0 ~JAN 19 i-J
FPL L-2001-009 10 CFR 50.55a
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555
Re: Turkey Point Unit 4 Docket No. 50-251 Inservice Inspection Report
Attached are the following reports for Turkey Point Unit 4 in
accordance with the provisions of the ASME Code, Section XI:
Form NIS-I Owners' Report for Inservice Inspections.
Form NIS-2 Owners' Report for Repairs or Replacements.
Form NIS-BB Owners' Data Report for Eddy Current Examination
Results.
Summary of Visual Examinations and Functional Testing of
Snubbers.
Summary of Inservice Inspection Examinations.
Summary of IWE Examinations.
Summary of System Pressure Testing.
Should there be any questions concerning this report, please contact
US.
Very truly yours,
R. J. Hovey Vice Presid nt Turkey Point Plant
OIH
Attachments
cc: Regional Administrator, Region II, USNRC
Senior Resident Inspector, USNRC, Turkey Point Plant
an FPL Group company
TURKEY POINT UNIT 4
2000 REFUELING OUTAGE
FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS
FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS Page 1 of 7
1. Owner: Florida Power and Light Company 700 Universe Blvd. Juno Beach, Florida 33408
2. Plant: Florida Power & Light Company Turkey Point Nuclear Power Plant 9760 SW 344 Street Florida City, Florida 33035
3. Plant Unit: 4
5. Commercial Service Date: September 7, 1973
7. Components Inspected:
4. Owner Certificate of Authorization (if required): N/A
6. National Board Number for Unit: N/A
Component or Manufacturer Manufacturer State or or Installer Province National Board No. Appurtenance or Installer Sra o o Serial No. No.
Reactor Pressure Vessel Babcock and 610-0116 N/A N-160 Wilcox
Regenerative HeatN/NA exhner Westinghouse 4E200 N/A N/A Exchanger
Reactor Coolant System Bechtel N/A N/A N/A
Reactor Coolant Pump A Westinghouse 5-618J713 N/A N/A
Safety Injection System Bechtel N/A N/A N/A
RHR System Bechtel N/A N/A N/A
16A-6341-1 ,2,3 Steam Generator A, B. C Westinghouse FSGT-2991, N/A N/A
2992, 2993
Main Steam System Bechtel N/A N/A N/A
Auxiliary Feedwater Bechtel N/A N/A N/A
Main Feedwater System Bechtel N/A N/A N/A
Component Cooling Bechtel N/A N/A N/A
FORM NIS-1 Report (continued) Page 2 of 7
Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408
Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035
Plant Unit: 4 Owner Certificate of Authorization (if required) N/A Commercial Service Date: September 7, 1973 National Board Number for Unit: N/A
8. Examination Dates: from 9/25/00 to 10/23/00
9. Inspection Period Identification: Second Period, from 04/15/97 to 04/14/01.
10. Inspection Interval Identification: Third Interval, from 04/15/94 to 04/14/04.
11. Applicable Edition of Section XI: 1989, No Addenda, (IWE) 1992/1992 Addenda
12. Date/Revision of Inspection Plan: June 30, 1998/Revision 1.
13. Abstract of examinations and test. Include a list of examinations and tests and a
statement concerning status of work required for the inspection plan.
Inservice Examinations of selected Class 1 and 2 components and piping systems of Florida
Power and Light's (FPL) Turkey Point Unit 4 was performed during the 2000 Refueling
Outage. This outage began on September 25, 2000 and ended October 23, 2000. This was
the third outage of the second period of the third ten-year interval.
The components and piping systems examined were selected in accordance with the Third
Ten-Year Inservice Inspection Program, which was prepared in accordance with the
requirements of the American Society of Mechanical Engineers (ASME) Section XI, 1989 Edition, No Addenda.
Manual and Automated Ultrasonic, Visual, Magnetic Particle, and Liquid Penetrant non
destructive methods were used to examine components, piping, and their supports. FPL
personnel supported by Washington International Group personnel performed the
examinations. See the attached report: Turkey Point Unit 4 Inservice Inspection Summary
and Turkey Point Unit 4 IWE Summary for examination scope and results.
FPL personnel supported by Westinghouse, Zetec, and NDE Technology personnel conducted
Eddy Current examinations on Steam Generators A, B, and C from October 04, 2000 through
October 09, 2000. Ten tubes were plugged during this outage. See the attached NIS-BB
report for the summary of examination results.
The Feedwater Nozzle piping augmented examinations of all 3 steam generators were
conducted utilizing the P-Scan automated ultrasonic examination system. The entire area
from the nozzle ramp to a point one-pipe diameter past the elbow weld was examined with
ultrasonics. No reportable indications were noted.
Snubber visual examinations and functional testing were conducted in accordance with
ASME Section XI and Turkey Point Technical Specifications as allowed under Relief
Request number 4. Basic-PSA, Inc supplied examination and testing services. See the
attached report: Summary of Visual Examinations and Functional Testing of Snubbers for
examination scope and results.
FORM NIS-1 Report (continued) Page 3 of 7
Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit: 4 Owner Certificate of Authorization (if required) N/A Commercial Service Date : September 7, 1973 National Board Number for Unit: N/A
System pressure testing was conducted by FPL visual examiners to meet the requirements of
ASME Section XI Code and Turkey Point Technical Specifications as allowed under Relief Request number 9, 11, 12, and 16 and implemented through applicable procedures. See the attached report: Summary of System Pressure Testing for test boundaries and results.
IWE examinations were conducted in accordance The Containment Building Metallic Liner
Inservice Inspection Program For Turkey Point Unit 3 & 4, which was written in accordance
with ASME Section XI 1992 Edition, 1992 Addenda and is subject to the limitations and
modifications of 10 CFR 50.55a(b)(2), 10 CFR 50.55a(g)(4), and 10 CFR 50.55a(g)(6). The
requirements for the first inspection period as required by 10 CFR50.55a (g)(6)(ii)(B)(1) have
been met as applicable to IWE, Program B of ASME Section XI.
The completed examination percentages for the second period meet the requirements of
Program B of ASME Section XI and applicable relief requests. A listing of examinations
performed during this outage is attached to this summary.
14. Abstract of Results of Examinations and Tests.
Class 1
Reactor Pressure Vessel
One-third of the studs and nuts were examined with Magnetic Particle and Ultrasonic
examination methods. One-third of the large and small washers was visually examined. No
reportable indications were identified.
Reactor Coolant Pump A
100% of the studs were examined with the ultrasonic method. No reportable indications were
identified.
Pressurizer
Pressurizer vessel welds and nozzle inner radii were examined with the ultrasonic method.
No reportable indications were identified.
Steam Generators (Eddy Current)
Eddy Current examinations were performed of the tubing of the three Steam Generators. The
results of the examinations are detailed in the NIS-BB report.
FORM NIS-1 Report (continued) Page 4 of 7
Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit: 4 Owner Certificate of Authorization (if required) N/A Commercial Service Date: September 7, 1973 National Board Number for Unit: N/A
Regenerative Heat Exchanger
Per Relief Request # 3, a VT-3 visual examination was performed near the beginning of the
outage to look for accumulated boric acid crystals and evidence of leakage and a VT-2 visual
examination was performed during the system leakage test to look for evidence of leakage. No reportable indications were identified.
Reactor Coolant Piping
Reactor Coolant piping welds and supports were examined with surface, volumetric and visual methods. No reportable indications were identified.
Safety Injection Piping
Safety Injection piping welds and supports were examined with the surface and visual methods. One support was found to have a 0" clearance between the sliding plate and the angle iron (Refer to section 15, "Abstract of Corrective Measures"). No additional reportable indications were identified.
Residual Heat Removal Piping
One Residual Heat Removal piping integral attachment weld and support were examined with surface and visual methods. No reportable indications were identified.
Class 2
Steam Generator B
Steam Generator inlet and outlet bolting was examined with the visual method. No reportable indications were identified.
Main Steam Piping
Main steam piping welds were examined with volumetric and surface methods. Acceptable geometric indications were noted. No reportable indications were identified.
Main Feedwater Piping
Main Feedwater piping supports were examined with the visual method. No reportable indications were identified.
Augmented examinations were performed of the piping of the Steam Generator Feedwater nozzles ramp to a point one-pipe diameter past the elbow weld on all three loops with the
FORM NIS-1 Report (continued) Page 5 of 7
Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit: 4 Owner Certificate of Authorization (if required) N/A Commercial Service Date: September 7, 1973 National Board Number for Unit: N/A
automated ultrasonic method. Acceptable geometric indications were noted. No reportable
indications were identified.
Auxiliary Feedwater
Auxiliary feedwater piping supports were examined with the visual method. One support was
found to have a discrepancy between the actual support configuration and the drawing (Refer
to section 15, "Abstract of Corrective Measures"). No reportable indications were identified.
Component Cooling Piping
Component Cooling piping supports were examined with the visual method. No reportable indications were identified.
IWE Examinations
General visual examinations were performed of selected containment penetrations and surfaces. The following areas are considered inaccessible:
Zone 1 Penetration 61A (due to Accumulator Tank platform)
Zone 2 Fuel Transfer Area - 740 to 1050 at elevation 14' to 39'6"
Zone 8 Fuel Transfer Area - 74' to 1050 at elevation 39'6" to 59'6"
Zones 13-18 Inaccessible areas on top of crane support throughout entire zone
Penetration 39 Fuel Transfer Tube (incased in concrete)
During the General Visual examinations one area was found to have separation between the moisture barrier liner plate and the concrete slab and another area was found to have coating damage (Refer to section 15, "Abstract of Corrective Measures").
15. Abstract of Corrective Measures
Support 3-SIH-56, on the Safety Injection system, was found to have 0" gap between the sliding plate and angle iron. An engineering evaluation showed the gap to be acceptable per Teledyne calculation TR-5322-106, Rev. 1(page 37 of Ref. 4). Engineering has issued drawing change (CRN-C-10835) to reflect the as-built condition. Refer to CR No. 00-1693.
Support 80117-H-341-18, on the Auxiliary Feedwater system, was found to have a drawing discrepancy and the threaded rod is in contact with a u-bolt. An engineering evaluation showed the condition to be acceptable. Engineering has issued drawing change (CRN-C10834) to reflect the as-built condition. Refer to CR No. 00-1725.
We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI, and c) corrective measures taken conform to the rules of the ASME Code, Section XI.
Certificate of Authorization No. ,//A Expiration Date A1114
Date:/2/A Signed:____________ By _Mc a-C6 - C170c-
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Dade County, Florida, and employed by Factory Mutual Insurance Company of Johnston, Rhode Island have inspected the components described in this Owner's Report during the period 4/8/99 to 10/23/00, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owner's Report in accordance with the Inspection Plan and as required by the ASME Code, Section XI.
By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
r 745- L - 3 Z Inspect r' Signature National Board, State,
Province, and Endorsements
Date: 000
FORM NIS-1 Report (continued) Page 7 of 7
Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 SW 344 Street, Florida City, Florida 33035 Plant Unit: 4 Owner Certificate of Authorization (if required) N/A Commercial Service Date : September 7, 1973 National Board Number for Unit: N/A
NIS-2 Reports
Abstract
The attached NIS-2 reports detail the repair/replacement of Class 1, 2 and 3 piping and components for Florida Power and Light Company, Turkey Point Unit 4. These repairs or replacements were performed prior to and during the fall 2000 refueling outage, between the dates of April 8, 1999 and October 23, 2000.
Piping and components were inspected/tested in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel code "Rules for Inservice Inspection of Nuclear Power Components, "1989 Edition, No Addenda.
NIS-2 LOG
Report No. Date
99-037-4 11/9/99 99-038-4 12/21/99 00-001-4 1/7/00 00-002-4 4/13/00 00-003-4 4/27/00 00-004-4 6/13/00 00-005-4 6/13/00 00-006-4 7/24/00 00-007-4 7/25/00 00-008-4 8/21/00 00-009-4 10/5/00 00-010-4 10/5/00 00-011-4 10/13/00 00-013-4 10/16/00 00-014-4 10/15/00 00-015-4 10/15/00 00-017-4 10/18/00 00-018-4 10/18/00 00-019-4 10/23/00 00-020-4 10/23/00 00-021-4 10/25/00 00-022-4 10/25/00 00-023-4 10/25/00 00-024-4 10/30/00 00-025-4 10/30/00 00-026-4 10/30/00 00-027-4 10/30/00 00-028-4 10/30/00 00-029-4 11/28/00 00-031-4 12/14/00
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
Florida Power & Light Name
700 Universe Blvd. Juno Beach, FL 33408
Date
SheetAddress
Turkey Point Plant Name
9760 SW 344 Street Florida City, FL 33035
d by
Address
Florida Power & LiahtNare
9760 SW 344 Street Florida City, FL 33035Address
Unit 4
WO#: 99017244 01 CR#: 99-1485
Repair Organization, P.O. No, Job No., tc.
Type Code Symbol Stamp N/A
Authorization Number N/A
Expiration Date N/A
4. Identification of System: Component Cooling Water System #: 30 Quality Group
5. (a) Applicable Construction Code B31.1
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements
1955 Edition,
19 89 Edition,
N/A Addenda,
N/A Addenda,
N/A Code Case
N/A Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
7. Description of Work:
REPLACED OUTLET SIDE CHANNEL HEAD COVER STUDS (6), NUTS (12), AND SCREWS (4).
8. Tests Conducted: Hydrostatic:
Other
Pneumatic
Pressure
Nominal Operating Pressure
psig Test Temperature
Owner
2. Plant
3. Work Performes
11/9/99
of 2
C
ASME Repaired, Code
Name of Name of Manufacturer National Other Year Replaced, or Stamp Component Manufacturer Serial Number Board Identification Built Replacememt Yes/No
ROD, THREADED, N/A N/A N/A STK CODE 29493 1 UNK REPLACEMENT NO (6) STUDS UTC 416044 FABRICATED, ASME SA-193, GR B7
NUT, CARBON N/A N/A N/A STK CODE 27963 1 UNK REPLACEMENT NO STEEL (12), ASTM UTC 423666 A-194 GRADE 2H
SCREW, CAP, N/A N/A N/A STK CODE 27122 1 UNK REPLACEMENT NO HEAVY HEX (4), UTC 373840 ASME SA-193, GR B7
dog F
99-037-4
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks Bolted connection, no welding required.
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors
and the state or Province of Dade County end employed by Factory Mutual Insurance Company of Norwood, Ma.
have inspected the components described in this Owners Report during the period of 9/21/99 to 11/9/99
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective
measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied,
concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither
the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss
of any kind arising from or connected with this inspection.
Commissions Il, /L - f 30S .... . ........ National Board. State, Providence, and Endorsements
Date __ _ _ _ _
99-037-4
1. Owner
Pl ant
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS
As Required by the Provisions of the ASME Code Section XI
Florida Power & Light Date 1 Name
700 Universe Blvd. Juno Beach, FL 33408 Sheet
Address
T-rk-~ Point Plant Unit
Name
9760 SW 344 Street Rorida City, FL 33035
WO#: 9901788
2/21/99
of 2
4
8 01 CR#: N/A
Address Repair Organization, P.O. No, Job No.. etc.
3. Work Performed by Rorida Power & Light Type Code Symbol Stamp N/A Name Authorization Number N/A
9760 SW 344 Street Rorida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Intake Cooling Water System #: 19 Quality Group C
5. (a) Applicable Construction Code 931.1 19 55 Edition, N/A Addenda, ........N/.A ... Code Case
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 89 Edition, N/A Addenda, N/A Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
ASME Repaired, Code
Name of Name of Manufacturer National Other Year Replaced, or Stamp
Component Manufacturer Serial Number Board Identification Built Replacememt Yes/No
Cover studs (14), A- Hayward 2298609390 N/A STK CODE 14188 2 UNK Replacement No
193 GR 7 UTC 394431
Nut, Heavy Hex 114) N/A N/A N/A STK CODE 44572 1 UNK Replacement No
A-194 GR 2H UTC 425631
7. Description of Work:
Replaced (14) cover studs and (14) nuts on cover.
3. Tests Conducted: Hydrostatic:
Other N/A
Pneumatic
Pressure N/A psig
Nominal Operating Pressure
Test Temperature N/A deg F
99-038-4
7• • ., u ,
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
99-038-4
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this replacement conforms to the rules of
the ASME Code, Section XI.
N/AType Code Symbol Stamp
N/A Expiration Date: N/ACertificate of Authorization No.
Date , "X/ -Owner or Owner's besignee, Title
CERTIFICATE OF INSERVICE INSPECTION
I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors
and the state or Province of Dade County and employed by Factory Mutual Insurance Company of Norwood, Ma.
have inspected the components described in this Owners Report during the period of 12/20/99 to 12/21/99
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective
measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied,
concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither
the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss
of any kind arising from or connected with this inspection.
AJ 7,5 • a4 4 X Commissions N97244'l'rL3aM
Inspector's Signature National Board. State. Providence. and Endorsements
Date Z(l Z 0 - c'
N/A
r•
ogn•
a
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
Florida Power & Light Name
700 Universe Blvd. Juno Beach, FL 33408
Address
Turkey Point Plant Name
9760 SW 344 Street Florida City, FL 33035
Date
Sheet
Unit
I(7/OO
of 2
4
WO#: 29020580 CR#: N/A
Florida Power & LightName
9760 SW 344 Street Florida City, FL 33035
4. Identification of System:
Addrem
Component Cooling Water
Re
Type Code Symbol
Authorization Numb4
Expiration Date
System #: 30 Quality Group
pair Organization, P.O. No. Job No.. ac.
Stamp N/A
or N/A
N/A
C
5. (a) Applicable Construction Code B31.1
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements
19 55 Edition,
1989 Edition,
N/A Addenda,
N/A Addenda,
N/A Code Case
N/A Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
7. Description of Work:
REPLACED BOLTING ON INLET HEAD COVER; (36) STUDS AND (72) NUTS.
, Tests Conducted: Hydrostatic: t4 11
Other
Pneumatic 10 W
Pressure N IL psig
Nominal Operating Pressure
Test Temperature I& deg F
Owner
2. Plant
3. Work Performed by
ASME Repaired, Code
Name of Name of Manufacturer National Other Year Replaced, or Stamp Component Manufacturer Serial Number Board Identification Built Replacememt Yes/No
ROD THREADED, N/A N/A N/A STK CODE 0029493-1 N/A REPLACEMENT N (36) STUDS FABRICATED, ASME UTC U 428803 SA-193, GR B7
NUT, HEAVY HEX, N/A N/A N/A STK CODE 0027837 N/A REPLACEMENT N (72), ASTM A-194, UTC #428761 GR. 7
4- I £ L I ___ ± _________ I _____
00-001-4
Sheet 2 of 2FORM NIS-2 (Back)
4. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
Certificate of Authorization No.
Signed
e~ow- ý wi
N/A
ner or Owner's Designee, Title
Expiration Date: N/A
Date " J
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state or Province of Dade County and employed by Factory Mutual Insurance Company of Norwood, Me. have inspected the components described in this Owners Report during the period of 11/9/99 to 1/7/00 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neithe the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions ,JA 7 7/ 1 National Board, State, Providence, and Endorsements
Date 9 1 --- 2& - VV
Inspector's Signature
00-001-4
_,-Z - I- "N/A
L -
700 Un
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
Florida Power & Light Date 4/13/ Name
iverse Blvd. Juno Beach, FL 33408 Sheet
Addrese
Turkey Point Plant Unit
Nasf.
9760 SW 344 Street Florida City, FL 33035Address
3. Work Performed by Florida Power & Light Name
9760 SW 344 Street Florida City, FL 33035
T
A
Address
4. Identification of System: Auxiliary Feedwater System #: 75
5. (a) Applicable Construction Code B31.1 1
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1
6. Identification of Components Repaired or Replaced and Replacement Components
00
2of
4
)wner
2. Plant
7. Description of Work:
REPLACED THE EXISTING 1/2" DIAMETER BOLT JOINING THE 3" PIPE CLAMP TO SUPPORT 4-AFX-8 WITH A 3/4" DIAMETER HEX HEAD BOLT AND DOUBLE NUT.
3. Tests Conducted: Hydrostatic: N/A
Other VT-3
Pneumatic N/A
Pressure N/A psig
Nominal Operating Pressure N/A
Test Temperature N/A deg F
00-002-4
WO#: 29011425 01 CR#: N/A
Repair Organization. P.O. No, Job No., etc.
ype Code Symbol Stamp N/A
,uthorization Number N/A
Expiration Date N/A
Quality Group B
9 55 Edition, N/A Addenda, N/A Code Case
9 89 Edition, N/A Addenda, N/A Code Case
ASME Repaired. Code
Name of Name of Manufacturer National Other Year Replaced, or Stamp Component Manufacturer Serial Number Board Identification Built Replacememt Yes/No
(1) SCREW, CAP, N/A N/A N/A STK CODE 27122 1 UNK REPLACEMENT N HEAVEY HEX, 3/4 UTC 424688 TRCE HCR63749 ",ASME SA-193 GR B7
(2) NUT, HEAVY N/A N/A N/A STK CODE 27930 1 UNK REPLACEMENT N HEX, 3/4"-10,ASTM UTC 418461 TRCE H8098740 A-563 GR B
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks BOLTED CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors
and the state of Florida and employed by Factory Mutual Insurance Company of Johnston, Rhode Island, have
inspected the components described in this Owners Report during the period of 1 2/3/99 to 4/13/00
and state that to the best of my knowledge and belief, the Owner has performed examninations and taken corrective
measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied,
concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither
the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss
of any kind arising from or connected with this inspection.
ctor', Signature
Commissions /4/; k-' > National Board, State, Providence, and Endorsements
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this replacement conforms to the rules of
the ASME Code, Section Xl.
Type Code Symbol Stamp N/A
Certificate of Authorization No. N/A Expiration Date: N/A
S Ow or O er's Designee. Title
00-002-4
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
Owner
2. Plant
3. Work Performe
4. Identification of System:
Florida Power & Light
Name
700 Universe Blvd. Juno Beach, FL 33408
Address
Turkey Point Plant Name
9760 SW 344 Street Florida City, FL 33035
Address
Florida Power & LightName
9760 SW 344 Street Florida City, FL 33035Address
Intake Cooling Water
Date
Sheet
Unit
4/27/00
of 2
4
WO#: 30007432 01 CR#: N/A
Repair Organizabon, P.O. No, Job No.. etc.
Type Code Symbol Stamp N/A
Authorization Number N/A
Expiration Date N/A
System #: 19 Quality Group C
5. (a) Applicable Construction Code B31.1
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements
19 55 Edition,
1989 Edition,
N/A Addenda,
N/A Addenda,
N/A Code Case
N/A Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
ASME Repaired, Code
Name of Name of Manufacturer National Other Year Replaced, or Stamp
Component Manufacturer Serial Number Board Identification Built Replacememt Yes/No
8" GATE VALVE, CRANE N7W30 N/A STK CODE 52836 2 UNK REPLACEMENT N
CAST IRON,ASTM A- UTC 410052 126
ROD, THREADED, N/A N/A N/A STK CODE 29493 1 UNK REPLACEMENT N
16 STUDS UTC 431593 FABRICATED,A-36
(32) NUTS, ASTM A- N/A N/A N/A STK CODE 27837 1 UNK REPLACEMENT N
194 GR 7, HEAVY UTC 431033
7. Description of Work:
REPLACED VALVE,ý-50-326 WITH NEW VALVE, ALSO REPLACED (16) STUDS AND (32) NUTS. e•r 0119,-1
8. Tests Conducted: Hydrostatic: Pneumatic Nominal Operating Pressure
Pressure 14.5 psig Test Temperature 87 deg FOther VT-2
X
00-003-4
V•U IJV
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks BOLTED CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this replacement conforms to the rules of
the ASME Code, Section XI.
Type Code Symbol Stamp
Certificatedization No.
i
N/A
N/A Expiration Date: N/A
Date W171 0'O/her or Owner's Designee, Title
L�
00-003-4
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors
and the state of Florida and employed by Factory Mutual Insurance Company of Johnston, Rhode Island, have
inspected the components described in this Owners Report during the period of 4/17/00 to 4/27/00
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective
measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied,
concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither
the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss
of any kind arising from or connected with this inspection.
Commissions t v idne 1 nd Endrseent National Board, State. Providence, and Endorsements
or's Signature
Date ci"2- U /I
N/A
Owner
2. Plant
700 Un
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS
As Required by the Provisions of the ASME Code Section XI
Florida Power & Light Date Name
iverse Blvd. Juno Beach, FL 33408 Sheet "Addrme
Turkey Point Plant UnitNam
9760 SW 344 Street Florida City, FL 33035WOO: 2900988
6/13/00
of 2
4
801 CR#: 99-0697
Address Repair Organization, P.O. No, Job No., etc.
3. Work Performed by Florida Power & Light Type Code Symbol Stamp N/A Name
Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035
"eExpiration Date N/A
4. Identification of System: Intake Cooling Water System #: 19 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Code Case
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacement* 1989 Edition, N/A Addenda, N41.6-1 Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
ASME Repaired, Code
Name of Name of Mfg Mfg Sedal National Other Year Replaced, or Stamp Component Number Board Identification Built Replacememt Yes/No
ROD, THREADED, (8) STUDS N/A N/A N/A STK CODE 29493 1 UNK REPLACEMENT N FABRICATED SA-193 GR B7 UTC 430115
(8) NUTHEAVY HEX, C.S. NIA N/A N/A STK CODE 27084 1 UNK REPLACEMENT N SA-194 UTC 428805
PIPE,C.S., 55" USED, SA- N/A N/A N/A STK CODE 30637 1 UNK REPLACEMENT N
106, GR B SCH. 40 UTC 431874
ELBOW, 90 DEGREE, 4%, N/A N/A N/A STK CODE 33893 1 UNK REPLACEMENT N SCHED. 40, SA-234 UTC 429994
ELBOW, 90 DEGREE, 4", N/A N/A N/A STK CODE 33893 1 UNK REPLACEMENT N SCHED. 40, SA-234 UTC 429995
7. Description of Work:
REPLACED VALVE 4-50-413 AND ASSOCIATED VENT LINE. ALL WORK ASSOCIATED WITH WO# 29009888 01 IS DOCUMENTED UNDER NIS-2 00-004-4 AND NIS-2 00-005-4.
8. Tests Conducted: Hydrostatic:
Other VT-2
Pneumatic
Pressure 4 psig
Nominal Operating Pressure X
Test Temperature 85 deg F
00-004-4
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks ALL WELDING PERF6RMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL. CODE CASE N-416.1 WAS
INVOKED FOR THIS REPLACEMENT ACTIVITY.
00-004-4
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors
and the state of Florida and employed by Factory Mutual Insurance Company of Johnston, Rhode Island, have
inspected the components described in this Owners Report during the period of 11/17/99 to 6/13/00
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective
measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xi.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied,
concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither
the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss
of any kind arising from or connected with this inspection.
Commissions
Inspector's Signature National Board, State, Providence, and Endorsements
Date __ _ _ _ _ _ _
")w ner
2. Plant
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Proviaiono of the ASME Code Section XI
Florida Power & Light Date Name
700 Universe Btvd. Juno Beech, FL 33408 Sheet
Addre•s
Turkev Point Plant Unit
Name
9760 SW 344 Street Florida City, FL 33035
WOO: 2900988
6/13/00
of 2
4
801 CR#: 99-0697
Address Repair Organization. P.O. No, Job Nf. etc.
3. Work Performed by Florida Power & Light Type Code Symbol Stamp N/A Name Authorization Number N/A
9760 SW 344 Street Florida City, FL 33035 Addos Expiration Date N/A
4. Identification of System: Intake Cooling Water System #: 19 Quality Group C
5. (s) Applicable Construction Code B31.1 1955 Edition, N/A Addenda, N/A Code Case
lb) Applicable Edition of Section Xl Utilized for Repairs or Replascement. 1989 Edition, N/A Addenda, N41 6-1 Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
ASME Repaired, Code
Name of Name of Mfg Mfg Serial Nationd Other Year Replaced, or Stamp
Component Number Board Identification Built Replacememt Yes/No
PIPE,C.S. 4" USED,SA-1O6 N/A N/A N/A STK CODE 30618 1 UNK REPLACEMENT N GR B SCHED. 40 UTC 408446
3/4 CAP, SA 105, C.S. N/A N/A N/A STK CODE 33565 1 UNK REPLACEMENT N
UTC 410324
HALF COUPLIN, C.S.SA-105 N/A N/A N/A STK CODE 33963 1 UNK REPLACEMENT N
UTC 373908
FLANGE, C.S. SA-105 N/A N/A N/A STK CODE 34080 1 UNK REPLACEMENT N
UTC 378035
3/4" GLOBE VALVE, MODEL EDWARDS N/A N/A STK CODE52980 1 UNK REPLACEMENT N
A848YT2 UTC 416498
7. Description of Work:
REPLACED VALVE 4-50-413 AND ASSOCIATED VENT UNE. ALL WORK ASSOCIATED WITH WO# 29009888 01 IS DOCUMENTED UNDER NIS-2 00-004-4 AND NIS-2 00-005-4.
8. Tests Conducted: Hydrostatic:
Other VT-2
Pneumatic
Pressure 4 psig
Nominal Operating Pressure X
Test Temperature 85 deg F
00-005-4
Sheet 2 of 2 FORM NIS-2 (Back)
9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL. CODE CASE N-416.1 WAS
INVOKED FOR THIS REPLACEMENT ACTIVITY.
00-005-4
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this replacement conforms to the rules of
the ASME Code, Section XI.
e .... e.., . N/A
N/ACertificate of Auhorization No. N/A Expiration Date:
31U[IUJ /~ Dotbvnoror Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors
and the state of Florida and employed by Factory Mutual Insurance Company of Johnston, Rhode Island, have
inspected the components described in this Owners Report during the period of 11/17199 to 6/13/00
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective
measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied,
concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither
the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss
of any kind aria g from or connected with this inspection.
______ ______ _____Commissions Me6 702ý 'R5~
Inspector's Signature National Board. State. Providence, and Endorsements
Date //
I
I ype %,008 rvw -1-
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
Florida Power & Light Date Name
700 Universe Blvd. Juno Beach, FL 33408 Sheet Address
Turkey Point Plant Uniteow
9760 SW 344 Street Florida City, FL 33035Address
3. Work Performed by Florida Power & Light Nome
9760 SW 344 Street Florida City, FL 33035
4. Identification of System:
Address
Component Cooling Water
5. (a) Applicable Construction Code B31.1
(b) Applicable Edition of Section XI Utilized for Repairs or Replae
7/24/00
of 2
4
1. Owner
2. Plant
Repair Organhzratm, P.O. No, Job No., etc.
Type Code Symbol Stamp NIA
Authorization Number N/A
Expiration Date N/A
System #: 30 Quality Group C
19 55 Edition, N/A Addenda, N/A Code Case
cements 1989 Edition, N/A Addenda, N/A Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
ASME Repaired, Code
Name of Name of Mfg Mfg Serial National Other Year Replaced, or Stamp Component Number Board Identification Built Replscememt Yes/No
ROD, THREADED (1 STUD N/A N/A N/A STK CODE 29493 1 UNK REPLACEMENT N FABRICATED) ASME SA-193 UTC 431734 GR B7
NUT (2), ASTM A-194 GR 7 N/A N/A N/A STK CODE 27837 1 UNK REPLACEMENT N HEAVY HEX UTC 428761
7. Description of Work:
REPLACED (1) STUD AND (2) NUTS
8. Tests Conducted: Hydrostatic: N/A
Other N/A
Pneumatic N/A
Pressure N/A psig
Nominal Operating Pressure N/A
Test Temperature N/A deg F
00-006-4
WO#: 29020678 01 CR0: 99-1485
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks BOLTED CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this replacement conforms to the rules of
the ASME Code, Section XI.
NIAType Code Symbol Stamp
N/A Expiration Date: N/A
V Datea 1 /6k"A " - -Owner or Owner's Designee, Title
LY�LI
Certificate 1 ,Authorization No.
00-006-4
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors
and the state of Florida and employed by Factory Mutual Insurance Company of Johnston, Rhode Island, have
inspected the components described in this Owners Report during the period of 5/31/00 to 7/24/00
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective
measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied,
concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither
the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss
of any kind arising from or connected with this inspection.
Commissions ' 1ze- 5 F6- •z8 National Board, State, Providence, and Endorsements
Itpe tors Signature
Date e') 06 z C70
N/AS....
| -| -I - -b,•yw
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS
As Required by the Provisions of the ASME Code Section XI
Florida Power & Light Date
Name
700 Universe Blvd. Juno Beach, FL 33408 Sheet
Turkey Point Plant UnitNamte
9760 SW 344 Street Florida City, FL 33035
1. Owner
2. Plant
7/25/00
of 2
4
501 CR#: N/A
Adm
3. Work Performed by Florida Power & Light Nam
9760 SW 344 Street Florida City, FL 33035
T A
4. Identification of System: Component Cooling Water System #: 30
5. (a) Applicable Construction Code B31.1 1
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacement* 1|
6. Identification of Components Repaired or Replaced and Replacement Components
Repair Organization, P.O. No, Job No., dc.
ype Code Symbol Stamp N/A
uthorization Number N/A
xpiration Date N/A
Quality Group C
9 55 Edition, N/A Addenda, N/A Code Case
89 Edition, N/A Addenda, N/A Code Case
ASME Repaired, Code
Name of Name of Mfg Mfg S0e6l National Other Year Replaced, or Stamp
Component Number Board Identification Built Replacememt Yes/No
NUT (2), 3/4', ASTM A-194 N/A N/A N/A STK CODE 27837 1 UNK REPLACEMENT N
GR 7 UTC 423130
+ + + + I I
-4 I T1
I I I I t t
7. Description of Work:
REPLACED (2) ERODED NUTS AT MANWAY ON THE 48 COMPONENT COOLING WATER HEAT EXCHANGER.
8. Tests Conducted: Hydrostatic: N/A
Other N/A
Pneumatic N/A
Pressure N/A psig
Nominal Operating Pressure N/A
Test Temperature N/A deg F
00-007-4
WOO: 3000919
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks BOLTED CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
N/AType Code Symbol Stamp
NExpiration Date: N/ACertificate ation No.
e=uthonz
�g; IIG/2Owner or Owner's Designee, Title
S on
Date 0OO
00-007-4
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Bo4ler and Pressure Vessel Inspectors
and the state of Florida and employed by Factory Mutual Insurance Company of Johnston, Rhode Island, have inspected the components described in this Owners Report during the period of 5/15/00 to 7/25/00
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective
measures described in this Owners' Report in accordance with the requirements of ASME Code, Section X1.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied,
concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither
the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss
of any kind arising from or connected with this inspection.
/,ý n o eý?_Commissions A6I'7,2ý( rls'2,eNational Board. State, Providence, and Endorsements
"I ns$ector's Signature
Date ______9____
66 116W N/A
N/A
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl
Florida Power & LightNaie
700 Universe Blvd. Juno Beach, FL 33408Add*e
Turkey Point Plant
Date
Sheet
Unit
NeMwe
9760 SW 344 Street Florida City, FL 33035
3. Work Performed by
Adrem
Florida Power & Light Nao
9760 SW 344 Street Florida City, FL 33035
4. Identification of System:
Address
Component Cooling Water
8/21/00
1 of 2
4
WO#: 30009032 CR#: N/A
Type Code Svmb4
Authorization Number
Expiration Date
System #: 30 Quality Group
Rela*r Organizatloe. P.O. Noe. Je f.. ,te.
o1 Stamp N/A
N/A
N/A
C
5. (a) Applicable Construction Code B31.1
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements
19 55 Edition. N/A
1989 Edition, NIA
6. Identification of Components Repaired or Replaced and Replacement Components
ASME Repaired. Code
Name of Name of Mfg Mfg Serial National Other Year Replaced, or Stamp
Component Number Board Identification Built Replacememt Yes/No
(1) NUT, ASTM A-194 GR 7, N/A N/A N/A STK CODE 27837 1 UNK REPLACEMENT N HEAVY HEX UTC 431033
7. Description of Work:
REPLACED ONE MISSING N`IT AT MANWAY ON THE 4A COMPONENT COOLING WATER HEAT EXCHANGER
8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure
N/A . Pressure N/A psig Test Temperature N/A deg F
)wner
2. Plant
Addends,
Addenda,
N/A
N/A
Code Case
Code Case
Other
N/A
00-008-4
FORM NIS-2 (Back)
9. Remarks BOLTED CONNECTION. NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
TypeCodeSymol SampN/A
Expiration Date: N/ACertificate of Authorization No.
Owner or Owner's Designee, TitleSigned
-) � AA4�
Sheet 2 of 2
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by Factory Mutual Insurance Company of Johnston, Rhode Island, have inspected the components described in this Owners Report during the period of 5/12/00 to 8/21/00 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
ionature Commissions l ,St/s Pvi -ad E / / nspcto's SgnaureNational Board. State. Providence, and Endorsements
Date /0/ 6vI
00-008-4
Type Code Symbol Stamp
N/A
Dat.C,. 2
r W
Owner
2. Plant
700 Un
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
Florida Power & Light Date 10/5/00 Name
iverse Blvd. Juno Beach, FL 33408 Sheet 1 of 2 AddTreo
Turkey Point Plant _____Unit 4Nom
9760 SW 344 Street Florida City, FL 33035WOO: 98014334 01 CR#: 95-240
Address Rspar Organlzaie., P.O. No. Job No. etc.
3. Work Performed by Florida Power & Light Type Code Symbol Stamp N/A Name
Authorization Number N/A 9760 SW 344 Street Florida City, FL 33035 "dress Expiration Date N/A
4. Identification of System: Intake Cooling Water System #: 19 Quality Group C
5. (a) Applicable Construction Code B31.1 1955 Edition, N/A Addenda, N/A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 19 89 Edition, N/A Addenda, N/A Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
ASME Repaired, Code
Name of Name of Mfg Mfg Seral National Other Year Replaced, or Stamp Component Number Board Identification Built Replacememt Yes/No
PUMP 4P9C JOHNSTON N/A N/A 4P9C (IST-3) UNK REPLACED N
PUMP 4P9C JOHNSTON N/A N/A 4P9C (IST-8) UNK REPLACEMENT N
ROD, THREADED, 20 STUDS N/A N/A N/A STK CODE 29507 1 UNK REPLACEMENT N FABRICATED ASTM A193 GR UTC 426373 B7
NUT HEAVY HEX (20) ASTM N/A N/A N/A STK CODE 27861 UNK REPLACEMENT N A-194 GR 7 UTC 433078
7. Description of Work:
REPLACED 4C ICW PUMP (IST-3) WITH SPARE PUMP (IST-8). ALSO REPLACED (20) STUDS AND (40) NUTS.
8. Tests Conducted: Hydrostatic: X
Other VT-2
Pneumatic
Pressure 18.5 psig
Nominal Operating Pressure
Test Temperature 91 deg F
00-009-4
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report awe correct and this replacement conforms to the rules of the ASME Code, Section Xl.
Type Code Symbol Stamp N/A
Certificate of Authorization No.
A,
C>
N/A Expiration Date: N/A
- DateOwner or Owner's Designee, Title
'-'- ()
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors
and the state of Florida and employed by Factory Mutual Insurance Company of Johnston, Rhode Island, have inspected the components described in this Owners Report during the period of 4/8/99 to 10/5/00
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of- ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither
the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any k ringfom or connected with this inspection.
__ __ __ __ _ __ __ __ _Commissions Al jjý 1K& 328
National Board, State, Providence, and EndorsementsU Inspector's Signature
Date /1//~
00-009-4
Owwner
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS
As Required by the Provisions of the ASME Code Section Xl
Florida Power & Light Date Name
700 Universe Blvd. Juno Beach, FL 33408 Sheet
AddsnmU
Tu~rks~ Point Plant Unit
Name
9760 SW 344 Street Florida City, FL 33035 Address
3. Work Performed by Rorida Power & Light
Name
9760 SW 344 Street Florida City, FL 33035
WO#: 9801433
T•
A E
Address
4. Identification of System: Intake Cooling Water System #: 19
S. (a) Applicable Construction Code B31.1 1
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1
6. Identification of Components Repaired or Replaced and Replacement Components
10/5/00
of 2
4
2 01 CR#: 95-240
Rei"l Organizabon, P.O. No. Job No., etc.
ype Code Symbol Stamp N/A
uthorization Number N/A
xpiration Date N/A
Quality Group C
955 Edition, N/A Addenda ....... N/A.. Code Case
9 89 Edition, N/A .Addenda, . ........ N......Code Case
ASME Repaired, Code
Name of Name of Mfg Mfg Seral National Other Year Replaced, or Stamp
Component Number Board Identification Built Replaoememt Yes/No
EXPANSION JOINT N/A N/A NIA STK CODE 14195 1 UNK REPLACEMENT N
UTC 433031
STUD (20), ASTM A193 B7 N/A N/A N/A STK CODE UNK REPLACEMENT N
UTC 428941
NUT HEAVY HEX (20), N/A N/A N/A STK CODE 27861 1 UNK REPLACEMENT N
ASTM A-194 GR 7 UTC 433078
7. Description of Work:
REPLACED EXPANSION JOINT, (20) STUDS AND (20) NUTS.
8. Tests Conducted: Hydrostatic: X
Other VT-2
Pneumatic
Pressure 18.5 psig
Nominal Operating Pressure
Test Temperature 91 deg F
00-010-4
' PI nt 7u• y • v... . .
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
N/AType Code Symbol Stamp
-Expiration Date: N/A
Date ,013 ciiSigned1- . V-Owner or Owner's Designee, Title
Certificate of Authorization No.
00-010-4
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by Factory Mutual Insurance Company of Johnston, Rhode Island, have inspected the components described in this Owners Report during the period of 4/8/99 to 10/5/00 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
a .... Commissions / 7 , Signature National Board. State, Providence, and Endorsements
Date 1/6 Z/lo
N/A
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS
As Required by the Provisions of the ASME Code Section XI
:wner Florida Power & Light Name
700 Universe Blvd. Juno Beach, FL 33408
Date
Sheet
Address
2. Plant Turkey Point Plant Unit
Nam WOS: 30C
9760 SW 344 Street Florida City, FL 33035 Address Rf
3. Work Performed by Rorida Power & Light Type Code Symbol NOAe
Authorization Numni 9760 SW 344 Street Florida City, FL 33035
4sresia HExpiration Date
4. Identification of System: Residual Heat Removal System #: 50 Quality Group
10/13/00
of 2
4
11717201 CR#: 00-1576
spalr Organdzatlon. P.O. No, Job No., etc.
St-n N/A
er N/AN/A
a _____
5. (a) Applicable Construction Code B31.1
(b) Applicable Edition of Section X1 Utilized for Repairs or Replacements
1955 Edition, N/A Addenda,
19 89 Edition. N/A Addenda,
N/A Code Case
N/A Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
ASME Repaired, Code
Name of Name of Mfg Mfg Serial National Other Year Replaced, or Stamp
Component Number Board Identification Built Replacememt Yes/No
ROD,THREADED (8) STUDS N/A N/A N/A STK CODE 29490 1 UNK REPLACEMENT N
FABRICATED,ASME SA 193 UTC 430227 GR B7
NUT (16), ASTM A-194 GR N/A N/A N/A STK CODE 27836 1 UNK REPLACEMENT N
2H HEAVY HEX UTC 424347
7. Description of Work:
REPLACED (8) STUDS AND (16) NUTS.
8. Tests Conducted: Hydrostatic: N/A
Other VT-I
Pneumatic N/A
Pressure N/A psig
Nominal Operating Pressure N/A
Test Temperature N/A deg F
00-011-4
1
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks BOLTED CONNECTION, NO WELDING REQUIRED.
00-011-4
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Ccde Symbol Stamp N/A
N/ACertificate
Date o(0 C-Signed
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors
and the state of Florida and employed by Factory Mutual Insurance Company of Johnston, Rhode Island, have
inspected the components described in this Owners Report during the period of 10/3/00 to 10/13/00
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective
measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied,
concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither
the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a lose
of any kind arising from or connected with this inspection.
SCommissions PC Inspector's Signature National Board, State, Providence, and Endorsements
Date
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS
As Required by the Provisions of the ASME Code Section XI
Rorida Power & Light
Name
700 Universe Blvd. Juno Beach, FL 33408
Address
Turkey Point Plant Name
9760 SW 344 Street Florida City, FL 33035Address
3. Work Performed by Florida Power & Light Name
9760 SW 344 Street Florida City, FL 33036 Address
Date
Sheet
Unit
10/18/00
1 of 2
4
WO#: 29009939 01 CR#: 99-0056
Repair Organization. P.O. No, Job No.. tc.
Type Code Symbol Stamp N/A
Authorization Number N/A
Expiration Date N/A
4. Identification of System: Intake Cooling Water System #: 19 Quality Group C
5. (a) Applicable Construction Code B31.1
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements
19 55 Edition,
19 89 Edition,
N/A Addenda, N/A Code Case
N/A Addenda, N/A Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
ASME Repaired, Code
Name of Name of Mfg Mfg Serial National Other Year Replaced, or Stamp
Component Number Board Identification Built Replacememt Yes/No
VALVE (1), 36" BUTTERFLY N/A N/A N/A STK CODE 52333 2 UNK REPLACEMENT N
UTC 325416
NUT, (10) HEAVY HEX, N/A N/A N/A STK CODE 27865 1 UNK REPLACEMENT N
ASTM A 194 GR 2H UTC 434721
STUD (2), ASTM A193, GR N/A N/A N/A STK CODE 28044 1 UNK REPLACEMENT N
B7 UTC 416373
STUD (6), ASTM A193, GR N/A NIA N/A STK CODE 28044 1 UNK REPLACEMENT N
B7 UTC 432745
7. Description of Work:
REPLACE VALVE 4-50-310, (10) NUTS & (8) STUDS
8. Tests Conducted: Hydrostatic: N/A Pneumatic NIA Nominal Operating Pressure
Pressure N/A psig Test Temperature N/A deg F
)wner
2. Plant
Other N/A
N/A
00-013-4
Sheet 2 of 2FORM NIS-2 (Back)
9. Renarks BOLTED CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report wre correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
Certificate ofthorization No.
i-- A f (1 14L/
N/A
Owner or Owner's Designee, Title
Expiration Date: N/A
Date 2d {1o
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by Factory Mutual Insurance Company of Johnston, Rhode Island, have inspected the components described in this Owners Report during the period of 5/15/00 to 10/16/00 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
10a-Comm~issions I < /~~~National Board, State, Providence, and Endorsements"Inspector's Signature
Date /I/ I.I /
00-013-4
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS
As Required by the Provisions of the ASME Code Section XI
Florida Power & Light Date Name
700 Universe Blvd. Juno Beach, FL 33408 Sheet
Address
Turkey Point Plant'� Ph�nt
Name
9760 SW 344 Street Florida City, FL 33035
Address
3. Work Performed by Florida Power & Light Namn
9760 SW 344 Street Florida City, FL 33035 Address
4. Identification of System: Supports and Hangers
5. (a) Applicable Construction Code B31.1
(b) Applicable Edition of Section X1 Utilized for Repairs or Replac
Unit 4
WO#: 30011986 01 CR#: N/A
Repair Organization, P.O. No, Job No., etc.
Type Code Symbol Stamp N/A
Authorization Number N/A
Expiration Date N/A
System #: 105 Quality Group A
19 55 Edition, N/A Addenda, N/A, Code Case
cements 1989 Edition, N/A Addenda, N/A . Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Comoonent
Name of Mfg Mfg Serial Number
Component___________I-I
SNUBBER 4-1051 PSA 10
SNUBBER 4-1051 PSA 10
SNUBBER 4-1053 PSA 10
SNUBBER 4-1053 PSA 10
PSA
PSA
PSA
11125
17904
11446
National Board
N/A
N/A
N/A
Other Identification
N/A
N/A
N/A
NIA
N/A
- 4- -I- + 1
PSA 16245
________________________________ 1 ______________1 _________ I
N/A N/A
N/A
ASME Repaired, Code
Year Replaced, or Stamp Built Replacememt Yes/No
UNK REPLACED N
UNK REPLACEMENT N
LINK REPLACED N
LINK REPLACEMENT N
7. Description of Work:
REPLACED (2) PRESSUREIZER SNUBBERS - REPLACED 4-1051 SIN 11125 WITH SIN 17904 - REPLACED 4-1053 S/N 11446 WITH
S/N 16245.
8. Tests Conducted: Hydrostatic: N/A
Other N/A
Pneumatic N/A
Pressure N/A psig
Nominal Operating Pressure N/A
Test Temperature N/A deg F
00-014-4
,. Owner10/15100
of
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
Certificate of Authorization No. N/A Ex
C; 14 Jjý -,AAWPW'-Owner or Owner's Designee, Title
piration Date: N/A
___Date - 0 t 00
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by Factory Mutual Insurance Company of Johnston. Rhode Island, have inspected the components described in this Owners Report during the period of 6/16/00 to 10/15/00
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions Inspector's Signature National Board, State. Providence, and Endorsements
Date
00-014-4
N/Agne
-" - i)
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
Florida Power & LightName
700 Universe Blvd. Juno Beach, FL 33408
Address
Turkey Point Plant
Name
9760 SW 344 Street Florida City, FL 33035
Address
Date
Sheet
U nit
10/15/00
1 of 2
4
WO#: 30011986 01 CR#: N/A
Repair organization. P.O. No, Job No., etc.
3. Work Performed by Florida Power & Light Name
9760 SW 344 Street Florida City, FL 33035Address
Type Code Symbol Stamp
Authorization Number
Expiration Date
-4. Identification of System: Supports and Hangers System #: 105 Quality Group
5. (a) Applicable Construction Code B31.1 1955 Edition,
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,
6. Identification of Components Repaired or Replaced and Replacement Components
N/A Addenda,
N/A Addenda,
N/A Code Case
N/A Code Case
T r r I 7 7
Name ot Component
SNUBBER 4-1057 PSA 3
SNUBBER 4-1057 PSA 3
Name of Mfg Mfg Serial Number
National Board
Other Identification
Year Built
-4 4 1
PSA 27080 N/A N/A
N/A
N/A
t _ _ _ i I
PSA 27092 N/A N/A
N/A
N/A
-I 4- 1- t T
I -� 4- 4 1 t
F -� 1
I I I__ _ I
Repaired, Replaced, or Replacememt
REPLACED
REPLACEMENT
I
7. Description of Work:
REPLACED ONE (1) PRESSURIZER SNUBBER - REPLACED 4-1057 S/N 27080 WITH SIN 27092.
8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure
Pressure N/A psig Test Temperature
1. Owner
2. Plant
N/A
N/A
N/A
A
ASME Code
Stamp Yes/No
N
N
Other N/A
N/A
N/A deg F
00-015-4
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks MECHANICAL CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct end this replaced component conforms to the
rules of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
Certificate outhorization No. N/A
Sinned A
Expiration Date: N/A
Dateo7 0Owner or Ovi/ner's Designee, Title
C*(J
00-015-4
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors
and the state of Florida and employed by Factory Mutual Insurance Company of Johnston, Rhode Island, have
inspected the components described in this Owners Report during the period of 6/16/00 to 10/15/00
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective
measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied,
concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither
the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss
of any kind arising from or connected with this inspection.
'~~ect or~~at u Commissions IA Y & ?c pector's Signature National Board. State. Providence, and Endorsements
Date
NIA
SU_
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS
As Required by the Provisions of the ASME Code Section Xl
Florida Power & Light Date Name
700 Universe Blvd. Juno Beach, FL 33408 Sheet Addrmm
Turkev Point Plant Unit
Nam
9760 SW 344 Street Florida City, FL 33035
10/18/00
of
4
2
WO#: 30018818 01 CRXU: N/A
"Addrnes Repa4r Orgflhzan",tio P.O. No, Job No., eo.
3. Work Performed by Florida Power & Light Type-Code Symbol Stamp N/A
Na Authorization Number N/A
9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A Address
4. Identification of System: Reactor Coolant System #: 41 Quality Group A
5. (a) Applicable Construction Code B31.1 1955 Edition ........ N./A .Addenda, ......N/A...... Code Case
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989 Edition, ........ Addenda ...... N/A .. Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
ASME
Repaired, Code
Name of Name of Mfg Mfg Serial National Other Year Replaced, or Stamp
Component Number Board Identification Built Replacememt Yes/No
NUT.(12) HEAVY HEX C.S. N/A N/A N/A STK CODE 27084 1 UNK REPLACEMENT N
ASME SA-194 GR 2H UTC 428805
ROD,THREADED (12) STUDS N/A N/A N/A STK CODE 29493 1 UNK REPLACEMENT N
FABRICATED ASME SA-193 UTC 434126 GR B7
7. Description of Work:
OVERHAULED VALVE MOV-4-535, REPLACED (12). STUDS AND (12) NUTS.
8. Tests Conducted: Hydrostatic: N/A
Other N/A
Pneumatic N/A
Pressure NIA psig
Nominal Operating Pressure N/A
Test Temperature N/A deg F
00-017-4
'wner
2. Plant
FORM NIS-2 (Back)
9. Remarks BOLTED CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp NIA
Certificate of uthorization No. N/A E
Signed__ _ ~Owner or Owner's Clesgnee, Title
xpiration Date: N/A
Date ' -b
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by Factory Mutual Insurance Company of Johnston, Rhode Island, have inspected the components described in this Owners Report during the period of 10/16/00 to 10/18/00 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code. Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any ki rising from or connected with this inspection.
cL o ew t ic• Commissions !•'\V- (.National Board, State, Providence, and EndorsementsInspector
Date
's Signature
Sheet 2 of 2
00-017-4
N/A
0ýd-
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provialiona of the ASME Code Section Xl
DateFlorida Power & Light Name
700 Universe Blvd. Juno Beach, FL 33408 Addres
Turkey Point Plant Nor"
9760 SW 344 Street Florida City, FL 33035 Address
Sheet
Unit
10/18/00
1 of 2
4
WOO: 29011641 01 CR#: 99-0813
Repair Organization. P.O. No, Job No., etc.
3. Work Performed by Florida Power & Light Name
9760 SW 344 Street Florida City, FL 33035
4. Identification of System:
Address
SPENT FUEL HANDLING
Type Code Symbol Stamp N/A
Authorization Number N/A
Expiration Date N/A
System *: 38 Quality Group MC
5. (a) Applicable Construction Code B31.1
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacement@
19 55 Edition,
1992 Edition,
N/A
92
Addenda,
Addenda,
N/A Code Case
N/A Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
ASME Repaired, Code
Name of Name of Mfg Mfg Serial National Other Year Replaced, or Stamp
Component Number Board Identification Built Replacememt Yes/No
BLIND FLANGE. DOUBLE N/A N/A N/A STK 0236100 2 UNK REPLACEMENT N
GROOVE ASME SA-182 GR UTC 0000434616 F304
7. Description of Work:
REPLACE BLIND FLANGE SPENT FUEL CANAL
8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure
Other APP.J TYPE B Pressure N/A psig Test Temperature N/A deg F
'wner
2. Plant
N/A
00-018-4
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks BOLTED CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report we correct and this replacement conforms to the rules of
the ASME Code, Section XI.
N/AType Code Symbol Stamp
Expiration Date: N/A
Date j(1710
Certificate of Authorization No. N/A
Siu nou51- AAf
Owner or Owner's Designee, Title
00-018-4
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors
and the state of Florida and employed by Factory Mutual Insurance Company of Johnston, Rhode Island, have
inspected the components described in this Owners Report during the period of 8/29/00 to 10/18/00
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective
measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied,
concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither
the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss
of any kind arising from or connected with this inspection.
_Commissions
n ctor's Signature National Board, State, Providence, and Endorsements
Date
NIAV
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS
As Required by the Provisions of the ASME Code Section XI
Date
Sheet
Unit
Florida Power & Light Name
700 Universe Blvd. Juno Beach, FL 33408 Address
Turkey Point Plant Name
9760 SW 344 Street Florida City, FL 33035Address
3. Work Performed by Florida Power & Light Name
9760 SW 344 Street Florida City, FL 33035
10/23/00
1 of 2
4
WO#: 29010612 01 CR#: 99-0690
Repair Organization, P.O. No, Job No., etc.
&l1A
Type Code Symbol Stamp,
Authorization Number
Fvminr tin n fl.*at
Addres6
4. Identification of System: Safety Injection - Systemn #: 62 Quality Group.
N/A
N/A
A
5. (a) Applicable Construction Code B31.1
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements
1955 Edition, N/A
1989 Edition, N/A
Addenda, N/A Code Case
Addenda, N-41 6-1 Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
ASME Repaired, Code
Name of Name of Mfg Mfg Seral National Other Year Replaced, or Stamp
Component Number Board Identification Built Replacememt Yes/No
VALVE (1), 2" PISTON CHECK EDWARDS N/A N/A STK CODE 30938 01 UNK REPLACEMENT N VALVES,INC
UTC 420971
7. Description of Work:
REPLACED VALVE 4-873A
8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure
Other VT-2 Pressure 2280 psig Test Temperature 547 deg F
Owner
2. Plant
X
00-019-4
I•11 PI,
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.
00-019-4
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.
N/AType Code Symbol Stamp
Expiration Date: N/ACertificate of Authorization No.
"C: A 11k,. 4, 5~~u~ Date CCOwner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by Factory Mutual Insurance Company of Johnston. Rhode Island, have inspected the components described in this Owners Report during the period of 5/20/00 to 10/23/00
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions A/7l" .32National Board, State, Providence, and Endorsements
Inspector's Signature
DateI
N/A
r
5ýr- k6i e-tin
W.•VA/ - 0I
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMEN iS As Required by the Provisions of the ASME Code Section XI
Florida Power & Light Name
700 Universe Blvd. Juno Beach, FL 33408 Addres
Turkey Point Plant Name
9760 SW 344 Street Florida City, FL 33035
Date
Sheet
Unit
10123/00
I of 2
4
WOO: 30017904 01 CR#: N/A
Address
3. Work Performed by Florida Power & Light Name
9760 SW 344 Street Florida City, FL 33035
4. Identification of System: Component Cooling Water System #: 30
Repair Organization, P.O. No. Job to.., ab.
Type Code Symbol Stamp N/A
Authorization Number N/A
Expiration Date N/A
Quality Group C
5. (a) Applicable Construction Code B31.1
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements
1955 Edition,
19 89 Edition.
N/A Addenda,
NIA Addenda,
NIA Code Case
N/A Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
ASME Repaired, Code
Name of Name of Mfg Mfg Serial National Other Year Replaced, or Stamp
Component Number Bord Identification Built Replacememt Yes/No
RELIEF VALVE,SET DRESSER TK-97939 N/A STK CODE 53486 1 UNK REPLACEMENT N
PRESSURE 150 PSIG UTC 407563
7. Description of Work:
REPLACED RELIEF VALVE RV-4-1431
8. Tests Conducted: Hydrostatic: X Pneumatic N/A Nominal Operating Pressure
Pressure 84 psig Test Temperature 77 deg F
Owner
2. Plant
Other VT-2
N/A
00-020-4
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks BOLTED CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report wre correct and this replacement conforms to the nAue of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
Certificate of Authorization No.
C; - u, ,gnSS
N/A Expiration Date: N/A
Date Lt/lo"" .. . Owner or Owner's Designee. Title
CERTIFICATE OF INSERVICE INSPECTION
I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by Factory Mutual Insurance Company of Johnston, Rhode Island, have inspected the components described in this Owners Report during the period of 10/1/00 to 10/23/00 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions aector's Signature National Board, State, Providence, and Endorsemnrits
Date /0/71
00-020-4
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provilione of the ASME Code Section X)
Florida Power & Ught Mem.
700 Universe Blvd. Juno Beach, FL 33408
Turkey Point Plant 9m4
9760 SW 344 Street Florida City, FL 33031
3. Work Performed by
Adm
Florida Power & Ught
9760 SW 344 Street Florida City, Fl. 33031
4. Identification of System: CVCS Boron Addition and Recycle S
Date
Sheet
Unit
10/25/00
1 of 2
4
WON' 29013107 01 CR9: N/A
Type Code Symbol
Authonzation Numi
Expiration Date
ystem 0: 46 Quality Group
"tSOw Orgaft4=n. P.O. meo. jb Me. d".
Stomp N/A
fer N/A
N/A
5. (a) Applicable Construction Code 131.1
(b) Applicable Edition of Section XI Utilized for Repairs or Repleosmente
19 SS Edition,
1989 Edition.
N/A Addenda.
N/A Addenda,
N/A Code Case
N/A Code Case
6. Identification of Components Repaired or Replced and Replacement Comporents
ASME Repired. Code
Name of Name of Mfg Mfg SoAal d Other Year Replaced, or Stamp
Component Number B.ead Identification Built Replacememt Yes/No
BONNET (1). 2' MANUAL N/A N/A N/A STK CODE 52627 1 UNK REPLACEMENT N
DIAPHRAGMASME SA351 UTC 433899
7. Description of Work:
REPLACED BONNET ON VALVE 4-313A. VALVE BODY AND BONNET WAS REQUSITIONED FROM STORES UNDER STOCK CODE #
52627 1, ONLY THE BONNET WAS UTIUZED FOR THIS REPLACEMENT.
8. Tests Conducted: Hydroetato: N/A Pnemende N/A Nominal opereting Pressure
Pressure 170 psig Test Temperature 81 deg F
1. Owner
2. P1ant
Other VT-2
X
00-021-4
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks BOLTED CONNECTION, NO WELDING REQUIRED.
00-021-4
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report we correct end this replaoement conforms to the rules of the ASME Code, Section XI.
N/ATVe Code Symbol Stamp
Expiration Date: N/ACertificate of Authorization No.
DateSignedOwner or Owner's Designee, Title
'- 0
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by Factory Mutual Insurance Company of Johnston. Rhode Island, have inspected the components described in this Owners Report during the period of 5/21/00 to 10/25/00
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor hWe smpayer makes any warranty, expressed or implied,
concerning the examinations and corrective meeree descrbed in this Owners' Report. Furthermore, neither the Inspector nor his emloyer shell be liable in an manner for any personal injury or property damage or a loss of any kind arlsing from or connected with this inspection.
Comevnismone -712, 3National Board. State, Providence. and Endorserms.s
--- ns''ctor's Signature
Date Wo.,.
56 Agi- -
I
N/A
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Pro-esinee of the ASME Code Section XI
Florida Power & Light
700 Universe Blvd. Juno Beach, FL 33408
Turkey Point Plant
m7o 97W0 SW 344 Street Florida City, Fl. 33035
3. Work Performed by Florida Power & LightNmm
9760 SW 344 Street Roride City, FL 33035
4. Identification of System: CVCS Charging and Letdown
Date
Sheet
Unit
10/25/00
I of 2
4
WOC* 20009247 01 CR0: N/A
Repai Or amA"n P.O. ow. Jo M -, d.
Type Code Symbol Stamp N/A
Authorization Number NIA
Expiration Date N/A
System #: 47 Quality Group a
5. (a) Applicable Construction Code 831.1
(b) Applicable Edition of Section XI Utilized for Repairs or Replacerments
19 S5 Edition, N/A Addenda.
19 89 Edition. N/A Addenda,
6. Identification of Components Repaired or Replaced end Replacemem Components
ASME Repaired. Code
Name of Name of Mfg Mfg Seuld Nelonal Other Year Replaced, or Stamp
Component Number Beau Identification Built Replacememt Yea/No
(1) RELIEF VALVE, NIA SEE # 7 NIA NIA UNK REPLACEMENT N
STAINLESS STEEL NIA
7. Descnption of Work:
REPLACED RELIEF VALVE RV-4-203 (SERIAL # NO2705-00-00041 WITH SPARE REUEF VALVE (SERIAL # N82706-00-0002).
8. Tests Conducted: Hydrostatic: X Pneumatic N/A Nominal Operating Pressure
Other VT-2 Pressure 2230 psig Test Temperature 547 dog F
1. Owner
2. Plant
N/A
NIA
Code Case
Code Case
N/A
00-022-4
I
Sheet 2 of 2FORM NIS-2 (Back)
9. Remarks BOLTED CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report we correot and this replacement conforms to the rules of the ASME Code, Section Xl.
N/AType Code Syrmtoi Stamp
Expiration Date: N/A
Date UA
Certificate of Authorization No.
i-'U. " -4
Owner or Owner's Deesignes Tide
00-022-4
CERTIFICATE OF W4SENVICE INSPECTION
I, the undersigned. holding a valid commirsion issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and mployed by Factory Mlutual Inourance Company of Johnston, Rhode Island, have inspected the components described in this Owners Repert during the period of 1/4/99 to 10/25/00
end state that to the best of my knowledge end belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xl.
By signing this certificato neither the Inspector nor his employer makes any warranty, expressed or implied. concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither
the Inspector nor his employer shall be liable in any nmane for any personal injury or property damage or a loss of my kind wising from or connected with this inspection.
Comrrismoonl Srl n e o National Board. Stat.o. Providence. and EndorsementsInspectors Signature
Date )11h IF)I I
• --- '" • Aa' 1:2l L/r
N/A
1. Owner
2. Plant
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
Florida Power & Light Date Newa
700 Universe Blvd. Juno Beach, FL 33400 Sheet
Tu,,rksu Pnint Plant Unit
Nasm
9760 SW 344 Street Florida City, FL 33035
10/25/00
of
4
2
WOO: 29008421 01 CR9: 99-0707
Adr Raeper OfgaflzaUen, P.O. Ne. Job . sec.
3. Work Performed by Florida Power & Light Type Code Symbol Stamp N/A
Authorization Number N/A
9760 SW 344 Street Florida City, FL 33035 Expiration Date N/A MAddessEprtonDt I
4. Identification of System: CVCS Charging and Letdown System #: 47 Quality Group B
5. (a) Applicable Construction Code a31.1 19 55 Edition. N/A Addenda, N/A Code Case
(b) Applicable Edition of Section XI Utilized for Relpirs or Rapleomen 1989 Edition, N/A Addenda, N416-1 Code Case
6. Identification of Comrponents Repaired or Repigoed and Replaeement Conponents
ASME
Repmred. Code
Nore of Name of Mfg Mfg Sed lNatiodal Other Year Replaced, or Stamp
Component Numbe Bod Identification Built Replacemernt Yes/No
(1) VALVE, 2' GLOBE S.S. N/A N/A N/A STK CODE 53130 1 UNK REPLACEMENT N
UTC 396545
(2) REDUCER, N/A N/A N/A STK COOE 237058 1 LINK REPLACEMENT I N
SEAMLESSASME UTC 434084 SA403,WP316 SCH 160
7. Description of Work:
REPLACED GLOBE VALVE 4-333 AND REDUCERS ON EACH SlOE OF VALVE.
8. Tests Conducted: Hydrostatic: N/A
Other VT-2
Pne.nm ac N/A
Preesre 2450 psig
Nominal Operating Pressure
Test Temperature 88
X
deg F
00-023-4
, 7wr• v., w ,
I
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report awe correct end this replacement conforms to the rules of the ASME Code. Section XI.
Type Code Sy"bol Stamp N/A
Certificate of Authorization No.
Signedwnero On4
N/A
Pr's Oesignee. Titde
CTIFICATE OF INSERVCE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Sailer and Pressure Vessel Inspectors and the state of Rodrda and employed by Factory MtuVd Inlurance Company of Johnston, Rhode Island, have
inspected the components deseribed in this Owners Report during the period of 8/g/00 to 10/25/00
and state that to the beet of my knowledge and billet, the Owner has performed examinations and taken corrective
mesures deecmribd in this Owners' Report in accoodence with the requirements of ASME Code, Section XI.
By sagnng this coertiflote neither the Inspector nor his mployer makes any warranty, expressed or implied,
concerning the examinationu ind corrective measures described in this Owners' Report. Furthermore, neither
the Inspector nor hie employer ohll be liable in any mntner far any personal injury or property damage or a lose of any kind aisin from or connected with thils inspection.
Comord.sons G ; 0 S I rr-dd o e Natlnei Board. Stats. Providmene end Endorsements
L/Dote /1 -7/U/"
Inspector's Signature
Expiration Dote: N/A
Oats
00-023-4
- 44ýý
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
Date
Sheet
Unit
Florida Power & LightName
700 Universe Blvd. Juno Beach, FL 33400
Turkey Point PlantName
9760 SW 344 Street Florida City, FL 33035Adde
3. Work Performed by Rorida Power & Light Neo
9760 SW 344 Street Florida City, FL 33036
4. Identification of System: Reactor Coolant System #' 41
10/30/00
1 of 2
4
W0 :30006911 01 CR9: N/A
Repaikr Orentzalk". P.O. "a, Job N,@., me.
Type Code Symbol Stamp N/A
Authorization Number N/A
Expiration Date N/A
Quality Grouo A
5. (a) Applicable Construction Cod. 831.1
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements
19 55 Edition,
1989 Edition.
N/A Addenda,
N/A Addenda,
N/A Code Case
N/A Code Case
6. Identification of Components Repaired or Replaced end Replecoment CompOnents
ASME Repaired, Code
Name of Name of Mfg Mfg Sral National Other Year Replaced, or Stamp
Component Number Bead Identification Built Replcemeamt Yes/No
RELIEF VALVE L), 4W N/A sMI Eow N/A STK COOE 53561 1 UNK REPLACEMENT N
UTC 388249
NUT, (1) HEAVY HEX, ASME NIA N/A N/A STK COOE 27840 1 UNK REPLACEMENT N
SA-194 GR 2H UTC 428811
NUT, (6) HEAVY HEX, ASTM N/A N/A N/A STK COOS 27861 1 UNK REPLACEMENT N
A-194 GR 7 UTC 428635
LI
7. Description of Work:
REPLACED VALVE RV-4-S5S1 (SERIAL # 411877-00-0005) WITH SPARE VALVE (SERIAL 5 69877-00-0004). ALSO REPLACED (7)
NUTS.
8. Tests Conducted: Hydrostatic: N/A
Other VT-1, VT-2
Pneumatic N/A
Pressure 2280 pug
Nominal Operating Pressure X
Test Temperature 547 dog F
1. Owner
2. Plant
00-024-4
S.... . -- -- r
FORM NIS-2 (Back)
9. Remarks BOLTED CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report wre correct and this replacement conforms to the rules of the ASME Code, Section XI.
Type Code Symbol Stamp N/A
Certificate of Authorization No. N/A Expiration Oats: N/A
� 1 I(i � N/ A A a-
SOwner or Owner's Designee. Trio
Sheet 2 of 2
Signed Date (I 0C
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid comrriesion issued by the National Board of Boaer and Pressure Vessel Inspectors and the state of Florida and employed by Factory Mu~tual Ineurance Company of Johnston, Rhode Island, have inspected the components described in this Owners Report during the period of 4/10100 to 10/30/00 and state that to the beet of my knowledge and belief, the Owner has performed exearinatioon and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By sgning thi coertificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the exawunaitons end corrective meumwae described in this Owners' Report. Furthermore, neither the Inspector nor hie employer shall be liable in any manner for any personal injury or property damage or a lose of any kind arising from or connected with this inspection.
a _--~/osigntreN_____ Corrnii Son, q r< dr
U IsetrsSignature Natinl DodSeM State. Provicdence. end Endorserme.Ws
Date _____________
00-024-4
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisons of the ASME Code Section X1
Date
Sheet
Unit
Florida Power & LightNme
700 Universe Uvd. Juno Beach, FL. 33406 AMMNm
2. Plant Turkey Point Plant Nme
9760 SW 344 Street Florida City, FL 33035
3. Work Performed by Florida Power & Light Maine
9760 SW 344 Street Florida City, Fl. 33035
4. Identification of System: Reactor Coolant System 8: 41
10/30/00
I of 2
4
WOO: 30006912 01 CR9: N/A
Repair Orpaniz~O, P.O. Mie, Job "a., -,t-.
Type Code Symbol Stamp N/A
Authorization Number N/A
Expiration Date N/A
Quality Group A
5. (a) Applicable Construction Code 931.1 19 55 Edition,
(b) Applicable Edition of Section X1 Utilized for Repairs or ReP1aomemMnt 1989 Edition,
6. Identification of Components Repaired or Replacod and Repladgrnet Components
Name of Component
RELIEF VALVE (1) 4"
Noae of MfgMfg Sded
N/A Addenda,
N/A Addenda,
I -I T - - r III
National 01-A~n Other IdAntilf~atlan
Year Built
N/A Code Case
N/A Code Case
Repaired, Replaced, or Replacememt
Nube Identification t
N/ASE BLO N/A STK COOE 176173 1
UTC 419093
UNK REPLACEMENT
I ______ I 4-+
___________ 1.-s T
marww. Code Stamp Yes/No
N
7. Description of Work:
REPLACED VALVE RV-4-SSIC (SERIAL 5 W51249-1361) WITH SPARE VALVE (SERIAL # HS1 249158!).
8. Tests Conducted: Hydrostatic: N/A Pneumedft N/A Nominel Operating Pressure
Preeewe 2230 peig Test Temperature 547 dog FOther VT-2
X
00-025-4
I I I - I
I •w•r
I
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks BOLTED CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.
N/AType Code Syibol Stamp
Expiration Date: N/A
o.Date (t,Signed &ký
V w ero
Certificate of Authorization No.
Owner's Oeeignee, Title
00-025-4
CERTIFICATE OF MMNMVWE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler end Pressure Vessel Inspectors
end the state of lorida and employed by Factory Atual Ineuirnce Company of Johnston, Rhode Island, have
inapected the components deecribed in this Ownes Repert during the period of 4/10/00 to 10/30/00
and state that to the beet of my knowledge and belief, the Owner has performed exarninatione and taken corrective
measures described in this Owners' Report in accordance with the requirements of ASME Code, Section Xl.
By signing ti coertificate neither the Inspector nor hi. employer make. any warranty, expressed or implied,
concerning the examinatione and corrective mesauree deocribed in thie Owners' Report. Furthermore, neither
the Inspector nor his employer shli be liale in any manne for any personal injury or property damage or a loss
of any kind arising from or connected with this inopetimn.
ie~n ConmniesoneInspector's Signature
Date /-7/_ __ ___0
-,WE,- X14firxvwýNIA
N/A
National lewil, Staem, Providence, and Endorsemeints
1. Owner
2. Plant
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisione of the ASME Code Section XI
Florida Power & iUght Date Nam
700 Universe Blvd. Juno Beach, FL 33408 Sheet
AddrmPt
Turkew Point Plant unlitNale
9760 SW 344 Street Florida City, FL 33036
WON: 3000691
10/30/00
of 2
4
001 CR9: N/A
8. Tests Conducted: Hydrostatic: N/A
Other VT-2
Pneumaeba N/A
Pressure 2280 psig
Nominal Operating Pressure X
Test Temperature 547 dog F
00-026-4
Adm *wsjr OtlRsew r"Aies. P o. me, jeo we., at.
3. Work Performed by Florida Power & Ught Type Cod* Symbol Stamp N/A Authorization Number N/A
9760 SW 344 Street Florida City, FL 33035 Expiratin Date N/A
4. Identification of System: Reactor Coolant System #: 41 Quality Group A
S. (a) Applicable Construction Code B31.1 1955 Edition. N/A Addenda, N/A Code Case
(b) Applicable Edition of Section Xl Utilized for Repaimr or Replacements 1989 Edition, N/A Addends. N/A Code Case
6. Identification of Components Repaired or Replaced and Replaoement Components
ASME Repaired, Code
Name of Name of Mfg Mfg Sedd National Other Year Replaced, or Stamp
Component Number Bard Identification Built Replacememt Yes/No
RELIEF VALVE 11). 4" NIA EE BELOA NIA $TK CODE 53661 1 UNK REPLACEMENT N
UTC 3819085
7. Description of Work:
REPLACED VALVE RV-4-651 A (SERIAL # HS1 249-1362) WITH SPARE VALVE (SERIAL H 5S1 249-1579).
Sheet 2 of 2
FORM NIS-2 (Beck)
9. Remarks BOLTED CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the rert wre correct and this replacement conforms to the rules of the ASME Code, Section XI.
N/AType Code Symbol Stamp
Expiration Date: N/A
- Date ((/.11 00
0
Certificate of Authorization No.
Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a vaed commission issued by the National Board of Boiler end Pressure Vessel Inspectors end the state of Rode and employed by Factory KWW Inewance Conpany of Johneton, Rhode Island, have inspected the components described in this Owners Report during the period of 4/10/00 to 10/30/00 and state that to the best of my knowledge and belief, the Owner has performed exmninations and taken corrective meaeures desced in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certifcte neither the Inspector nor Wie emplyer makes any warranty, expressed or implied, concerning the exantinatlone and corrective measures deecilibd in this Owners' Report. Furthermore, neither the Inepeotor nor Si employer shall be aisdN in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
CoNm issions N -y P d n 3An National Dowd, State, Providence. end EndorsemetmsInspectors Signature
Data I I/ it
00-026-4
N/A
- I I
i
WgFvý
C, V-e
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
FRondd Power & Light
700 Universe Blvd. Juno Beach. FL 33408
Turkey Point Plant
Date
Sheet
Unit
Mie
9760 SW 344 Street Florida City, Fl. 33035
by
4. Identification of System:
AddM
Florida Power & Light"4a11
9760 SW 344 Street Florida City, FL 33035
Main Foedwater
10/30/00
1 of 2
4
WOO: 30002493 01 CRO: N/A
Type Code Symbol
Authorization Nurni
Expiration Date
System 0: 74 Quality Group
"oW~m O•DWU~, P.O. Me. Job No., 9C©.
Stamp N/A
oer N/A N/A
5. (a) Applicable Construction Code S31.1
(b) Applicable Edition of Section XI Utilized for Repairs or Replacement•
19 55 Edition,
1989 Edition,
N/A Addends.
N/A Addenda,
N/A Code Case
N/A Code Case
6. Identification of Components Repaired or Replaced and Replacement Components
ASME Repaired, Code
Name of Name of Mfg Mfg SeISI No"" Other Yew Replaced, or Stamp
Component Number Bead Identification Built Replacememt Yea/No
NUT (8) HEAVY HEX. C.S. N/A N/A N/A $TK CODE 27084 1 UNK REPLACEMENT N
ASME SA-194 GR 2H UTC 433908
ROD, THREADED (6) STUDS N/A N/A N/A STK CODE 29493 1 UNK REPLACEMENT N
FABRICATED ASME SA-193 UTC 431593 GR 87
7. Description of Work:
REPLACED (8) NUTS AND E8) STUDS ON VALVE BONNET 4-20-333.
8. Toets Conducted: Hydrostatic: NIA
Other NIA
Pneumade N/A
pressure N/A poig
Normir Operating Pressure N/A
Teat Temperature N/A dog F
00-027-4
1. Owner
2. Plant
3. Work Performed
Sheet 2 of 2
FORM NIS-2 (Back)
9. Remarks BOLTED CONNECTION, NO WELDING REQUIRED.
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report awe correct and this replacement conforms to the rules of
the ASME Code, Section Xl.
N/AType Code Symbol Stamp
Expiration Date: NIA
Date ( 2�1 NSignedOwnew or Owner's Designoe, Title
c1IRCATU OF W11E1ICE INSPECTION
I, the undersigned, holding a valid comrnision issued by the National Board of Boiler and Pressure Vessel Inspectors
and the state of Florid and employed by Factory Mutual Ineurance Company of Johnston. Rhode Island. have
inspected the components described In this Owners Report during the period of 5/8/00 to 10/30/00
and state that to the beot of my knowledge and belef, the Owner has performed examinations and taken corrective
measures dooeribed in this Owners' Report in accordance with the requirements o~f ASME Code, Section Xl.
By s.igng thi ertificate neither the Inepector nor hi employer makes any warranty, expressed or implied.
concerning the exarminations end correcthve measures described In this Owners' Report. Furthermore, neither
the Inspector nor NIo Omployer shal be liable in any manner for any personal injury or property damage or a loss
of any kind awisig from or connected with this inspedton.
Na$ion s Board m rrd 3oS Natona Bord.State, Providence. and Endorsemeints'e Signature"Inspeoto
Date I L P
Certificate of Authorization No.
00-027-4
N/A
I
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisione of the ASME Code Section XI
Date
Sheet
Rornda Power & Light
700 Universe Blvd. Juno Beach, FL 33405
Turkey Point Plant Nam
9760 SW 344 Street Florida City, FL 33035
Unit
10/30/00
1 of 2
4
WOO: 30015586 01 CRO: 00-0114
Repeaw Organrmat"•. P.O. Ne. Joe ", etc.
LI'l
3. Work Performed by Florida Power & Light
9760 SW 344 Street Florida City, FL 33035
4. Identification of System: CVCS Charging and Letdown
Type Code Symbol Stamp.
Authorization Number
Expiration Date
System *: 47 Quality Group
5. (a) Applicable Construction Code B31.1
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements
19 55 Edition,
19 89 Edition,
N/A Addenda,
N/A Addenda,
N/A Code Case
N416-1 Code Case
6. Identification of Components Repaired or Repleced and Replacement Components
ASME Repaired. Code
Name of Name of Mfg Mfg Serd National Other Year Replaced, or Stamp
Component Number Board Identification Built Replecemnemt Yes/No
VALVE (1) 2' GLOBE, 316 N/A N/A N/A STK COOE 53135 1 UNK REPLACEMENT N
S.S. UTC 434725
7. Description of Work:
REPLACED VALVE 4-1316.
8. Tests Conducted: Hydrostatic: N/A
Other VT-2
Pneumatic N/A
Preeeo e 2450 psig
Nominal Operating Pressure X
Test Temperature N.O.T deg F
1. Owner
2. Plant
N/A N/A
a
00-028-4
NIM
FORM NIS-2 (Back)
9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report ore correct and this replacement conforms to the rules of the ASME Code, Section Xl.
Type Code Symbol Stamp N/A
Sheet 2 of 2
Certificate of Authorization No.
Signed
(1
N/A Expiration Date: N/A
Owner or Owner's Designee, TitleDate LT-1c
CERTIFICATE OF INSURVICE INSPECTION I. the undersigned. holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors end the state of Florida end employed by Factory Mutual Insurance Company of Johnston, Rhode Island, heve inspected the components desoribed in this Ownerws Report during the period of 9/9/00 to 10130/OO and state that to the best of my knowledge and belief, the Owner has performed examinations end taken corrective measures described in this Owners' Report In accordance with the requirements of ASME Code, Section Xl.
By signing this certificate neither the Inspector nor his employor makes any warranty, expressed or implied. concerning the exameinations and corrective meaewes described in this Owners' Report. Furthermore, neither the Inspector nor hi employer shall be iNable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Comrnissione A ' ?Xd E-ndo-t 32j'es National Board, Stats, Providence. and EndiorsemenitsOate__ _ _ r__Signature Dae. Z :
00-028-4
V to- , . - - --
•
v
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
Florida Power & LightNarm
700 Universe Blvd. Juno Beach, FL 33408
Date
SheetAddress
Turkey Point Plant Unit
WO#: 30008436 01
4
CR# N/A
3. Work Performed by
4. Identification of System:
Florida Power & LightNam
9760 SW 344 Street Florida City, FL 33035 Address
Containment Airlocks / Hatches
Type Code Symbol Stamp
Authorization Number
Expiration Date
System #: 51 Quality Group
5. (a) Applicable Construction Code B31.1
(b) Applicable Edition of Section Xl Utilized for Repairs or Replacements
6. Identification of Components Repaired or Replaced and Replacement Components
19 55 Edition, N/A Addenda,
19 92 Edition, 92 Addenda,
N/A Code Case
N/A Code Case
Name of Component
Name of Mfg Mfg Serial National Number Board
Other Identification
Repaired, Year Replaced, or Built Replacememt
HEAVY HEX NUT (2) ASTM A- UNK UNK N/A Stock Code 0027975 1 UNK Replacement 194 GR 4, 1"-8 UNC-2B UTC 429857
UTC 42985
7. Description of Work:
REPLACE UNDERSIZED BOLTING
8. Tests Conducted: Hydrostatic: N/A Pneumatic N/A Nominal Operating Pressure
Pressure N/A psig Test Temperature
1. Owner
2. Plant
11/28/00
Namn
9760 SW 344 Street Florida City, FL 33035 Address
of 2
Repair Organizatbon, P.O. No, Job No., etc.
N/A
NIA
NIA
MC
ASME Code Stamp Yes/No
N
Other N/A
N/A
N/A deg F
00-029-4
1
FORM NIS-2 (Back)
9 Remarks BOLTED CONNECTION. NO WELDING REQUIRED.
Sneet 2 of 2
CERTIFICATE OF COMPLIANCE
We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.
TypeCodeSymol SainN/A
Certificate of thorization No N/A Expiration Date
Signed Dcat
Owner or Owneks Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the state of Florida and employed by Factory Mutual Insurance Cmrnnnv of Johnctnin Dhode Island, have inspected the components described in this Owners Report during 1 5/3/00 1 do 11/28/00 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code,
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
ii - - r
National Board. State. Providence. and Endorsements'• U 1nspector's Signature
Dat
00-029-4
N/A
Type Code Symbol Stare
N/A
!
FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS
As Required by the Provisions of the ASME Code Section XI
Florida Power & Light Date 12/14/00
Name
700 Universe Blvd. Juno Beach, FL 33408 Sheet 1 of 2
Address
T.,,-.,, Pnont Plant Unit 42. Plant 7"•° ' .. . ..
Name
9760 SW 344 Street Rorida City, FL 33035
WO#: 30019143 01 CR#: 00-1650
Address Repair Organization, P 0. No. Job No.. etc
3. Work Performed by Florida Power & Light Type Code Symbol Stamp N/A Name Authorization Number N/A
9760 SW 344 Street Florida City, FL 33035 Expiration Date NIA Address
4. Identification of System: Emergency Diesel Engine and Oil System #: 22 Quality Group C
5. (a) Applicable Construction Code B31.1 19 55 Edition, N/A Addenda, N/A Cod
(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition, N/A Addenda, N/A Cod
6. Identification of Components Repaired or Replaced and Replacement Components
Name of Comnonnent
3" Tee, Sch 40 SA 403. 316 SS
Name of Mfg Mfg Serial Number
NA NA
National Board
Comnonen
NA
Other Identification
Year Built
UNKSC 0035133 1
UTC 381879 -
Repaired, Replaced, or Replacememt
Replacement
3" Pipe, Sch 40, SA 312, NA NA NA SC 0030911 1 UNK Replacement
316 SS UTC 374076 "
Bar Stock, ASTM A 240, NA NA NA SC 0223204 1 UNK Replacement
Type 316 SS, 3" x 1/2" UTC 418529 (Welded attachment)
(2) 3" Elbows. Sch 40, SA 403, 316 SS
NA NA NA
t _________ L 4. .4
3" Sch 40 x 1/2" Sch 80 Reducer, SA 403, 316 SS
NA NA
I~ IL
NA
UNKSC 0034893 1
UTC 435075
Replacement
UNK ReplacementSC 0238223 1
UTC 4350793
ASME Code
Stamp Yes/No
N
N
N
N
N
7. Description of Work:
Replaced leaking pipe per CR 00-1650 & PCM 00-035
8. Tests Conducted: Hydrostatic: No
Other VT-2
Pneumatic Yes
Pressure 200 psig
Nominal Operating Pressure NOP
Test Temperature 82.7 deg F
00-031 4
1. Owner
e Case
e Case
I
SSheet 2 of 2
FORM NIS-2 (Back)
9. Remarks ALL WELDING PERFORMED IN ACCORDANCE WITH THE FPL WELD CONTROL MANUAL. CODE CASE N-416.1 WAS INVOKED FOR THIS REPLACEMENT ACTIVITY.
CERTIFICATE OF COMPLIANCE
N/A
Certificate of : %horization No. N/A Expiration Date:
Signed 6 /O I Dat,"O wner or Owners Designee, Title
N/A
• (00
CtRTIFICATE OF INSERVICE INSPECTION
I, n.! md.ersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors ana :*2 state of Florida and employed by Factory Mutual Insurance Company of Johnston, Rhode Island, have insoý. -.d the components described in this Owners Report during the period of 10/20/00 to 12/14/00 aic -zate that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Report in accordance with the requirements of ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Report. Furthermore, neither the Inspector nor his employer shell be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions A115 7-7"< OW f 7, C& National Board. State, Providence. and Endorsements
Date JP/I1A
U Inspector's Signature
00-031 4
Type Code Symbol Stamp
ý:: A>-t
TURKEY POINT UNIT 4
2000 REFUELING OUTAGE
Form NIS-BB Owner's Data Report for Eddy Current Examination Results
CSI-NDE-O0-078 Attachment 1
II
Page 1 of 1 FORM NIS-BB OWNERS' DATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS
As required by the provisions of the ASME CODE RULES
EDDY CURRENT EXAMINATION RESULTS
PLANT: Turkey Point Unit 4
EXAMINATION DATE: October 4, 2000 thru October 9, 2000
TOTAL TOTAL TOTAL TUBES TUBES TOTAL STEAM TUBES TUBES TUBES PREVENTIVELY PLUGGED PLUGGED
GENERATOR INSPECTED 20%-39% >40%, PIT & PLUGGED (PTP) THIS TUBES VOL OUTAGE IN S/G
4E210A (Bobbin) 1602 0 0 0 0 See RPC 4E210B (Bobbin) 1604 1 (1) 0 1 (2) 1 (2) See RPC 4E210C (Bobbin) 1607 3 (1) 0 1 (3) 1 (3) See RPC
4E210A (RPC) 3242 (4) 0 2 1 (5) 3 (6) 19 4E210B (RPC) 3247 (4) 0 4 0 4(6) 13
4E210C (RPC) 3254(4) 0 1 0 1 (6) 11
LOCATION OF INDICATIONS (20% - 100%, PIT & VOL)
Tube Tube Freespan Top of Top of Total Total STEAM AVB Supports Supports 6H thru 6C Tubesheet Tubesheet Indications Indications
GENERATOR Bars 1 thru 6 1 thru 6 UBEND to #1 to #1 20%-39% >40%, PIT C/L H/L Support C/L Support H/L & VOL
4E210A (Bobbin) 0 0 0 0 0 0 0 0 4E210B (Bobbin) 1 (1) 0 0 0 0 0 1 0 4E210C (Bobbin) 30) 0 0 0 0 0 3 0
4E210A (RPC) 0 n/a n/a 0 n/a 2 n/a 2 4E210B (RPC) 0 n/a n/a 0 n/a 4 n/a 4 4E210C (RPC) 0 n/a n/a 0 n/a 1 n/a 1
Remarks: (1) Mechanical wear damage at anti-vibration bars (AVB) was depth sized using qualified bobbin coil sizing technique. (2) One tube in 4B was preventatively plugged due to minor wear at the hot leg baffle plate. (3) One tube in 4C was preventatively plugged for AVB wear progression. (4) Includes tubes in the dent, low row U-bend and hot leg TTS expansion transition programs. (5) One tube in 4A was preventatively plugged due to permeability in the hot leg expansion transition area. (6) Includes volumetric (VOL) and pit (PIT) like indications.
CSI-NDE-00-078 Attachment 2
Page 1 of 2
PTN-4 S/G "B
Indication Report
ROW COL CAL
34 46 BC009
TOTAL INDICATIONS: 1
TOTAL TUBES: 1
VOLTS
0.55
DEG
0
CH
P2
10/16/00 9:40:28 AM
Page 1 of 1
% IND SUPPORT INCHES
20 AV2 -0.35
CSI-NDE-00-078 Attachment 2
Page 2 of 2
PTN-4 S/G "C
Indication Report
ROW COL CAL
13 43 CCO06
32 70 CCO12
35 31 CC013
TOTAL INDICATIONS: 3
TOTAL TUBES: 3
VOLTS
1.07
0.61
0.67
DEG
0
0
0
CH
P2
P2
P2
% IND SUPPC
36 AV3
24 AVI
28 AV2
10/16/00 9:43:24 AM
Page 1 of 1
ORT INCHES
-0.79
-0.09
0.15
CSI-NDE-00-078 Attachment 3
Page 1 of 3
PTN-4 S/G "A
Pluggable Indications
ROW COL CAL
12 25 AH009
26 80 AH028
33 73 AH029
TOTAL INDICATIONS: 3
TOTALTUBES: 3
VOLTS
0
0.16
0.41
DEG
0
92
114
CH %
0
P1 0
P1 0
IND
PTP
PIT
VOL
10/16/00 9:37:17 AM
Page 1 of 1
SUPPORT INCHES
0
TSH 2.27
TSH 0.17
CSI-NDE-00-078 Attachment 3
Page 2 of 3
PTN-4 S/G "B
Pluggable Indications
ROW COL CAL
2 90 BH056
20 80 2H025
21 80 BH024
29 62 BH007
43 51 BH023
TOTAL INDICATIONS: 5
TOTAL TUBES: 5
10/16/00 9:41:42 AM
Page 1 of 1
VOLTS DEG CH % IND SUPPORT INCHES
0 0 P4 0 PTP BAH -0.46
023 114 P1 0 PIT TSH 0
0.08 91 P 1 0 PIT TSH 0.05
0.07 84 P1 0 PIT TSH 0.12
0.25 107 P 1 0 PIT TSH -0.04
CSI-NDE-O0-078 Attachment 3
Page 3 of 3
PTN-4 S/G "C
Pluggable Indications
ROW
3
COL
91
CAL
CHO 11
13 43 CH035
VOLTS
0.86
0
DEG
81
CH
P1
0
0
10/16/00 9:43:17 AM
Page 1 of 1
IND SUPPORT INCHES
PIT TSH 0
0 PTP AV3 -0.79
TOTAL INDICATIONS:
TOTAL TUBES:
2
2
%
TURKEY POINT UNIT 4
2000 REFUELING OUTAGE
SUMMARY OF VISUAL EXAMINATIONS AND FUNCTIONAL TESTING OF SNUBBERS
Abstract
The attached report details the snubber inspection/testing performed for Florida Power and Light Company, Turkey Point Unit 4. These tests and inspections were performed during the fall 2000 refueling outage, between the dates of September 25, 2000 and October 23, 2000.
Snubber inspection/testing was conducted in accordance with Plant Technical Specifications as allowed under Relief Request 4 of the Third Ten-Year Interval ISI Program.
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
TAG #
4-1004
S
VISUAL T SERIAL # REPLACE- INSPECT A
MENT S/N DATE T
1 3168 1 N/A 1 9/25/001 P
4-1009 1 1228 1203 9/26/00 P
S S S FUNCTIONAL T T HAND. T
INSPECT A A STROKE A DATE T L DIMEN T ? T VISUAL SUMMARY FUNCTIONAL TEST SUMMARY
10/9/00 P 27 1/4" P Yes P THIS SNUBBER WAS SCHEDULED FUNCTIONAL TEST PERFORMED? Yes FOR REBUILD PER CR 97-399. SNUBBER WAS VISUALLY STATUS P INSPECTED, REMOVED FROM ONE END AND HANDSTROKED, THEN TENSION COMPRESSION CRITERIA REMOVED COMPLETELY TO BE REBUILT AND FUNCTIONALLY TEST 1 1690 129.3 2500.0 TESTED. REINSTALLED AND TEST 2 291.8 364.0 2500.0 LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH TEST 3 0.003 0.004 .02g NEOLUBE #24982-3.
9/28/00 1 P 27 1/2" P Yes P THIS SNUBBER WAS SCHEDULED FOR REBUILD PER CR 97-399. SNUBBER WAS VISUALLY INSPECTED, IT WAS DIFFICULT TO HANDSTROKE SO IT WAS REMOVED AND TRANSPORTED TO THE TEST BENCH TO STROKE. AFTER TEST MACHINE STROKE IT WAS TORN DOWN FOR REBUILD. THE SNUBBER HAD WORN PARTS AND WAS REPLACED WITH S/N 1203 AFTER FUNCTIONAL TEST. LUBRICATED LOAD PINS AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
TEST 4 307.6
TEST SAMPLE?
604.2 2500.0
No SAMPLE CLASS N/A
DATE REINSTALLED: 9/27/00
FUNCTIONAL TEST PERFORMED? Yes
STATUS P
TENSION COMPRESSION CRITERIA
TEST 1 193.5
TEST 2 221.6
TEST 3 0.007
TEST 4 326.9
TEST SAMPLE?
222.5
483.1
0.008
486.1
2500.0
2500.0
.02g
2500.0
No SAMPLE CLASS N/A
DATE REINSTALLED: 9/29/00
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
SFUNCTIONAl VISUAL T INSPECT
SERIAL # REPLACE- INSPECT A DATE
TAG # MENT SIN DATE T DATE
4.1004 1 3168 1 N/A 1 9/25/001 P 1 10/9/00
S S S L T T HAND- T
A A STROKE A
T L DIMEN T ? T VISUAL SUMMARY FUNCTIONAL TEST SUMMARY
P 27 1/4" P Yes P REMOVED SNUBBER FROM ONE END FUNCTIONAL TEST PERFORMED? Yes
AND STROKED, THEN REMOVED COMPLETELY TO BE FUNCTIONALLY STATUS P TESTED AND REBUILT- REINSTALLED TE S O ......... .... I . l~, Nl nl
AND LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3 TEST I
TEST 2
TEST 3
TEST 4
TENSION
169.0
291.8
0.003
307,6
TEST SAMPLE?
COMPRESSION
129.3
364.0
0.004
604.2
DATE REINSTALLED:
CRI I ERIA
2500.0
2500.0
.02g
2500.0
9/27/00
_________ J _________ I __________ I __________ I ________ I __________ L...............E ___________ I _______ _______ 1 __________________________________________ .1. ________________________________________________________________ Yes
4-1009 1 1228 1203 9/26/001 P 9/28/00 P 27 1/2" P Yes P SNUBBER HANDSTROKED AND REMOVED FOR FUCTIONAL TEST AND REBUILD. SNUBBER HAD WORN PARTS AND WAS REPLACED WITH S/N 1203. LUBRICATED LOAD PINS AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
FUNCTIONAL TEST PERFORMED?
STATUS P
TEST 1 TEST 2
TEST 3
TEST 4
TENSION
193.5
221.6
0.007
326.9
TEST SAMPLE? No
DATE REINSTALLED:
COMPRESSION
2225
483 1
0.008
4861
CRITERIA
2500.0
2500 0
.02g
25000
_________ I _________ I __________ __________ I ________ I __________ � ___________ I _______ � __________________________________________ .1 ________________________________________________________________
No SAMPLE CLASS N/A
SAMPLE CLASS N/A
9/29/00
Yes
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
S S S S VISUAL T FUNCTIONAL T T HAND- T
SERIAL# REPLACE- INSPECT A INSPECT A A STROKE A SERIL # EPLCE- NSPET A DATE T LDMN T ? TVSA UMR
MENT SIN DATE T T L DIMEN T ? T VISUAL SUMMARY FUNCTIONAL TEST SUMMARY .. ............ I................................................... ,....... -......-....... ;.................... . ... ... .... . ... ... ... ... ... ... .
16243 N/A 10/2/00 P 10/2/00 P 22 5/8" P No N/A PERFORMED VISUAL INSPECTION. FUNCTIONAL TEST PERFORMED? Yes
REMOVED FOR FUNCTIONAL TEST (SAT). REINSTALLED SNUBBER. STATUS P LUBRICATED LOAD PIN AND
-tt-^ AlOlkif•c! kAlITI- TENSION COMPRESSION CRITERIAN-Er-lrUE r 24,IL DC8 NEOLUBE 24982-3.
TEST 1
TEST 2
TEST 3
TEST 4
49.2
66.3
0.010
77.5
TEST SAMPLE? Yes
DATE REINSTALLED:
28.6
51.9
0.007
22.3
750 0
7500
.02g
750.0
SAMPLE CLASS SR
10/2/00
_______ [ ______ I ________ [ _______ i ______ _______ i ____ ________ _____ ______________________________ L _____________________________________________ FUNCTIONAL TEST PERFORMED? Yes
4-1036 1 11461PERFORMED VISUAL INSPECTION. SNUBBER REMOVED AND TAKEN TO TEST MACHINE FOR STROKE/REGREASE/REBUILD. LUBRICATED LOAD PINS AND SPHERICAL BEARINGS, REINSTALLED SNUBBER.
FUNCTIONALTEST PERFORMED?
STATUS P
TEST 1 TEST 2
TEST 3
TEST 4
TENSION
19.5
39.8
0.010
50.9
COMPRESSION 49.5
56.7
0 008
46.9
Yes
CRITERIA
750 0
750 0
029
750,0
TEST SAMPLE? No SAMPLE CLASS N/A
DATE REINSTALLED: 10/5/00
__________ I __________ I ____________ I __________ J _________ I __________ I _______ I ____________ I _______ _______ I _____________________________________________ i _____________________________________________________________________
TAG #
4.1034
N/A 10/2/001 P 10/3/00 1 P 18 5/8" P Yes IP
TURKEY POINT NUCLEAR PLANT OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986S S S S
VISUAL T FUNCTIONAL T T HAND- T SERIAL# REPLACE- INSPECT A INSPECT A A STROKE A
MENT S/N DATE T DATE T L DIMEN T ? T ".................1.......... ...... ......... ................ ....... ........... 17419 N/A 9/28/00 P 9/30/00 P 17" P rNo N/A
VISUAL SUMMARY FUNCTIONAL TEST SUMMARY ........ I ............................ .............. ... ... ..... .... ... . PERFORMED VISUAL INSPECTION. FUNCTIONAL TEST PERFORMED? Yes REMOVED FOR FUNCTIONAL TEST (SAT). REINSTALLED SNUBBER. STATUS P LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH TENSION COMPRESSION CRITERIA NEOLUBE 24982-3
TEST 1 133
TEST 2 22.2
TEST 3 0.008
TEST 4 19.3
TEST SAMPLE?
14.8
18.5
0.013
20.9
300.0
300.0
.02g
300.0
Yes SAMPLE CLASS SR
________i ______ _______ i.........i_________ I_____ _____ I_________________________________.1 _____________________________________10______00 _
3919 17902 10/4/001 P 3/5/00 P 20 3/8" P IYes IP PERFORMED VISUAL/HANDSTROKE. REMOVED SNUBBER FOR FUNCTIONAL TEST/REBUILD. LUBRICATED PINS AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3. S/N 17902 WAS INSTALLED. S/N 3919 PUT IN STORAGE AS SPARE.
FUNCTIONAL TEST PERFORMED? Yes
STATUS P
TENSION COMPRESSION
TEST1, 60 94
TEST 2 133.65
TEST 3 0.009
TEST 4 85.57
TEST SAMPLE?
72.58
8539
0.008
6256
CRITERIA
750.0
750.0
.02g
750.0
No SAMPLE CLASS N/A
DATE REINSTALLED: 10/4/00_______ - ______ - _________ _______ _______ .I-------i L .L. .. JI
TAG #
4-1040
4-1044
DATE REINSTALLED: 10/1!00
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
S S
VISUAL T FUNCTIONAL T
SERIAL # REPLACE- INSPECT A DATE TA MENT S/N DATE T DATE T
3905 17906 10/4/00 P 10/6/00 P
I _______ �I _______ I-I -.
N/A 10/5/001 P 10/5/00 P 18 1/2"
S S T HAND- T A STROKE A
L DIMEN T ? T VISUAL SUMMARY FUNCTIONAL TEST SUMMARY
21 5.8" P Yes P PERFORMED VISUAL/HANDSTROKE FUNCTIONAL TEST PERFORMED? Yes
REMOVED SNUBBER FOR
FUNCTIONAL TEST/REBUILD STATUS P
LUBRICATED PINS AND SPHERICAL
BEARINGS WITH NEOLUBE #24982-3 TENSION COMPRESSION CRITERIA
S/N 17906 WAS INSTALLED S/N 3905
PUT IN STORAGE AS SPARE.
P No INIA PERFORMED VISUAL INSPECTION. REMOVED FOR FUNCTIONAL TEST (SAT). REINSTALLED SNUBBER. LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE 24982-3.
TEST 2
TEST 3
54.3
0.010
TEST4 73.0
TEST SAMPLE?
36.9 0.007
47 9
300.0 .02g
300.0
No SAMPLE CLASS NIA
DATE REINSTALLED: 10/4/00
FUNCTIONAL TEST PERFORMED? Yes
STATUS P
TENSION COMPRESSION
TEST 1 262 TEST 2 400
TEST 3 0011
34 7
347
0 008
CRITERIA
750,0
7500
02g
TEST 4 480 241 7500
TEST SAMPLE? Yes SAMPLE CLASS QR
DATE REINSTALLED: 10/6/00
TAG #
4-1046
4-1060 1 12374
I L
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
S S VISUAL T FUNCTIONAL T
SERIAL # REPLACE- INSPECT A INSPECT A MENT SIN DATE T DATE T
1 2........ 5 ..................... .... .1. ... ....../... P 1 5 ... .. 111125 1 17904 1 10/4/001 P 1 10/5/00 1 P
4-1053 1 11446 16245 10/4/001 P 10/5/00 1 P
S T HANDA STROKE
S T A
L DIMEN T ? T VISUAL SUMMARY FUNCTIONAL TEST SUMMARY
22 1/2" 1 P IYes P PERFORMED VISUAL/IHANDSTROKE. I FUNCTIONAL TEST PERFORMED? Yes I REMOVED SNUBBER FOR
21 3/4" P Yes P
FUNCTIONAL TEST/REBUILD LUBRICATED PINS AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3. S/N 17904 WAS INSTALLED. S/N 11125 PUT IN STORAGE AS SPARE.
STATUS P
TENSION COMPRESSION CRITERIA
TEST1 482
TEST 2 75.2
TEST 3 0.010
TEST 4 87-1
TEST SAMPLE?
32.5
49.6
0.008
35.8
300 0
300.0
.02g
300.0
No SAMPLE CLASS N/A
DATE REINSTALLED:10/4/00
_______ L _____________________________________________ I _____________________________________________________________________
PERFORMED VISUAL/HANDSTROKE. REMOVED SNUBBER FOR FUNCTIONAL TEST/REBUILD. LUBRICATED PINS AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3. S/N 16245 WAS INSTALLED. S/N 11446 PUT IN STORAGE AS SPARE.
FUNCTIONAL TEST PERFORMED? Yes
STATUS P
TENSION COMPRESSION CRITERIA
TEST 1 14.7
TEST 2 42.8
TEST 3 0012
TEST 4 40.8
TEST SAMPLE?
42.5
744
0.007
767
300 0
300.0
0.02g
300 0
No SAMPLE CLASS N/A
DATE REINSTALLED: 10/4/00_________ - _________ - ___________ __________ ________ __________ �-..........L ___________ L _______ J.............4. I__________________________________________ I. _______________________________________________________________
TAG #
4-1051
10/4/00
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
S S S S
VISUAL T FUNCTIONAL T T HAND- T SERIAL# REPLACE- INSPECT A INSPECT A A STROKE A
TAG # MENT SIN DATE T DATE T L DIMEN T ? T VISUAL SUMMARY FUNCTIONAL TEST SUMMARY
4-1057 1 27080 27092 10/4/001 P 1 10/6/00 P 18 9/16" Yes IP PERFORMED VISUAL/HANDSTROKE. I FUNCTIONAL TEST PERFORMED? YesREMOVED SNUBBER FOR FUNCTIONAL TEST/REBUILD. LUBRICATED PINS AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3. S/N 27092 WAS INSTALLED, S/N 27080 PUT IN STORAGE AS SPARE.
STATUS P
TENSION COMPRESSION CRITERIA
TEST 1 19.7
TEST 2 24.4
TEST 3 0.003
TEST 4 24.6
TEST SAMPLE?
221
26.5
0.003
22.2
300.0
300 0
.02g
300.0
No SAMPLE CLASS N/A
DATE REINSTALLED: 10/4/00
J .1 1 I. J L...................1 J _________________________________________________ I
4-1059 1 27103 10/5/00 1 P 17" P No IN/A PERFORMED VISUAL INSPECTION. REMOVED FOR FUNCTIONAL TEST (SAT). REINSTALLED SNUBBER.
LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH
NEOLUBE 24982-3
FUNCTIONAL TEST PERFORMED? Yes
STATUS P
TENSION COMPRESSION CRITERIA
TEST 1 13.3
TEST 2 26.3
TEST 3 0006
TEST 4 247
TEST SAMPLE?
160
191
0.006
21.3
300.0
300 0
02g
300.0
Yes SAMPLE CLASS SR
DATE REINSTALLED: 10/6/00
________ _______ J. _________ .1. L _______ I ________ _________ .1. ______ 1....J ______ .1. ________________________________________________________
N/A 10/5/001 P
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
S S S S VISUAL T FUNCTIONAL T T HAND- T
SERIAL# REPLACE- INSPECT A INSPECT A A STROKE A MENT SIN DATE T DATE T L DIMEN T ? T VISUAL SUMMARY FUNCTIONAL TEST SUMMARY
1 10036 1 N/A 1 9/28/001 P 1 9/29/00 1 P 1 26 3/4" 1 P I No IN/A I PERFORMED VISUAL INSPECTION. I FUNCTIONAL TEST PERFORMED? Yes
4-1072 1 16235 10/2/00 1 P 1 21 3/16" P Yes IP
REMOVED FOR FUNCTIONAL TEST (SAT). REINSTALLED SNUBBER. LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE 24982-3.
Performed visual inspection, snubber was removed and taken to test trailer to stroke on bench. Although the snubber tested SAT it was tom down and the thrust bearing was replaced. Final functional was SAT. Snubber was reinstalled and pipe clamp adjusted per CR 00-1758. Lubricated loadpins and spherical bearings with neolube #24982-3.
STATUS P
TENSION COMPRESSION CRITERIA
TEST 1 798.7
TEST 2 823.4
TEST 3 0.002
TEST4 274.0
TEST SAMPLE?
227.0
674.9
0.003
197.0
2500.0
2500.0
.02g
2500.0
Yes SAMPLE CLASS SR
DATE REINSTALLED:
FUNCTIONAL TEST PERFORMED?
1011/00
Yes
STATUS P
TENSION
TEST 1 40.4
TEST 2 81.7
TEST 3
TEST 4
0.007
63.5
TEST SAMPLE?
COMPRESSION CRITERIA
32.8 750.0
42.1
0.008
38.2
750.0
.02g
750.0
No SAMPLE CLASS N/A
DATE REINSTALLED: 10/7100
TAG #
4-1070
N/A 10/2/001 P
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
S S S S
VISUAL T FUNCTIONAL T T HAND- T SERIAL# REPLACE- INSPECT A INSPECT A A STROKE A
TAG # MENT S/N DATE T DATE T L DIMEN T ? T VISUAL SUMMARY FUNCTIONAL TEST SUMMARY
4-1074 19298 N/A 9/28/00 P 9/30/00 P 17 3/4" P No N/A PERFORMED VISUAL INSPECTION. FUNCTIONAL TEST PERFORMED? Yes REMOVED FOR FUNCTIONAL TEST (SAT). REINSTALLED SNUBBER. STATUS P LUBRICATED LOAD PIN AND
#nu•Dt-^, •^•,•t^.TUTFNSRIONJ C'OMPRFRRIfN C.RITFRIA
__________ 1 __________ .1 ____________ .1. ___________ L _________ .1. ___________ L _______ L _____________ 4.
4-1078 124430A
______ J ______ ________ L _______ .1 ______ 1 _______ J ____ J ________ I _____ J ____ I _____ I
NElUBEUML D"#Mll•t- "1 1 r2 NEOLUBE 24982-3.
PERFORMED VISUAL INSPECTION. REMOVED FOR FUNCTIONAL TEST (SAT). REINSTALLED SNUBBER. LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE 24982-3.
TEST 1 165
TEST 2 23.1
TEST 3 0.014
TEST 4 20.2
TEST SAMPLE?
15.6
19.0
0.004
24.4
300.0
300.0
.02g
300.0
Yes SAMPLE CLASS SR
DATE REINSTALLED:
FUNCTIONAL TEST PERFORMED?
9/30/00
Yes
STATUS P
TENSION COMPRESSION
TEST 1 2.2
TEST 2 7.5
TEST 3 0.012
TEST 4 9.7
TEST SAMPLE?
8.1
97
0012
8.3
CRITERIA
75.0
75.0
02g
75,0
Yes SAMPLE CLASS SR
DATE REINSTALLED: 9/30/00
N/A 9/28/001 P 9/30/00 1 P 13 5/8" P No IN/A
TENSION COMPRESSION CRITERIA
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
S S S S
VISUAL T FUNCTIONAL T T HAND- T SERIAL# REPLACE- INSPECT A INSPECT A A STROKE A
MENT S/N DATE T DATE T L DIMEN T ? T VISUAL SUMMARY FUNCTIONAL TEST SUMMARY
12994 N/A 9/26/00 P 9/27/00 P 27 1/2" P No N/A PERFORMED VISUAL INSPECTION FUNCTIONAL TEST PERFORMED? Yes REMOVED FOR FUNCTIONAL TEST (SAT). REINSTALLED SNUBBER. STATUS P LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH TENSION COMPRESSION CRITERIA NEOLUBE 24982-3 TEST 1 171.0 216.3 2500.0
TEST 2 255.5
TEST 3 0.003
TEST4 197.1
TEST SAMPLE?
227.1
0.003
125.7
2500 0
.02g
2500.0
Yes SAMPLE CLASS OR
DATE REINSTALLED: 9/29/00
PERFORMED VISUAL INSPECTION. REMOVED FOR FUNCTIONAL TEST (SAT). REINSTALLED SNUBBER. LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE 24982-3.
FUNCTIONAL TEST PERFORMED? Yes
STATUS P
TENSION COMPRESSION CRITERIA
TEST 1
TEST 2
154.8
155 4
TEST 3 0004
TEST4 147.3
TEST SAMPLE?
99 5
124.4
0.003
146.3
2500 0
2500 0
02g
2500 0
Yes SAMPLE CLASS QR
DATE REINSTALLED: 9/29/00
TAG #
4-1087
4-1091 12998 NIA 9/26/00l P 9/28;00 1 P 29" P No
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
S S S S
VISUAL T FUNCTIONAL T T HAND- T
SERIAL# REPLACE- INSPECT A INSPECT A A STROKE A DATE TLDMN T ? TVSA UMR
TAG # MENT S/N DATE T T L DIMEN T ? T VISUAL SUMMARY FUNCTIONAL TEST SUMMARY
4-1096 17871 N/A 9/25/00 P 9/26/00 P 19 3/16" P No N/A PERFORMED VISUAL INSPECTION. FUNCTIONAL TEST PERFORMED? Yes
REMOVED FOR FUNCTIONAL TEST (SAT). REINSTALLED SNUBBER. STATUS P
LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH TENSION COMPRESSION CRITERIA
NEOLUBE 24982-3. TEST 1 80.3 40.8 750.0
TEST2 110.1 40.8 750.0
TEST 3 .007 0.011 .02g
TEST 4 107.7 41.4 750.0
TEST SAMPLE? Yes SAMPLE CLASS QR
DATE REINSTALLED: 9/27/00
I__ _j _ _ _I I__ _J__ _ _ I_ __I_ _ __ 1_I_1__ _ __I _ ___ _ _iI_ _ __ _ __I_ _ __ _ __I __ _ __I_ _ __ _ __I_ _ __ _ __I_ _ _
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
TAG# SERIAL#
4-1 032 1-3707-I
S VISUAL T
REPLACE- INSPECT A MENT S/N DATE T
-.... .G ~ - .
S FUNCTIONAL T
INSPECT A DATE T
L DIMEN
26"
S S T HAND- T A STROKE A T ? T
P
VISUAL SUMMARY
PERFORMED HANDSTROKE. LUBRICATED LOAD PIN AND SPHERICAL BEARING WITH NEOLUBE #24982-3.
FUNCTIONAL TEST SUMMARY
FUNCTIONAL TEST PERFORMED? No
I I I I I 1 1
4-1033 7001 N/A 9/28100 P 26 13/16" P Yes P PERFORMED VISUAL/HANDSTROKE. FUNCTIONAL TEST PERFORMED? No
LUBICATED LOAD PIN AND SPHERICAL BEARINGS WITH
NEOLUBE#24982-3
4-1035 1 11439 N/A 10/2/00 P
41 11 14-1037 1 11930 N/A 10/2/00 P
.1 1 4 I I-I
21 1/4"
26 1/2"
P
P
Yes P
YesI P
PERFORMED VISUAL/HANDSTROKE. LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
PERFORMED VISUAL/HANDSTROKE. LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
ONAL TEST PERFORMED? No
es PP
NoFUNCTIONAL TEST PERFORMED?
FUNCTIq
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
VISUAL REPLACE- INSPECT
TAG# SERIAL# MENT S/N DATE
0389 497 N/A 9/0/ -
S S T FUNCTIONAL T A INSPECT A T DATE T
S S T HAND- T A STROKE A
LDIMEN T ? T
-*/'16:[ N/A IYes p
VISUAL SUMMARY
PERFORMED VISUAUHANDSTROKE LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
FUNCTIONAL TEST SUMMARY
FUNCTIONAL TEST PERFORMED? No
4-1039 12988 N/A 10/3/00 P 25 5/8" P Yes P PERFORMED VISUAL ON SUPPORT FUNCTIONAL TEST PERFORMED? No
END BY USE OF MANBASKET.VISUAL/HANDSTOKE. LOAD PIN AND SPHERICAL BEARING WAS WORN, BOTH REPLACED. LUBRICATED LOAD PIN AND SPHERICAL BEARING WITH NEOLUBE #24982-3.
4-1041 19721 N/A 10/1/00 P 17 7/8" P Yes P PERFORMED VISUAUHANDSTROKE FUNCTIONAL TEST PERFORMED? No
LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
4-1042 19727 N/A 10/6/00 P 17 7/16" P Yes P PERFORMED VISUAL/HANDSTROKE. FUNCTIONAL TEST PERFORMED? No
LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
TAG # SERIAL#
VISUAL REPLACE- INSPECT MENT S/N DATE
_4-10,4-31 27099 N/ I1060
S T A T
FUNCTIONAL INSPECT
DATE
S T A T L DIMEN
17 3/8"
S ST HAND- T A STROKE A T ? T
P
VISUAL SUMMARY
PERFORMED VISUAL/HANDSTROKE. LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
FUNCTIONAL TEST SUMMARY
FUNCTIONAL TEST PERFORMED? No
4-1046 187 N/A 10/5/00 P 19 1/4" P Yes P PERFORMED VISUAL/HANDSTROKE. FUNCTIONAL TEST PERFORMED? No
LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
4-1047 185 N/A 10/5/00 P 19 1/2" P Yes P PERFORMED VISUAL/HANDSTROKE FUNCTIONAL TEST PERFORMED? No
LUBRICATED LOAD PIN AND
SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
4-1048 4251 N/A 10/5/00 P 20 3/16" P Yes P PERFORMED VISUAL/HANDSTROKE FUNCTIONAL TEST PERFORMED? No
LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
P Yes
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
VISUAL REPLACE- INSPECT
TAG# SERIAL# MENT S/N DATE
S T A T
-4 -,49"-1 0,-*9-f - ..- N/"-.. *l**1-*,5/ -. ;-
FUNCTIONAL INSPECT
DATE
S S ST T HAND- T A A STROKE A T L DIMEN T ? T
---i--1- 9- 5/-8. [1 P---r Y-es- - --P-
VISUAL SUMMARY
PERFORMED VISUAL/REMOVED FOR HANDSTROKE. LUBRICATED LOAD PINS/SPHERICAL BEARINGS WITH NEOLUBE # 24982-3. REINSTALLED SNUBBER.
FUNCTIONAL TEST SUMMARY
FUNCTIONAL TEST PERFORMED? No
4-1052 17189 N/A 10/5/00 P 21 7/8" P Yes P PERFORMED VISUAL/HANDSTROKE. FUNCTIONAL TEST PERFORMED? No LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
4-1054 17899 N/A 10/5/00 P 21 7/8" P Yes P PERFORMED VISUAL/HANDSTROKE FUNCTIONAL TEST PERFORMED? No LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
4-1055 17900 N/A 10/5/00 P 20 7/8" P Yes P PERFORMED VISUAL/HANDSTROKE FUNCTIONAL TEST PERFORMED? No LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
TAG# SERIAL#
VISUAL REPLACE- INSPECT MENT SIN DATE
S T A T
FUNCTIONAL INSPECT
DATE
S T A T L DIMEN
S ST HAND- T A STROKE A T ? T
-P
VISUAL SUMMARY
PERFORMED VISUALIHANDSTROKE. LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
FUNCTIONAL TEST SUMMARY
FUNCTIONAL TEST PERFORMED? No
1 I- -I 1 4-1058 21379 N/A 10/6/00 P 16 9/16" P Yes P PERFORMED VISUALIHANDSTROKE FUNCTIONAL TEST PERFORMED? No
LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
4-1061 19722 N/A 10/6/00 P 16 13/16" P Yes P PERFORMED VISUAL/HANDSTROKE FUNCTIONAL TEST PERFORMED? No
LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3
4-1062 1 27076 N/A 10/6/00 P 17 1/8" P Yes P PERFORMED VISUAL/HANDSTROKE LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
.1 1 1 4 l-I 4 _______ _______ ___________________________________________ .4
P Yes 213/8.. 1 F-
... ..4-1056 17903..............
FUNCTIONAL TEST PERFORMED? No
- ] .....
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
VISUAL REPLACE- INSPECT
TAG# SERIAL# MENT S/N DATE
4-1063 27098 N/A 10/6/00
S T A T
P
FUNCTIONAL INSPECT
DATE
S T A T
S S T HAND- T A STROKE A
L DIMEN T 7 T
S1-7 1/2" [ p Yes P
VISUAL SUMMARY
PERFORMED VISUAL/HANDSTROKE LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
FUNCTIONAL TEST SUMMARY
FUNCTIONAL TEST PERFORMED? No
4-1064 27077 N/A 10/6/00 P 17 1/5" P Yes P PERFORMED VISUAL/HANDSTROKE. FUNCTIONAL TEST PERFORMED? No
LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
4-1065 20873 N/A 10/6/00 P 15 3/4 P Yes P PERFORMED VISUAL/HANDSTROKE. FUNCTIONAL TEST PERFORMED? No LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
4-1066 27094 N/A 10/6/00 P 16 3/8" P Yes P PERFORMED VISUAL/HANDSTROKE FUNCTIONAL TEST PERFORMED? No
LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
S VISUAL T
REPLACE- INSPECT A
TAG# SERIAL# MENT S/N DATE T
4-10671 27097 I N/A
S S S FUNCTIONAL T T HAND- T
INSPECT A A STROKE A
DATE T L DIMEN T ? T
P 171/2 fP Yes P
VISUAL SUMMARY
PERFORMED VISUAL/HANOSTROKE. LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3
FUNCTIONAL TEST SUMMARY
FUNCTIONAL TEST PERFORMED? No
I I I- I- I. 4-1068 27085 N/A 10/6/00 P 17 7/16" P Yes P PERFORMED VISUAL/HANDSTROKE. FUNCTIONAL TEST PERFORMED? No
LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
4-1069
4-1071
10033 N/A 10/1/00 P
1 4 � 416247 N/A 10/2/00 1,, P
27"
20 3/4"
P
P
Yes
Yes
P
P
PERFORMED VISUAL, REMOVED FOR HANDSTROKE. LUBRICATED LOAD PINS AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3. REINSTALLED SNUBBER.
PERFORMED VISUAL/HANDSTROKE. LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3. LOOSE PIPE CLAMP. CR 00-1758 WRITTEN TO TIGHTEN/ADJUST PIPE CLAMP
FUNCTIONAL TEST PERFORMED? No
FUNCTIONAL TEST PERFORMED? No
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
S S
VISUAL T FUNCTIONAL T REPLACE- INSPECT A INSPECT A
TAG# SERIAL# MENT SIN DATE T DATE T
4-1073 3941 N/A 10/2/00 P
L DIMEN
21 9/16E
S S T HAND- T A STROKE A T ? T
"i - T-Y'sF -p,.VISUAL SUMMARY
PERFORMED VISUAL/HANDSTROKE. LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3
FUNCTIONAL TEST SUMMARY
FUNCTIONAL TEST PERFORMED? No
4-1075 19297 N/A 9/30100 P 15 3/4" P Yes P PERFORMED VISUAL/HANDSTROKE. FUNCTIONAL TEST PERFORMED? No LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
4-1076 24414A N/A 9/30/00 P 13" P Yes P PERFORMED VISUAL/HANDSTROKE. FUNCTIONAL TEST PERFORMED? No LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
4-1077 18014 N/A 9/30/00 P 13 1/4" P Yes P PERFORMED VISUAL/HANDSTROKE. FUNCTIONAL TEST PERFORMED? No LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
S VISUAL T
REPLACE- INSPECT A
TAG# SERIAL# MENT S/N DATE T
4-1079 [23227 [- N/A J9/30/00 [
S FUNCTIONAL T
INSPECT A DATE T
L DIMEN
S S T HAND- T A STROKE A T ? T
-1 .21,1/16. f *P - rYes F P- i
VISUAL SUMMARY
PERFORMED VISUAL/HANDSTROKE. LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
FUNCTIONAL TEST SUMMARY
FUNCTIONAL TEST PERFORMED? No
4-1080 24431 N/A 9/30/00 P 11 3/4" P Yes P PERFORMED VISUAL/HANDSTROKE FUNCTIONAL TEST PERFORMED? No LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
4-1081 19295 N/A 10/1/00 P 15 15/16" P Yes P PERFORMED VISUAL/HANDSTROKE FUNCTIONAL TEST PERFORMED? No LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
4-1082 19296 N/A 10/1/00 P 17 11/16" P Yes P PERFORMED VISUAL/HANDSTROKE FUNCTIONAL TEST PERFORMED? No LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3
TURKEY POINT NUCLEAR PLANT
OUTAGE SUMMARY REPORT
UNIT 4 2000 CYCLE 19 REFUELING OUTAGE WO # 30011986
TAG# SERIAL#
VISUAL REPLACE- INSPECT MENT S/N DATE
24408 A I -. N/A J I.10/1/00
S T A T
S S S FUNCTIONAL T T HAND- T
INSPECT A A STROKE A DATE T L DIMEN T ? T
P 1 .4 1/8 [ P Yes P
VISUAL SUMMARY
... .. .. ......................
PERFORMED VISUAL/HANDSTROKE LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3
FUNCTIONAL TEST SUMMARY
FUNCTIONAL TEST PERFORMED? No
1 I I4 I I-I I-I4-1084 23229 N/A 10/1100 P 12 7/8" P Yes P PERFORMED VISUAL/HANDSTROKE. FUNCTIONAL TEST PERFORMED? No
LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3.
4-1085 33622 N/A 10/1/00 P 10 7/16" P Yes P PERFORMED VISUAL/HANDSTROKE FUNCTIONAL TEST PERFORMED? No
LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH NEOLUBE #24982-3
4-1100 N/A 10/1/00 P 10 5/8" P Yes P PERFORMED VISUAL/HANDSTROKE FUNCTIONAL TEST PERFORMED? No LUBRICATED LOAD PIN AND SPHERICAL BEARINGS WITH
NEOLUBE #24982-3.
TURKEY POINT UNIT 4
2000 REFUELING OUTAGE
SUMMARY OF INSERVICE INSPECTION EXAMINATIONS
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (00RF)
CLASS 1 PCBNA STATUS CCOPONENTS
REACTOR PRESSURE VESSEL
ZONE NUMBER: 4-001
SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION
ASME
SEC. XI
CATEGY ITEM NO
EXAM METHOD
N S O T R A E
PROCEDURE T C
I N S I G
G E 0 H
0 T H E R
REMARKS
"**CALIBRATION BLOCK**
(REF. DWG. NO. 5614-M-4000)
011795 VESSEL TO CLOSURE HEAD B-N-I
SURFACE ON HEAD B13.10
VT-3 4.3-19 C X - - - 10/11/00 - VT3 Completed
(REF. DWG. NO. 5614-M-4001)
023520 4-CH-S-21 THRU 40
RPV STUDS
029320 4-CH-N-21 THRU 40
RPV NUTS
B-G-1 MT 2.2-1 & 2.2-2
B6.30 UT 5.8-1
B-G-1 MT 2.2-3 & 2.2-4
B6.10 UT 5.10-1
CX - -
X - -
CX - -
X - - -
10/03/00 - MT Completed
10/03/00 - UT Completed
**UT-11**
10/03/00 - MT Completed
10/03/00 - UT Completed
**UT-25**
035020 4-CH-LW 21 THRU 40
RPV LARGE WASHERS
040820 4-CH-SW-21 THRU 40
RPV SMALL WASHERS
B-G-1
B6.50
B-G-1
B6.50
VT-i
VT-1
4.1-10
4.1-11
C X - - - 10/03/00 - VT1 Completed
C X - - - 10/03/00 - VT1 Completed
PAGE: 1
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 2
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SECOQD PERIOD, THIRD OUTAGE (0ORF)
CLASS 1 PCBER STATUS COMPONENTS
STEAM GENERATOR B PRIMARY SIDE
ZONE NUMBER: 4-004
SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION
ASME
SEC. XI CATEGY ITEM NO
EXAM METHOD
N I 0 S O N G T T R S E H A E I 0 E
PROCEDURE T C G M R
REMARKS "tt
CALIBRATION BLOCK**
(REF. DWG. NO. 5614-M-4004)
052000 4-SGB-I BOLTING B-G-2
STEAM GENERATOR INLET B7.30
MANWAY BOLTING
052100 4-SGB-O BOLTING B-G-2
STEAM GENERATOR OUTLET B7.30
MANWAY BOLTING
VT-I 4.1-12
VT-I 4.1-13 & 4.1-14
CX - -
CX - - -
10/07/00 - VT1 Completed
10/07/00 - VTI Completed (Studs
#1 thru #10 and #12 thru #16)
10/08/00 - VT1 Completed (#11)
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (CORF)
CLASS 1 PCBEA STATUS COMPONENTS
PRESSURIZER
ZONE NUMBER: 4-006
SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION
ASME
SEC. XI CATEGY ITEM NO
EXAM METHOD
N S 0 T R A E
PROCEDURE T C
I N S I G
G E 0 M
0 T H E R
REMARKS
**CALIBRATION BLOCK" *
(REF. DWG. NO. 5614-M4-4002)
054300 4-PLW-2 B-B
UPPER SHELL LONG SEAM B2.12
054400 4-PCW-7
UPPER SHELL TO HEAD
054600 SAFETY NOZZLE
SAFETY NOZZLE INSIDE
RADIUS SECTION
054800 SAFETY NOZZLE
SAFETY NOZZLE INSIDE
RADIUS SECTION
055000 SAFETY NOZZLE
SAFETY NOZZLE INSIDE
RADIUS SECTION
055200 RELIEF NOZZLE
RELIEF NOZZLE INSIDE
RADIUS SECTION
055400 SPRAY NOZZLE
SPRAY NOZZLE INSIDE
RADIUS SECTION
B-B
B2.11
B-D
B3.120
B-D
B3.120
B-D
B3.120
B-D
B3.120
B-D
B3.120
UT 5.1-1
UT 5.1-1
C X - - - 10/05/00 - UT Completed **UT-6**
CX -
UT 5.13-1
UT 5.13-2
UT 5.13-3
UT 5.13-4
UT 5.13-5
- - 10/05/00 - UT Completed **UT-8**
CX - - - 10/04/00 - UT Completed **UT-8**
C X - - - 10/04/00 - UT Completed **UT-8**
C X - - - 10/04/00 - UT Completed **UT-B**
C X - - - 10/04/00 - UT Completed **UT-8**
C X - - - 10/04/00 - UT Completed **UT-B**
PAGE: 3
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICN INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OGRF)
CLASS 1 PCBEA STATUS COMPONENTS
REACTOR COOLANT SYSTEM PRESSURIZER SURGE LINE
ZONE NUMBER: 4-016 ASME N I 0
SEC. XI S O N G T SUMMARY EXAMINATION AREA CATEGY EXAM T R S E H A E 1 0 E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
(REF. DWG. NO. 5614-P-766-S SH. 2)
PAGE: 4
REMARKS "*CALIBRATION BLOCK**
062710 SR-400
SPRING HANGER
F-A
Fl. 10
VT-3 4.3-12 C X - - - 10/01/00 - VT3 Completed
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 1 PCBEA STATUS COMPONENTS
REACTOR COOLANT SYSTEM PRESSURIZER SAFETY LOOP A
ZONE NUMBER: 4-017 AS
SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION
SEC. XI
CATEGY EXAM ITEM NO METHOD
N I S 0 N T R S A E I
PROCEDURE T C G
0 G T E H 0 E M R
REMARKS "**CALIBRATION BLOCK**
(REF. DWG(. NO. 5614-P-564-S SR. 3)
063300 4"-RC-1401-1A
NOZZLE TO SAFE-END
064250 4"-RC-1401-FB B-G-2
PIPING FLANGE BOLTING B7.50
B-F PT 3.3-8
B5.40 RT 9.3-1
VT-1 4.1-7
CX - -
X
Cx - - -
10/01/00 - PT Completed
10/02/00 - RT Completed
(Acceptable rounded indications
recorded in area 0 to 4 1/2) **NOZZLE - TBD, UT-53**
9/30/00 - VTl Completed
PAGE: 5
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICE INSPECTION SU.4WARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 1 PCBEA STATUS COMPONENTS
REACTOR COOLANT SYSTEM PRESSURIZER SAFETY LOOP B
ZONE NUMBER: 4-018 ASHE N I 0
SEC. XI S O N G T SUMMARY EXAMINATION AREA CATEGY EXAM T R S E H A E 1 0 E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
(REF. DWG. NO. 5614-P-564-S SH. 3)
064400 4"-RC-1402-lA
NOZZLE TO SAFE-END
B-F PT 3.3-9
B5.40 RT 9.3-2C - - X
X - - -
PAGE: 6
REMARKS
"**CALIBRATION BLOCK**
10/01/00 - PT Completed
(Acceptable Indications)
10/02/00 - RT Completed
10/01/00 - RT Completed **NOZZLE
- TBD, UT-53**
065350 4"-RC-1402-FB B-G-2
PIPING FLANGE BOLTING B7.50
VT-I 4.1-8 C X - - - 9/30/00 - VTl Completed
DATE: 01/04/01
REVISION: 0
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 1 PCBEA STATUS COMPONENTS
REACTOR COOLANT SYSTEM PRESSURIZER SAFETY LOOP C
ZONE NUMBER: 4-019 ASME
SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION
SEC. XI CATEGY ITEM NO
EXAM METHOD
N I 0 S 0 N G T T R S E H A E I 0 E
PROCEDURE T C G M R
(REF. DWG. NO. 5614-P-564-S SH. 2)
065500 4"-RC-1403-1A
NOZZLE TO SAFE-END
B-F PT 3.3-7
B5.40 RT 9.3-3C - - - X
X
REMARKS
"*CALIBRATION BLOCK**
10/01/00 - PT Completed
(Acceptable Indications)
10/02/00 - RT Completed
(Acceptable tungston reported in
area 6 1/2 to 10 1/2, ID surface
in area 10 1/2 to 13 1/2 and ID
surface in area 13 1/2 to 0)
10/01/00 - RT Completed **NOZZLE
- TBD, UT-53**
066450 4"-RC-1403-FB B-G-2
PIPING FLANGE BOLTING B7.50
VT-1 4.1-9 C x - - - 9/30/00 - VT1 Completed
PAGE: 7
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (0ORF)
CLASS 1 PCBEA STATUS CCbfPONENTS
REACTOR COOLANT SYSTEM PRESSURIZER SPRAY TO PRZ.
ZONE NUMBER: 4-020 ASME
SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION
SEC. XI CATEGY EXAM ITEM NO METHOD
N I S O N T R S A E I
PROCEDURE T C G
0 G T E H 0 E M R
REMARKS
"**CALIBRATION BLOCK**
(REF. DWG. NO. 5614-2-566-S SH. 1)
068750 4-RCH-6
SPRING HANGER
069600 4"-RC-1404-31
SAFE-END TO NOZZLE
F-A VT-3 4.3-15
Fl. 10
B-F PT 3.3-5
B5.40 RT 9.3-4
Cx - - -
C X - -
-- X
10/02/00 - VT3 Completed
10/01/00 - PT Completed
10/02/00 - RT Completed
(Acceptable 1/16 rounded
indication reported in area 13
1/2 to 16 1/2) **UT-53**
PAGE: 8
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SZCOND PERIOD, THIRD OUTAGE (00RF)
CLASS 1 PCBDA STATUS CCMPONENTS
REACTOR COOLANT SYSTEM PRESSURIZER RELIEF LINE
ZONE NUMBER: 4-022 ASmr
SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION
SEC. XI CATEGY EXAM ITEM NO METHOD
N I S O N T R S A E I
PROCEDURE T C G
0 G T E H 0 E M R
REMARKS
**CALIBRATION BLOCK**
(REF. DWG. NO. 5614-P-564-S SH. 1)
076700 4"-RC-1406-1.A
NOZZLE TO SAFE-END
077450 4-RCH-4
SPRING HANGER
B-F PT 3.3-6
B5.40 RT 9.3-5
F-A
Fl. 10
VT-3 4.3-13
CX - -
X
C X - - -
10/01/00 - PT Completed
10/02/00 - RT Completed
(Acceptable 1/16" tungston
reported in area 6 to 10 1/2)
**NOZZLE - TBD, UT-53**
9/30/00 - VT3 Completed
PAGE: 9
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (CORF)
CLASS 1 PCBDA STATUS COMPONENTS
REACTOR COOLANT PUMP A
ZONE NUMBER: 4-056
SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION
ASME
SEC. XI CATEGY ITEM NO
EXAM METHOD
N I 0 S O N G T T R S E H A E I 0 E
PROCEDURE T C G M R
REMARKS
"**CALIBRATION BLOCK**
(REF. DWG. NO. 5614-M-4006)
196900 4-RCP-FSA-1 THRU 24 B-G-1
FLANGE STUDS B6.180
UT 5.8-2 C K - - - 10/07/00 - UT Completed
**UT-18**
PAGE: 10
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 11
INSERVICZ INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 1 PCEA STATUS COIMPONENTS
CHEMICAL & VOLUME CONTROL, REGENERATIVE HEAT EXCH
ZONE NUMBER: 4-059 ASME
SUbftARY EXAMINATION AREA NUMBER IDENTIFICATION
SEC. XI CATEGY ITEM NO
EXAM METHOD
N I 0 S O N G T T R S E H A E I 0 E
PROCEDURE T C G M R
REMARKS "tt
CALIBRATION BLOCK**
(REF. DWG. NO. 5614-M-4009)
199290 RGX 4E200
VISUAL FOR LEAKAGE
VT-2 4.2-2 VT-3 4.3-11
CX - -X - - -
09/25/00 - VT3 Completed
10/21/00 - VT-2 Completed
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICZ INSPECTION SUMOMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 2 PCBSA STATUS COMPONENTS
STEAM GENERATOR B SECONDARY SIDE
ZONE NUMBER: 4-061 ASME N I 0
SEC. XI S O N G T SUMMARY EXAMINATION AREA CATEGY EXAM T R S E H A E 1 0 E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
(REF. DWG. NO. 5614-M-4004)
PAGE: 12
REMARKS **CALIBRATION BLOCK**
206600 4-SGB-SS
SECONDARY SIDE
EXAMINATION
VISUAL 4.4-1 UT 5.18-1
A X - - - 10/01/00 - Visual Completed X - - - 10/01/00 - UT Thickness
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 2 PCEA STATUS COMPONENTS
RESIDUAL HEAT REMOVAL SYSTEM INSIDE CONTAINMENT
ZONE NUMBER: 4-081 ASME
SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION
SEC. XI
CATEGY EXAM ITEM NO METHOD
N I 0 S 0 N G T T R S E H A E I 0 E
PROCEDURE T C G M R
REMARKS
"**CALIBRATION BLOCK**
(REF. DWG. NO. 5614-P-509-S SH. 2)
233540 8073-H-808-01
DOUBLE ACTING
RESTRAINT
F-A VT-3 4.3-17
F1.20 VT-3 4.3-18A - X - - 10/07/00 - VT-3 Completed
X - - - (CR#00-1787 - Clamp slipping on
pipe and spherical bearings are
painted)
10/10/00 - VT3 Completed after
corrective action.
PAGE: 13
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICE INSPECTION SU)MMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 2 PCBEA STATUS COMPONENTS
HIGH HEAD SAFETY INJECTION OUTSIDE CONTAINMENT
ZONE NUMBER: 4-097 ASME N I 0
SEC. XI S O N G T SUMMARY EXAMINATION AREA CATEGY EXAM T R S E H A E 1 0 E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
(REF. DWG. NO. 5614-P-572-S SH. 3)
PAGE: 14
REMARKS "*CALIBRATION BLOCK**
256828 3-SIH-56
DOUBLE ACTING
RESTRAINT
F-A
Fl. 20
VT-3 4.3-9 C - X 09/27/00 - VT3 Completed. CR
00-1693 was written to address
clearance of 0" instead of 1/16"
per drawing. Engineering has
issued a CRN-C-10835 to change
the drawing. Hanger is
acceptable as is.
256829 3-SIH-56 IA
INTEGRAL ATTACHMENT
C-C
C3.20
PT 3.3-1 C X - - - 09/25/00 - PT Completed
(REF. DWG. NO. 5614-P-783-S SH. 1)
257140 4"-SI-2401-52
2" BRANCH CONNECTION
C-F-l
C5.21
257144 4"-SI-2401-53 C-F-I
2" BRANCH CONNECTION C5.21
PT 3.3-2 CX -
PT 3.3-2
- 09/25/00 - PT Completed
C X - - - 09/25/00 - PT Completed
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (0ORF)
CLASS 2 PCBEA STATUS CCOMPONENTS
HIGH HEAD SAFETY INJECTION
ZONE NUMBER: 4-098
SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION
ASME
SEC. XI CATEGY ITEM NO
EXAM METHOD
N I 0 S O N G T T R S E H AS I 0 E
PROCEDURE T C G M R
REMARKS
"**CALIBRATION BLOCK**
(REF. DWG. NO. 5614-P-783-8 SH. 3)
257853 8081-H-003-03
DOUBLE ACTING
RESTRAINT
F-A
Fl. 20
VT-3 4.3-1 C X - - - 09/25/00 - VT3 Completed
(REF. DWG. NO. 5614-P-513-S SH. 1)
257916 CONT PENETRATION P-59 F-A
ANCHOR FI.20
VT-3 4.3-10 C X - - - 09/28/00 - VT3 Complete
PAGE: 15
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SECOID PERIOD, THIRD OUTAGE (OORF)
CLASS 2 PCBNA STATUS CG(PONENTS
MAIN STEAM SYSTEM LOOP A OUTSIDE CONTAINMENT
ZONE NUMBER: 4-102 ASME
SEC. XIN I 0
S O N G TSUMMARY EXAMINATION AREA CATEGY EXAM T R S E H
A E I 0 E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
(REF. DWG. NO. 5614-P-562-S
REMARKS
"**CALIBRATION BLOCK**
SH. 2)
262300 26"-MSA-2404-2
6" WELDOLET
262400 26"-MSA-2404-3
12" WELDOLET
262500 26"-MSA-2404-4
12" WELDOLET
C-F-2
C5.81
C-F-2
C5.81
C-F-2
C5.81
262550 26"-MSA-2404-5LU C-F-2
LONGITUDINAL SEAM WELD C5.52
MT 2.2-6
MT 2.2-7
C X - - - 10/06/00 - MT Completed
CX
MT 2.2-7
MT 2.2-7 UT 5.2-1
- - 10/04/00 - MT Completed
C X - - - 10/04/00 - MT Completed
CX X -
10/04/00 - MT Completed
10/05/00 - UT Completed
**UT-21**
262600 26"-MSA-2404-5
PIPE TO VALVE
POV-4-2604
263200 14"-MSA-2402-1
12" WELDOLET TO PIPE
C-F-2 MT 2.2-7
C5.51 UT 5.2-1
C-F-2
C5.51
MT 2.2-7
CX - -- - X -
CX - - -
10/04/00 - MT Completed
10/05/00 - UT Completed
**UT-21**
10/04/00 - Completed
PAGE: 16
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 2 PCBZA STATUS COMPONENTS
MAIN STEAM SYSTEM LOOP B OUTSIDE CONTAINMENT
ZONE NUMBER: 4-103 ASME
SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION
SEC. XI
CATEGY ITEM NO
EXAM METHOD
N I 0 S O N G T T R S E H A E I 0 E
PROCEDURE T C G M R
RP EMARKS **CALIBRATION BLOCK**
(REF. DWG. NO. 5614-P-562-S
264250 26"-MSB-2405-lLU C-F-2
LONGITUDINAL SEAM WELD C5.52
264300 26"-MSB-2405-1 C-F-2
PIPE TO PIPE C5.51
264350 26"-MSB-2405-1LD C-F-2
LONGITUDINAL SEAM WELD C5 .52
264400 26"-MSB-2405-2 C-F-2
6" WELDOLET C5.81
264500 26"-MSB-2405-3
12" WELDOLET
C-F-2
C5.81
MT 2.2-5 UT 5.2-2
MT 2.2-5 UT 5.2-2
MT 2.2-5 UT 5.2-2
MT 2.2-5
MT 2.2-8
CX - -
X - -
CX - --- X
CX - -
X - -
cx - - -
Cx - - -
10/06/00 - MT Completed
10/07/00 - UT Completed
**UT-21**
10/06/00
10/07/00
**UT-21**
10/06/00
10/07/00
**UT-21**
MT Completed
UT Completed
MT Completed
UT Completed
10/06/00 - MT Completed
10/04/00 - MT Completed
PAGE: 17
SH. 2)
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSURVICZ INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 2 PCBEA STATUS CO(PONENTS
MAIN FEEDWATER SYSTEM LOOP A
ZONE NUMBER: 4-111 ASME N I 0 SEC. XI S O N G T
SUMMARY EXAMINATION AREA CATEGY EXAM T R S E H A E 1 0 E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
(REF. DWG. NO. 5614-P-770-S SH. 3)
PAGE: 18
REMARKS
**CALIBRATION BLOCK**
280650 4-FWH-38
SPRING HANGER
F-A
Fl. 20
VT-3 4.3-14 C X - - - 10/02/00 - VT3 Completed
(REF. DWG. NO. 5614-P-557-S SH. 1)
284460 Augmented Exam
FROM NOZZLE RAMP TO 1
PIPE DIA. ON ELBOW
AUG UT AUT001-1 C - - X - 10/5/00 - UT Completed **UT-20,
UT-29**
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICZ INSPECTION SUMO4ARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 2 PCBEA STATUS COMPONENTS
MAIN FEEDWAATER SYSTEM LOOP B
ZONE NUMBER: 4-112 ASME N 1 0
SEC. XI S O N G T SUMMARY EXAMINATION AREA CATEGY EXAM T R S E H NUBRA E 1 0 E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
(REF. DWG. NO. 5614-P-558-S SH. 1)
PAGE: 19
REMARKS
"**CALIBRATION BLOCK**
286980 Augmented Exam
FROM NOZZLE RAMP TO 1
PIPE DIA. ON ELBOW
AUG UT AUT001-2 A- - X - 10/06/00 - UT Completed **UT-20,
UT-29**
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 2 PCBEA STATUS COMPONENTS
MAIN FEEDWATER SYSTEM LOOP C
ZONE NUMBER: 4-113
SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION
ASME
SEC. XI
CATEGY ITEM NO
EXAM METHOD
N I 0 S 0 N G T T R S E H A E I 0 X
PROCEDURE T C G M R
REMARKS
"**CALIBRATION BLOCK**
(REF. DWG. NO. 5614-P-789-S SH. 1)
289650 Augmented Exam
FROM NOZZLE RAMP TO 1
DIA. ON ELBOW
AUG UT AUT001-3 A - - X - 10/06/00 - UT Completed **UT-20,
UT-29**
PAGE: 20
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 21
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 2 PCBEA STATUS COMPONENTS
MAIN FEEDWATER BYPASS LOOP B
ZONE NUMBER: 4-115 ASME
SEC. XI
SUMMARY EXAMINATION AREA CATEGY EXAM NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE
(REF. DWG. NO. 5614-P-770-S SH. 2)
N I 0 S 0 N G T T R S E H A E I 0 E T C G M R
REMANBRS **CALIBRATION BLOCK**
290850 7884-R-014-02
DOUBLE ACTING
RESTRAINT
F-A
Fl. 20
VT-3 4.3-16 C X - - - 10/04/00 - VT3 Completed
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (O0RF)
CLASS 2 PCBEA STATUS COMPONENTS
RESIDUAL HEAT EXCHANGER A
ZONE NUMBER: 4-117 ASME
SEC. XI S T
SUMMOARY EXAMINATION AREA CATEGY EXAM A
NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T
(REF. DWG. NO. 5614-M-4010)
N 0 R E C
I N S I G
0 G T E H O E M R
REMARKS "**CALIBRATION BLOCK**
292600 4-RHE-A3 C-B
INLET NOZZLE TO SHELL C2.33
VT-2 4.2-1 C X - - - 7/11/00 - VT2 Completed
292900 4-RHE-SPA-2 IA
INTEGRALLY WELDED
ATTACHMENT
C-C
C3. 10
PT 3.3-4 C X - - - 09/22/00 - PT Completed
PAGE: 22
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 23
INSERVICZ INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 3 PCBIA STATUS CQtnPONENTS
COMPONENT COOLING WATER SYSTEM TO CCW PUMP C
ZONE NUMBER: 4-122 ASME
SEC. XI SUMMARY EXAMINATION AREA CATEGY EXAM NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE
(REF. DWG. NO. 5614-P-518-S SH. 9)
N I 0 S O N G T T R S E H A E I 0 E T C G M R
REMARKS **
CALIBRATION BLOCK**
294900 4-ACH-193
SPRING HANGER
294950 4-ACH-193 IA
INTEGRAL ATTACHMENT
F-A
Fl. 30
D-A
D1. 20
VT-3 4.3-6
VT-I
C X - - - 09/25/00 - VT3 Completed
C X - - - 09/25/00 - VT1 Completed4.1-4
DATE: 01/04/01
REVISION: 0
PAGE: 24TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICZ INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 3 PCEEA STATUS COMPONENTS
COMPONENT COOLING WATER SYSTEM FRCN CCW PUMP A
ZONE NUMBER: 4-152 ASHE
SUMMARY NUMBER
EXAMINATION AREA IDENTIFICATION
SEC. XI CATEGY ITEM NO
EXAM METHOD
N I 0 S O N G T T R S E H A E I 0 E
PROCEDURE T C G M R
REMARKS *
*CALIBRATION BLOCK**
(REF. DWG. NO. 5614-P-501-S SH. 1)
314900 4-ACH-188
SPRING HANGER
315000 4-ACH-188 IA
INTEGRAL ATTACHMENT
F-A
Fl. 30
D-A
Dl. 20
VT-3 4.3-5
VT-1
C X - - - 09/25/00 - VT3 Completed
C X - - - 09/25/00 - VT1 Completed4.1-3
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 25
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 3 PCBXA STATUS COMPONENTS
CCMPONENT COOLING WATER SYSTEM FROM CCW PUMP B
ZONE NUMBER: 4-155 ASME
SEC. XI
SUhMARY EXAMINATION AREA CATEGY EXAM NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE
(REF. DWG. NO. 5614-P-501-S SH. 2)
N I 0 S 0 N G T T R S E H AE I 0 E T C G MR
REMARKS
"**CALIBRATION BLOCK**
317800 4-ACH-184
DOUBLE ACTING
RESTRAINT
F-A
Fl. 30
VT-3 4.3-7 C X - - - 09/25/00 - VT3 Completed
317850 4-ACH-184 IA
INTEGRAL ATTACHMENT
D-A
Dl. 20
VT-I 4.1-5 C X - - - 09/25/00 - VT1 Completed
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 26
INSERVICE INSPECTION SUMMOARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (0ORF)
CLASS 3 PCEUA STATUS CamPoNENTS
AUXILIARY FEEDWATER SYSTEM PUMP DISCHARGE
ZONE NUMBER: 4-160 ASME
SEC. XI SUM14ARY EXAMINATION AREA CATEGY EXAM NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE
(REF. DWG. NO. 5614-P-807-S SH. 4)
N I 0 S 0 N G T T R S E H A E I 0 E T C G M R
REMARKS **CALIBRATION BLOCK**
322800 80117-H-324-07
SINGLE AND DOUBLE
ACTING RESTRAINT
322850 80117-H-324-07 IA
INTEGRAL ATTACHMENT
F-A
Fl.30
D-A
Dl. 20
VT-3 4.3-3
VT-I 4.1-2
C X - - - 09/25/00 - VT3 Completed
C X - - - 09/25/00 - VTI Completed
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 27
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SZCOND PERIOD, THIRD OUTAGE (OORF)
CLASS 3 PCBZA STATUS CCUPONENTS
AUXILIARY FEEDWATER SYSTEM PUMP DISCHARGE
ZONE NUMBER: 4-162 ASME
SEC. XI
SUMMARY EXAMINATION AREA CATEGY EXAM NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE
(REF. DWG. NO. 5614-P-807-S SH. 5)
N 1 0 S O N G T T R S E H A E I 0 E T C G M R
REMARKS **CALIBRATION BLOCK"*
324600 4-CSTH-124
SINGLE ACTING
RESTRAINT
F-A
Fl. 30
VT-3 4.3-4 C X - - - 09/26/00 - VT3 Completed
324610 4-CSTH-124 IA
INTEGRAL ATTACHMENT
D-A
D1.20
VT-I 4.1-6 C X - - - 09/28/00 - VTl Complete
TURKEY POINT NUCLEAR PLANT UNIT 4
INSERVICZ INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 3 PCBEA STATUS CCbfPONENTS
AUXILIARY FEEDUATER PUMP SUCTION FRO4 COND.STG.TK.
ZONE NUMBER: 4-163 ASME
SUMMARY NUMBER
EXAMINATION AREA IDENTIFICATION
SEC. XI
CATEGY ITEM NO
EXAM METHOD PROCEDURE
N S O T R A E T C
I N S I G
G E 0 M
0 T H E R
REMARKS **CALIBRATION BLOCK**
(REF. DWG. NO. 5610-P-818-S SH. 3)
326400 80117-H-341-18
SINGLE ACTING
RESTRAINT
F-A
Fl.30
VT-3 4.3-2 C X - - - 09/26/00 - VT3 Completed. CR
No. 00-1725 was issued due to a
drawing discrepancy and the
threaded rod in contact with a
u-bolt. An engineering
evaluation showed the condition
to be acceptable. Engineering
has issued drawing change
(CRN-C-10834) to r
326450 80117-H-341-18 IA
INTEGRAL ATTACHMENT
D-A
Dl. 20
VT-I 4.1-1 C X - - - 09/26/00 - VT1 Completed
DATE: 01/04/01
REVISION: 0
PAGE: 28
DATE: 01/04/01
REVISION: 0
TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 29
INSERVICE INSPECTION SUMMARY
THIRD INTERVAL, SECOND PERIOD, THIRD OUTAGE (OORF)
CLASS 3 PCBZA STATUS COMPONENTS
INTAKE COOLING WATER FRCM CCW HEAT EXCHANGERS
ZONE NUMBER: 4-167 ASME
SEC. XI
SUM4ARY EXAMINATION AREA CATEGY EXAM NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE
(REF. DWG. NO. 5614-P-810-S SH. 1)
N I 0 S O N G T T R S E H A E I 0 E T C G M R
REMARKS
**CALIBRATION BLOCK**
330100 8046-H-190-10
SINGLE ACTING
RESTRAINT
F-A
Fl. 30
VT-3 4.3-8 C X - - - 09/27/00 - VT3 Completed
TURKEY POINT UNIT 4
2000 REFUELING OUTAGE
SUMMARY OF IWE EXAMINATIONS
DATE: 01/04/01
REVISION: 0
PAGE: 1IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (OORF)
CLASS PCBEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-001 ASME N I 0
SEC. XI S O N G T T R S E H
SUMMARY EXAMINATION AREA CATEGY EXAM A E I 0 E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
14 TO 74 DEGREES AT 14' TO 39'6" (REF. DWG. NO.
REMARKS **CALIBRATION BLOCK**
410000 CONTAINMENT LINER
LINER PLATE-GENERAL
VISUAL
E-A
El.11
GENERAL 4.7-21 C X - - - 10/06/00 - General Visual
Completed
14 to 74 DEGREES AT 14' TO 39'6" (REF. DWG. NO. )
410010 PENETRATION #1 E-A
RESID.HT.REMOVAL TYPEI E1.11
DETAIL3
PENETRATION #2 E-A
RESID.HT.REMOVAL TYPEI E1.11
DETAIL3
PENETRATION #3
R/C COOLING IN TYPEI
DETAIL3
E-A
El.11
GENERAL 4.7-10
GENERAL------- 4.7....- 10...
GENERAL 4.7-10
GENERAL 4.7-10
CX - -
CX - -
CX - - -
9/30/00
Completed
9/30/00
Completed
9/30/00
Completed
General Visual
General Visual
General Visual
14 TO 74 DEGREES AT 14' TO 39'6" (REF. DWG. NO. )
410040 PENETRATION #4 E-A
R/C COOLING OUT TYPEI E1.I1
DETAIL3
410050 PENETRATION #5
PZR RELIEF TANK VENT
TYPEV DETAIL12
410060 PENETRATION #6
PZR RELIEF TANK N2
SUPPLY TYPEV DETAIL12
E-A
E1.11
E-A
El.11
GENERAL 4.7-10
GENERAL 4.7-10
GENERAL 4.7-10
C X - -
CX - - -
C X - - -
9/30/00
Completed
9/30/00
Completed
9/30/00
Completed
General Visual
General Visual
General Visual
410020
410030
DATE: 01/04/01
REVISION: 0
IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (OORF)
CLASS PCBEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-001 ASME N
SEC. XI S 0
SUMMARY EXAMINATION AREA CATEGY EXAM T R A E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C
14 TO 74 DEGREES AT 14' TO 39'6" (REF. DWG. NO.
I N S I G
G E 0 M
0 T H E R
REMARKS **CALIBRATION BLOCK**
410070 PENETRATION #7 E-A
PZR RELIEF TANK H20 E1.11
DEMIN. TYPEI DETAIL3
410080 PENETRATION #8 E-A
PZR STEAM SPACE SAMP. ElI.I
TYPEIV DETAIL9
410090 PENETRATION #9 E-A
PZR LIQUID SPACE SAMP. E1.11
TYPEIV DETAIL9
410100 PENETRATION #10
R/C DRAIN TANK VENT
TYPEI DETAIL3
410110 PENETRATION #11
LOW HEAD SAFTEY INJ.
TYPEI DETAIL3
410120 PENETRATION #12
EXCESS LETDOWN HX IN
TYPEI DETAIL3
410130 PENETRATION #13
EXCESS LETDOWN HX OUT
TYPEI DETAIL3
410140 PENETRATION #14
LETDOWN TO NON REGEN
HX TYPEI DETAIL3
E-A ElI.11
E-A
El.11
E-A
E1.11
E-A
E1.11
E-A
El. 11
GENERAL 4.7-11
GENERAL 4.7-10
GENERAL 4.7-10
GENERAL 4.7-11
GENERAL 4.7--1-0
GENERAL 4.7-10
GENERAL 4.7-10
GENERAL 4.7-10
CX 10/01/00
Completed
C X - - - 9/30/00
Completed
CX --
CX --
CX --
CX - -
CX - -
CX - - -
9/30/00
Completed
10/01/00
Completed
9/30/00
Completed
9/30/00
Completed
9/30/00
Completed
9/30/00
Completed
General Visual
General Visual
General Visual
General Visual
General Visual
General Visual
General Visual
General Visual
PAGE: 2
DATE: 01/04/01
REVISION: 0
PAGE: 3lWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (00RF)
CLASS PCBERA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-001 ASME N
SEC. XI S O T R
SUMMARY EXAMINATION AREA CATEGY EXAM A E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C
14 TO 74 DEGREES AT 14' TO 39'6" (REF. DWG. NO.
I N S I G
G E 0 M
0 T H E R
REMARKS **CALIBRATION BLOCK**
410150 PENETRATION #15
CHARGING TO REGEN HX
TYPEI DETAIL3
410160 PENETRATION #16
SPARE TYPEI DETAIL3
410170 PENETRATION #17
SAFETY INJ. TEST &
PURGE TYPEI DETAIL3
E-A
El.11
E-A
El. 11
E-A
E1 .11
410180 PENETRATION #18 E-A
SAFETY INJECTION TYPEI E1.11
DETAIL3
410190 PENETRATION #19 ( 2)
CONTAINMENT SPRAY
TYPEI DETAIL3
410200
410210
PENETRATION #20
R/C HOTLEG SAMPLE
TYPEIV DETAIL9
PENETRATION #21
VENT COOLER CW LINE
TYPEI DETAIL3
E-A
E1.11
E-A
El. 11
E-A
E1.11
410220 PENETRATION #22 E-A
VENT COOLER CW RETURN E1.-1
TYPEI DETAIL3
GENERAL 4.7-8
GENERAL 4.7-11
GENERAL 4.7-11
GENERAL 4.7-11
GENERAL 4.7-8
GENERAL 4.7-8
GENERAL 4.7-11
GENERAL 4.7-8
CX - - - 9/30/00
Completed
CX - -
CX - -
CX--
CX - -
CX - -
CX - -
CX - - -
10/01/00
Completed
10/01/00
Completed
10/01/00
Completed
9/30/00
Completed
9/30/00
Completed
10/01/00
Completed
General Visual
General Visual
General Visual
General Visual
General--------Visual---General Visual
General Visual General Visual
9/30/00 - General Visual
Completed
DATE: 01/04/01
REVISION: 0
PAGE: 4IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (O0RF)
CLASS PCBBA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-001 ASME
SEC. XI SUMMARY EXAMINATION AREA CATEGY EXAM NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE
14 TO 74 DEGREES AT 14' TO 39'6" (REF. DWG. NO. )
N I 0 S O N G T T R S E H A E I 0 E T C G M R
REMARKS **CALIBRATION BLOCK**
410230 PENETRATION #23 E-A
CONT SUMP PUMP/HOLD UP El 11
TYPEI DETAIL3
410240 PENETRATION #24 (3)
CHARGEPUMP DIS TO RC
PUMP TYPEI DETAIL3
E-A
El 11
410250 PENETRATION #25 E-A
COOLANTPUMP DIS TO RC E1.11
PUMP TYPEI DETAIL3
410260 PENETRATION #31
RC DRAIN TK H2 ANAL
TYPEIV DETAIL9
410270
410280
PENETRATION #32
CONT AIR SAMPLE IN
TYPEI DETAIL3
PENETRATION #33
CONT AIR SAMPLE OUT
TYPEI DETAIL3
410290 PENETRATION #37
PLUGGED W/CONCRETE
TYPEVI DETAIL13
410300 PENETRATION #43
R/C PUMP CW OUTLET
TYPEI DETAIL3
E-A
E1 .11
E-A El1.11
E-A
E1 .11
E-A
E1 .11
E-A
El.11
GENERAL 4.7-11
GENERAL 4.7-8
GENERAL 4.7-11
GENERAL 4.7-11
GENERAL 4.7-11
GENERAL 4.7-11
GENERAL 4.7-11
GENERAL 4.7-9
CX - - - 10/01/00
Completed
CX - -
CX --
CX - -
CX - -
C X - -
CX - -
CX - - -
9/30/00
Completed
10/01/00 Completed
10/01/00
Completed
10/01/00 Completed
10/01/00
Completed
10/01/00
Completed
10/01/00
Completed
General Visual
General---------Visual----
General Visual
General Visual
General---------Visual----General Visual
General Visual
General Visual
General Visual
General Visual
IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (0ORF)
CLASS PCBEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-001 ASME
SEC. XI SUMMARY EXAMINATION AREA CATEGY EXAM NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE
14 TO 74 DEGREES AT 14' TO 39'6" (REF. DWG. NO. )
N S 0 T R A E T C
I N
S I G
G E
0 M
0 T H E R
REMARKS **CALIBRATION BLOCK**
410310 PENETRATION #44 (3)
CW TO EMERG CONT
COOLERS TYPEI DETAIL3
410320 PENETRATION #45 (3)
CW FROM EMERG CONT
COOLERS TYPEI DETAIL3
410330 PENETRATION #51
SPARE TYPEI DETAIL3
410340 PENETRATION #52
R/C DRAIN TANK DISCH.
TYPEI DETAIL3
410350 PENETRATION #64B
S/G SAMPLE TYPEV
410351 PENETRATION #66A
SPARE
410355 PENETRATION #64C
STEAM GEN SAMPLE
410356 PENETRATION #66B
SPARE
E-A
E1.11
E-A
El.11
E-A
El.11
E-A
El.11
(2) E-A
El. 11
(2) E-A
El.11
E-A
El.f11
E-A
E1.11
GENERAL 4.7-9
GENERAL 4.7-8
GENERAL 4.7---9
GENERAL 4.7-9
GENERAL 4.7-13
GENERAL 4.7-13
GENERAL 4.7-13
GENERAL 4.7-13
C X - - - 10/01/00 - General Visual
Completed
CX - -
CX - -
CX - - -
CX-- --
CX - -
CX - -
CX - - -
9/30/00
Completed
General Visual
10/01/00 - General Visual
Completed
10/01/00
Completed
General Visual
10/1/00 - General Visual
Completed
10/1/00 - General Visual
Completed
10/1/00 - General Visual
Completed
10/01/00 - General Visual
Completed
DATE: 01/04/01
REVISION: 0
PAGE: 5
DATE: 01/04/01
REVISION: 0
IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (00RF)
CLASS PCBEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-001 ASME N I 0
SEC. XI S O N G T SUMMARY EXAMINATION AREA CATEGY EXAM T R S E H
A E 1 0 E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
14 TO 74 DEGREES AT 14' TO 39'6" (REF. DWG. NO.
PAGE: 6
REMARKS
**CALIBRATION BLOCK**
410360 PENETRATION #55
ACCUM. SAMPLE LINE
TYPEIV DETAIL9
E-A
E1.11
GENERAL 4.7-9 C X - 10/01/00 - General Visual
Completed
14 TO 74 DEGREES AT 14' TO 39'6" (REF. DWG. NO. )
410370 PENETRATION #56 E-A
SPARE TYPEI DETAIL3 EBll
GENERAL 4.7-9 CX - - - 10/01/00 - General Visual
Completed
14 TO 74 DEGREES AT 14' TO 39'6" (REF. DWG. NO. )
410390 PENETRATION #59 E-A
HIGH HEAD INJ. TO LOOP E1.11
B TYPEI DETAIL3
410400 PENETRATION #60 E-A
HIGH HEAD INJ. TO LOOP El.11
C TYPEI DETAIL3
410410 PENETRATION #61B E-A
PZR DEAD WEIGHT TESTER E1.11
TYPEVI DETAIL13
410420 PENETRATION #61A E-A
SPARE TYPE I DETAIL3 E1.11
410430 PENETRATION #63 E-A
INSTR. AIR BLEED TYPEI E1.l1
DETAIL3
GENERAL 4.7-8
GENERAL 4.7-9
GENERAL 4.7-9
GENERAL 4.7-12
GENERAL 4.7-8
CX - -
CX - -
CX - -
CX - -
CX - - -
9/30/00 - General Visual
Completed
10/01/00 - General Visual
Completed
10/01/00 - General Visual
Completed
10/01/00 - General Visual
Completed . Weld is partially
hidden behind concrete platform.
9/30/00 - General Visual
Completed
DATE: 01/04/01
REVISION: 0
PAGE: 7IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (OORF)
CLASS PCBEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-001 ASME
SEC. XI SUMMARY EXAMINATION AREA CATEGY EXAM NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE
14 TO 74 DEGREES AT 14' TO 39'6" (REF. DWG. NO. )
N S 0 T R A E T C
I N
S I G
0 G T E H 0 E M R
REMARKS
**CALIBRATION BLOCK"
410440 PENETRATION #64 A
S/G SAMPLE TYPEI
DETAIL3
410740 PENETRATION #33
BOLTING (PENETRATION
33 TYPEI DETAIL3 )
E-A
E1.11
E-G
EB.10
410910 LINER PLATE @ AZIMUTH E-C
VISIBLE SURFACES E4.11
410930 MOISTURE BARRIER
LINER PLATE TO FLOOR
(MOISTURE BARRIER)
E-D
E5.30
GENERAL 4.7-13
VT-1 4.7-27
VT-I 4.7-35
VT-3 4.7-16
C X - - - 10/01/00 - General Visual
Completed
CX - -
C- X - -
C - X - -
10/07/00 - VT1 Completed
10/07/00 - VTI Complete
Blistered coating has signs of
repeated wetting .
CR-00-1881 generated.
Wetting caused by condensation
due to containment air
conditioning
Repair of blistered coating is
addressed in PMAI
#PMOO-10-111.
10/04/00 - VT3 Completed 1
1/2" x 5" gap lacated between
the concrete floor and a steel
angle is holding water.
CR#00-1817 generated. Steel
angle is part of the containment
air test system and is no longer
in service.
DATE: 01/04/01
REVISION: 0
IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (OORF)
CLASS PCBEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-002 ASME N I 0
SEC. XI S O N G T T R S E H
SUMMARY EXAMINATION AREA CATEGY EXAM A E I 0 E A E 1 0 E
NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
74 TO 134 DEGREES AT 14' TO 39'6" (REF. DWG. NO.
REMARKS **CALIBRATION BLOCK**
410940 CONTAINMENT LINER E-A
LINER PLATE-GENERAL E1.11
VISUAL
GENERAL 4.7-26 C X - - - 10/07/00 - General Visual
Completed
PAGE: 8
DATE: 01/04/01
REVISION: 0
METALLIC CONTAINMENT LINER
PAGE: 9IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (O0RF)
CLASS PCBEA STATUS COMPONENTS
ZONE NUMBER: 4-003 ASME N I O
SEC. XI S O N G T T R S EE
SUMMARY EXAMINATION AREA CATEGY EXAM A E I 0 E A E 1 0 E
NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
134 TO 194 DEGREES AT 14' TO 39'6" (REF. DWG. NO. )
411030 LINER PLATE
LINER PLATE (GENERAL
VISUAL)
411040 PENETRATION 40
EQUIPMENT HATCH
(GENERAL VISUAL)
E-A
El.11
E-A
El.11
GENERAL 4.7-25
GENERAL 4.7-45
C X - - - 10/07/00 - General Visual
Completed
C X - - - 10/02/00 - General Visual
Completed
REMARKS
**CALIBRATION BLOCK**
DATE: 01/04/01
REVISION: 0
PAGE: 10IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (OORF)
CLASS PCBEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-004 ASME
SEC. XI SUMMARY EXAMINATION AREA CATEGY EXAM NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE
194 TO 254 DEGREES AT 14' TO 39'6" (REF. DWG. NO. )
N I 0 S O N G T T R S E H A E I 0 E T C G M R
REMARKS "*CALIBRATION BLOCK**
411120 LINER PLATE
LINER PLATE (GENERAL
VISUAL)
411130 PENETRATION 28 (3)
S/G BLOWDOWN SPECIAL
DETAIL15
411140 PENETRATION 29
INSTRUMENT AIR TYPE I
DETAIL3
411150 PENETRATION 29
BOLTING (INSTRUMENT
AIR TYPE I DETAIL3)
411160 PENETRATION 30
SPARE TYPE I DETAIL3
E-A
El 11
E-A
E1 .11
E-A
E1 .11
E-G
E8 .10
E-A
E1 .11
411170 PENETRATION 30 BOLTING E-G
BOLTING (SPARE TYPE I E8.I0
DETAIL3)
411180 PENETRATION 65 A
CONT. ITEGRETY&LEAK
RATE TYPE I DETAIL3
411185 PENETRATION 65 B
CONT. ITEGRETY&LEAK
RATE TYPE I DETAIL3
E-A
E1 .11
E-A
El. 11
GENERAL 4.7-24
GENERAL 4.7-7
GENERAL 4.7-7
VT-i 4.7-19
GENERAL 4.7-7
VT-1 4.7-19
GENERAL 4.7-33
GENERAL 4.7-33
CX - - - 10/07/00
Completed
CX - -
CX - -
CX - -
CX - -
CX - -
CX - -
CX - - -
9/30/00
Completed
9/30/00
Completed
General Visual
General Visual
General Visual
10/05/00 - VT1 Completed
9/30/00 - General Visual
Completed
10/05/00 - VTl Completed
9/30/00 - General Visual
Completed
9/30/00 - General Visual
Completed
DATE: 01/04/01
REVISION:
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-004 ASME
SEC. XI SUMMARY EXAMINATION AREA CATEGY EXAM NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE
194 TO 254 DEGREES AT 14' TO 39'6" (REF. DWG. NO. )
N S 0 T R A E T C
I N S I G
G E 0 M
0 T H E R
PAGE: II
REMARKS
**CALIBRATION BLOCK**
411186 PENETRATION 65 C
CONT. ITEGRETY&LEAK
RATE TYPE I DETAIL3
E-A
E1.11
GENERAL 4.7-33 CX - 9/30/00 - General Visual
Completed
411240 PENETRATION 65 A
BOLTING (PENETRATION
65 A TYPE I )
411245 PENETRATION 65 B
BOLTING (PENETRATION
65 A TYPE I )
411250 PENETRATION 65 C
BOLTING (PENETRATION
65 CTYPE I )
E-G
E8. 10
E-G
E8.10
E-G
E8.10
411260 PENETRATION 65A GASKET E-D
GASKET (PENETRATION E5.20
65A TYPE I )
------------------------------------------------------------
411265 PENETRATION 65B GASKET E-D
GASKET (PENETRATION E5.20
65A TYPE I )
411270 PENETRATION 65C E-D
GASKETS (PENETRATION E5.20
65C TYPE I )
411300 MOISTURE BARRIER
LINER PLATE TO FLOOR
(MOISTURE BARRIER)
E-D
E5.30
VT-1 4.7-32
VT-1 4.7-32
VT-1 4.7-32
VT-3 4.7-31
VT-3 4.7-31
VT-3 4.7-31
VT-3 4.7-20
CX - -
CX - - -
CX - - -
C X - - -
10/06/00 - VT1 Completed
10/06/00 - VTI Completed
10/06/00 - VT1 Completed
10/06/00 - VT3 Completed
C X - - - 10/06/00 - VT3 Completed
C.. X.. - --........ .. ...... .... ....-1- VT3.. .... Co.. .... leted......
C X - - - 10/06/00 - VT3 Completed
C X - -- 10/06/00 - VT3 Completed
IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (OORF)
CLASS PCBEA STATUS COMPONENTS
0
DATE: 01/04/01
REVISION: 0
IWE UNIT 4 PAGE: 12
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (O0RF)
CLASS PCBEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-005
SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION
ASME N I 0
SEC. XI S O N G T T R S E H
CATEGY EXAM A E I 0 E A E P D E ITEM NO METHOD PROCEDURE T C G M R
REMARKS **CALIBRATION BLOCK**
254 TO 314 DEGREES AT 14' TO 39'6" (REF. DWG. NO. )
411310 LINER PLATE
LINER PLATE (GENERAL
VISUAL)
411320 PENETRATION 38B (28)
ELECTRICAL
PENETRATIONS TYPEIII
411330 PENETRATION 41
PERSONNEL AIRLOCK
SPECIAL
411370 PENETRATION 41
SURFACE AREA GRID-MIN
WALL THICKNESS LOC
411380 PENETRATION 41
PERSONNEL AIRLOCK
SEALS SPECIAL
411390 PENETRATION 41
PERSONNEL AIRLOCK
GASKETS SPECIAL
E-A
E1.1i
E-A
El.11
E-A
El. 11
AUG
AUG
E-D
E5. 10
E-D
E5. 20
GENERAL 4.7-23
GENERAL 4.7-5
GENERAL 4.7-5
VOLUMETRI 5.18-XX
VT-3 4.7-1
VT3 4.7-1
C X - - - 10/06/00 - General Visual
Completed
CX - -
CX - -
cx - -
CX - - -
9/30/00 - General Visual
Completed
9/30/00 - General Visual
Completed
9-25-00 - UT THICKNESS
MEASUREMENTS TAKEN FOR
CR#97-1336 & PMAI99-05-163
9/27/00 - VT3 Completed
C X - - - 9/27/00 - VT3 Completed
411400 PENETRATION 41 BOLTING E-G
BOLTING (PEN.41 DIFF. E8.10
PRESSURE GAUGE)
VT-I 4.7-44 CX - - - 10/05/00 - VTlCompleted
DATE: 01/04/01
REVISION: 0
IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (CORF)
CLASS PCBEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-005
SUMMARY NUMBER
EXAMINATION AREA
IDENTIFICATION
ASME
SEC. XI CATEGY ITEM NO
EXAM METHOD
N I 0 S O N G T T R S E H A E I 0 E
PROCEDURE T C G M R
REMARKS
"**CALIBRATION BLOCK**
254 TO 314 DEGREES AT 14' TO 39'6" (REF. DW1G. NO.
411410 PENETRATION 41 BOLTING E-G
BOLTING (PEN.41 DIFF. E8.10
PRESSURE VALVE)
VT-1 4.7-44 C X - - - 10/05/00 - VT1 Completed
PAGE: 13
DATE: 01/04/01
REVISION: 0
PAGE: 14IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (OGRF)
CLASS PCBEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-006 ASME N I 0
SEC. XI S O N G T
SUMMARY EXAMINATION AREA CATEGY EXAM T R S E H A E 1 0 E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
314 TO 14 DEGREES AT 14' TO 39'6" (REF. DWG. NO.
REMARKS "**CALIBRATION BLOCK**
411450 LINER PLATE E-A
LINER PLATE (GENERAL EI.ll
VISUAL)
GENERAL 4.7-22 C X - - - 10/06/00 - General Visual
Completed
411460 PENETRATION 38A (28)
ELECTRICAL
PENETRATIONS TYPEIII
E-A
El.11
GENERAL 4.7-6 C X - - - 9/30/00 - General Visual
Completed
314 TO 14 DEGREES AT 14' TO 39'6" (REF. DWG. NO. )
411470 PENETRATION 48B (2) E-A
ELECTRICAL PEN. (RC El.11
PUMP) TYPEIII
411475 PENETRATION 48C (2) E-A
ELECTRICAL PEN. (RC E1.11
PUMP) TYPEIII
GENERAL 4.7-34
GENERAL 4.7-34
CX - -
CX - - -
9/30/00 - General Visual
Completed
09-30-00 -GENERAL VISUAL
COMPLETE
314 TO 14 DEGREES AT 14' TO 39'6" (REF. DWG. NO. )
411480 PENETRATION 46 (3) E-A
CONT. PRESSURE INSTR. El.11
TYPEI DETAIL3
GENERAL 4.7-6 CX - - - 9/30/00 - General Visual
Completed
314 TO 14 DEGREES 14' TO 39'6" (REF. DWG. NO. )
411490 PENETRATION 36
CONTAINMENT PURGE
SPECIAL DETAIL2
E-A
El.11
GENERAL 4.7-6 C X - - - 9/30/00 - General Visual
Completed
DATE: 01/04/01
REVISION: 0
PAGE: 15IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (CORF)
CLASS PCBEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-007 ASME N I 0
SEC. XI S O N G T T R S E H SUMMARY EXAMINATION AREA CATEGY EXAM A E I E H
A E 1 0 E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
14 TO 74 DEGREES AT 39'6" TO 59'6" (REF. DWG. NO.
REMARKS
"**CALIBRATION BLOCK**
411590 LINER PLATE
LINER PLATE (GENERAL
VISUAL)
E-A
El. 11
GENERAL 4.7-36 C X - - - 10/09/00 - General Visual
Completed
DATE: 01/04/01
REVISION: 0
IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (O0RF)
CLASS PCBEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-008 ASME N I
SEC. XI S O N T R S
SUMMARY EXAMINATION AREA CATEGY EXAM A R I A R I NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G
74 TO 134 DEGREES AT 39'6" TO 59'6" (REF. DWG. NO.
0 G T E H 0 E M R
PAGE: 16
REMARKS "**CALIBRATION BLOCK**
411630 LINER PLATE
LINER PLATE (GENERAL
VISUAL)
E-A
E1.11
411640 PENETRATION 49 E-A
EMERGENCY ESCAPE HATCH El.11
SPECIAL DETAIL3
GENERAL 4.7-3
GENERAL 4.7-3
C X - - - 9/30/00 - General Visual
Completed
C X - - - 9/30/00 - General Visual
Completed
DATE: 01/04/01
REVISION: 0
IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (ORF)
CLASS PCBEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-009 ASME
SEC. XI SUMMARY EXAMINATION AREA CATEGY EXAM NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE
134 TO 194 DEGREES AT 3916" to 59' 6" (REF. DWG. NO.
N I 0 S O N G T T R S E H A E I 0 E T C G M R
REMARKS "**CALIBRATION BLOCK**
411720 LINER PLATE
LINER PLATE (GENERAL
VISUAL)
E-A
E1.11
GENERAL 4.7-2 C X - - - 9/30/00 - General Visual
Completed
PAGE: 17
IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (O0RF)
CLASS PCBEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-010 ASME
SEC. XI
SUMMARY EXAMINATION AREA CATEGY EXAM
NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE
194 TO 254 DEGREES AT 39'6" TO 59'6" (REF. DWG. NO. )
N S O T R A E T C
I N S I G
G E 0 M
0 T H E R
REMARKS **CALIBRATION BLOCK**
411760 LINER PLATE E-A
LINER PLATE (GENERAL EI.11
VISUAL)
GENERAL 4.7-4 C X - - - 9/30/00 - General Visual
Completed
411770 PENETRATION 27 (3)
FEEDWATER SPECIAL
DETAIL4
E-A
El.11
GENERAL 4.7-4 C X - - - 9/30/00 - General Visual
Completed
254 TO 314 DEGREES AT 39'6" TO 59'6" (REF. DWG. NO. )
411775 PENETRATION 26 A
MAIN STEAM SPECIAL
DETAIL4
E-A
E1.11
GENERAL 4.7-4 CX - - - 9/30/00 - General Visual
Completed
DATE: 01/04/01
REVISION: 0
PAGE: 18
DATE: 01/04/01
REVISION: 0
IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (OORF)
CLASS PCBEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-011
SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION
ASME
SEC. XI CATEGY ITEM NO
EXAM METHOD
N S O T R A E
PROCEDURE T C
I N S I G
G E 0 M
0 T H E R
REMARKS "**CALIBRATION BLOCK**
254 TO 314 DEGREES AT 39'6" TO 59'6" (REF. DWG. NO. )
411820 LINER PLATE E-A
LINER PLATE (GENERAL E1.11
VISUAL)
411830 PENETRATION 48A (4) E-A
R/C PUMP POWER TYPEIII E1.11
DETAIL
411840 PENETRATION 26 B
MAIN STEAM SPECIAL
DETAIL4
411845 PENETRATION 26 C
MAIN STEAM SPECIAL
DETAIL4
E-A
El.11
E-A
El.11
GENERAL 4.7-28
GENERAL 4.7-14
GENERAL 4.7-14
GENERAL 4.7-14
C X - - - 10/06/00 - General Visual
Completed
CX - -
CX - -
cx - - -
10/2/00 - General Visual
Completed
10/2/00 - General Visual
Completed
10-02-00 - GENERAL VISUAL
COMPLETE
PAGE: 19
DATE: 01/04/01
REVISION: 0
PAGE: 20IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (OORF)
CLASS PCEEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-012 ASME N I 0
SEC. XI S O N G T T R S E H
SUMMARY EXAMINATION AREA CATEGY EXAM A E I 0 E A E 1 0 E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
314 TO 14 DEGREES AT 39'6" TO 59'6" (REF. DWG. NO.
REMARKS **CALIBRATION BLOCK**
411900 LINER PLATE
LINER PLATE (GENERAL
VISUAL)
E-A
E1.11
GENERAL 4.7-29 C X - - - 10/06/00 - General Visual
Completed
DATE: 01/04/01
REVISION: 0
PAGE: 21IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (O0RF)
CLASS PCBEA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-013 ASME N I 0
SEC. XI S O N G T T R S E H
SUMMARY EXAMINATION AREA CATEGY EXAM A E I 0 E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
14 TO 74 DEGREES AT 59'6" TO 125-10" (REF. DWG. NO.
REMARKS **CALIBRATION BLOCK**
411940 LINER PLATE
LINER PLATE (GENERAL
VISUAL)
E-A
El.11
GENERAL 4.7-37 C X - - - 10/09/00 - General Visual
Completed
DATE: 01/04/01
REVISION: 0
PAGE: 22IWE UNIT 4
INSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (OORF)
CLASS PC!EA STATUS COMPONENTS
METALLIC CONTAINMENT LINER
ZONE NUMBER: 4-014 ASME
SEC. XI SUMMARY EXAMINATION AREA CATEGY EXAM NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE
74 TO 134 DEGREES AT 59'6" TO 125'10" (REF. DWG. NO. )
N I 0 S O N G T T R S E H A E I 0 E T C G M R
REMARKS
"**CALIBRATION BLOCK**
411980 LINER PLATE
LINER PLATE (GENERAL
VISUAL)
E-A
El. 11
GENERAL 4.7-39 C X - - - 10/09/00 - General Visual
Completed
DATE: 01/04/01
REVISION: 0
IIU UNIT 4
IMSERVICE INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (OORF)
CLASS PCBZA STATUS COMPONENTS
METALLIC COWTAI03ENT LINER
ZONE NUMBER: 4-015
SUMMARY EXAMINATION AREA NUMBER IDENTIFICATION
ASME
SEC. XI CATEGY ITEM NO
EXAM METHOD
N I 0 S O N G T T R S E H A E I 0 E
PROCEDURE T C G M R
REM4ARKS
"**CALIBRATION BLOCK**
134 TO 194 DEGREES AT 59'6" TO 125'1O" (REP. DWG. NO.
412020 LINER PLATE E-A
LINER PLATE (GENERAL E1.11
VISUAL)
GENERAL 4.7-38 CX - - - 10/09/00 - General Visual
Completed
PAGE: 23
DATE: 01/04/01
R3VI8ION: 0
IWE UNIT 4
INSERVICZ INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (OORF)
CLASS PCBEA STATUS COMPONENTS
YAgEhLLIC CONTAINMENT LINER
ZONE MISER: 4-016 ASHE N I 0
SEC. XI S O N G T SUMMARY XAMINATION AREA CATEGY EXAM T R S E H A E 1 0 E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
194 TO 254 DEGREES AT 59'6" TO 125'10" (REF. DWG. NO.
PAGE: 24
REMARKS
"**CALIBRATION BLOCK**
412060 LINER PLATE
LINER PLATE (GENERAL
VISUAL)
E-A
El.Il
GENERAL 4.7-40 C X - - - 10/09/00 - General Visual
Completed
DATE: 01/04/01
REVISIGE: 0
INX UNIT 4
INSERVICZ INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (OORF)
CLASS PCNEA STATUS COMPONENTS
METALLIC =&IUM LIN
ZONE NUMBER: 4-017 ASME N I 0
SEC. XI S O N G T SU1MARY EXAMINATION AREA CATEGY EXAM T R S E H A E 1 0 E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
254 TO 314 DEGREES AT 5916" TO 125'10" (REF. DWG. NO.
PAGE: 25
REMARKS
**CALIBRATION BLOCK**
412100 LINER PLATE
LINER PLATE (GENERAL
VISUAL)
E-A
El. 11
GENERAL 4.7-41 C X - - - 10/09/00 - General Visual
Completed
DAWN: 01/04/01
WM8IOw: 0
I=K UNIT 4
INSERVICZ INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (O0RF)
CLASS PCBEA STATUS COMPONENTS
MICALLIC CONTAINMENT LINER
ZONK NtMER: 4-018 ASME N I 0
SEC. XI S O N G T SU)SXY EXAMINATION AREA CATEGY EXAM T R S E H A E 1 0 E NUMB= IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
314 TO 14 DEGREES AT 59'6" TO 12510" (REF. DWG. NO. )
PAGE: 26
REMARKS
"CALIBRATION BLOCK**
412140 LINER PLATE E-A
LINER PLATE (GENERAL EI.11
VISUAL)
GENERAL 4.7-42 C X - - - 10/09/00 - General Visual
Completed
412150 PENETRATION 35
CONTAINMENT PURGE
SPECIAL DETAIL2
E-A
E1.11
412160 PENETRATION 35 BOLTING E-G
BOLTING PENETRATION 35 ES.10
SPECIAL DETAIL2
GENERAL 4.7-18
VT-I 4.7-17
CX - - -
CX - - -
10/04/00 - General Visual
Completed
10/04/00 - VT1 Completed
DATE: 01/04/01
REISZIZO: 0
== UNIT 4
INSERVICZ INSPECTION SUMMARY
FIRST INTERVAL, FIRST PERIOD, SECOND OUTAGE (OORF)
CLASS PCBDA STATUS COMPONENTS
METALLIC CONTAIMIENT LINER
ZONE NUMBER: 4-019 ASME N I O
SEC. XI S O N G T SU1MMARY EXAMINATION AREA CATEGY EXAM T R S E H A E 1 0 E NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T C G M R
0 TO 360 DEGREES 125'10" TO TOP OF DOME (RZF. DWG. NO.
PAGE: 27
REMARKS
"**CALIBRATION BLOCK**
412210 LINER PLATE (DOME) E-A
DOME (GENERAL VISUAL) El.11
GENERAL 4.7-43 C X - - - 10/09/00 - General Visual
Completed
TURKEY POINT UNIT 4
2000 REFUELING OUTAGE
SUMMARY OF SYSTEM PRESSURE TESTING
Abstract
This report details the pressure testing of selected class 1, 2 and 3 piping and components of the Florida Power and Light Company Turkey Point Unit 4 cycle 19 which were performed prior to and during the fall 2000 refueling outage. This outage occurred between the dates of September 25, 2000 and October 23, 2000, and the testing period covers the dates from April 10, 1999 through October 23, 2000. This pressure testing is being reported following the third outage of the second period for 3rd ten year interval for Turkey Point Unit 4.
Piping and components were selected and tested in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code "Rules for Inservice Inspection of Nuclear Power Components", 1989 Edition with no addenda with specific relief as granted under 10 CFR 50.55a.
Procedures
The following Florida Power and Light (FPL) procedures and documents have been implemented to provide instructional guidance for the performance of the required ASME XI pressure testing and subsequent inspections.
4-OSP-041.25 RCS Overpressure Leak Testing
4-OSP-45.1 ASME Section XI Quality Group A Bolting Examination*
4-OSP-45.2 ASME Section XI Quality Group B Bolting Examination*
0-ADM-523 ASME Section XI Pressure Tests for Quality Group A, B, C Systems/Components.
4-OSP-041.2 Reactor Coolant System Visual Leak Inspection and Leak Evaluation.
NDE-4.2 Visual Examination VT-2 Conducted During System Pressure Tests.
*Relief Request No 18, Use of Code Case N-533 Authorized for Turkey Point Units 3 and 4 (TAC NOS. M98149 AND M98150).
System Summary:
The following safety related Class 1, 2, and 3 systems, or sections thereof were pressure tested in accordance with the requirements of the 1989 ASME Section XI Code.
System Name System Number
Condensate Storage 18
Intake Cooling Water 19
Emergency Diesel 22
Component Cooling Water 30
Spent Fuel pool Cooling 33
Reactor Coolant 41
Chemical and Volume Control 47
Residual Heat Removal 50
Safety Injection 62
Containment Spray 68
Main Steam 72
Feedwater 74
Auxiliary Feedwater 75
Acronyms
ADM: Administrative
ASME: American Society of Mechanical Engineers
CSS: Containment Spray System
CCW: Component Cooling Water
CVCS: Chemical Volume Control System
ECC: Emergency Containment Cooler
FW: Feedwater
HX: Heat Exchanger
ICW: Intake Cooling Water
NDE: Non Destructive Examination
PWO: Plant Work Order
PZR: Pressurizer
RCP: Reactor Coolant Pump
RHR: Residual Heat Removal
RO: Restricting Orifice
RV: Relief Valve
RX: Reactor
SFPC: Spent Fuel Pool Cooling
SG: Steam Generator
WO: Work Order
Test Package Development
The specific pressure test boundaries were selected after review of the applicable plant Operating diagram/code boundary drawings. The piping systems were broken into sub systems. The sub-systems were selected based on Technical Specifications operability requirements, acceptable isolation points and availability of test connections and vent valves. The sub-systems were then assigned test package numbers, which could be tested in entirety, or based on availability could be broken down further into numerous tests within the specific sub-system.
The pressure test package numbers contain six (6) segments of information,
Sample: 04-CCW-30110-1-01 A A A A A A
1 2 3456
1. Unit Number (00) common to both units 3 and 4. (03) Unit specific. (04) Unit specific.
2. System abbreviation
3. System number [First (2) digits].
4. Sub-system number [(2) or (3) digits].
5. Type of test (H) Hydrostatic, (P) Pneumatic, (L) Leakage, (F) Functional, (I) Inservice, (S) Static head.
Number of test performed within the specific sub-system.6.
CONDENSATE STORAGE SYSTEM 18
04-CST-1802-F-02 Test Date: 09/21/00
This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure Test requirements. No leakage was noted during this test.
INTAKE COOLING WATER SYSTEM 19
04-ICW-1973-I-02 Test Date: 09/20/00
This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure Test requirements. No leakage was noted during this test.
04-ICW-19103-L-01 Test Date: 10/11/00
This test due to the replacement of valve 4-50-411 under WO# 99005389. No leakage was observed during this test.
04-ICW-191 10-L-01 Test Date: 05/17/00
This test performed due to replacement of piping and valve 4-50-413 vent line, ref WO# 29009888. No leakage was observed during this test.
4-ICW-19111-L-01 Test Date:04/17/00
This test performed due to replacement of valve 4-50-326, Ref WO# 30007432. No leakage was observed during this test.
04-ICW-19104-L-01 Test date: 09/11/00
This test due to replacement of 4C Intake Cooling Water pump, Expansion joint, and 450-331 Check valve under WO# 98014334,98014332, and 30011986. No leakage was observed during this leakage test.
EMERGENCY DIESEL GENERATOR SYSTEM 22
04-EDG-2203-F-02 Test Date: 10/07/00 This test was performed to meet ASME Section XI 1989 Edition periodic pressure Test requirements. No leakage was observed during this functional test.
04-EDG-2205-F-02 Test Date:09/22/00 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure Test requirements. Leakage was identified @ 90 Deg elbow thru wall, ref CR# 00-1650
04-EDG-2206-F-02 Test Date: 10/07/00 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure Test requirements. No leakage was noted during this test.
04-EDG-2207-F-02 Test Date: 10/11/00 This test was performed to meet ASME Section XI 1989 Edition periodic pressure Test requirements. No leakage was observed during this functional test.
04-EDG-2209-F-02 Test Date: 09/22/00 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure Test requirements. No leakage was noted during this test.
04-EDG-2252-L-01 Test Date: 11/17/00 This pressure being performed due to piping replacement of air start system, on Diesel 4B ref WO# 30019143. No leakage was observed during this test.
04-EDG-2253-L-01 Test Date: 10/22/00 This pressure being performed due to piping replacement of air start system, on Diesel 4A ref WO# 30019132. No leakage was observed during this test.
COMPONENT COOLING WATER SYSTEM 30
04-CCW-30205-I-02 Test Date: 09/22/00 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure Test requirements. No leakage was noted during this test.
04-CCW-30206-I-02 Test Date: 09/22/00 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure Test requirements. No leakage was noted during this test.
04-CCW-30210-I-02 Test Date: 09/22/00 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure Test requirements. No leakage was noted during this test.
04-CCW-30212-I 02 Test Date: 09/22/00 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure Test requirements. No leakage was noted during this test.
04-CCW-30324-L-01 Test Date: 10/18/00 This test was performed due to the replacement of RV-4-1431 for the CCW CRDM cooler per WO# 30017904. No leakage was observed during this test.
COMPONENT COOLING WATER SYSTEM 30 (CONTINUED)
04-CCW-30220-I-02 Test Date: 09/22/00 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure Test requirements. No leakage was noted during this test.
04-CCW-30224-I-02 Test Date: 09/22/00 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure Test requirements. No leakage was noted during this test.
04-CCW-30225-I-02 Test Date: 09/22/00 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure Test requirements. No leakage was noted during this test.
SPENT FUEL POOL COOLING SYSTEM 33
04-CCW-30225-I-02 Test Date: 09/22/00 This test was performed to meet the 1989 Edition of ASME Section XI periodic pressure Test requirements. No leakage was noted during this test.
REACTOR COOLANT SYSTEM 41
04-RCS-4111-L-03 Test Date 10/21/00
This test involved the leakage test of the Reactor Coolant System piping inside containment following the Unit 4 Cycle 19 Refueling Outage. This leakage test addressed the following replacements.
Component
RV-4-551A RV-4-551B RV-4-551C RV-4-203 4-873A
WO#
30006910 30006911 30006912 98009247 29016612
Replaced
Remove, install spare Remove, install spare Remove, install spare Remove, install spare Remove, install new valve
No leakage was observed during this test.
CHEMICAL AND VOLUME CONTROL CHARGING AND LETDOWN SYSTEM 47
04-CVCS-4754-I-02 Test date: 09/18/00 This Inservice test was performed to meet the ASME Section XI 1989 Edition periodic Pressure test requirements. No through wall leakage was observed.
04-CVCS-4755-I-02 Test date: 09/18/00 This Inservice test was performed to meet the ASME Section XI 1989 Edition periodic Pressure test requirements. No through wall leakage was observed.
04-CVCS-4756-L-02 Test date: 09/18/00 This Inservice test was performed to meet the ASME Section XI 1989 Edition periodic Pressure test requirements. No through wall leakage was observed.
04-CVCS-4760-I-02 Test date: 09/18/00 This Inservice test was performed to meet the ASME Section XI 1989 Edition periodic Pressure test requirements. No through wall leakage was observed.
04-CVCS-4769-L-01 Test Date: 10/21/00 This test due to welding of the pressure boundary seal weld on valve 4-293A under WO# 30008363. No leakage was observed during this test.
04-CVCS-4770-L-01 Test Date: 10/21/00 This test due to welding of the pressure boundary seal weld on valve 4-293B under WO# 30012451. No leakage was observed during this test.
04-CVCS-4771-L-01 Test Date: 10/21/00 This test due to the replacement of valve 4-333 under WO# 29008421. No leakage was observed during this test.
04-CVCS-4772-L-01 Test Date: 10/10/00 This test due to the replacement of valve 4-353A under WO# 29013107. No leakage was observed during this test.
04-CVCS-4773-L-01 Test Date: 10/21/00 This test due to the replacement of valve 4-1316 under WO# 30015586. No leakage was observed during this test.
RESIDUAL HEAT REMOVAL SYSTEM 50
04-RHR-5029-02 Test Date: 07/11/00
This Functional pressure test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements.
04-RHR-5030-02 Test Date: 10/10/00
This Functional pressure test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements. No leakage was observed during this functional test.
SAFETY INJECTION SYSTEM 62
04-SIS-6232-F-02 Test Date: 07/07/00
This test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements. No leakage was observed during this functional test.
04-SIS-6233-F-02 Test Date: 07/07/00
This test was performed to meet ASME Section XI 1989 Edition periodic pressure Test requirements. No leakage was observed during this functional test.
04-SIS-6237-L-01 : Test Date: 10/04/00 This test due to replacement of valve 4-873A under WO# 29010612. No leakage was observed during this test.
CONTAINMENT SPRAY SYSTEM (68)
04-CSS-6814-F-02: Test Date: 10/19/00
This Functional test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements. No through wall leakage was observed.
MAIN STEAM SYSTEM 72
04-MS-7204-I-02: Test Date: 09/16/00
This Inservice test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements. No leakage observed during this test.
04-MS-7205-I-02: Test Date:09/16/00 This Inservice test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements. No leakage observed during this test.
04-MS-7206-I-02: Test Date: 09/16/00 This Inservice test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements. No leakage observed during this test.
FEEDWATER SYSTEM 74
04-FW-7425-I-02: Test Date: 09/16/00 This Inservice test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements. No leakage observed during this test.
04-FW-7426-I-02: Test Date: 09/16/00 This Inservice test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements. No leakage observed during this test.
04-FW-7427-I-02: Test Date: 09/16/00 This Inservice test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements. No leakage observed during this test.
04-FW-7431-I-02: Test Date: 09/16/00 This Inservice test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements. No leakage observed during this test.
04-FW-7432-I-02: Test Date: 09/16/00 This Inservice test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements. No leakage observed during this test.
04-FW-7433-I-02: Test Date: 09/16/00 This Inservice test was performed to meet ASMIE Section XI 1989 Edition periodic pressure test requirements. No leakage observed during this test.
AUX FEEDWATER SYSTEM 75
04-AFW-7551-F-02: Test Date: 09/16/00 This Funtional test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements. No leakage observed during this test.
04-AFW-7552-F-02: Test Date: 09/23/00 This Funtional test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements. No leakage observed during this test.
04-AFW-7553-F-02: Test Date: 09/23/00 This Funtional test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements. No leakage observed during this test.
04-AFW-7554-F-02: Test Date: 09/23/00 This Funtional test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements. No leakage observed during this test.
04-AFW-7555-F-02: Test Date: 09/23/00 This Funtional test was performed to meet ASME Section XI 1989 Edition periodic pressure test requirements. No leakage observed during this test.
04-AFW-7556-F-02 Test Date: 09/23/00 This test was performed to meet ASME Section XI 1989 Edition periodic pressure Test requirements. No leakage was observed during this functional test.