Inspection and Test Plan for Switchgear
No. Inspection and Test Plan Reference Document Acceptance Criteria
Pre Inspection Meeting‐ Spec. Spec.
Before Manufacturing
CalculationDWG, Design, Document IEC,ISO NEC, ANSI, NEMA, CI, IPCEA FDF, IEC,ISO NEC, ANSI, NEMA, CI, IPCEA FDF,
SwitchgearProcedure Resistance Test IEC,ISO NEC, ANSI, NEMA, CI, IPCEA FDF, IEC,ISO NEC, ANSI, NEMA, CI, IPCEA FDF,
VoltageSwitchgearTest) Test Procedure Withstand (Dielectric IEC,ISO NEC, ANSI, NEMA, CI, IPCEA FDF, IEC,ISO NEC, ANSI, NEMA, CI, IPCEA FDF,
SwitchgearProcedure Sequence Test IEC,ISO NEC, ANSI, NEMA, CI, IPCEA FDF, IEC,ISO NEC, ANSI, NEMA, CI, IPCEA FDF,
SwitchgearTest of ProcedureProtection Characteristics Relays IEC,ISO NEC, ANSI, NEMA, CI, IPCEA FDF, IEC,ISO NEC, ANSI, NEMA, CI, IPCEA FDF,
OperationSwitchgear Test Mechanical Procedure IEC,ISO NEC, ANSI, NEMA, CI, IPCEA FDF, IEC,ISO NEC, ANSI, NEMA, CI, IPCEA FDF,
Materials
www.inspection for industry.com‐ ‐
Inspection and Test Plan for SwitchgearActivity By Remark
Verifying Document
Manuf. TPI Client ‐
MOM H H H ‐
CalculationDWG, book H R A ‐
Procedure H R A
Procedure H R A
Procedure H R A
Procedure H R A
Procedure H R A
8
9
10
11
12
13
14
2
www.inspection for industry.com‐ ‐
Raw Material Inspection ASTM ASTM
Review of Certificates ASTM ASTM
Material Identification ASTM ASTM
During Fabrication
Fabrication Inspection DWG/Spec DWG/Spec
Outline Dimensions,
Interface Dimensions,
Busbar Dimensions and DWG/Spec DWG/Spec
Clearances and other
Specified Dimensions
Inspections
Tightness / Torque DWG/Spec DWG/Spec
Inspection of Terminals
Control for Degree of DWG/Spec DWG/Spec
Protection
www.inspection for industry.com‐ ‐
OriginalCertificates Material H H ‐ ‐
Certificates H H ‐ ‐
Report H H ‐
Report H SW ‐
DWG/Spec H W ‐
Report H SW ‐
Report H H ‐
15
16
17
18
19
20
21
3
Inspection to Confirm that www.inspection for industry.com‐ ‐
Instruments,
Compartments, Control
Switches, protective DWG/Spec DWG/Spec
relays, fuses and etc. are
Correctly Rated and are
Correctly Located, with
Specified Labeling.
Inspection to Confirm
Earthling Arrangements DWG/Spec DWG/Spec
for Continuity in Circuit
Checking to Confirm
Wiring Correct Grade and DWG/Spec DWG/Spec
Size, Wiring Tightness in
Terminations.
Checking for Incoming and
Outgoing Cable Boxes and DWG/Spec DWG/Spec
Glands.
Checking all Circuit
Breakers for Fit up and DWG/Spec DWG/Spec
Fitting Ease of Operation
Range and Setting of
Meters and Relays, Correct DWG/Spec DWG/Spec
Fitting of Doors, Circuit
Labels and Dimensions to
Checking Complete Boards
for Finish, Lines Out of DWG/Spec DWG/Spec
Units
www.inspection for industry.com‐ ‐
DWG/Spec H H ‐
Report H SW ‐
Report H SW ‐
Report H SW ‐
Report H SW ‐
Report H SW ‐
Report H SW ‐
22
23
24
25
26
27
28
29
30
31
32
33
4
www.inspection for industry.com‐ ‐Checking all Shutters and DWG/Spec DWG/Spec
Interlock Operation
Welding Inspection on WPS WPS
Welded Component
Switchgear Resistance Test Procedure Procedure
Switchgear Withstand
Voltage Test (Dielectric Procedure Procedure
Test)
Switchgear Sequence Test Procedure Procedure
Switchgear Characteristics Procedure Procedure
Test of Protection Relays
Switchgear Mechanical Procedure Procedure
Operation Test
Final Inspection
Final Visual & DWG DWG
Dimensional Check
Check of Final Book Spec. Spec.
Documentation
Inspection Reports Spec./DWG Spec./DWG
NCR Spec./DWG Spec./DWG
Review Final Data Report Spec./DWG Spec./DWG
Pre Shipment Inspection‐
Report H SW ‐
Report H SW ‐
Report H H ‐
Report H H ‐
Report H H ‐
Report H H ‐
Report H H ‐
Report H H ‐ ‐
DWG/ P.O H R ‐
Report H R ‐ ‐
Report H R ‐ ‐
Report H R ‐ ‐
34
35
36
37
5
www.inspection for industry.com‐ ‐Preservation and Packing Spec. Spec.
Marking Spec. Spec.
Loading Inspection Spec. Spec.
ShippingControl Document Procedure Spec.
Abbreviations:
H: Hold Point = Hold on the production till TPI Inspector performs inspection and supervise the required test
W: Witness Point = Manufacture shall notify client and TPI Inspector but there is no hold on the production;
Client can waive this inspection based on his discretion and informs TPI Inspector accordingly.
R: Document Review = Review means Review document, which includes of material test certificates, WPS, PQR, NDT Procedures and etc.
A: Approval
SW: Spot Witness = for items with spot witness manufacture shall notify TPI inspector as fulfilling the monitoring;
For example one random visit for whole UT tests or one or two visits for whole surface preparation works for painting.
MOM: Minute of Meeting
P.O: Purchase Order
for more information review following articles:
http://www.inspection for industry.com/third party inspection for switchgear.html‐ ‐ ‐ ‐ ‐ ‐
http://www.inspection for industry.com/inspection and test plan for switchgear.html‐ ‐ ‐ ‐ ‐ ‐ ‐
www.inspection for industry.com‐ ‐Report H H ‐ ‐
Report H H ‐ ‐
Report H H ‐ ‐
Packing List H H ‐ ‐
H: Hold Point = Hold on the production till TPI Inspector performs inspection and supervise the required test
W: Witness Point = Manufacture shall notify client and TPI Inspector but there is no hold on the production;
R: Document Review = Review means Review document, which includes of material test certificates, WPS, PQR, NDT Procedures and etc.
SW: Spot Witness = for items with spot witness manufacture shall notify TPI inspector as fulfilling the monitoring;
For example one random visit for whole UT tests or one or two visits for whole surface preparation works for painting.
http://www.inspection for industry.com/third party inspection for switchgear.html‐ ‐ ‐ ‐ ‐ ‐
http://www.inspection for industry.com/inspection and test plan for switchgear.html‐ ‐ ‐ ‐ ‐ ‐ ‐
Thank you for evaluating Wondershare PDF to Excel.
You can only convert 5 pages with the trial version.
To get all the pages converted, you need to purchase the software from:
https://www.regnow.com/checkout/cart/add/8799-279?affiliate=214927&ss_short_order=true