2
OPERATES WITHIN A SINGLE LANE TELESCOPING BASKET BOOM ROLLING STABILIZERS 600 lB BASKET LOAD CAPACITY EXPANDABLE BASKET After installing over 500,000 linear feet of utilities under virtually every pofile of bridge, we fully understand the associated challenges. We would love to assist on your next project and help make it go as smooth as possible. Bridge Masters Inc. has over 2 decades of hands-on experi- ence in this specialized field. Through these years we have been vigorously perfecting our methods and machines. Allow us to help you benefit from these refinements. PM-260 Largest UBIT Reach and Coverage For Large Scale and Difficult-to-Reach Inspection/ Work Environments Increase Productivity Conserve Corporate Resources Get Answers from Master Bridge Technicians Innovative Under-Bridge Utility Solutions INSTALLATION INSPECTION For immense under bridge access, up to 6,800 square feet, thanks to the 360 degree main turret rotation, 270 degree 2nd turret rotation and the 60’ horizontal reach from outer edge of the bridge deck. UTILITY INSTALLATION BRIDGE INSPECTION

Innovative Under-Bridge INSTALLATION INSPECTION Utility

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

OPERATES WITHIN A SINGLE LANE

TELESCOPING BASKET BOOM

ROLLING STABILIZERS

600 lB BASKET LOAD CAPACITY

EXPANDABLE BASKET

After installing over 500,000 linear feet of utilities under

virtually every pofile of bridge, we fully understand the

associated challenges. We would love to assist on your

next project and help make it go as smooth as possible.

Bridge Masters Inc. has over 2 decades of hands-on experi-

ence in this specialized field. Through these years we have

been vigorously perfecting our methods and machines.

Allow us to help you benefit from these refinements.

PM-260 Largest UBIT Reach and CoverageFor Large Scale and Difficult-to-Reach Inspection/Work Environments

Increase Productivity Conserve Corporate Resources Get Answers from Master Bridge Technicians

InnovativeUnder-Bridge

UtilitySolutions

INSTALLATION INSPECTION

For immense under bridge access, up to

6,800 square feet, thanks to the 360

degree main turret rotation, 270 degree

2nd turret rotation and the 60’ horizontal

reach from outer edge of the bridge deck.

UTILITY INSTALLATION BRIDGE INSPECTION

Manufactured by Paxton-Mitchell in the USA. One of the world’s recognized and respected bridge inspection crane manufacturers.

A 360 Degree Main Turret Rotation

UNIQUE CAPABILITIES • 360º Main Turret Rotation • 270º 2nd Turret Rotation • Massive 6,800 Square foot Under-bridge Access

All rights reserved © 2016 Bridge Masters, Inc.

Working Surface (Large Basket)

Working Payload

18” x 72” x 42“ tall46 x 183 x 106 cm

For more specific vehicle options, capabilities, and dimensions please contact one of our specialists at:

600 lb/272 kg

SPECIFICATIONS

Bridge Masters, Inc.

[email protected] call 1.888.851.0744

Toll Free 888.851.0744 www.bridgemastersinc.com

PLATFORM SPECS VEHICLE INFO

PM-260 Largest UBIT Reach and CoverageFor Large Scale and Difficult-to-Reach Inspection/Work Environments

Under Reach

Down Reach

Down Reach

from handrail (42” height)

from level surface

from handrail

65/19.8

75/22.9

78.5/23.9

MAXIMUM REACH ft/m

Max Horizontal Reach Under Bridge Max Vertical Reach Below Bridge

5010203040506070 0

0

10

10

20

20

30

40

50

60

70

80

501020304050 0

0

10

10

20

20

30

40

50

60

70

80

65

19.8 meters

75

22.9

met

ers