11
www.congreso.expomin.cl INNOVACIÓN PARA EL DESARROLLO MINERO INNOVATION FOR MINING DEVELOPMENT 23 27 ABRIL/APRIL 2018 Santiago, Chile ORGANIZA Y PRODUCE ORGANIZED AND PRODUCED BY INNOVATION IN MINING CODELCO 25 ABRIL “AUTOMATION PROJECTS IN SURFACE MINES” Tyler Berens Product Line Manager Automation, Epiroc (Part of Atlas Copco Group)

INNOVATION IN MINING CODELCO 25 ABRIL · .1 contents: 1. introduction 2. development 3. final remarks innovation in mining –codelco –25 abril “automation projects in surface

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: INNOVATION IN MINING CODELCO 25 ABRIL · .1 contents: 1. introduction 2. development 3. final remarks innovation in mining –codelco –25 abril “automation projects in surface

www.congreso.expomin.cl

INNOVACIÓN PARA EL DESARROLLO MINEROINNOVATION FOR MINING DEVELOPMENT

23 – 27 ABRIL/APRIL 2018

Santiago, Chile

ORGANIZA Y PRODUCEORGANIZED AND PRODUCED BY

INNOVATION IN MINING – CODELCO – 25 ABRIL

“AUTOMATION PROJECTS IN SURFACE MINES”

Tyler Berens

Product Line Manager Automation,

Epiroc (Part of Atlas Copco Group)

Page 2: INNOVATION IN MINING CODELCO 25 ABRIL · .1 contents: 1. introduction 2. development 3. final remarks innovation in mining –codelco –25 abril “automation projects in surface

.1

CONTENTS:

1. INTRODUCTION

2. DEVELOPMENT

3. FINAL REMARKS

INNOVATION IN MINING – CODELCO – 25 ABRIL

“AUTOMATION PROJECTS IN SURFACE MINES”

Page 3: INNOVATION IN MINING CODELCO 25 ABRIL · .1 contents: 1. introduction 2. development 3. final remarks innovation in mining –codelco –25 abril “automation projects in surface

1. INTRODUCTION: DISRUPTING THE CULTURE OF DRILLING

1.

“AUTOMATION PROJECTS IN SURFACE MINES”

Mexico

Chile Australia

South Africa Sweden

Page 4: INNOVATION IN MINING CODELCO 25 ABRIL · .1 contents: 1. introduction 2. development 3. final remarks innovation in mining –codelco –25 abril “automation projects in surface

2.

Val

ue

Ch

ain

Pro

cess

WorkflowTools promote effective integrated operations: Planning -> Operations -> Reporting

OperationsLEAN Drilling influences the value chain downstream

“AUTOMATION PROJECTS IN SURFACE MINES”

2. DEVELOPMENT: A MANUFACTURING MINDSET

Page 5: INNOVATION IN MINING CODELCO 25 ABRIL · .1 contents: 1. introduction 2. development 3. final remarks innovation in mining –codelco –25 abril “automation projects in surface

2. DEVELOPMENT: OPERATIONAL EQUIPMENT EFFECTIVENESS

2.

“AUTOMATION PROJECTS IN SURFACE MINES”

The standard for measuring manufacturing productivity. Simply put – it identifies the percentage of manufacturing time that is truly productive.

Page 6: INNOVATION IN MINING CODELCO 25 ABRIL · .1 contents: 1. introduction 2. development 3. final remarks innovation in mining –codelco –25 abril “automation projects in surface

2.

“AUTOMATION PROJECTS IN SURFACE MINES”

2. DEVELOPMENT: MONITORING

Inst. Penetration

Rate

Meters

per Op Hour

(MPOH)

Z Value (Depth)

X & Y Value (Diameter)

TotalAutonomous

Op Hours

Total Drill Availability/

Utilization

Sum of Planned

Time Delays

Sum of Unplanned Time Delays

Cycle Time:

(Tram/ Level/ Drill/ De-level)

Total Drilling Time

Total Non Drilling Task

Time

Zeroing Time

Drill Clean/Retract

Total Autonomous Availability

Level/Delevel

Tram

Operational / Process Delays:

1. Shift Changes

2. Blasting

3. Meal Periods (Lunch/ Dinner)

4. Other (to be determined)

5. Stand-by Mode

* Gathered thru Surface Manager/ Operator Logs

Unplanned Delays:

1. Mechanical Failures

2. Technical Failures

3. Other (Safety Issues, etc)

• Gathered thru SM Data/ Operator Logs

• Monitored thru SM Drill Utilization Tool

Predictable, Quality,

Meters per time period

Automation Focused

People/ Process Focused

Other

Results Driven

Productivity AccuracyPredictability

Page 7: INNOVATION IN MINING CODELCO 25 ABRIL · .1 contents: 1. introduction 2. development 3. final remarks innovation in mining –codelco –25 abril “automation projects in surface

2. DEVELOPMENT: CONTROL

2.

“AUTOMATION PROJECTS IN SURFACE MINES”

Inst. Penetration

Rate

Meters

per Op Hour

(MPOH)

Z Value (Depth)

X & Y Value (Diameter)

TotalAutonomous

Op Hours

Total Drill Availability/

Utilization

Sum of Planned

Time Delays

Sum of Unplanned Time Delays

Cycle Time:

(Tram/ Level/ Drill/ De-level)

Total Drilling Time

Total Non Drilling Task

Time

Zeroing Time

Drill Clean/Retract

Total Autonomous Availability

Level/Delevel

Tram

Operational / Process Delays:

1. Shift Changes

2. Blasting

3. Meal Periods (Lunch/ Dinner)

4. Other (to be determined)

5. Stand-by Mode

* Gathered thru Surface Manager/ Operator Logs

Unplanned Delays:

1. Mechanical Failures

2. Technical Failures

3. Other (Safety Issues, etc)

• Gathered thru SM Data/ Operator Logs

• Monitored thru SM Drill Utilization Tool

● AutoLevel

● AutoDrill

● Auto Rod Change

● Hole Navigation

Predictable, Quality,

Meters per time period

Automation Focused

People/ Process Focused

Other

Results Driven

+4 Hours ahead

∆= 1 min/rod

= 2184 more holes = 5 MBCY drilled / year

Page 8: INNOVATION IN MINING CODELCO 25 ABRIL · .1 contents: 1. introduction 2. development 3. final remarks innovation in mining –codelco –25 abril “automation projects in surface

2. DEVELOPMENT: OPTIMIZATION

2.

“AUTOMATION PROJECTS IN SURFACE MINES”

● (Multi) Teleremote

Inst. Penetration

Rate

Meters

per Op Hour

(MPOH)

Z Value (Depth)

X & Y Value (Diameter)

TotalAutonomous

Op Hours

Total Drill Availability/

Utilization

Sum of Planned

Time Delays

Sum of Unplanned Time Delays

Cycle Time:

(Tram/ Level/ Drill/ De-level)

Total Drilling Time

Total Non Drilling Task

Time

Zeroing Time

Drill Clean/Retract

Total Autonomous Availability

Level/Delevel

Tram

Operational / Process Delays:

1. Shift Changes

2. Blasting

3. Meal Periods (Lunch/ Dinner)

4. Other (to be determined)

5. Stand-by Mode

* Gathered thru Surface Manager/ Operator Logs

Unplanned Delays:

1. Mechanical Failures

2. Technical Failures

3. Other (Safety Issues, etc)

• Gathered thru SM Data/ Operator Logs

• Monitored thru SM Drill Utilization Tool

Predictable, Quality,

Meters per time period

Automation Focused

People/ Process Focused

Other

Results Driven

+9 Hours Drilling/Day @ 45 MPOH

∆ from 1:20 to :20

+3.5 Holes/Shift

∆ 60%Non Drilling time decrease

Page 9: INNOVATION IN MINING CODELCO 25 ABRIL · .1 contents: 1. introduction 2. development 3. final remarks innovation in mining –codelco –25 abril “automation projects in surface

2. DEVELOPMENT: AUTONOMY

2.

“AUTOMATION PROJECTS IN SURFACE MINES”

● Autonomous Drill

Inst. Penetration

Rate

Meters

per Op Hour

(MPOH)

Z Value (Depth)

X & Y Value (Diameter)

TotalAutonomous

Op Hours

Total Drill Availability/

Utilization

Sum of Planned

Time Delays

Sum of Unplanned Time Delays

Cycle Time:

(Tram/ Level/ Drill/ De-level)

Total Drilling Time

Total Non Drilling Task

Time

Zeroing Time

Drill Clean/Retract

Total Autonomous Availability

Level/Delevel

Tram

Operational / Process Delays:

1. Shift Changes

2. Blasting

3. Meal Periods (Lunch/ Dinner)

4. Other (to be determined)

5. Stand-by Mode

* Gathered thru Surface Manager/ Operator Logs

Unplanned Delays:

1. Mechanical Failures

2. Technical Failures

3. Other (Safety Issues, etc)

• Gathered thru SM Data/ Operator Logs

• Monitored thru SM Drill Utilization Tool

Predictable, Quality,

Meters per time period

Automation Focused

People/ Process Focused

Other

M/Operational hr+15-20%

M/Shift+20-30%

Redrills-30%

Productivity AccuracyPredictability

Placement+20-60% change

1/3 Extra Drill Capacity

Page 10: INNOVATION IN MINING CODELCO 25 ABRIL · .1 contents: 1. introduction 2. development 3. final remarks innovation in mining –codelco –25 abril “automation projects in surface

3. FINAL REMARKS

3.

“AUTOMATION PROJECTS IN SURFACE MINES”

Page 11: INNOVATION IN MINING CODELCO 25 ABRIL · .1 contents: 1. introduction 2. development 3. final remarks innovation in mining –codelco –25 abril “automation projects in surface

www.congreso.expomin.cl

INNOVACIÓN PARA EL DESARROLLO MINEROINNOVATION FOR MINING DEVELOPMENT

23 – 27 ABRIL/APRIL 2018

Santiago, Chile

ORGANIZA Y PRODUCEORGANIZED AND PRODUCED BY

INNOVATION IN MINING – CODELCO – 25 ABRIL

“AUTOMATION PROJECTS IN SURFACE MINES”

Tyler Berens

Product Line Manager Automation, Epiroc

(Part of Atlas Copco Group)