing of line through forest area. Details of forest cover of thesedistricts are as follows:

In sq. Km.

District Geographic Dense open forest Total % forestarea forest Cover

Seoni 8,758 2,237 910 3,147 35.93Chindwara 11,815 2,631 1,864 4,545 38.47

6

Page 9: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

HUMAN AND ECONOMIC DEVELOPMENT:The total population of Madhya Pradesh based on 1991 census is 6,03,85,118out of which 73.3% is rural and 26.7 % is urban. The state supports 5.9% ofcountry's total population. The population density is 196 persons per sq.km. Sexratio is females per thousand males are 920. Literacy in males=76.80% & in females50.28%. Madhya Pradesh in its present form came into existence on November 1,2000 following its bifurcation to create a new state of Chhattisgarh.

Agriculture is the mainstay of the state's economy and 74.73% of the people arerural. Almost 49% of the land area is cultivable. Madhya Pradesh consists largely ofa plateau streaked with the hill ranges of the Vindhyas and the Satpuras with theChhattisgarh plains to the east. Madhya Pradesh is one of the leading states in thecountry in mineral production 26 percent of total Minerals of India are found in M.P.The share of M.P, in India's production of such vital minerals as diamond (100%),dolomite (39%), bauxite (28%), iron ore (24%), coal (23%), and limestone (23%). Inshort about 30 different types of minerals are known to occur in the state. Recentlydeposits of tin and uranium have been located in this state. Rich and varied mineraldeposits have been surveyed and identified in this state A large number ofautomobile industries have been established at Pithambore near Indore. M.P is richin low-grade coal suitable for power generation and has also got immense potentialof hydro-energy. The total installed power generation capacity in year 2000-2001was 2900 MW. There are eight hydro-electric power stations with installed capacity747.5 MW. A total of 50,271 out of 51,806 villages have been electrified by 2000-2001. Power generation is 14023.7 m Kwh. The Govt. of M.P has formed a jointventure (Narmada Hydro Electric Development Corporation) with NationalHydro-Electric Power Corporation, a Govt. of India undertaking for execution of1000MW Power from Indira Sagar Hydro-Electric Project and 520 MWOmkareshwar Hydro-Electric Power Project. . The unique temple of Khajuraho arefamous all over the world.

7

Page 10: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

SECTION III: POLICY, LEGAL & REGULATORY FRAMEWORK

3.0 POWERGRID's activities by their inherent nature and flexibility have negligibleimpacts on environmental and social attributes. Indian laws relating toenvironmental and social issues have strengthened in the last decade bothdue to local needs and international commitments. POWERGRID undertakesits activities within the purview of Indian laws keeping in mind appropriateinternational obligations and directives and guidelines with respect toenvironmental and social considerations of Funding Agencies.

3.1 ENVIRONMENTAL

3.1.1 MANDATORY REQUIREMENTS (NATIONAL)

* MOP order/sanction under The Electricity Act, 2003:Sanction of MOP, GOI is a mandatory requirement for taking up any newtransmission project under the section 68(1) of The Electricity Act, 2003. Thesanction authorize POWERGRID to plan and coordinate activities tocommission the new project. Electricity act does not explicitly deal withenvironmental implications of activities related to power transmission.However, POWERGRID always integrates environmental protection within itsproject activities.

* Forest Clearance Under The Forest (Conservation) Act, 1980When transmission projects pass through forest land, clearance has to beobtained from relevant authorities under the Forest (Conservation) Act, 1980.This Act was enacted to prevent rapid deforestation and environmentaldegradation. State governments cannot de-reserve any forest land orauthorize its use for any non-forest purposes without approval from theCentral government. POWERGRID projects, when involving forest areas,undergo detailed review and approval procedures to obtain a ForestClearance certificate from MOEF, Government of India before starting anyconstruction activity in designated forest area.

* Environmental Clearances under Environment (Protection) Act,1986Since transmission line projects are environmentally clean and do not involveany disposal of solid waste, effluents and hazardous substances in land, airand water they are kept out of the purview of Environment (Protection) Act,1986. However, the recent amendment in the Environment (Protection) Act,1986 made it necessary to obtain clearance from MoEF for powertransmission projects in two districts in the Aravalis (viz., Alwar in Rajasthanand Gurgaon in Haryana). The Aravali range, in these two areas, is heavilydegraded, hence, any industrial activity there becomes critical. EnvironmentImpact Notification, 1994 lays down specific project categories that requireclearance from MoEF Power transmission projects are not included in this list.

8

Page 11: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

* Batteries (Management and Handling) Rules, 2001:MOEF vide its notification dt. 16th May, 2001 under the section of 6,8 and 25of the Environment (Protection) Act, 1986 has put certain restriction ondisposal of used batteries and its handling. As per the notification it is theresponsibility of bulk consumer (POWERGRID) to ensure that used batteriesare not disposed of, in any manner, other than by depositing with thedealer/manufacturer/registered recycler/importer/reconditioner or at thedesignated collection centers - and to file half yearly return in prescribed formto the concerned State Pollution Control Board.

* Hazardous Wastes (Management and Handling)Amendment Rules, 2003:MOEF vide its notification dt. 20 th May, 2003 under the section of 6,8 and 25of the Environment (Protection) Act, 1986 has put used mineral oil under thecategory of hazardous waste which require proper handling and disposal. Asper the notification, all used oil is to be auctioned/sold to registered recyclersonly and file annual return on prescribed form to the concerned State PollutionControl Board.

* Ozone Depleting Substances (Regulation and Control) Rules, 2000:MOEF vide its notification dt. 17th July, 2000 under the section of 6, 8 and 25of the Environment (Protection) Act, 1986 has notified rules for regulation/control of Ozone Depleting Substances under Montreal Protocol adopted on16th September 1987. As per the notification certain control and regulationhas been imposed on manufacturing, import, export and use of thesecompound. POWERGRID is following provisions of notification and is phasingout all equipment which uses these substances and planning to achieve CFCfree organization in near future.

* The Biological Diversity Act, 2002:Under the United Nations Convention on Biological Diversity signed at Rio deJaneiro on the 5th day of June, 1992 of which India is also a party, MoEF hasenacted the Biological Diversity Act, 2002 to provide for conservation ofbiological diversity, sustainable use of its components and fair and equitablesharing of the benefits arising out of the use of biological resources,knowledge and for matters connected therewith. As per the provision of actcertain area which are rich in biodiversity and encompasses unique andrepresentative ecosystems are identified and designated as BiosphereReserve to facilitate its conservation. All restrictions applicable to protectedareas like National Park & Sanctuaries are also applicable to these reserves.POWERGRID will abide by the provision of act wherever applicable and try tototally avoid these biosphere reserves while finalizing the route alignment.

3.1.2 FUNDING AGENCIES:

WB Operational Policies (OP) 4.01/ADB's Operations Manuals (OM)- F1/BPand JBIC Environmental Guidelines: These outlines funding agencies policyand procedures for environmental assessment (EA) of differentdevelopmental projects. All these guidelines classified developmental projects

9

Page 12: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

into three categories (A-C) based on its possible environmental and socialimpacts though WB & ADB has another category Fl applicable only toprojects involving a credit line through a financial intermediary.

Transmission line projects are categorized as category-B project havinglimited impact that can be further minimized through mitigative/managementmeasures and would normally require only an environmental review.POWERGRID takes remedial measures to prevent, minimize, mitigate, orcompensate for adverse impact and improve environmental performance.Environment Assessment will take account the natural environment, humanhealth and safety, and social aspects and trans- boundary and globalenvironmental aspects. During EA process public is also informed at everystage of project execution and their views are considered during decision-making process.

3.1.3 PRESCRIPTIVE FRAMEWORK (NATIONAL)

* Constitutional Guarantees

* Applicable Legislations

3.1.4 RELEVANT POLICIES

* National Conservation Strategy and Policy Statementon Environment and Development, 1992

* Policy statement for Abatement of pollution, 1992

3.2.0 SOCIAL

3.2.1 MANDATORY REQUIREMENTS (NATIONAL)

* National Policy on Resettlement and Rehabilitation for Project AffectedFamilies: Ministry of Rural Development, Government of India has notified aNational policy on R&R for PAFs in Feb'04 applicable to all developmentalprojects where 500 or more families enmass in plain areas or 250 or morefamilies enmass in hilly areas are displaced due to project activity. Itessentially addresses the need to provide succour to the assetless rural poor,support the rehabilitation efforts of the resources and provide a broad canvasfor an effective consultation between PAFs and authorities responsible fortheir R&R. It has also listed R&R measures and entitlements for differentcategory of PAFs. Though the National policy as such is not applicable toPOWERGRID because transmission projects do not involve displacement ofsuch a large numbers of families since land required for substations is quitesmall. However, the entitlement benefits listed in the National policy for PAFshave been adopted by POWERGRID in its "Social Entitlement Framework"that is being implemented wherever land acquisition for substations isundertaken.

10

Page 13: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

* Rights of Way And Compensation Under Electricity Act,2003:The act has a provision for notifying transmission company under section 164(B) to avail benefits of eminent domain provided under the Indian TelegraphAct, 1885. MOP, GOI vide gazette notification dt 23rd Dec'03 had alreadynotified POWERGRID under this section of said act. Therefore, for thepurpose of placing of any wires, poles, etc., POWERGRID has all the powersthat the telegraph authority possesses. Thus, POWERGRID can erect andconstruct towers without actually acquiring the land. However, all damagesdue to POWERGRID activity are compensated at market rate. Powertransmission schemes are always planned in such a way that the power ofeminent domain is exercised responsibly.

* Provisions Under Land Acquisition Act, 1894, as amended in 1984:When land is acquired for sub-stations, POWERGRID will follow procedureslaid down under the Land Acquisition Act (LA Act), 1894. POWERGRID sub-stations have never resulted in large scale displacement or loss of livelihoods.There have been only marginal impacts due to flexibility exercised byPOWERGRID in selecting sites. The LA Act specifies that in all cases of landacquisition, no award of land can be made by the government authoritiesunless all compensation has been paid.

3.2.2 FUNDING AGENCIES

For POWERGRID, mandatory requirements vis-a-vis Funding Agencies arecomprehensive Resettlement and Rehabilitation (R&R) guidelines and anentitlement framework as per World Bank Operational Directives 4.30 (OP-4.12) and 4.20 and ADB's Operations Manual OM-F2/BP.

* World Bank OD 4.30 (OP-4.12): Involuntary Resettlement:This directive describes Bank Policy and procedures on involuntaryresettlement as well as conditions that borrowers are expected to meet duringoperations involving resettlement of affected groups. It requires a entitlementframework aimed at restoration, replacement and participation of affectedgroups. A detailed social assessment and development of an action planhaving list of measures for betterment/restoration of lost assets/income isrequired to be submitted to bank before start of project work. However whereonly a few people (e.g. about 100-200 individuals) are to be relocated at aparticular location, appropriate compensation for assets, logistical support formoving and a relocation grant may be the only requirements but the principleon which compensation is to be based will remain same as for larger groups.

* World Bank OD 4.20: Indigenous People (IP):This directive describes World Bank policies and procedures for projects that

affect indigenous people. The objective is to ensure that development benefitsare socially and culturally compatible and that the IPs are consulted. Thus, theIndigenous People Development Plan/Tribal Development Plan is to beprepared as a prerequisite. POWERGRID will not only incorporate the IP

11

Page 14: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

component whenever necessary, but will also pay attention to marginalizedgroups such as women, children, etc.

ADB Operations Manual -F2/BP: Involuntary Resefflement:The OP describes Bank Policy and procedures on involuntary resettlement aswell as conditions that borrowers are expected to meet during operationsinvolving resettlement. Its objective is to avoid such resettlement as far aspossible if unavoidable measures like assistance to affected persons forrestoration of their assets/livelihood as would have been in the absence ofproject. It also classified project into three categories like category-A whereresettlement is significant and involve physical displacement of more than 200persons, which require a detailed resettlement plan. Category-B whereresettlement is not that significant and requires a short resettlement plan.Category-C where no resettlement of peoples are foreseen and neitherrequire neither resettlement plan nor a resettlement framework.

POWERGRID emphasizes that displacement is not an issue withtransmission projects because land below tower/line is not acquired and onlya small piece of land is required for substations. However, all affectedpersons/families shall be provided compensation and rehabilitation assistancealong with other measures as per POWERGRID's social entitlementframework which is based on these directives/manuals and National R&RPolicy to restore income/livelihood of all affected persons.

3.2.3 PRESCRIPTIVE FRAMEWORK (NATIONAL)

* Constitutional Guarantees

* National and State-wide Laws and Policies Relatingto Land Acquisition and Issues of R&R

* Madhya Pradesh Pariyojana Ke Karan Visthapit Vyakti (Punsthapan)Adhiniyam, 1985

* Maharashtra Project Affected persons Rehabilitation Act, 1986

3.2.4 RELEVANT POLICIES

* The Orissa Resettlement and Rehabilitation of Project AffectedPersons Policy, 1994 (water resources projects)

* Resettlement & Rehabilitation Policy - NTPC

12

Page 15: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

I SECTION-IV: POWERGRID APPROACH FOR ROUTE SELSCTION

4.0 ROUTE SELECTION - (ASSESSMENT & MANAGEMENT PROCESS)

At the system planning stage itself one of the factors that govern the evolution ofsystem is the possible infringement with the forest. Wherever such infringementsare substantial, different alternative options are considered. The route/ siteselection criteria followed by POWERGRID is detailed below:While identifying the transmission system for a generation project or as a part ofNational Power Grid, preliminary route selection is done by POWERGRID basedon the topo sheets of Survey of India and Forest Atlas (Govt. of India's Publi-cation). Further optimization is done during detailed survey using GIS/GPS.During route alignment all possible efforts are made to avoid the forest areainvolvement completely or to keep it to the barest minimum, whenever it becomesunavoidable due to the geography of terrain or heavy cost involved in avoiding it.

4.1.1 STUDY OF ALTERNATIVES

Environmental Criteria for Route selection

For selection of optimum route, the following points are taken into consideration:(i) The route of the proposed transmission lines does not involve any human

rehabilitation.

(ii) Any monument of cultural or historical importance is not affected by theroute of the transmission line.

(iii) The proposed route of transmission line does not create any threat to thesurvival of any community with special reference to Tribal Community.

(iv) The proposed route of transmission line does not affect any public utilityservices like playgrounds, schools, other establishments etc.

(v) The line route does not pass through any sanctuaries, National Park etc.

(vi) The line route does not infringe with area of natural resources.

In order to achieve this, POWERGRID undertakes route selection for individualtransmission lines in close consultation with representatives from the Ministry ofEnvironment and Forests and the Department of Revenue. Although underNational law POWERGRID has right of eminent domain yet alternativealignments are considered keeping in mind the above-mentioned factors duringsite selection, with minor alterations often added to avoid environmentallysensitive areas and settlements at execution stage.

* As a rule, alignments are generally cited 10-15 km away from major towns,whenever possible, to account for future urban expansion.

* Similarly, forests are avoided to the extent possible, and when it is not possible, aroute is selected in consultation with the local Divisional Forest Officer, thatcauses minimum damage to existing forest resources.

13

Page 16: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

* Alignments are selected to avoid wetlands and unstable areas for both financialand environmental reasons.

In addition, care is also taken to avoid National parks and sanctuaries and anyother forest area rich in wild life.

Keeping above in mind the routes of proposed line under this transmissionSystem has been so aligned that it takes care of above factors. As such differentalternatives were studied with the help of Govt. published data like Forest atlas,Survey of India topo maps etc. to arrive at most optimum route which can betaken up for detailed survey using GIS/GPS and assessment of environmental &social impacts for their proper management.

4.1.2 Evaluation of alternatives Route Alignment of 765 KV S/C Seoni- WardhaLine:

Three different alignments (Map-3) were studied with the help of publisheddata/maps and walkover survey to arrive at most optimum route for detailedsurvey. The comparative details of these three alternatives are as follows:

Sl.NO. DESCRIPTION ALT-I ALT-Il ALT-Ill1. Route particulars

i) Length in Kms 254 Kms 276 Kms 268 Kmsii) Terrain - (a) Plain 86% 86% 85%

(b) Hilly 14% 14% 15%2. Environmental impact Seoni,Chindwara,Nag- Seoni,Chindwara,Na Seoni,Chindwara,Nagp-

i) Town in alignment pur and Wardha -gpur and Wardha ur and Wardha

ii) House within ROW Nil Nil Nil

iii) Tree/Crops and its To be assessed during To be assessed To be assessed duringextent of damage detail survey during detail Survey detail Survey

iv) Forest involvement RF-16.0 RF-13.5 RF10.5PF-6.0 PF-3.5 PF-3.5

a) Type of forest Reserve/protected Reserve/protected Reserve/protectedb) Density of forest dense Dense Open to moderatec) Type of founa & floura Flora:Teak, Banyan, Flora: Teak, Banyan, Flora: Teak, Banyan,

Neem, Tamarinds Neem, Tamarinds Neem, TamarindsFauna: Dear, Bear, Fauna: Dear, Bear, Fauna: Dear, Bear,Indian wild dog, pig etc. Indian wild dog, pig Indian wild dog, pig etc.

etc.

d) Endangered species, Nil Nil Nilif any

v) Historical/cultural Nil Nil Nilmonuments

vi)Details of Tribal areas, Nil Nil Nilif any

3 Compensation Costa) Towards forest Rs. 1438 lakh lakh Rs. 1112 lakh lakh Rs. 907 lakh lakh

clearance (Including NPV @ 9.2 (Including NPV @ (Including NPV @ 9.2lakh/ha.) 9.2 lakh/ha.) lakh/ha.)

b) Tree/crop Can be assessed during Can be assessedtower spotting during tower spotting Can be assessed during

I_____________________I____________________ tow er spotting

4. Major Crossings: I

14

Page 17: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

River 4 3 2Power line 9 10 9Railway line 7 5 4National highway 6 7 8

4. Construction problems Right of way problems Right of way Right of way problemsare more due to more problems are more are less due to lessforest area, more due to more forest forest area, lessdamage of trees/crops. area, more damage damage of trees/crops.At many places in forest of trees/crops. At less hilly area, easyand more hills are many places in forest accessibilitywithout accessibility and more hills arewhich require new without accessibilityaccess roads. Some which require newcoal bearing area are access roads.also getting affected.

5 O&M problems O&M problems are O&M problems are O&M problems arecomparatively more in comparatively more less in this alignmentthis alignment due to in this alignment due due to more approachnon availability of to non availability of roads, less forest area,approach roads, approach roads, with open to degraded

nature, less city limitsand more plain areas

6 Overall remarks Shortest route length More forest, non- Minimum Railwaybut Max. forest, coal availability of access crossings, no Coalbelt involved huge cost road and longest belt involved,towards forest route length huge Moderate route lengthclearance cost towards forest hence recommended

clearance.

It may be seen from above that Alternative-lIl is the most optimum route as itinvolve minimum ecological sensitive areas like forest having lesser density devoidof any endangered or endemic sp. whereas other alternative (Alt-I) is shorter in linelength but involve more forest and may require heavy tree felling that may causeserious environmental problem. Alt-Il is having ROW problem involvement of moreforest and maximum crossing. Hence Alternative -l1l has been found to be mostoptimum and recommended for detailed survey.

4.1.3 Evaluation of alternatives Route Alignment of 400 KV S/C Wardha-AkolaLine:

Three different alignments (Map-4) were studied wth the help of publisheddata/maps and walkover survey to arrive at most optimum route for detailedsurvey. The comparative details of these three alternatives are as follows:

Si.NO. DESCRIPTION ALT-I ALT-Il ALT-Ill1 . Route particulars

i) Length in Kms 181Kms 173 Kms 170 Kmsii) Terrain - (a) Plain 95% 95% 95%

(b) Hilly 05% 05% 05%2. Environmental impact

e) Town in alignment The line is routed The line is routed The line is routedavoiding towns. The line avoiding towns. The avoiding towns. Thehas to be routed close to line has to be line has to becertain towns namely routed close to routed close toWardha, Amravati & certain towns certain townsAkola. namely Wardha, namely Wardha,

Amravati & Akola. Amravati & Akola.ii) House within ROW Nil Nil Niliii) Tree/Crops and its extent To be assessed during To be assessed To be assessed

of damage detail Survey during detail during detailSurvey Survey

15

Page 18: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

iv)Forest involvement(Km) Nil PF-5.5 PF-1.25a)Type of forest protected protectedb)Density of forest Moderate Moderatec)Type of founa & Teak, Banyan, Teak, Banyan,floura Neem, Tamarinds Neem, Tamarinds

d)Endangered species, Nil Nil Nilif anyv)Historical/cultural Nil Nil Nilmonuments

vii)Details of Tribal areas, if Nil Nil Nilany

3. Compensation Cost Rs.295 lakh Rs.76 lakh includingForest clearance Nil including NPV @ NPV @ Rs. 9.2

Rs. 9.2 lakh/ha lakh/ha

Tree/crop Can be assessed during Can be assessed Can be assessedtower spotting during tower during tower

spotting spotting

4. Major Crossings:River 2 2 2Power line 2 2 2Railway line 2 2 2National highway 4 4 4

5. Construction problems Prima facie no problem No problem except No problem exceptis anticipated involvement of involvement of

forest forest6 O&M problems No such problem is Forest insolvent Forest insolvent

anticipated. may pose certain may pose certainO&M problem O&M problem

7 Overall remarks No forest and feasible Forest involved Forest involvedroute hencerecommended

It may be seen from above that Alternative-I is the most optimum route though it isthe longest route but does not involve any ecological sensitive areas like forest.whereas other alternatives are shorter in line length but involve ecological sensitiveareas like forest that may cause some environmental problem. Hence, Alternative-Ihas been found to be most optimum and recommended for detailed survey.

4.1.4 Evaluation of alternatives Route Alignment of 400 KV S/C Akola-Aurangabad Line:

Three different alignments (Map-5) were studied with the help of publisheddata/maps and walkover survey to arrive at most optimum route for detailedsurvey. The comparative details of these three alternatives are as follows:

Sl.NO. DESCRIPTION ALT-I ALT-Il ALT-Ill1. Route particulars

i) Length in Kms 2641 Kms 244 Kms 255Kmsii) Terrain - (a) Plain 90% 78% 85%

(b) Hilly 10% 22% 15%

16

Page 19: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

2. Environmental impacti) Town in alignment The line is routed The line is routed The line is routed

avoiding towns. Due to avoiding towns. Due avoiding towns. Duescattered nature of to scattered nature to scattered naturesettlements, the line has of settlements, the of settlements, theto be routed close to line has to be routed line has to be routedcertain towns namely close to certain close to certainBuldana,Jalna & towns namely towns namelyAurangabad. Buldana,Jalna & Buldana,Jalna &

Aurangabad. Aurangabad.

ii) House within ROW Nil Nil Nil

iii) Tree/Crops and its To be assessed during To be assessed To be assessedextent of damage detail Survey during detail Survey during detail Survey

iv)Forest involvement(Km) RF-1.0 RF-3.55 RF-1.5PF-Nil PF-2.30 PF-2.3

a)Type of forest Reserve Reserve/protected Reserve/protectedb)Density of forest 30% 45% 30%c)Type of founa & floura Teak, Banyan, Neem, Teak, Banyan, Teak, Banyan,

Tamarinds Neem, Tamarinds Neem, Tamarinds

d)Endangered species, if Nil Nil Nilany

v)Historical/cultural Nil Nil Nilmonuments

vii)Details of Tribal areas, if - do - - do - - do -any

3. Compensation Cost Rs. 53 lakh including Rs. 310 lakh Rs. 201 LakhForest clearance NPV

Trees/ crop Can be assessed during Can be assessed Can be assessedtower spotting during tower spotting during tower spotting

4. Major Crossings:River 3 3 3Power line 13 11 16Railway line 3 3 3National highway 10 9 8

4. Construction problems No ROW problem is NO ROW problem NO ROW problemanticipated other than but involvement of but involvement ofcrossings. forest may pose forest may pose

certain problem in certain problem inrespect to time and respect to time andcost. cost.

5 O&M problems No Such problem is Some minor O&M Some minor O&Manticipated. problem in forest problem in forest

area area6 Overall remarks Minimum forest, No Maximum Forest Forest & more power

ROW problem hence line crossingsrecommended I_ I

It may be seen from above that Alternative-I is the most optimum route though it isthe longest route but involve minimum ecological sensitive areas like forest havinglesser density devoid of any endangered or endemic sp. whereas other alternativesare shorter in line length but involve more forest and may require comparativelyhigher tree felling that may cause some environmental problem. Hence,Alternative-I has been found to be most optimum and recommended for detailedsurvey.

17

Page 20: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

SECTION-V: SCREENING OF POTENTIAL ENVIRONMENTAL IMPACT,EVALUATION AND ITS MANAGEMENT

5.0 Impact Due to Project Location and Design

Environmental impact of transmission line projects are not far reaching and aremostly localized to ROW. However, transmission line project has some affects onnatural and socio-culture resources. These impacts can be minimized by carefulroute selection. In order to get latest information and further optimization of routemodern survey techniques/tools like GIS, GPS aerial photography are also applied.Introduction of GIS and GPS in route selection result in access to updated/latestinformation, through satellite images and further optimization of route having minimalenvironmental impact. Moreover, availability of various details, constraints liketopographical and geotechnical details, forest and environmental details etc. help inplanning the effective mitigative measures including engineering variationsdepending upon the site situation/location. In the instant project also thesetechniques are used and detailed survey using GIS/GPS is under progress(Annexure-2). Although, all possible measures have been taken during thefinalization of route alignment for the proposed transmission system but due topeculiarity of terrain and demography of the area where project is beingimplemented, some environmental impacts may be there. The explanations in briefwith regard to specific environment review criteria based on preliminary survey areas follows:

(i) Resettlement

As described earlier all measures are undertaken by POWERGRID at line routingstage itself to avoid settlements such as cities, villages etc. It may be seen from theabove description of proposed route alignment and also keeping in mind that no landis acquired for tower foundation as per existing law, the project does not require anyresettlement of villagers.

The proposed project envisages construction of one new substation at Wardha forwhich government land belonging to Maharashtra Industrial DevelopmentCorporation (MIDC) has been selected to avoid R&R issues. For other substationsland for their extension is already available for proposed bays. Hence no fresh landacquisition or R&R issues are involved in the present projects except for Wardhasubstation which is being dealt separately.

(ii) Land value depreciation

Based on past experience land prices are generally expected to rise in the areasreceiving power. Further, transmission lines generally pass through uninhabitedarea, agriculture fields and forests, where the land-use is not going to change inforeseeable future. Therefore, the value of land will not be adversely affected to asignificant degree.

18

Page 21: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

(iii) Historical/cultural monuments/value

As per the POWERGRID's policy of route selection only that route alignment isfinalized this avoids all the historical and cultural monuments. As per the preliminaryassessment carried out during finalization of route alignment in consultation withState revenue authorities and ASI, no such monuments are coming in the proposedroute alignment.

(iv)Encroachment into precious ecological areas

As already explained all precautions have been taken to avoid routing of line throughforest and ecological sensitive areas and National park/Sanctuaries. However,complete avoidance of forest area was not possible though National Park/Sanctuaryor any other protective areas have been completely avoided. But the routes ofproposed transmission line are so finalized that it affect minimum forest area, whichhas also been certified by concerned Divisional Forest Officer (DFO). In order tominimize forest involvement and subsequent environmental impact special towerdesign for 765 KV line has been developed which has reduced the requirementof ROW by 21 m (from 85 m to 64 m) thereby saving large area of forest. It maybe seen from the above referred tables that out of total transmission line lengthof about 714 Km about 15 Km (2.1% only) length shall pass through forest landconsisting of 94 Ha. forest area in the states of Madhya Pradesh andMaharashtra. Prior approval of GOI/MOEF shall be obtained for affected forest underForest (Conservation) Act, 1980 after detail survey and finalization of route throughforest area in consultation with local forest authorities. Most of the forests to betraversed by the lines are already heavily degraded and the wildlife speciespresent are those who have been adapted to open or disturbed habitat.Therefore with provision of Compensatory Afforestation the overall forest statuswill in many cases improve. Nonetheless, to mitigate losses to existing forests,clearing of the transmission line Right-of-way will be done under supervision ofForest Department, and some low canopy seed trees and shrubs may be keptintact if they do not interfere with tower erection and line installation. The woodwill be sold by the Forest Department, who will also retain the sale proceeds. Three-meter wide strips of land under each conductor will be cleared and maintained asmaintenance rows, but the remaining land will be allowed to regenerate. Lopping oftrees to maintain line clearance will be done under the direction of ForestDepartment. POWERGRID will provide construction crews with fuel wood oralternative fuels as a precaution against collection of fuel wood from nearby forest.

Transmission lines can serve as new access routes into previously inaccessible orpoorly accessible forests, thereby accelerating forest and wildlife loss. In such cases,POWERGRID cannot take action itself, but local Forest Department personnel willnormally assess the dangers and take appropriate action, such as establishing guardstations at the entrance to the forest etc. cost of which is borne by POWERGRIDand is included in the compensatory afforestation scheme. Given the already easyaccess and degraded conditions at the proposed projects sites, this problem is notexpected to be encountered. Nonetheless, POWERGRID staff will report to theForest Department any noticeable encroachment induced by the Projects.

19

Page 22: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

(v) Encroachment into other valuable lands

Impacts on agricultural land will be restricted to the construction phase and whenlarge-scale maintenance measures are required. Some stretch of the line will passthrough Agricultural fields. Agricultural land will be lost at the base of the tower,which is estimated to be 0.2-1 sq. m per average farm holding (Fig-1).

In areas where lines will traverse agricultural land, compensation will be paid toowners for any crop damage incurred as a result of construction activities.POWERGRID field staff will consult affected villagers and local revenue departmentand apprise him about the project and tower location, which shall be erected in theagricultural land, for compensation. Revenue department, after evaluating the lossdue to construction activity and productivity of land, arrives at the compensation costthat is paid to farmer. Agricultural activities will be allowed to continue following theconstruction period. If bunds or other on-farm works are disturbed duringconstruction or maintenance, they will be restored to the owner's satisfactionfollowing cessation of construction or maintenance activities. In the event that privatetrees are felled during construction or maintenance operations, compensation will bepaid to the owner in an amount determined by the estimated loss of products fromthe tree over an eight year period (for fruit bearing trees) and for other treescompensation is finalized in consultation with local forest authorities. Agriculturallands under private ownership will be identified, and in accordance with normalPOWERGRID procedures compensation will be paid to the affected villagers.Budgetary provision Rs. 715 lakh @ Rs. 1.00 Lakh per Km is made in the costestimate to meet these expenses.

(vi) Interference with other utilities and traffic

As per regulations enacted by Government of India, it is mandatory forPOWERGRID to seek clearance prior to construction from department of Railways,Telecommunications and wherever necessary from aviation authorities that are likelyto be affected by the construction of transmission lines. The transmission lines affectnearby telecommunication circuits by causing electrical interference. A standingcommittee -- Power Telecom Co-ordination Committee (P.T.C.C.) has beenconstituted by Government of India to plan and implement the mitigating measuresfor the induced voltage which may occur to nearby telecom circuit and suggestnecessary protection measures to be adopted. The committee suggests measureslike rerouting of the telecom circuits, conversion of overhead telecom circuits intocables etc. to minimize the interference.

The cost of such measures is determined by the Committee and is shared byPOWERGRID and Telecom Department on the basis of prevailing norms andguidelines. Though the exact cost to mitigate the impacts of induction in neighboringtelecom circuits would vary from case to case, the cost on an average works out tobe Rs.50000/- per km for POWERGRID. Provision to meet these expenses has beenmade in the cost estimate for the same.

Wherever transmission line crosses the railways, clearance is taken from thatdepartment. In general, the system is planned and executed in such a way thatadequate clearance is maintained between transmission lines on the one hand, and

20

Page 23: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

railways, civil aviation and defense installations on the other. Wherever thetransmission lines pass by the airports the towers beyond specified height arepainted in alternate orange and white stripes for easy visibility and warning lights areplaced atop these towers.

(vii) Interference with drainage pattern

As the transmission lines are constructed aerially and the blockage of groundsurface is limited to area of tower footings, which is very small, there is littlepossibility of affecting drainage pattern. In the infrequent instances where thedrainage is affected, flow will be trained and guided to safe zones.

5.1 Environmental Problems Due to Design

(i) Escape of polluting materials

The equipments installed on lines and substations are static in nature and do notgenerate any fumes or waste materials.

(ii) Explosion/fire hazards

During the survey and site selection for transmission lines and sub-stations, it hasbeen ensured that these are kept away from oil/gas pipelines and other sites withpotential for creating explosions or fires.

Fires due to flashover from lines can be a more serious problem in forest. However,adequate safety measures shall be taken to avoid such incidence besides this forestauthorities also incorporate measures like making fire lines to prevent spreading offire in the affected forest area.

(iii) Erosion hazards due to inadequate provision for resurfacing of exposed area

Adequate measures are taken to re-surface the area where excavation works aredone. Topsoil disturbed during the development of sites will be used to restore thesurface of the platform. Infertile and rocky material will be dumped at carefullyselected dumping areas and used as fill for tower foundations.

(iv) Environmental aesthetics

Since spacing between the towers in case of 765/400 KV lines is approx. 400 metersthese will not affect the visual aesthetics of the localities particularly when it isensured to route the lines as far away from the localities as possible. POWERGRIDtakes up plantation of trees to buffer the visual effect around its substations and toprovide better living conditions. Wherever POWERGRID feels it appropriate,discussions will be held with local Forest Department officials to determine feasibilityof planting trees along roads running parallel to transmission lines to buffer visualeffect in these areas. In addition, towers may be painted grey or green to merge withthe background.

21

Page 24: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

(v) Noise/vibration nuisances

The equipment installed at sub-station are mostly static and are so designed that thenoise level always remains within permissible limits i.e. 85 dB as per Indianstandards. The noise levels reported during normal operating conditions are about60 to 70 dB at 2 m. distance from the equipment. To contain the noise level withinthe permissible limits whenever noise level increases beyond permissible limits,measures like providing sound and vibration dampers and rectification of equipmentare undertaken. In addition, plantations of sound absorbing species like Casuarinas,Tamarind, and Neem are raised at the sub-stations that reduce the sound levelappreciably. It is reported that 93 m3 of woodland can reduce the noise level by 8 dB.Actual noise levels measured at perimeters of existing Substations are 20 to 30 dB.

(vi) Blockage of wildlife passage

Since the line is passing through mostly agricultural, wasteland and the affectedforest area is also not a migration path of wild life hence, possibility of disturbance towild life are nil/remote.

5.2 Environmental Problems During Construction Phase

(i) Uncontrolled silt runoff

The Project involves only small scale excavation for tower foundations at scatteredlocations that are re-filled with excavated material therefore uncontrolled silt run off isnot expected.

(ii) Nuisance to nearby properties

As already described in preceding paras, during site selection due care is taken tokeep the transmission line and substations away from settlements. Further, all theconstruction activities will be undertaken through the use of small mechanicaldevices e.g. tractors and manual labour therefore nuisance to the nearby propertiesif any, is not expected.

(iii) Interference with utilities and traffic and blockage of access way

Access to the site will be along existing roads or village paths; minor improvementsto paths may be made where necessary, but no major construction of roads will benecessary either during construction or as a part of maintenance procedures.

As and when a transmission line crosses any road/ railways line, the terminal towersare located at sufficient distance so as not to cause any hindrance to the movementof traffic. Stringing at the construction stage is carried out during lean traffic period inconsultation with the concerned authorities and angle towers are planted to facilitateexecution of work in different stages.

(iv) Inadequate resurfacing for erosion control

Since proposed line is to be constructed in plain area where erosion problem is notanticipated. However, if due to terrain at some points transmission towers may be

22

Page 25: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

placed on slopes and erosion prone soils internationally accepted engineeringpractices will be undertaken to prevent soil erosion. This will include cutting andfilling slopes wherever necessary. The back cut slopes and downhill slopes will betreated with revetments. As explained above adequate steps shall be taken toresurface the area after construction. Wherever sites are affected by active erosionor landslides, both biological and engineering treatment will be carried out, e.g.provision of breast walls and retaining walls, and sowing soil binding grasses aroundthe site. Furthermore, construction is generally undertaken outside the rainy season.

(v) Inadequate disposition of borrow area

As mentioned earlier the transmission tower foundations involve excavations onsmall scale basis and the excavated soil is utilized for back filling. In case ofsubstations generally the sites are selected in such a manner that the volume ofcutting is equal to volume of filling avoiding borrowing of the area.

(vi) Protection of Worker's health/safety

The Safety Regulations/Safety Manual published by POWERGRID, and included intender documents will guide provisions for workers' health and safety. Variousaspects such as, work and safety regulations, workmen's compensation, insuranceare adequately covered under the Erection Conditions of Contract (ECC), a part ofbidding documents.

In addition training is imparted to the workers in fire fighting and safety measures.Safety tools like helmet, safety belt, gloves etc. are provided to them in accordanceto the provisions of Safety Manual. First aid facilities will be made available with thelabour gangs, and doctors called in from nearby towns when necessary. Thenumber of outside (skilled) labourers will be quite small, of the order of 25-30 peopleper group. The remaining workforce of unskilled labourers will be comprised of localpeople. Workers are also covered by the statutory Workmen (Compensation) Act.POWERGRID has a dedicated unit to oversee all health and safety aspects of itsproject under the Operation Service Deptt. POWERGRID has framedguidelines/checklist for workers' safety as its personnel are exposed to live EHVapparatus and transmission lines. These guidelines/checklist include work permitsand safety precautions for work on the transmission lines both during constructionand operation (Annexure-3 ) and is monitored regularly by site in-charge andcorporate Operation Services.

5.3 Environmental Problems Resulting from Operation

(i) O&M Staff/Skills less than acceptable resulting in variety of adverse effects

The O&M program in POWERGRID is normally implemented by sub-stationpersonnel for both, the lines as well as sub-stations. However in respect of the longdistance transmission lines, there are monitoring offices that are located at variouspoints en-route. Monitoring measures employed include patrolling and thermo-visionscanning.

23

Page 26: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

The supervisors and managers entrusted with O&M responsibilities are intensivelytrained for necessary skills and expertise for handling these aspects.

A monthly preventive maintenance program will be carried out to disclose problemsrelated to cooling oil, gaskets, circuit breakers, vibration measurements, contactresistance, condensers, air handling units, electrical panels and compressors. Anysign of soil erosion is also reported and rectified. Monitoring results are publishedmonthly, including a report of corrective action taken and a schedule for futureaction.

POWERGRID is following the approved international standards and design, whichare absolutely safe. Based on the studies carried out by different countries on thesafety of EHV lines in reference to EMF affect POWERGRID have also carried outsuch studies with the help of PTI, USA and CPRI, Bangalore on their design. Thestudies inferred that the POWERGRID design are safe and follow the requiredinternational standard. Because of issues relating to need to ensure health andsafety relating to the line such as fire safety, safe voltages on metallic parts ofbuildings, and safety clearances to avoid flashover, the transmission lines will notpass directly over any residential properties and as such the potential for EMFeffects to occur will be further diminished. Given that it will be necessary to ensurethat there are no properties in the ROW beneath and to the sides of the overheadline, automatic mitigation against EMF will be provided between the source ofpotentially high strengths (the transmission line) and the residential properties.

Poly Chlorinated Biphenyls (PCBs) due to its high heat capacity, low flammabilityand low electrical conductivity was extensively used as insulating material incapacitors and transformers. But after the finding that these PCBs are non-biodegradable and has carcinogenic tendency, its use in electrical equipments asinsulating medium has been banned all over the world long back. However, it hasbeen reported in some studies that chances of contamination of oil with PCB ispossible. Keeping that in mind, POWERGRID has taken all possible steps inassociation with NGC, UK and setup Regional testing laboratories for testing ofexisting oil for PCB traces and results of this suggests that PCB contamination is notan issue with POWERGRID. The World Bank has also made following commentsafter a detailed study on Management of PCBs in India:

" Power Grid was the most advanced in testing for PCBs of the organizationsvisited for this project. They have established a procedure for identification ofthe presence of PCBs in transformer oil and more detailed analysis for positiveidentification sample. To date no significant concentrations of PCBs have beendetected. Power Grid do not appear to have any significant issues regardingPCB management and have initiated a testing program. The experience &laboratories of Power Grid could be used to provide a national PCB auditingservice".

5.4 CRITICAL ENVIRONMENTAL REVIEW CRITERIA

(i) Loss of irreplaceable resources

The transmission projects do not involve any large scale excavation and land is lostto the extent of 0.2-1 sq m only for each foundation. As the lines in the subject

24

Page 27: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

project are not passing through any forest area, the problem of losing naturalresources in this project is not envisages.

(ii) Accelerated use of resources for short-term gains

The project will not be making use of any natural resources occurring in the areaduring construction as well as maintenance phases. The construction material suchas tower members, cement etc shall come from factories while the excavated soilshall be used for backfilling to restore the surface. Thus the project shall not causeany accelerated use of resources for short term gains.

(iii) Endangering of species

No endangered species of flora and fauna exist in the project area as well as noreserve forest is getting affected thus there is no possibility of endangering/causingextinction of any species.

(iv) Promoting undesirable rural-to urban migration

The project will not cause any submergence or loss of land holdings that normallytrigger migration. It also does not involve acquisition of any private land holdings.Hence, there is no possibility of any migration.

5.6 PUBLIC CONSULTATION:

Public consultation/information is an integral part of the project implementation.Public is informed about the project at every stage of execution. During survey alsoPOWERGRID's site officials meet people and inform them about the routing oftransmission lines. During the construction, every individual, on whose land tower iserected and people affected by ROW, are consulted.

Apart from this, public consultation using different technique like Public Meeting,Small Group Meeting, informal Meeting as per Environmental Social Policy &Procedures of POWERGRID (ESPP) shall also be carried out during differentactivities of project cycle. During such consultation the public will be informed aboutthe project in general and in particular about the following:

* complete project plan (i.e. its route and terminating point and substations, if any,in between);

* POWERGRID design standards in relation to approved international standards;* Health impacts in relation to EMF;* Measures taken to avoid public utilities such as school, hospitals, etc.;* Other impacts associated with transmission lines and POWERGRID's approach

to minimizing and solving them;* Land acquisition details, proposed R&R measures and compensation packages

in line with POWERGRID's policy;* Trees and crop compensation process.

Apart from organising many informal group meetings in different villages (Table-5.1)a public meeting was also organised in the village Nandanwadi (Pandurana) ofChindwara distt. of Madhya Pradesh on 25.9.04. To get the maximum participation

25

Page 28: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Table-5.1: PUBLIC CONSULTATION ENROUTE OF TRANSMISSION LINES

S. No. Line Village Name Person attended1. 765 KV Seoni-Wardha 1. Somariya Village Sarpanch anda. 9th to 11th Oct'04 2. Jamunia general/interested

Distt.-Seoni 3. Kapurda resident of village4.Chaurrai

b. 16'n to 20tn Oct'04 1. Palri -Do-Distt.-Chindwara 2. Khuttiya

3. Bhamadehi4. Lauaghogir5. Kalamgaon6. Shikarpur

c. Iltn to 13th Sept'04 1. Dandhri -Do-Distt.-Nagpur 2. Ghogra

3. Khapa4. Lohari5. Mayradi

d. 15tn to 18'h Sept'04 1. Jarodha -Do-Distt.-Wardha 2. Karauja

3. Borgaon4. Chopan5.Pipal Kunta6. Panwadi7. Jigaon

2. 400 KV Wardha-Akola 1. Deoli -Do-a. 16th to 18 Oct'04 2.Loni

Distt.-Wardha 3. Babulgaon Balde4. Parrodi

b.. 19'" to 21st Oct'04 1. Manjarkhed -Do-Distt.-Amravati 2. Yekpol

3. Satargaon4. Jasapur

c. 23ra to 24U Oct'04 1. ManaDistt.- Akola 2. Hirpur

3. Dahigaon -Do-4.Chachandi5. Kharat

3. 400 KV Akola -Aurangabad 1. Pancmari16 h to 18lh Oct'04 2. Jakli Jolum -Do-

a. Distt.-Akola 3. Amrandapur4. Mardua Buzurk

b. 19"' to 20'" Oct'04 1. GaneshpuraDistt.-Buldana 2. Pedka

3. Jakarkhed4. Khor -Do-

c.. 20'" to 22 n Oct'04 1. KarliDistt.-Jalna 2. Javkheda -Do-

3. Baraujasabhe4. Sisagaon5. Dhonoa

d. 22 n to 24n Oct'04 1. GirravliDistt.-Aurangabad 2. Dongragaon -Do-

3. Phulambi4. Varegaon5. Gokulavadi6. Ghonegaon

26

Page 29: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

during the Public consultation Programme a notice was served well in advance to thevillagers (Annexure- 4). The details of line and its importance was explained to thevillagers by the Shri R.M. Pillai, DGM, Bhadravati . More than fifty villagers includingSurpanchs, and POWERGRID representative participated in the programme (Plate-1 &2). Pamphlets in local language were circulated during the programme amongstthe participants (Annexure-5). The programme was arranged in interactive way andqueries like crop compensation, route alignment etc. were replied. Most of theparticipants were small farmers and were worried about their land through which theline will pass. They were informed that POWERGRID will not acquire their land forconstruction of transmission lines. Only towers will be spotted in their fields wherethey can do farming without any fear because the tower height is very high and eventractor can pass below the tower. Moreover, there is no risk of passing current fromthe above line as there is foolproof system of earthing for tower.The consultationprocess was appreciated by the villagers. They were happy to know about thetransparent policy of POWERGRID for execution of the project and promised toextend their cooperation during construction of the line. The villagers expressed theirgratitude to POWERGRID for organizing "public Consultation Programme"andsharing information regarding details of the project and environmental policy ofPOWERGRID. The process of such consultation and its documentation shallcontinue during project implementation and even during O&M stage.

5.7 CONCLUSIONS:

From the above discussion, it would seem that the area is rich in physical resources.But careful route selection has avoided involvement of any National Park/Sanctuaryor protected area but involvement of forest could not be avoided due to terrain andother physiographical reasons. Thus, routes selected for detailed survey are themost optimum route alignment and involved minimum forest and no R&R issues areanticipated as only government land belonging to MIDC is used for construction ofWardha substation. Hence, based on the criteria agreed with The Bank the project iscoming under the P2 category or non sensitive as only 2.1% of total length ispassing through forest which is already degraded in nature and no impact onwild life is envisages as the forest is not the habitat of any endangered orendemic sp. of fauna and flora. The infrastructural constraints are very real andpose a limiting factor on the development of the area. The above facts while on theone hand underline the need for implementation of the project for overalldevelopment of the area and on another hand suggest that a detailed E.I.A. may notbe necessary.

27

Page 30: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

I SECTION-VI: MONITORING AND ORGANISATIONAL SUPPORT STRUCTURE

6.0 ENVIRONMENTAL MONITORING PROGRAM IN POWERGRID:

Monitoring is a continuous process for POWERGRID projects at all the stages be itthe site selection, construction or maintenance.

The success of POWERGRID lies in its strong monitoring systems. Apart from thesite managers reviewing the progress on daily basis regular project review meetingsare held at least on monthly basis which is chaired by Executive Director of theregion wherein apart from construction issues the environmental aspects of theprojects are discussed and remedial measures taken wherever required. Theexceptions of these meetings are submitted to the Directors and Chairman andManaging Director of the Corporation. The progress of various on-going projects isalso informed to the Board of Directors. Following is the organization support systemfor proper implementation and monitoring of Environmental & Social ManagementPlan:

6.1 Corporate Level

An Environmental Management Cell at corporate level was created withinPOWERGRID in 1992 and subsequently upgraded to an Environment ManagementDepartment (EMD) in 1993 and in 1997 it has been further upgraded to Environment& Social Management Deptt. (ESMD) by incorporating social aspect of project.Briefly, the ESMD's responsibilities are as follows:

* Advising and coordinating RHQs and Site to carry out environmentaland social surveys for new projects.

* Assisting RHQs and site to finalize routes of entire power transmissionline considering environmental and social factors that could ariseenroute

* Help RHQs and Site to follow-up with the state forest offices and otherstate departments in expediting forest clearances and the landacquisition process of various ongoing and new projects

* Act as a focal point for interaction with the MOEF for expediting forestclearances and follow-ups with the Ministry of Power.

* Imparts training to POWERGRID's RHQs & site Officials onenvironment and social issues and their management plan.

6.2 Regional Level

At its Regional Office POWERGRID has a Environmental and Social Managementcell (ESMC) to manage Environmental and Social issues and to coordinate betweenESMD at the Corporate level and the Construction Area Office (CAO). The keyfunctions envisaged for ESMC are:

28

Page 31: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

* Advising and coordinating field offices to carry out environmental andsocial surveys for new projects envisaged in the Corporate InvestmentPlan

* Assisting the ESMD and CAO to finalise routes of entire powertransmission lines considering the environmental and social factors thatcould arise en-route

* To follow-up forest clearances and land acquisition processes withstate forest offices and other state departments for various ongoingand new projects

* Acting as a focal point for interaction with the ESMD and CAOs onvarious environmental and social aspects.

6.3 Site Office

At the Site level , POWERGRID has made the head of the CAOs responsible forimplementing the Environmental and Social aspect of project and are termed asEnvironmental and Social Management Team (ESMT) . Key functions of the ESMTare:

* Conduct surveys on environmental and social aspects to finalise theroute for the power transmission projects

* Conduct surveys for the sites to being considered for land acquisition* Interact with the Forest Departments to make the forest proposal and

follow it up for MOEF clearance.* Interact with Revenue Authorities for land acquisition and follow it up

with Authorised Agencies for implementation of Social ManagementPlan (SMP).

* Implementation of Environment Management Plan (EMP) and SMP* Monitoring of EMP and SMP and producing periodic reports on the

same.

It may be noted that POWERGRID is well equipped to implement and monitor itsenvironment and Social Management plans.

As regards monitoring of impacts on ecological resources particularly in Forest,Sanctuary or National Park, it is generally done by the concerned Divisional ForestOfficer, Chief Wildlife Warden and their staff as a part of their normal duties. Amonitoring system (done by the Forest Department) is also in place forcompensatory forests established as part of the Project. A detailed EnvironmentManagement Plan (EMP) including monitoring plan for all possibleenvironmental and social impact and its proper management has been drawn(Table- 6.1) and will be implemented during various stage of project execution.

Environmental Review: Periodic review by corporate ESMD and highermanagement including review by POWERGRID's CMD of all environmental andsocial issues is under taken to ensure that EMP and other measures areimplemented at site. Besides it annual review by independent Auditor under ISO:14001 shall also be undertaken for compliance of agreed policy and managementplan.

29

Page 32: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Table-6.1 Environment Management Plan

Project activity Potential Proposed mitigation Parameter to be Measurement Institutional Implementation/stage 1 impact measure monitored and responsibility schedule

I_______________ _______________________ ___________________ frequencyPre-constructionLocation of Exposure to Setback of dwellings to Tower location and Setback POWERGRID Part of towertransmission safety related overhead line route line alignment distances to siting surveytowers and risks designed in accordance selection with nearest and detailedtransmission line with permitted level of respect to nearest houses - once alignmentalignment and power frequency and dwellings survey anddesign the regulation of design

supervision at sites.Equipment Release of PCBs not used in Transformer design Exclusion of POWERGRID Part of tenderspecifications chemicals and substation transformers PCBs in specificationsand design gases in or other project facilities transformers for theparameters receptors (air, or equipment. stated in equipment

water, land) tenderspecification -once

Processes, equipment Process, Exclusion of POWERGRID Part of tenderand systems not to use equipment and CFCs stated in specificationschlorofluorocarbons system design tender for the(CFCs), including halon, specification - equipmentand their use, if any, in onceexisting processes andsystems should bephased out and to be Phase out Part ofdisposed of in a manner schedule to be equipment andconsistent with the prepared in process designrequirements of the case still in useGovernment - once

Transmission line Exposure to Transmission line Electromagnetic Line design POWERGRID Part of detaileddesign electromagnetic design to comply with field strength for compliance alignment

30

Page 33: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Project activity Potential Proposed mitigation Parameter to be Measurement Institutional Implementation/stage impact measure monitored and responsibility schedule

frequencyinterference the limits of proposed line with relevant survey and

electromagnetic design standards - designinterference from onceoverhead power lines

Substation Exposure to Design of plant Expected noise Compliance POWERGRID Part of detailedlocation and noise enclosures to comply emissions based with siting surveydesign with noise regulations. on substation regulations - and design

design onceLocation of Impact on Consideration of tower Tower location and Consultation POWERGRID Part of towertransmission water bodies location at where they line alignment with local siting surveytowers and and land could be located to selection (distance authorities and and detailedtransmission line avoid water bodies or to water and/or land owners - alignmentalignment and agricultural land. agricultural land) once survey anddesign design

Social Careful route selection Tower location and Consultation POWERGRID Part of detailedinequities to avoid existing line alignment with local tower siting and

settlements selection (distance authorities and alignmentto nearest land owners - survey anddwellings or social once designinstitutions)

Minimise need to Tower location and Consultation POWERGRID Part of detailedacquire agricultural land line alignment with local tower siting and

selection (distance authorities and alignmentto agricultural land) land owners - survey and

once design

31

Page 34: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Project activity Potential Proposed mitigation Parameter to be Measurement Institutional Implementation/stage impact measure monitored and responsibility schedule

frequencyInvoluntary Social Compensation paid for RAP Consultation POWERGRID Prior toresettlement or inequities temporary/ permanent implementation with affected constructionland acquisition loss of productive land parties - once phase

as per LAA & its in a quarterprocess

Encroachment Loss of Avoid encroachment by Tower location and Consultation POWERGRID Part of detailedinto precious precious careful site and line alignment with local siting andecological areas ecological alignment selection selection (distance forest alignment

values/ to nearest authorities - survey /designdamage to designated onceprecious ecologicalspecies protection area)

Transmission line Deforestation Avoid encroachment by Tower location and Consultation POWERGRID Part of detailedthrough and loss of careful site and line alignment with local siting andforestland biodiversity alignment selection selection (distance authorities - alignment

to nearest once survey/designMinimise the need by protected or Consultationusing existing towers, reserved forest) with localtall towers and RoW, authorities andwherever possible design

engineers -once

Obtain statutory Statutory approvals Complianceclearances from the from Government withGovernment regulations -

once for eachI_subproject

32

Page 35: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Project activity Potential Proposed mitigation Parameter to be Measurement Institutional Implementation/stage impact measure monitored and responsibility schedule

frequencyEncroachment Loss of Use existing tower Tower location and Consultation POWERGRID Part of detailedinto farmland agricultural footings/towers line alignment with local alignment

productivity wherever possible selection authorities and survey anddesign designengineers -once

Avoid siting new towers Tower location and Consultation Part of detailedon farmland wherever line alignment with local siting andfeasible selection authorities and alignment

design survey /designengineers -once

Farmers compensated Design of Consultation Prior tofor any permanent loss Implementation of with affected constructionof productive land Crop parties - once phase

Compensation in a quarter(based on affectedarea)

Farmers/landowners Design of Consultation Prior tocompensated for Implementation of with affected constructionsignificant trees that Tree compensation parties - once phaseneed to be trimmed/ (estimated area to in a quarterremoved along RoW. be

trimmed/removed)Statutory approvals Compliance Part of detailedfor tree trimming with siting and/removal regulations - alignment

once for each survey /designsubproject

Noise related Nuisance to Substations sited and Noise levels Noise levels to POWERGRID Part of detailedneighbouring designed to ensure be specified in equipment

L_______________ properties noise will not be a tender | design

33

Page 36: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Project activity Potential Proposed mitigation Parameter to be Measurement Institutional Implementation/stage impact measure monitored and responsibility schedule

frequencynuisance. documents -

onceInterference with Flooding Appropriate siting of Tower location and Consultation POWERGRID Part of detaileddrainage hazards/loss of towers to avoid channel line alignment with local alignmentpatterns/Irrigation agricultural interference selection (distance authorities and survey andchannels production to nearest flood design design

zone) engineers -once

Escape of Environmental Transformers designed Equipment Tender POWERGRID Part of detailedpolluting pollution with oil spill containment specifications with document to equipmentmaterials systems, and purpose- respect to potential mention design

built oil, lubricant and pollutants specifications - /drawingsfuel storage system, oncecomplete with spillcleanup equipment.Substations to include Substation sewage Tender POWERGRID Part of detaileddrainage and sewage design document to substationdisposal systems to mention layout andavoid offsite land and detailed designwater pollution. specifications - /drawings

onceExplosions/Fire Hazards to life Design of substations to Substation design Tender POWERGRID Part of detailed

include modern fire compliance with document to substationcontrol fire prevention and mention layout andsystems/firewalls. control codes detailed designProvision of fire fighting specifications - /drawingsequipment to be located onceclose to transformers.

ConstructionEquipment layout Noise and | Construction techniques Construction Construction POWERGRID Constructionand installation vibrations and machinery selection techniques and techniques and (Contractor period

seeking to minimize machinery machinery through

34

Page 37: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Project activity Potential Proposed mitigation Parameter to be Measurement Institutional Implementation/stage impact measure monitored and responsibility schedule

frequencyground disturbance. creating contract

minimal provisions)grounddisturbance -once at thestart of eachconstructionphase

Physical Disturbed Construction activities Timing of start of Crop POWERGRID Constructionconstruction farming activity on cropping land timed construction disturbance - (Contractor period

to avoid disturbance of Post harvest throughfield crops (within one as soon as contractmonth of harvest possible but provisions)wherever possible). before next

crop - once persite

Mechanized Noise, vibration Construction equipment Construction Complaints POWERGRID Constructionconstruction and operator to be well maintained. equipment - received by (Contractor period

safety, efficient estimated noise local throughoperation emissions authorities - contract

every 2 weeks provisions)Noise, Turning off plant not in Construction Complaints POWERGRID Constructionvibration, use. equipment - received by (Contractor periodequipment estimated noise local throughwear and tear emissions and authorities - contract

operating every 2 weeks provisions)schedules

35

Page 38: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Project activity Potential Proposed mitigation Parameter to be Measurement Institutional Implementation/stage impact measure monitored and responsibility schedule

frequencyConstruction of Increase in Existing roads and Access roads, Use of POWERGRID Constructionroads for airborne dust tracks used for routes (length and established (Contractor periodaccessibility particles construction and width of new roads through

maintenance access to access roads to be wherever contractthe line wherever constructed) possible - provisions)possible. every 2 weeks

Increased land New access ways Access width Access POWERGRID Constructionrequirement for restricted to a single (meters) restricted to (Contractor periodtemporary carriageway width within single throughaccessibility the RoW. carriageway contract

width within provisions)RoW - every 2weeks

Temporary Overflows, Temporary placement of Temporary fill Absence of fill POWERGRID Constructionblockage of reduced fill in drains/canals not placement (m3) in sensitive (Contractor periodutilities discharge permitted. drainage areas through

- every 4 contractweeks provisions)

Site clearance Vegetation Marking of vegetation to Vegetation marking Clearance POWERGRID Constructionbe removed prior to and clearance strictly limited (Contractor periodclearance, and strict control (area in m2 ) to target throughcontrol on clearing vegetation - contractactivities to ensure every 2 weeks provisions)minimal clearance.

Trimming/cutting Fire hazards Trees allowed growing Species-specific Presence of POWERGRID Constructionof trees within up to a height within the tree retention as target species (Contractor periodRoW RoW by maintaining approved by in RoW through

adequate clearance statutory authorities following contractbetween the top of tree (average and vegetation provisions)and the conductor as maximum tree clearance -per the regulations. height at maturity, once per site

l _____l_________ in m eters) l l l_l

36

Page 39: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Project activity Potential Proposed mitigation Parameter to be Measurement Institutional Implementation/stage impact measure monitored and responsibility schedule

frequencyLoss of Trees that can survive Species-specific Presence of POWERGRID Constructionvegetation and pruning to comply tree retention as target species (Contractor perioddeforestation should be pruned approved by in RoW through

instead of cleared. statutory authorities following contractvegetation provisions)clearance -once per site

Felled trees and other Disposal of cleared Use or POWERGRID Constructioncleared or pruned vegetation as intended use (Contractor periodvegetation to be approved by the of vegetation throughdisposed of as statutory authorities as approved contractauthorized by the (area cleared in by the provisions)statutory bodies. m 2 ) statutory

authorities -once per site

Wood/vegetation Loss of Construction workers Illegal wood Complaints by POWERGRID Constructionharvesting vegetation and prohibited from /vegetation local people or (Contractor period

deforestation harvesting wood in the harvesting (area in other evidence throughproject area during their m2 , number of of illegal contractemployment, (apart from incidents reported) harvesting - provisions)locally employed staff every 2 weekscontinuing current legalactivities).

Surplus Runoff to cause Soil excavated from Soil disposal Acceptable soil POWER GRID Constructionearthwork/soil water pollution, tower footings disposed locations and disposal sites - (Contractor period

solid waste of by placement along volume (m3) every 2 weeks throughdisposal roadsides, or at nearby contract

house blocks if provisions)requested bylandowners.

Substation Loss of soil Fill for the substation Borrow area siting Acceptable POWERGRID Constructionconstruction foundations obtained by (area of site in M2 borrow areas (Contractor period

37

Page 40: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Project activity Potential Proposed mitigation Parameter to be Measurement Institutional Implementation/stage impact measure monitored and responsibility schedule

frequencycreating or improving and estimated that provide a throughlocal water supply volume in m3) benefit - every contractponds or drains, with the 2 weeks provisions)agreement of localcommunities.

Substation Water pollution Construction activities Seasonal start and Timing of POWERGRID Constructionconstruction involving significant finish of major major (Contractor period

ground disturbance (i.e. earthworks disturbance throughsubstation land forming) activities - prior contractnot undertaken during to start of provisions)the monsoon season. construction

activitiesSite clearance Vegetation Tree clearances for Ground Amount of POWERGRID Construction

easement establishment disturbance during ground (Contractor periodto only involve cutting vegetation disturbance - throughtrees off at ground level clearance (area, every 4 weeks contractor pruning as mi2 ) provisions)appropriate, with tree Statutory approvals Statutory POWERGRID Constructionstumps and roots left in approvals for (Contractor periodplace and ground cover tree throughleft undisturbed. clearances - contract

once for each provisions)site

Tower Waste disposal Excess fill from tower Location and Appropriate fill POWERGRID Constructionconstruction - foundation excavation amount (m3)of fill disposal (Contractor perioddisposal of disposed of next to disposal locations - throughsurplus roads or around houses, every 2 weeks contractearthwork/fill in agreement with the provisions)

local community orlandowner. .

Storage of Contamination Fuel and other Location of Fuel storage in POWERGRID Constructionchemicals and of receptors hazardous materials hazardous material appropriate (Contractor period

38

Page 41: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Project activity Potential Proposed mitigation Parameter to be Measurement Institutional Implementation/stage impact measure monitored and responsibility schedule

frequencymaterials (land, water, securely stored above storage; spill locations and through

air) high flood level. reports (type of receptacles - contractmaterial spilled, every 2 weeks provisions)amount (kg or m3)and action taken tocontrol and cleanup spill)

Construction Noise nuisance Construction activities Timing of Daytime POWERGRID Constructionschedules to neighbouring only undertaken during construction (noise construction (Contractor period

properties the day and local emissions, [dB(a)]) only - every 2 throughcommunities informed of weeks contractthe construction provisions)schedule.

Provision of Contamination Construction workforce Amenities for Presence of POWERGRID Constructionfacilities for of receptors facilities to include Workforce facilities proper (Contractor periodconstruction (land, water, proper sanitation, water sanitation, throughworkers air) supply and waste water supply contract

disposal facilities. and waste provisions)disposalfacilities - onceeach newfacility

Encroachment Loss of Use existing access Usage of existing Complaints POWERGRID Constructioninto farmland agricultural roads wherever possible utilities received by (Contractor period

productivity Ensure existing Status of existing local people throughirrigation facilities are facilities /authorities - contractmaintained in working every 4 weeks provisions)conditionProtect /preserve topsoil Status of facilitiesand reinstate after (earthwork in m3)construction completed

39

Page 42: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Project activity Potential Proposed mitigation Parameter to be Measurement Institutional Implementation/stage impact measure monitored and responsibility schedule

frequencyRepair /reinstate Status of facilitiesdamaged bunds etc (earthwork in m3)after constructioncompleted

Social Compensation for Implementation of Consultation POWERGRID Prior toinequities temporary loss in Crop compensation with affected construction

agricultural production (amount paid, parties - oncedates, etc.) in a quarter

Uncontrolled Soil loss, Need for access tracks Design basis and Incorporating POWERGRID Constructionerosion/silt runoff downstream minimised, use of construction good design (Contractor period

siltation; existing roads. procedures and throughLimit site clearing to (suspended solids construction contractwork areas in receiving waters; management provisions)Regeneration of area re-vegetated practices -vegetation to stabilise in M2; amount of once for eachworks areas on bunds constructed sitecompletion (where [length in meter,applicable) area in m2, orAvoidance of excavation volume in i 3])in wet seasonWater courses protectedfrom siltation throughuse of bunds andsediment ponds

Nuisance to Losses to Contract clauses Contract clauses Incorporating POWERGRID Constructionnearby neighbouring specifying careful good (Contractor periodproperties land uses/ construction practices. construction through

values management contractpractices - provisions)once for eachsite

Page 43: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Project activity Potential Proposed mitigation Parameter to be Measurement Institutional Implementation/stage impact measure monitored and responsibility schedule

frequencyAs much as possible Design basis and Incorporatingexisting access ways layout good designwill be used. engineering

practices -once for eachsite

Productive land will be Reinstatement of Consultationreinstated following land status (area with affectedcompletion of affected, m2 ) parties - twiceconstruction - immediately

aftercompletion ofconstructionand after thefirst harvest

Social Compensation will be Implementation of Consultation POWERGRID Prior toinequities paid for loss of Tree/Crop with affected construction

production, if any. compensation parties - once(amount paid) in a quarter

Inadequate siting Loss of land Existing borrow sites will Contract clauses Incorporating POWERGRID Constructionof borrow areas values be used to source good (Contractor period

aggregates, therefore, construction throughno need to develop new management contractsources of aggregates practices - provisions)

once for eachsite

Health and Injury and Contract provisions Contract clauses Contract POWERGRID Constructionsafety sickness of specifying minimum (number of clauses (Contractor period

workers and requirements for incidents and total compliance - throughconstruction camps

41

Page 44: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Project activity Potential Proposed mitigation Parameter to be Measurement Institutional Implementation/stage impact measure monitored and responsibility schedule

frequencymembers of the Contractor to prepare lost-work days once every contractpublic and implement a health caused by injuries quarter provisions)

and safety plan. and sickness)Contractor to arrangefor health and safetytraining sessions

Inadequate Likely to Training of Training schedules Number of POWERGRID Routinelyconstruction maxim ise POWERGRI D programs throughoutstage monitoring damages environmental attended by construction

monitoring personnel each person - periodonce a year

Implementation of Respective Submission ofeffective environmental contract checklists duly completedmonitoring and reporting and remedial checklists of allsystem using checklist actions taken contracts forof all contractual thereof. each site -environmental oncerequirementsAppropriate contact Compliance report Submission ofclauses to ensure related to duly completedsatisfactory environmental complianceimplementation of aspects for the report for eachcontractual contract contract - onceenvironmental mitigationmeasures.

Operation and MaintenanceLocation of Exposure to Setback of dwellings to Compliance with Setback POWERGRID Duringtransmission safety related overhead line route setback distances distances to operationstowers and risks designed in accordance ("as-built" nearesttransmission line with permitted level of diagrams) houses - oncealignment and power frequency and in quarterdesign the regulation of

42

Page 45: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Project activity Potential Proposed mitigation Parameter to be Measurement Institutional Implementation/stage impact measure monitored and responsibility schedule

frequencysupervision at sites.

Equipment Contamination Equipment installed Substation design Base height as POWERGRID Duringsubmerged of receptors above the high flood to account for HFL per flood operationsunder flood (land, water) level (HFL) by raising ("as-built" design - once

the foundation pad. diagrams)Oil spillage Contamination Substation transformers Substatio bunding Bunding (Oil POWERGRID During

of land/nearby located within secure (Oil sump) sump) capacity operationswater bodies and impervious sump ("as-built" and

areas with a storage diagrams) permeability -capacity of at least once100% of the capacity ofoil in transformers andassociated reservetanks.

Inadequate Injury and Careful design using Usage of Preparedness POWERGRID Design andprovision of sickness of appropriate appropriate level for using operationstaff/workers staff /workers technologies to technologies (lost thesehealth and safety minimise hazards work days due to technologies induring operations illness and injuries) crisis - once

each yearSafety awareness Training/awareness Number ofraising for staff. programs and programs andPreparation of fire mock drills percent of staffemergency action plan /workersand training given to covered -staff on implementing once eachemergency action plan yearProvide adequate Provision of Complaintssanitation and water facilities received fromsupply facilities staff /workers

every 2 weeks

43

Page 46: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Project activity Potential Proposed mitigation Parameter to be Measurement Institutional Implementation/stage impact measure monitored and responsibility schedule

frequencyElectric Shock Injury/mortality Careful design using Usage of Preparedness POWERGRID Design andHazards to staff and appropriate appropriate level for using Operation

public technologies to technologies theseminimise hazards (number of injury technologies in

incidents, lost work crisis - once adays) month

Security fences around Maintenance of Report onsubstations fences maintenance -Barriers to prevent Maintenance of every 2 weeksclimbing on/dismantling barriersof transmission towersAppropriate warning Maintenance ofsigns on facilities warning signsElectricity safety Training Number ofawareness raising in /awareness programs andproject areas programs and percent of total

mock drills for all personsconcerned parties covered -

once eachyear

Operations and Unnecessary Adequate training in Training/awareness Number of POWERGRID Operationmaintenance environmental O&M to all relevant staff programs and programs andstaff skills less losses of of substations and mock drills for all percent of staffthan acceptable various types transmission line relevant staff covered -

maintenance crews. once eachPreparation and training yearin the use of O&Mmanuals and standardoperating practices.

Inadequate Diminished Power Grid staff to Training/awareness Number of POWERGRID Operationperiodic ecological and receive training in programs and programs and

44

Page 47: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Project activity Potential Proposed mitigation Parameter to be Measurement Institutional Implementation/stage impact measure monitored and responsibility schedule

frequencyenvironmental social values. environmental mock drills for all percent of staffmonitoring. monitoring of project relevant staff covered -

operations and once eachmaintenance activities. year

Equipment Release of Processes, equipment Process, Phase out POWERGRID Operationsspecifications chemicals and and systems using equipment and schedule to beand design gases in cholofluorocarbons system design prepared inparameters receptors (air, (CFCs), including halon, case still in use

water, land) should be phased out - once in aand to be disposed of in quartera manner consistentwith the requirements ofthe Government.

Transmission line Exposure to Transmission line Required ground Ground POWERGRID Operationsmaintenance electromagnetic design to comply with clearance (meters) clearance -

interference the limits of onceelectromagneticinterference fromoverhead power lines

Noise related Nuisance to Substations sited and Noise levels Noise levels at POWERGRID Operationsneighbouring designed to ensure (dB(a)) boundaryproperties noise will not be a nearest to

nuisance. properties andconsultationwith affectedparties if any -once

45

Page 48: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

-

t 4~~~~MA-

s~~FRS MAP

c MA A A Hp

'p;,

. V..

¢ :

e £MP1

Page 49: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

l S ~~~~~~~~~~3

Ft\zt~~~~~~~~~~~~~ -'_ -

1R ar O~~~~~~~~~~~~~~~~~~~~~~~~~~~~~O.'dr

l ~~~~FRESTA COVE MAP OF MAHARASTR

Page 50: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

C.-.,s s-

I le-II;lI :

e- ~ ~ ~~ MA-

s 1- ~FOREST COVER MAP OFc, MADHYA PRADESH

C L

6

C

S

679V

Page 51: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

9~AJAS r-AN

9. 3.4H

-.i;, 4 a

.'."-j ,-F.

Forest Cover Map of Madhya Pradesh

,,c4 a -.-, <a2 qw9.

Page 52: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

'"Vo

F -rtF MAP-

LIw

s~~LENTV ROT AINETCi-~~~~~~~O

r75KsiSEN -WADALN

'ps

7

pv

p-

a''-

Page 53: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

E O ~ ~ 1 -- lij~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

~~~~~~I

C6Z-,~~~~~~~~~~~~~~~~~~~~~~~~~~'

K $ I~~~~~~~~~~9

4 4 ~~44~)4 ~~' r I

Page 54: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

C?-~~~~7

z ~~~~~~~~~~~~~~~*jl~J -lm &I w'' n o

Pdgoon k 4 ote,oon M J ' W A

~~~~~~ 4 olonO~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~B4u

A- ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~ A

-,~~~~~~~~~~~~~~~~~~~--hd 4o romg'~

Page 55: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

�hth�

swi

9.6 kd -hft(_017X4 LM

-All I-wljgb,W.�

59

,od,15,22,v

Page 56: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

*j 137

C dr 1 dme , a t',.d4 V I

2~~~~~~~~ '~~~~~~~~~~fORE$7~~~~~~~~~~~A

- w~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~%. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ k

'M~~~~~~~~~~~~~~~~~~~~~~~~~~pp(a,

rra~~~~~~~~~~~~~~~~~~~~f d,

Page 57: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

-- s -. 3 k

9~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Page 58: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

43

,*Ci ., ... .' .7

Page 59: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

YHiX...ep-

ob Cr' '

k,- MAP-4

ALTERNATIVE ROUrE AUMENTSPF ",.

-~~~~~~ ~~OF400W KSVC WARDHA -AKOLA LINE

t~~~~~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . V

4

_~-

Page 60: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

----------- ___ __ ----- J-

-------- -e Jl

AKOLA, AMRAVATI, PARBHANI MAHARASHTRAAND YAVATMAL DISTRICTS. S.-y.d 1975-78 Magnerc Var,ar,on fom i,e Norrl at I -

A K 0 TAN

r - r -----~ '7 AA AN G A, MII N YJ0 \ cvO 14583

2'1

I a. 30 4 £

z~ ~ ~ ~ ~ ~ ~ ~~~~~~~~~lN,/b n

Page 61: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

No.55 HNont, *b,O West 19n AMRAVATI

D|45. xb ,s suxst > D a 7 3

MI, I '¼IIk'H Crfl

I&ID'1-ti-.~Pfl(IJ V ~ %* s~~~!l ~,fo U

> o: -^:52; b |~W

Page 62: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

t .

MAP-5

; 4

ALTERNATIVE ROUrE ALIGNMENTSOF

400 KV S/C AKOLA-AURANGABAD LINE

,w

1 1tv

Page 63: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

-9~~~~~~~~~~~~~~~~~~~~~~A1VED- ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

M,hh... I ~ ~ ~ ~ ~ '40..

Page 64: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Miry GrA

S31 IN'SlY A

no

An

asof

1, 7

Xi

q� n'a

Z--� 7

Page 65: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

,'1I- \ 4 Mkh4 ~~~~~~~~~~~~~~~~4wr"kt247\ ~ ~ ~ ~ ~ ~ Odh S

Nt~~~~~~~~~~~~~~Yt

M- L~ ~ ~~ *--

4 MAD /I~~.., r~ >P%J

Page 66: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

kh~~~~~~~~~~~~~AI r-14

Ce,, ~~~~~~~~~~~~~~~~~~3A L., 63REQ MI1~~~~~~~~~~~~~~..~~~~~~~~~~~~~

~~~~~ / h~~~~~~~~~~~~~4RESE~VE ~ftES1 mrfl

-

L~ ~ ~ ~ ~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~RI 4.

-- I.~~~~t

3x j~1

,~~u'~" F4'"" -•T

'~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~* ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

5*1 f ~~~~~~~~~~~~~~~~~~~~~~~~~ __~~~~~~~~ -I _ _ ~~~~~~~~~~~~~~~~~~~~~~J

Ti 1,.:le -1-0. cz~~~~~~~~~~~~~~~~~~~~~~~~tmaue-l ______

II L ,ka,L sAsoti ~451,N

ut ~~~~~~~~~~~~~~~I___________v~.*'j* -___________________________________

~k ~ - _ __R' LE_E_ _

Page 67: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

is. E~~~~~~~~~~N

-C GkKN. -P

~~~~~~~~350~~- -d _

Page 68: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

T .r-14, .P. 4 , '_' 11 w I v ' .

J~~~~ gL di f~~~~~~~~~ .- fT h~~~'- I 96 4rrtArl ~~~~~~~~~~~~~~~~~~~~~~~~~~~~x~~~~~§ (49 -* 'wtK~~~~~~~~~~~~~~~~~J~I

m. I

'A ~~~~~~~~~ ~ ~ ~ ~ I ~~~~~~~~~ -I ~

1wr" '44~~I' ~ (\I 32 a X W I dJL AOI RU±

-~ ~~~~~~~~~~ HOJLV ,, 1 ; )\/,f,^ a>/ i

I | sI S J' ' i ;() ~ \ j i;P- <-< [rl - Syi;$

* * ' *~~~~~~~~~~~~~~~V ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 1 ~~~~~~~-%tIb 4- ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ t

Page 69: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

ANNEXURE-1

POWER MAP OF THE WESTERN REGIONTRANSMISSION GRID HIGHLIGHTING THE

PRESENT PROJECT

X6t

6s

(L

4>s

Page 70: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

SEONI-WARDHA-AKOLA-AURANGABAD TRANSMISSION SCHEME¶ GWALIOR

(Initially to be operated at 400kV)

NAGDA - SATNADEHGAML-Z 1 - -- VINOH-IYACH-AAL STPP

ITARSI/ / // *\ SIPAT (3x660+2x500 M\, v)

RAIGARH KORBASTPP

(CQuag_ SEON

KHANDWA

SARDAR SAROVAR

/ / ~~~~275 kmZ t /

DHULE AKOLA WARDHR

f > / ~~~2-311 HA HDRAVAT I EGN

LEGEND| 1 265 km 4~~~~~~~~~~~ 765KV LINECHANDRAPU - - 765KV PROPOSED LINE

I AURE NT A BAD 4S KV E LINESIPAt -11 SUPPLEMENTARY SCHEME A--400oK\ PROPOSED LINE

Page 71: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

ANNEXURE-2

OPTIMIZATION OF ROUTE ALIGNMENT USINGSATELLITE IMAGERY/IGISI GPS

- 46

c14

v

Page 72: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

l~~~~~~~~~~~r fl laS_CflWALtLZLtLt'L5IJ

Satellite Imagery of Wardha-Akola Route

Digitized vector data of Wardha-Akola Route Alternatives

Page 73: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

ir r t r -e : . kIS

Ede Edt Yeh Ihenme Swiace Iiraphic: Wrdow (bP Wap Imae

l *0l * lsi n1alaleslr l SIwj9ir l [ Scale 1:j15.816

l ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~3 xi 'o

SETTLEMN

OrigntTE799.S20.66)dg Ertert. (123.70.111731m Aiae 140,65212eqm j

.~ ~ ~ ~ ~~~~~~~~~~~~l

Page 74: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

ff F) cl ( r ' n v) V r ) f o_ I

Ef E&Vie Y,w Nu Sulace fiaOics frni Halp Wa limap

A/NE f

Ti .Vn .dxf

6I ,iBLA@fGlfi Teal Er.

T RIVext 7

Vlo Wba-Ing.h

ALTER (1 77 31 m Ara 1 t i;i

Tet 7 t ,f a Or bsld*.dw ii..,g "k --t-r.i ..b z.v

Aign177.2/ 71diEdhtr 579.3 4.1mAe:t60FO m-J

Page 75: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

--

S S

W g

[Tv 1

4 Iv -'1'@

W_j

v 14s wl)

e* ec ecw w

i e ANNEXURE-3* R

C : HEALT AND SAFETY CHECKLISTs;s b

C -;s ?,. ?

o Pv P

s:

;',;

cec :(, ;

,

Ce ,;s_

l

Page 76: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

SAFETY RELATED CHECK LIST DURING CONSTRUCTION OF TRANSMISSION LINES

Region: .... Name of DHQ / GHQ: .......... ...... Date of Safety Audit :

Name of Tr. Line: .

Loc. No: .Voltage Level:

Name of Contractor:.

Name of Sub Contractor:.

A. During Tower Foundation:

SL.l Description of Activity Feed back RemarksNO.i) Excavation:1. Dumping of Excavated soil. ( Minimum 1.5 Mts. or half the

depth of the pit which ever is more ) Yes / No.2. Whether angle of repose of soil as per design in the

foundation is maintained or not. Yes / No.3. De watering arrangement is available ( If necessary) Yes / No.4. Working area has been protected properly to avoid against

fall of passerby or animal in the excavated pit. Yes / No.5 Shoring & Shuttering to protect the loose rock I soil against

I fall exists. Yes / No.6 Arrangement of illumination at construction site is

available. (if required ) Yes I No.7 Check proper / adequate arrangement is made for

extension of electric supply. (Proper size of cable, Use of Yes / No.fuse, No loose connection for De watering Pumps /Illumination / Electric compressors etc. if applicable).

8 Check for damage / Uneven settlement of foundabon. Yes / No.9 Ensure Life saver arrangements has been made during

construction of well foundation in river bed. Yes I No.(Where necessary)

10 Check that the adequate arrangement is made for thestorage of blasting material at safe place. (if required) Yes I No.

11 Check that the blasting materials is handled with due careat site. ( If required ) Yes / No.

12 Check that during blasting operation, Labour / Workmen /Passerby are at safe places and arrangement is made to Yes / No.inform public by caution markings ( Red Flag ) I PublicNotices.

13 Check that the Blaster is holding the proper license issuedby the appropriate authority. as per the Indian Explosive Yes / No.Act.

-i.1- 14 Check that the length of the fuse wire used during blasting; operation is adequate. Yes / No.

_2 ,15 Ensure Laying of temporary cable used for operation of .Machines used during construction should not cause any Yes / No.

i 16 danger for electrocution of workmen.16 Check that PPEs i.e. Safety helmets, Safety Shoes, is

used by blaster and their gang members during blasting. Yes I No.17 Ensure that Shuttering and timbering has been made as

detailed in l:S: 3764. Yes No.

r1

Page 77: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

74

18 Ensure that before undertaking excavation, the soil hasbeen tested and in case of availability of any explosive / Yes / No.dangerous gas, necessary arrangement must be made toremove I dilute such gases.

19 The positions of underground installations such as sewers,water pipes and electrical cables has been verified and in Yes / No.case of their existence, they must be isolated.

20 Arrangement shall be made to prevent external vibrationsdue to rail / road traffic ( If required ). Yes / No.

21 Safety is ensured during the construction of Tr. Lines forbuildings, structures etc. which are coming in the vicinity of Yes / No.

; _ the excavated area from collapse. ( If required )22 Check that sufficient strong ladder of suitable length is

available for ingress / outgress of persons in the pit Yes I No.23 Lone worker should not be allowed to work in the

excavated area beyond shoulder level. Yes / No.24 Check for any possibility of seepage of water from nearby

pond / river should be estimated and taken care of. Yes / No.25 After excavation the work has been completed speedily26 and back filling done at the earliest. Yes / No.

Yes/ No.-27

1_____________________________________________ Y es / N o.28 Yes / No.ii) Casting of Foundation / Concreting:I Check construction materials are stacked at safe place

and also does not cause any danger.(Away from pit by 1.5 Yes / No.Mtrs. Or half the depth of pit, which ever is more. )

2 Check arrangement of illumination at Construction Site. ( Ifrequired ). Yes! No.

3 Ensure life saver arrangements has been made duringconstruction of Well foundation in River Bed. Yes / No.

4 Check that the Concreting Mixer machine is placed at asafe place. (Not very near to pit.) Yes / No.

5 Check proper / adequate arrangement is made forextension of electric supply. (Proper size of cable, Use of Yes / No.fuse, No loose connection for De watering Pumps /Illumination / Electric compressors etc. if applicable).

6 Check that laying of temporary cables used duringconstruction activities should not cause any danger for Yes / No.electrocution to workmen.

7 Inspection of excavations shall be made by a CompetentPerson every day. In case, possible cave in or slide is Yes / No.apparent, all working in the excavation shall be seized untilthe necessary precautions have been taken to safeguard

Ithe possible cave in or slide.8 Jacks and vertical supports shall be posiboned in such a

manner that the vertical loads are distributed equally and Yes / No.do not exceed the capacity of the jacks and the jacks are

1';1 placed away from pit edge etc.9 Proper Jacking arrangement is made to take the entire

load of template. Yes / No.10 In case of long template in stub setting, more jacks has

been provided and check that the Jacks are placed on Yes / Noleveled and hard surface to avoid the unbalancing andfallen.

"OI

Page 78: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

III Wire mesh rolls shall be secured in order to preventdangerous recoiling action. Yes I No.

12 Lone worker should not be allowed to work in the

excavated area. Yes / No.

1 3 Check that sufficient strong ladder of suitable length isavailable for ingress I outgress of persons in the pit Yes I No.

14_ Yes / No.

is ~~~~~~~~~~~~~~~Yes I No.

16 Yes;/ No.

17 _______________________________________________ Yes I No. ___________

18 ~~~~~~~~~~~~~~~Yes I No.Yes!I No.

B. Tower Erection:SL. Description of Activity Feed back Remarks

NO.1 Check proper communication facility is available at site

during Tower erection. ( If required ) Yes INo.

2. Check damages or uneven settlement of foundation. Yes/ No-"

3. Ensure the derrick used before tower erection has beenchecked for adequate strength I size. Ensure for Yes I No.

copy of test certificate for all the lifting machines andJ

tackles.4. Ensure that the pulleys used before tower erection has

been checked for adequate strength I proper size Yes / No.

(diameter). Also in case of open type pulleys proper

locking arrangements like providing of Safety Pin is made.

Ensure for copy of test certificate for all the lifting machines

and tackles.5. Ensure that the ropes used before tower erection has been

checked for adequate strength I physical condition ( Free Yes No.

from break of strands and knots etc.6. Check that the lifting tools and tackles i.e. Winch Machine,

Chain Pulley Block, Trifor, D - Shackle etc. are in healthy Yes I No.

condition and has been tested periodically. (Attach copy of

test certificate).7. Ensure that permission has been obtained from Aviaton

Authority for erection of special towers. (Where Yes No.

necessary).8. En ure that permission has been obtained form Aviation

Authority for erection of towers which comes in the vicinity Yes I No.

of flvnq zone. ( Where necessary )9. Check that the safety measures has been taken before

undertaking for the Road e Rail / River Xing jobs involving Yes / No.

like wise stretches.10. For rail or road crossing check whether written working

plan is available at site with specific reference to safety e.g. Yes I No.

local earthing, skilled & experience manpower, proper

T&P f strength and height of scaffolding to maintain the

recuired clearance etc.11. Ensure that all the members and proper size of Nuts and

Bolts of lower section are fitted properily before erection of Yes No.

the upper section of tower is taken up.

r1 912. Check that the anti climbing devices are provided in the

tower after erection job, Yes I No.lI~~~~~~~~~~lkBWs trths

Page 79: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

13. Check that the danger plates has been provided. Yes / No

14. Check that only erection team members are allowed tostand near the tower while erection is in process and Yes / No.should wear the safety helmet / Safety Shoes.

15. Working area of the tower has been demarcated duringerection. Yes / No.

16 Check that proper guying arrangement has been made.And also to see that proper size of the crow bars has been Yes / No.used which has been fixed at hard surface in case of sandysoil or loose soil.

17 Check that proper arrangement is made while lifting thetower members and fixing them at height. i.e. Proper size Yes / No.and strength of the hook used for lifting the towermembers.

18 Check sufficient numbers of guys are made while lifting theassembled cross arm and also avoiding use of single Yes / No.sheeve pulleys while lifting the assembled cross arm I

____ heavy load.19 Yes I No.

20 Yesl/ No.

j4 b T21 Yes I No.

C. Conductor Stringing:

SL. Description of Activity Feed back RemarksNO.1. All drivers and plant operators are holding the valid driving

license. Yes I No.

2. Check that the permit has been obtained from theCompetent Authority for stringing of conductor while Yes / No.cl-ossing through Road / Rail / River / Venerable areas etc.

I (Where necessary)3. Check that required painting has been made on tower

falling in the vicinity of aviation zones. (Where necessary.) Yes I No.

4. Check that all safety measures has been taken duringstringing of conductor crossing the EHV I HV / LT lines Yes / No.(Earthing of existing lines etc. _

5. Ensure that proper size of Nuts and Bolts are rigidlytightened and punching / tacking / tack welding is done in Yes I No.

_____ towers before undertaking stringing job.6. Ensure that proper scaffolding arrangements made during

stringing of conductor (While Road Xing / Power Line Xing Yes I No.etc.

7. Ensure that all members are fitted in tower beforeundertaking conductor stringing work. Yes I No.

8. Check that the back filling of the foundation has been doneas per specification. Yes I No.

9. Ensure that the discharge rod is electrically tested beforeuse. . Yes I No.

10. Stringing Machine / Tension pullor Machine are properlyearthed, Yes I No.

11. Check the brake arrangement of the TSE Machines isworking. Yes I No.

12. Ensure that the pulleys used before conductor stringinghas been checked for adequate strength I proper size Yes I No.(diameter), also in case of open type pulleys proper lockingarrangements like providing of Safety Pin is made Ensure

r 1

Page 80: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

for copyof test certificate for all the lifting machines andtackles.

13. Ensure the ropes used before conductor stringing hasbeen checked for adequate strength / physical condition ( Yes / No.Free from break of strands and knots etc.

. i w14. Check that the lifting tools and tackles i.e. Winch Machine,Chain Pulley Block, Trifor, D - Shackle etc. are in healthy Yes / No.condition and has been tested periodically. (Attach copy oftest certificate).

15. Check for the brake arrangement of the Drum reel ofconductor during laying I paying out of conductor. Yes / No.

16. Check that proper communication facility is available atsite during of stringing of conductor ( If required ) Yes / No.

17. Whether the tower has been permanently earthed. Yes / No.18. Check that Sag Board is provided at two locations. Yes / No.19. Check that the Sag Board arrangement is made by the

experienced / trained persons. Yes / No.20. Check approved Sag tension chart is available and

followed at site. Yes / No.21. While clamping of conductor / EW to be done, check for

*_ _1z b earthing. Yes / No.

22. Ensure sending signal to puller to stop when last layer of-§ ¢_ conductor / EW being pulled. Yes / No.

23. Check tension applied on the dynamo meter dial andcheck values with approved data. Yes / No.

24. Before stringing starts check that the villagers do not comeunderneath the job of the concemed section. Yes / No.

25. Only nylon or polypropylene ropes should be used duringconductor stringing in vicinity of live overhead lines. Yes/ No.

26. Ensure that PTW has been taken from the concernedauthority. Yes / No.

27. Ensure that Winch, Pulleys etc. are property earthed. Yes / No.28. For LT lines, whether special persons are posted at eachr_____ point of isolation till return of permit ( PTW). Yes / No.29. Whether the network of LT lines has been thoroughly

checked and precautions taken Against inadvertent Yes /No.charging.

30. Check that proper arrangement is made / available fordevelopment and use of a Portable Earthing and Short - Yes / No.Circuiting Devices which can be engaged and disengagedto and from the LT lines, keeping away from the LT lines,until all operations on the same are completed and all menand materials are removed from LT lines.

31. Check the provision and proper positioning for the guyingand back staying ( Where necessary). Yes / No.

32. Check demarcation of feeder is done for D/c Line. Yes / No.33. Ensure that all the insulator strings are thoroughly checked

for availability and proper fixing of cotter / split pins before Yes / No.hoisting the same.

34. Yes / No.

35. Yes No.

36. Yes I No.

37. Yes i No.

Page 81: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

D. General Points common for all activities during Excavation, Casting of Foundation,Erection of tower and Stringing of Conductor:

SL. Description of Activity Feed back RemarksNO.I. Check whether the contractor had procured required

quantity of PPEs considering maximum numbers of Yes / No.erection gangs deployed at one time.

2. Supervisors I Workmen have been provided with requiredhealthy PPEs, like Safety helmet / Safety Belts / Safety Yes / No.

IShoes / Gum Boot etc. as applicable.3. Availability of First Aid Box with required medicines at site. Yes / No.4. Instruction register is available at site. Yes / No.5. Ensure that Supervisor I Gang Leader always issues

instruction to the Workmen before start of work. Yes / No.6. Ensure that supervisory staff from Powergrid is available at

site during construction. Yes / No.7. All driver and plant operators are holding valid driving

Ilicense. Yes / No.8. Check the vehicle for rescue is available at site. Yes / No.9. Ensure engaged labour are aware of the job. Yes / No.10. Check that the unskilled labourers are not engaged in

v' -1.> skilled job. Yes / No. _11. Ensure that supervisor I workmen engaged in the field are

aware of First Aid Techniques ( Such as in case of Electric Yes / No.Shock, Fall from the height, Snake bite and the person

Irescued from buried under the debris etc.12. Check for nearby Hospital I Doctor in case of emergencies

arises. Yes / No.13. While transporting heavy consignment of conductor / EW

drums from central store to site by the use of Cranes, Yes / No.Truck, Tractor. The safety aspect for construction andfailure of brake system of moving -machinery Is to bechecked.

14. At least one dry powder type of portable fire exbnguishershall be provided especially where explosive or blasting Yes / No.agents are used for excavation.

15. Check the competence (Qualification / Experience ) ofsupervisor I gang leader of contractor. Yes / No.

16. Yes / No.17. ____________________YesI/ No.18. Yes / No.

REMARKS IF ANY:

Signature Signature Signature

Name: Name: Name:Designation: Designation: Designation:Representative of Powergrid Rep. from Site. Powergrid Rep. from RHQ.Contractor

AU

Page 82: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

SAFETY RELATED CHECK LIST DURING CONSTRUCTION OF SUB -STATION

Region: ..... Name of DHQ I GHO: ................ Date of Safety Audit :...................... .

Name of Sub Stn. / Switching Stn.: .

Name of ContractorCr:..

cr7.-" -:40 Contractor License / Registration No.: Validity,

.1' Name of Sub Contractor : .

C. SUB STATION CIVIL WORKS:

SL.| Description of Activity Feed back RemarksNO.i): Safety during Excavation:

1. Check Sub station area has been protected byr :$ constructing boundary wall all around the sub station to Yes / No.avoid entry of passerby / unauthorized person or animalin the sub stabon.

r l 2. De watering arrangement is available ( If necessary) Yes / No.. -3. Check proper / adequate arrangement is made for

extension of electric supply. (Proper size of cable, Use of Yes / No.fuse, No loose connection and no naked wire connectionto Pumps / Illumination / Electric compressors etc. ifapplicable).

4. Check arrangement of illuminabon at construction site isavailable. Yes i No.

5. Check dumping of Excavated soil ( Minimum 1.5 Mts. Orhalf the depth of the pit which ever is more from the edge Yes I No.of the pit.)

6. Check Shoring & Shuttering to protect the loose rock / Yes / No.soil against fall. (if required).

7. Check lone worker is not be allowed to work in theexcavated area. Yes / No.

S. Ensure Laying of temporary cables used for operation of Yes I No.Machines used during construction should not causeany danger for electrocution of persons / animals.

9. Ensure that before undertaking excavation, the soil hasbeen tested and in case of availability of any explosive / Yes / No.

-__| dangerous gas, necessary arrangement must be madeto remove / dilute such gases.

10. The positions of underground installations such assewers, water pipes and electrical cables has been Yes / No.verified and in case of their existence, they must beisolated before further excavation works to ensureHuman Safety.

11. Check that the scaffolds are not overloaded in any case. Yes I No.v i. Scaffolds are to be erected and supported properly.

12. Stability of the soil of the excavated pit for safe working isto be checked and certified by a competent person daily Yes I No.before start of work. A register at site is maintainedwhere competent person can certify accordingly. Nomanhole should remain uncovered during night & offdays.

13. Check the provision of sufficient strong ladder of suitablel__. _ length is available near the working place during Yes / No.

Page 83: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

excavation.r__ _ _ _ _ _ _

14. Check if any permission is required from local statutory___,__ body before excavation. Yes / No.

15. Check for No undercutting / toe cutting in soil. Yeus / No.

16. Check after excavation the work should be speedilycompleted without delay and back filling done at the Yes / No.earliest.

17, Check for any possibility of seepage of water fromnearby pond / river has been estimated and taken care Yes / Noof.

18. Check to avoid slide / collaps of side walls of excavatedpit, the excavation is to be done in trapezoidal cross - Yes / No.section.

ii): Safety precaution during Storage, Handling and Use of Blasting Material:

tI;> 1 Check that the adequate arrangement is made for thestorage of blasting material at safe place. (Temporary Yes / No.Magazine is to be installed observing all norms) as perIndian Explosive Act.

2. Check that the blasting materials is handled by licensed Yes / No.

E,9 : blaster with due care at site. (If applicable)

3. Check smoking is prohibited in the vehicle carrying Yes / No.explosives.

4. Check that the Blaster is holding proper license issued Yes / No.by the appropriate authority. As per Indian Explosive Act.

5. Check that the length of the fuse wire used during Yes / No.blasting operation is adequate.

6. Check while transportation, no unauthorized person is Yes I No.allowed in vehicle carrying explosives.

7. Check that the loading and unloading of explosives is Yes/ No.being done carefully. Yes_/_No.

8. Check explosives and detonators or blasting caps is not Yes /No.being transported in the same vehicle.

9. Check while transportation the detonators and Yes / No.explosives are not carried loose or mixed with other

_m materials.10 Check surplus explosives shall not be stacked near Yes/ No.

working area during loading / unloading.11. Check explosives shall not be held in hands when Yes/ No.

lightening the fuse.12. Check that blasting in the open has been carried out Yes/ No.

during the fixed hours every day or on fixed days in theweek so that the public at large should know about this.

13. Check that arrangement has been made to display Yes I No.sufficient warnings / sign board to enable the people toget out of the blasting area to get off the danger zone

14. Check that the danger zone has been suitably cordonedoff. Yes / No.

15. Check during blasting operations begin / after the firingof explosives shall follow the loud siren. Yes / No.

16. Check that during blasting operation, Labour / Workmen ./ Passerby are at safe places and arrangement is made Yes / No.to inform public by caution markings ( Red Flag ) / PublicNotices etc.

17. Check that PPEs i.e. Safety helmets, Safety Shoes, isused by blaster and their gang members during blasting Yes / No.

b at

Page 84: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

~tv-

and also the persons supervising the blasting. oD~~~~~~~~~2erations.

i 18. For covered blasting ensure placement of cover platesof proper thickness and sufficient numbers of sand filled Yes / No.bags.

19. Ensure that permission for blasting has been obtainedfrom the appropriate authority. Yes / No.

20. Yes / No.21. Yes / No.

22 _ _ __ _ _ _ __ _ _ _ __ _ _ _ __ _ _ _ Y es I N o. _ _ _ _ _ _ _

_ 23 _i Yes / No.iii) Safetv during casting of Foundation I Concreting:

1. Check construction materials are stacked at safe placeand also does not cause any danger.(Away from pit )i.e. Yes / No

CO r 1.5 Mtrs. or half the depth of the pit which ever is more.)2. Check proper arrangement of illumination at Construction

Site of Sub station is available. Yes / No.3. Check that the Concreting Mixer/ Vibrator machines etc

are placed at a safe place (Not very near to any pit at least Yes / No.1.5 Mtr. from the edge of the pit) to avoid transfer ofvibrations and should be operated by skilled persons. _______________

4. Check proper a adequate arrangement is made forextension of electric supply. (Proper size of cable, Use of Yes / No.fuse, No loose connection for De watering Pumps IIllumination / Electric compressors etc. if applicable).

5. Check for laying of temporary cables used duringconstruction activities should not cause any danger for Yes / Noelectrocution to persons / animals.

6. All bracing, struts and shuttering in excavations shall beadequately secured so as to prevent their accidental Yes / No.displacement.

7. Ensure Shuttering and timbering has been made asdetailed in l:S: 3764 for protecting the loose rock / soil Yes / No.against fall.

8. Check for proper placing of Hydraulic jacks with stabilityand constant watch of these instruments (which are Yes I No.continuously loaded) to avoid any danger of displacementcausing sever accident.

9 Yes / No.

10 Yes / No.

B.: Safety during Structure, Equipment Erection & Cable laying etc.:

SL. Description of Activity Feed back RemarksNO.

1. Check Back filling done prior to erection activity. Yes / No.2. Check the derrick used before structure erection has been Test certificate

checked for adequate strength / size and no joints are Yes / No. Is requiredpermitted. apart from

*,-- L;;> visualI Inspection.

--A;; ~~~~~~3. Check that the pulleys used before structure erection /TestEquipment Erection has been checked for adequate Yes / No. certificate isstrength / proper size (diameter), also in case of open typepulleys proper locking arrangements like providing of requiredSafety Pin is made Safe working load should be punched. apart from

__________________________________________________visual

e2e i

Page 85: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

C;-.;t~~~~ ~~ ~ ~~~~~~~~~~~ *_| _* inspection.

4. Check the ropes used before structure erection / F Test certificateEquipment Erection has been checked for adequate Yes No. Is requiredstrength / physical condition (free from break of strands apart fromand knots etc. visual

-- | _ ........................... ~~~~~~~~~~inspection.*:;h, 5. Check that the lifting tools and tackles are in healthy Test certificatecondition and has been tested periodically. Yes / No. is required

apart fromvisualinspection.

6. Check permission has been obtained from AviationAuthority for erection of Lightning Mast which comes in the Yes / No.vicinity of flying zone. (Where necessary )

7. Check that all Nuts and Bolts are fitted in the stnucturel4i~ __ before undertaking the job of other section of the structure Yes / No.

i._- 3 _____ and are tightened.8. Check area has been cordoned off to prevent injuries to

unauthorized persons from hitting against structural Yes / No.component or falling in the excavated pits.

9. Check that danger plates are available on all theequipment & structures in the switchyard. Yes / No.

10. Check demarcation of feeder is done for Double CircuitLine. Yes / No.

11. Check only erection team members are allowed to standnear the structure / Equipment while erection is in process Yes / No.and should wear the safety helmet I Safety Shoes.

12. Check proper guying arrangement has been made whilelifting structure I Equipment, if necessary. Yes / No.

13. Check that proper afrangement is made while lifting thestructure members and fixing them at height. i.e. Proper Yes / No.size and strength of the hook used for lifting the structuremembers.

14. Check sufficient numbers of guys are made while lifting theassembled structure / heavy loads and also avoiding use Yes I No.of single sheeve pulleys while lifting the assembledstructure / heavy load.

15. Check arrangement has been made for equipmentidentification. Yes / No.

16. Check that required painting made on tower falling in the=-I';> vicinity of aviation zones. ( Where necessary.) Yes / No.

17 Check no live wires nearby. Take shut down if necessary. Yes I No.18. Check the structure has been permanently earthed. Yes I No.19. Check crane are preferably be used for erection of pipe

structure in the sub station building works ( if required.) Yes / No.20. Check all safety procedures for erection work like use of

safety helmets, Safety belts , use of guy wires, lowering / Yes I No.lifting of tools by rope etc. are strictly adhered to duringstructure erection works is in progress in the swftchyard.

21. Check that correct size of spanner (Box or ring type) aswell as DE spanners are being used. Yes / No.

22. Check working area of the structure has been demarcatedduring erection. Yes / No.

23. Check heavy structures are lifted with crane with proper Yes / No.b l ) _ safety.

c>I _ . 24. Only polypropylene ropes are to be used to tie thealluminium tube / Bus bar since this is soft material and will Yes I No.cj1 ;2 not damage alluminium tube / Bus bar during erection.

-I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Page 86: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

25. Ensurd that R clips in insulator caps are fixed properly toavoid disconnection of insulator discs. Yes I No.

CC1J 26. Ensure that all the necessary security pins (split pins) arefixed. Yes / No.

27. Check all nuts of jumper fittings are properly tightened andlive metal clearance have been maintained as per Yes I No.POWERGRID specificaton.

28. In case of tension fitting dead end joint dimensions before& after the compression are checked and recorded. Yes I No.

29. No damaged component of any hardware fitting should beused on works. Yes I No.

30. Length of jumpers has been measured properly to give it a: 1 ;> parabolic shape. No sharp bend should exist. Yes I No.

31. Check surge counter erection facilitates proper readingand that earthing is done with minimum bends. Yes / No.

32. Check Surge monitor has been earthed by connecting it tomain earth mat with ( G I Flat 75 x 12 mm ) and earth pit Yes / No.separately as per drawing.

33. Check the alignment of earth switch with isolator, earthswitch of isolator is put into operation and the contacts are Yes / No.cleaned. After completion of pre commissioning checks

[ and formats are dully filled and signed.34. Ensure that the rubber beedings are kept in good

condition. Yes / No.35. Check CT has been placed on the support structure very

carefully and all nuts have been tightened. Earthing is Yes / No.done as per drawing.

36. Ensure the lattice structure of CT has been earthed at twopoints. Yes / No.

37. Check the marshalling box in the switchyard has properillumination arrangement. Yes I No.

38. Check the capacitor unit is short circuited & earthed, untilerection and commissioning works are being done on Yes No.CVT. (The capacitor get charged by the electrical fields inthe vicinity and they keep these charges for a long time,which can be darigerous to human life. Hence the shortingof capacitor unit is necessary). It should be removedbefore tests I use.

39. Check Fuses in the marshaling box are OK. Yes I No.40. Check proper earthing of CVT tank has been done. Yes / No.41. Check all housing accessories, mounting stools including

bolts I Nuts for fixing Line Trap and insulators are of non Yes I No.magnetic material.4_ l:42. Check H.F. points of CVTs on which the coupling device isnot mounted has been earthed. Yes / No.

43. Check the remaining CVTs have been earthed thro'coupling device. Yes / No.

44. Cable drums after visual inspection should be storedpreferably in the covered area. Cable ends should be Yes / No.clamped.

45. Ensure each cable and conduit run should be tagged withcable identity numbering as per the approved that appear Yes / No.in the cable and conduit schedule.

46. The tag should be of aluminum plate with ID numberpunched on it and securely attached to the cable conduit Yes / No.by not less than two tums. Cable tags should ofrectangular shape for power cables and of circular shapefor control cables.

47. Check underground cable markers should project 150 mm

qu-S

Page 87: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

above ground and spaced at an interval of 30 Mts. They Yes / No.shall be located on both sides of road and drain crossingand also at every change in direction.

48. Check cable tags should be provided inside theswitchgear, motor control centres, control and relay panels Yes / No.etc. wherever required for cable identification, where anumber of cables enter together through a gland plate.

49. The cable (power and control ) between LT station,Control room, OG set building and fire fighting pump house Yes / No.should be laid in the buried cable trenches. In addition tothe above, for lighting purpose also, buried cable trenchcan be used in outdoor area.( as per Technical

I specification of specific contract )50. Cable route and joint markers and RCC waming covers

should be provided wherever required. The voltage grade Yes / No.of cables should be engraved on the marker.

6 51. Tray Identification Number on each run of trays at anI3 interval of 10 Mtrs should be painted. Yes No.

52. In case the outer sheath of a cable is damaged duringhandling / installation, the same should be repaired to the Yes I No.satisfaction of the site. In case any other part of a cable isdamaged, the same should be replaced by a healthy cable.Power cables should be at the top most layer. The armor ofcontrol cable is to be earthed.

53. All cable termination should be appropriately tightened toensure secure and reliable connections. All the exposed Yes I No.parts of cable lugs should be covered with tape, sleeve orpaint.

54. Power and control cables are laid on separate cable trays Yes I No. _-55. Co-axial cable is laid separately from power cable. Yes I No.56. All cable trays, racks and metallic ducts have been

grounded by connectng each to earth / mat. ( As per Yesl No.Scheme )

57. Check sections of cable trays have been bridged bycopper jumpers I G I to retain continuity of earthing. ( As Yes / No.

__ per Scheme )58. Check earthing of panel is done by the erection contractor

for connecting it with switchyard earth mat. ( As per Yes / No.Scheme )

59. Auxilary bus wiring for AC and DC supplies, VoltageTransformer circuits, annunciation circuits and other Yes I No.common services is provided near the top of the panelsrunning through out the entire length of the panels.

60. All internal wiring to be connected to external equipment isterminated on terminal blocks, preferably vertically Yes / No.mounted on the side of each panel.

61. Check whether Mimic Diagram is available preferablymade of anodized alluminium or plastic of approved fast Yes ( No.colour material and screwed on to the panel that can be

2 easily cleaned.62. Check the panels all equipment mounted on front and rear

side as well as equipment mounted inside are provided Yes / No.with individual name plates with equipment designated

_ ~ engraved.63. Check on top of each panel on front as well as rear side,

large and bold name plates are provided for circuit / feeder Yes / No.designation.

64. Check all front mounted equipments are provided at therear with individual name plates engraved with tag Yes / Nonumbers corresponding to panel intemal wiring to facilitate

Page 88: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

_____ easy tracing of the wiring.65. Check the name plates mounted directly by the side of the

respective equipments should not be hidden by equipment Yes I No.wiring.

66. Check availability of 240V single phase 50 HZ, AC socketlI. with switch suitable to accept 5 Amps and !5 Amps pin Yes I No.

round standard plug, is provided in the interior of eachcubicle with ON-OFF switch for connection of hand lamps.

f67. Check that panels are provided with a fluorescent lightingfixture rated with 240 Volts single phase, 50 Hz supply for Yes I No.the interior illumination of the panel during maintenance.The fittings is complete with switch fuse unit and switchingof the lighting is controlled by the respective panel doorswitch. Adequate lighting with fuse unit is also provided forthe corridor in control panels.

68. Check control panels are provided with necessaryarrangements for receiving, distributing, isolating and Yes I No.fusing of DC and AC supplies for various control,signaling, lighting and space heater circuits. The incoming

_____ and sub circuits are separately with switch fuse units.69. Check panels are provided with a space heater rated for

240 V, single phase, 50 Hz, AC supply for the intemal Yes I No.heating of the panel to prevent coridensation of moisture.

70. Check all panels are equipped with an earth bus securelyfixed Yes I No.

71. Check when several panels are mounted adjoining eachother, the earth bus is made continuous with necessary Yes / No.connectors and clamps for this purpose.

72. Check provision is made for extending the earth bus barsto adjoining panels on either side. Yes / No.

73. Check provision is made on each bus bars of the endpanels for connecting earthing grid. Yes I No.

74. Check all metallic cases of relays, instruments and panelmounted equipment including gland plates are connected Yes I No.

l _ ~~~~~~~to the earth bus by copper wires of specfied size.75. Check the colour code of the earthing wire is green. Yes I No.76. Check that earthing made with equipment are with Nuts

and Bolts. i.e. For such connecton lugs should be pressed Yes I No.and tightened to the terminals through Nuts and Bolts.

77. Check that no equipment is mounted on the panel doors. Yes I No.t 78. Check each switch should bear clear inscription identifying

e- S _ its function. Yes I No.; 79. Check those who have sufficient knowledge of steel

structrual job has been employed in steel structural works Yes I No.only.__ _ _ _

~it 980. Check necessary instruction has been communicated bysupervisor before start of the days works to workmen Yes / No.under his control.

81. Storing of equipments are to be made properly to avoidany accident during handling. Yes I No.

13 82. Check all Nuts and bolts are properly raised or loweredpreferably using closed loop pulleys and gully bags I hand Yes / No.

v' l bags tied at the end for carrying nuts and bolts.83. Check that Fire resistant sheets are used before entrance

of control cable in control room. Yes / No.* 84. Check air compressor tubing properly tightened. Yes I No.

485. Check all carrying connectors/ clamps properly tightened. Yes / No.86. Yes I No.

4t

Page 89: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

87__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ [ es /N o . _ _ _ _ _86. Yes / No.

i:;:h ~~~89. ____________ ________ Yes / No. ____. t ~~~~~~90. _ Yes / No.

C. Conductor Layout during construction stage:

SL. Description of Activity Feed back Remarks*Z iW NO.1. Check all members are fixed in structure and ensure

proper size of Nuts and Bolts are rigidly tightened and Yes / No.punching / tacking / tack welding is done in towers /Ilk_ structures before undertaking conductor laying job.

2. Ensure proper scaffolding arrangements made duringlilr- *laying of conductor (While Power Line crossing etc). Yes / No.3. Ensure that all members are fitted in structure before

undertaking conductor laying work. Yes / No.4. Ensure that the discharge rod is electncally tested before

use. Yes / No.5. Ensure whether the structure is properly earthed. Yes / No.6. Only nylon or polypropylene ropes should be used during

conductor laying in vicinity of live overhead lines. Yes / No-. 7. Ensure that PTW has been taken from the concerned

authority when extension of existing sub station is under Yes / No._ execution.8. Ensure that Winch, Pulleys etc. are properly earthed. Yes / No.9. For LT lines, check whether special persons are posted at

each point of isolabon till return of permit ( PTW) if Yes / No.positioning of person is not possible then it is to be seenthat all the point of isolation has been kept in the locked

=____ position till the work is in progress.10. Whether the network of LT lines has been thoroughly

checked and precautions taken against inadvertent Yes I No.1_____ charging.11. Check that proper arrangement is made / available for

grounding LT lines coming across during conductor laying. Yes / No.(This can be done by way of portable earthing and shortcircuiting devices which cab be engaged to anddisengaged from LT lines, keeping away from the LT linesuntl all operations on the same are completed and all manand materials are removed from the LT lines).

12. Check the provision and proper positioning for the guyingl____ and back staying ( Where necessary). Yes / No.

13. Check working of hydraulic crimping machine. Yes / No.= u1 14. Check before and after crimping, dimensional changes inclamps and are in accordance with the drawings and Yes / No.specifications.

15. Yes / No.16. Yes I No.17. Yes / No.-. t 18. Yes / No.19. Yes / No.

D: Switchyard Earthing during construction stage:

*

Page 90: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

SL. Descripton of Activity Feed back | RemarksNO.

_ 1. Check that while earthing conductor crossing the road islaid 300 mm below the road or at greater depth depending Yes / No.upon the site conditions.

2. Check that while laying the Earthing conductor in outsidearea is buried at least 600 mm below the furnished ground Yes / No.level.

3. Check that the earthing pads have been provided for theI apparatus / equipments at accessible position. Yes / No.

4. Check all steel columns, metallic stairs are connected tonearby earthing grid conductor by two earthing leads. Yes I No.

5. Check of earthing of lightening fixtures, receptaclesswitches, junction boxes lighting conduits has been done Yes I No.bv a separate earthing conductor.

6. Check that the railway tracks within switchyard area hasbeen earthed at a spacing of 30 Mts. I specified distance Yes / No.and also at both ends.

7. Check cable trays has been connected to earthing flat of50X6 mm I specified sized earthing flat at intervals Yes I No.specified in approved drawing.

8. Check that this earthed flat is earthed at about 30 Mts.distance. Yes / No.

9. All accessories in transformer and reactor like radiatorstank, cooling banks etc are connected to the earthing grid Yes / No.at minimum two points.

10. Check metallic conduits are not used as earth continuityconductor. . Yes I No.

31. Check flexible earthing connectors should be provided forthe moving parts. Yes I No.

12. Check sheath and armor of single core power cable isearthed at switchgear end and equipment side. Yes I No.

13. Check contact surface of earthing pads for jointing freefrom scale, paint, enamel, grease, rust or dust. Yes I No.

14. Check that light poles, junction boxes on the poles, cableand cable boxes I glands, lockout switches etc. are Yes / No.connected to the earthing conductor running along with thesupply cable which intem is connected to the earthing gridconductor at a minimum two points.Check earthing conductor which is generally buried 2000

15. mm outside the switchyard fence. All the gates and every Yes / No.altemate post of the fence is be connected to earthing grid.Check megger used for measuring soil resistivity is

16. calibrated with desired accuracy. Yes / No.The earth resistvity has been measured in dry weather

17. condition. Yes I No.Check the earthing of Transformers and Shunt reactor,

18. earth pits are constructed as per relevant standard I Yes I No.approved drawing.

. Check that the measured value of combined earth19. resistance should be less than 1 Ohm. Yes / No.

Check that for earth electrode and individual earth pits, this20. value should not be more than one Ohm. Yes / No.

Check all non current carrying metal parts shall be21. effectively earthed by two separate and distinct earth Yes / No.

connections ( Indian Electricity Rule 61,67)5_ ) II22. Check that all pyion supports in the Fire Fighting HVSW

at

-A.L

Page 91: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

I system has been earthed to the earthmat. | Yes / No. l23. Yes / No.24. Yes/ No.

E: General Points common for all activities during Excavation, Casting of Foundation,Erection of structures, Laying of Conductor, storage and transportation of material:

SL. Description of Activity Feed back RemarksNO.

1. Check Supervisors / Workmen have been provided withrequired healthy PPEs. Like ( Safety helmet I Safety Belts Yes I No./ Safety Shoes I Gum Boot etc. as applicable )

2. Check availability of First Aid Box with required medicinesI at site. Yes I No.

3. Check Site Instruction register is available at site. Yes I No.4. Ensure Supervisor I Gang Leader always issues

instruction to the Workmen including contractor labour Yes / No.before start of work.

5. Ensure supervisory staff from Powergrid is available at siteduring construction. Yes / No.

6. Check all driver and plant operators are holding validdriving license. Yes ! No.

7. Check the vehicle for rescue is available at site. Yes / No.8. Ensure engaged labour are aware of the job. Yes / No9. Ensure supervisor / workmen engaged in the field are Yes / No.

aware of First Aid Techniques ( Such as in case of ElectricShock, Fall from the height, Snake bite and the personrescued from buried under the debris, rescue of personfrom drowning etc.

10. Check for availability and to keep a record of nearbyHospital / Doctor in case of emergencies arises. Yes / No.

11. While transporting heavy consignment of conductor / EWdrums from central store to site by the use of Cranes, Yes / No.Truck. Tractor. The safety aspect for construction andfailure of brake system of moving machinery is to bechecked.

12. At least one dry powder type of portable fire extinguishershall be provided especially where explosive or blasting Yes / No.agents are used for excavation.( If applicable )

13. Check the competence (Qualification / experience) ofsupervisor / gang leader of contractor. Yes / No.

14. Wire mesh rolls shall be secured in order to prevent Yes / No.Idangerous recoiling action.

15. Proper unloading arrangement has been made at site( Preferably with crane ) to unload the material. Yes / No.

16. After unloading the material visual inspecton of thematerials has been carried out along with the erection Yes / No.contractor to check that the material has not beendamaged or not ( Galvanizing is proper or not)

v_r__ As per approved Field Quality Plan etc.17. I While transporting the heavy laden equipment like

transformer I Reactor by road from Rly Stn to Sub station Yes I No.check whether for all safety precaution taken. Like safelifting capacity of crane, safe load on culvert / Bridge I Nala/ Drain etc.and working plan is available at site withspecific reference to safety e.g. local earthing, skilled &

<

Page 92: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

'experience manpower, proper T&P, strength and LT wires/ HT wires interrupting the height of equipment and the

jt required clearance maintained etc. Pemission to beobtained from concemed authority if required. 'Impactrecorder on the equipment like Reactor / Transformer

, t.Iw __ must be installed during transportation'18. Check that the adequate and safe means of access and

aggress has been provided for all work places as far as Yes / No.reasonably practicable and is being used by the workers.

19. Check proper illumination is provided at the work placesand their approaches including passage ways. Yes I No.

20. Check that the lamps has been protected by suitableguards where necessary to prevent danger, in case the Yes / No.lamp breaks.

21. Check loose materials which are not required for use shallnot be placed or left so as dangerously to obstruct work Yes / No.places or passage ways.

22. Check all projected nails has been removed or bent over toprevent injury. Yes / No.

23. Check scrap, waste and rubbish has not been allowed toaccommodate on the site or the scrap materials has been Yes / No.stored at the isolated place.

64t- 24. Check that the worker while working at height scaffoldmaterials, waste materials and tools are not being thrown Yes / No.by them to cause injury to any person.

25. Check whether contractor has procured required quantityof PPE considering maximum number of erection gangs Yes / No.deployed at one time. Check the quantity of PPEs.

26. Check that the PPEs. required by the workmen are beingutilized by them always. Yes / No.

27. Check the worker are under constant surveillance by the_____ other person while working at height. Yes I No.

28. Check construction site has been barricaded forunauthorized persons / animals. Yes / No.

29. Check that lifting appliances and machines and vehiclesused on the construction site is of sound material and good Yes / No.quality and is free from patent defects and is strongenough to with safely the load and stresses to which theywill be subjected .

30. Check structures and equipment is being used only for thepurpose for which they were intended. Yes / No.

31. Check equipment has been operated by the competentperson. Yes / No.

32. Check portable ladders shall not exceed 9 Mts. in length, Yes / No.other wise may cause danger while climbing of person andback legs shall be equally braced.

33. Check unskilled labour are not utilized for skilled jobs andonly experience persons are deployed for erection. Yes / No.

34. Check a well planed and documented procedure for theentire Construction works of Sub station shall be prepared Yes / No.by contractor and get approved from Powergrid fordistribution to Contractors' field staff and Powergrid forfollow up.

35. Check no metallic measuring tapes are being used duringexpansion of charged bays. Yes / No.

36. Check metal ladders are not being used in the vicinity ofexposed live electrical eguipment. Yes / No.

37. Check one bore well is available for water supply in case

Page 93: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

Municipal Construction supply is not available Yes / No.38. Check charged area of a yard should be properly fenced

off. Yes I No. ______39. Check ladders / lengthy articles I lengthy equipments etc.~~~~~~~~~~should always be carried in horizontal position. | Yes I No.40. Check insurance by contractor for the labour to provide Yes / No.

C | ~~~~~~~~adequate coverage for any accident etc. |YsIN41.

Yes__ _ _ _ _ _ _ _ _ _ _No.42.

_ _ /No

REMARKS IF ANY:

Signature Signature Signature

Name: Name: Name:Designation: Designation: Designation:Powergrid Rep. Rep. from Contractor Rep. from

Page 94: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

l~~~~~~~~~~~~~~~~~~C :

E

3:OILON 3IlUfld

t31SnX3NNV E |~c~L

ctI

- , . t~~~~~~~~e§

Page 95: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

POWER GRID CORPORATION OF INDIA LIMITED -(A Government of India Enterprise) -I-

m3 h §1s1 Z~~~~5-09-2004 VT-z lrt 4f- 1.0 Wt ff li<,.tl 4 Z-TK<q, q jg4um,

ftr. f. 2rvc4PS (qQtqT) 4 fiqfw 2 3TITi4i WTUIT gu1tl t 3r fTf wir T

i= >iR: f ;0~Tg 765 $i. ftmt Riqkl4T qf<tEm T -T #T qqqu 'T wm tfm zT w; fTft 2

F i1§cT i-T~i qsliMt qMfOH4 W MY S14*0wi f,r t I ST- cl4ffR -T aT"g t RFq

L6> q)q41 cT ES:qlk oiMA ue941d s1fi402 -t

3Tfw!9~~~~~~~~~~~~~I

Page 96: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

[-~~~~~~ ?:., 'i:::

I ~ ~ ~ ~ ~ ~ - sr* e ''I' F |Or X.Vt ~ ' 4 m . .' ' . -b;i

# ,, ,~~~~'aL- *-*' *a ' -''

** , - . - I. . , t '; -

I.-~ ~ ~ -& ' s-., 1 ' ,

_ > .. -e L; ''+ ' ;'Lf iLfJL2~ '

Page 97: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

-r~ P- -- T 7R7 T U T > ..f fuT

(?) %i j -f 3R WRqT WTt.

r~ ~

Tm~ Z TmT 7 I -F -Tr wI Z4 R wOO orq

|~~~~~~~~~~~~~~#f ',0 L4 W,)4Ri51 :TM rqM - 0 0

Page 98: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

f#uaT)q tq). I ftaT*7ofE~

-T) qo- L9F /'oo/RRo Uq* ;

-~~~~ ~ ~ a) Thqt- ~q i (oo y ,. f q

'H.o _ _ _ _ _ _ _

( ft 5 f q 3 arMT ft 37~zf C ifT

q--) u 3 gu m -

;w~~~~~F N rf k A qz~j-W4~T~ df

9~~~~~~~-f ~R7f- m- &tf e~~~~~~~T Sltu 7" fw~ - ~~i"7 it#T77 a

Page 99: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

s^~~~~~~~~~VR; -~ q ~ ;4 lff CtI

T-,4T tz i; ~TT4q ~ tt mf~, I fET1~ ~T

mso~~. -yU~

mw~~~~~~q R t WiT

C.o

g T2qw f5 T (awdm f, a 0 i

v4)

IC 5

Page 100: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

- ~~~~~~~~~~~~~~~

l; 3

jl 3

* ~ h4Is ( 4k

I 4~k2 a thP 1; l4x ( t

I th~h W j h 4J1t% >lJ (W

~~~t@WI3 W:+t9X(

Page 101: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

-; ~~~~PLATE 1-2

[t.X , g ~~PUBLIC CONSULTATION

Page 102: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

PLATE-1

i . iif-uJ•

4i~~~~

--~~~~~~~~-'~ IZ t -

e e #640 i

PBIME N _ K '~~~ ._._ X' ^ 't '-- + , , '', H '' .v

PULI METN AT VILG NADNWD

Page 103: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

P LATE-2

XW -w

S~~ ~ a 5 s -- j

r~~~~ ,lj-vw ~ ,-,W

,~~~~~ _ w s X .,, Wqrz;

'7t: - arr vtr , *

PUBLIC MEETING AT VILLAGE NANDANWADI

Page 104: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

1-

| 09 ~~~FIGURE-1

1--A

-Io

Page 105: INITIAL ENVIRONMENT ASSESSMENT REPORT Public …documents.worldbank.org/curated/en/274691468771684851/pdf/E10650VOL-03.pdf · Chandrapur, Gadchirali, Bhandara and Nagpur Districts

TYPICAL PLAN OF TRANSMISSION LINE TOWER FOOTINGS

I~~~~~~~~~~~~~~~~

-I7

__ RANS

S S

0

N

N

INDICATIVE MEASURES

X & Y = 10- 15 iMETERS

a 00- 450 mm

I I