INSTALLATION AND MAINTENANCE INSTRUCTIONS MOS GB 1435-4 ELK 42 231253 ELK 42 LEK

INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit

INSTALLATION ANDMAINTENANCE INSTRUCTIONSMOS GB 1435-4ELK 42231253 ELK 42

LEK

Page 2: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit
Page 3: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit

For Home Owners

General

System description3Principle of operation3Components3System diagram

Maintenance routines4General4Operation4Venting4Safety valve4Actions in the event of freeze risk

Dealing with malfunctions5Low room temperature

For the Installer

General information for the installer6General

6Assembly

Pipe installation7Circulation pump7Pressure drop diagram ELK 42

Electrical installation8Power supply

Service9Draining

Miscellaneous

Electrical circuit diagram10ELK 42

Technical specifications11Dimensions12Component positions12List of components13Technical specifications

1ELK 42

Table of Contents

Page 4: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit

GeneralIn order to get the greatest benefit fromelectric heater ELK 42 you should read through the "For the Property owner"section in this Installation and Maintenance Instruction..

ELK 42 is an electric heater that is intended for installation together with a heat pump for heating detached housesand small apartment buildings.

ELK 42 is a Swedish-made quality product offering long life and reliable operation.

The serial number* (95)must always be stated in all correspondence with NIBE.

069_ _ _ _ _ _ _ _ _ _ _

Installation date

Plumber

Electrician

Installed power on the immersion heater

Insert any notes here.

Datum__________________________ Sign___________________________

*The serial number can be found at the bottom corner on the inside of the electric heater.

This appliance canbeusedby childrenaged from8years andaboveandpersonswith reducedphysical, sensory ormental capabilities or lack of experience and knowledge if they havebeengiven supervision or instruction concerninguse of the appliance in a safeway andunderstandthehazards involved. Children shall notplaywith theappliance. Cleaningandusermaintenanceshall not be made by children without supervision.

Rights to make any design or technical modifications are reserved.

©NIBE 2014.

ELK 422

For Home Owners

General

Page 5: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit

System description

Principle of operationNIBE ELK 42 is an electric heater that is primarily intendedfor installation together with a heat pump for heatingbuildings.

ELK 42 contains overheat protection and contactors forexternal control of the three power groups, 6, 12 and24 kW.

The electric heater is in principle an immersion heatermounted in awater container or an electric boilerwithouta water heater.

The stainless steel electric coils and electric boiler tube aremade of stainless steel (SIS 2333) which gives a very goodservice life.

Economical

A small water volume and a well insulated cassette meansmall heat losses.

ComponentsvalveAV

Non-return valveBV

Circulation pumpCP

Expansion vesselEXP

Flow line sensorFG

Return line sensorRG

Control valveRV

Safety valveSÄV

NOTE! This is an outline sketch. Actual installations mustbe planned according to applicable standards.

To connect the d erent heat pumps, please refer to therelevant outline diagram.

System diagramAdditional heat from ELK 42 is controlled by the heat pump.

LEK

BV

RV

AV

AV

SÄV

EXP

CP FG

RG

ELK 42

3ELK 42

For Home Owners

System description

Page 6: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit

Maintenance routinesGeneralAfter installation, check with the installer that the unit isin perfect condition. Request that the installer shows youthe controls and functions so that you are fully aware ofhow the installation should work and be maintained.

OperationElectrical output is controlled externally by the heat pump.This means that the electrical output is connected anddisconnected by the additional heater.

VentingRegularly check that there is water in the system. Air canremain in the system after installation and the radiatorsand boiler should be bled again. After bleeding, the pres-sure must be checked and water topped up if necessary.

Safety valveThe heating system's safety valve must be completelysealed and not release any water. The safety valve mustbe checked regularly, about 4 times a year. Perform checksas follows:1. Open the valve.2. Check that water flows through the valve.3. Close the valve.

Reset the pressure by filling with water.

Actions in the event of freeze riskIn the event of extreme cold, nopart of the heating systemmust be switched off, there is a risk of frost damage.

If a part of the heating system is thought to be frozen,contact the installer.

If the heating system will not be used for an extendedperiod of time, the water should be drained and stepstaken to ensure that the immersion heater cannot bestarted.

ELK 424

For Home Owners

Maintenance routines

Page 7: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit

Dealing with malfunctionsIn the event of a malfunction or disruption to normal operation, first check the points below:

Low room temperatureCircuit or main MCB tripped.Possible earth circuit-breaker tripped.Overheat protection 6 has deployed. If the overheatprotection has deployed, the function of the system'scirculationpumpsandvalvesmust be checked. Resettingoccurs by pressing the button on the overheat protec-tion, when the temperature has fallen below 80 °C.Circulation pump stopped.Thermostat on immersion heater (1) set too low.Air in boiler or system.The pressure is to low in the expansion vessel.The loadmonitor or someexternal control unitmayhaveblocked the power output.

NOTEWork behind panels secured by screws may only be

carried out by a qualified installation engineer.

5ELK 42

For the Installer

Dealing with malfunctions

Page 8: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit

General information for the installer

GeneralThe area of use for ELK 42 is in combination with NIBEground source and air/water heat pumps. When theheating demand is greater than the heat pump's capacity,the immersion heater connects automatically for supple-mentary heating. The electrical equipment is adapted tothe heat pump's function.

ELK 42 contains overheat protection and three contactorsto control the three power steps 6, 12 and 24 kW respect-ively. For best function thepower shouldbinary controlled,that is to say 6, 12, 18, 24, 30, 36 and 42 kW.

The products that do not have an internal immersionheater canuse the emergencymode relay for this function.Ensure that the heating medium circulates through theelectric heater.

Assembly

LE

K

NOTEThe thermostat (35) must be adjusted so that thesystem's highest permitted temperature is not ex-ceeded. The adjustment must not be so great that it

limits the power.

The electric heater must be installed upright (see imageabove).

Free space of 500mm is required in front of the heater forservice. If this is not possible, detachable connectionsmustbe used.

ELK 426

For the Installer

General information for the installer

Page 9: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit

Pipe installationThe pipe installation must be carried out in accordancewith applicable standards.

Circulation pumpA circulation pump must be used to ensure the overthe immersion heater. If the heating system valves canclose the circulation completely, the bypass valvemust beinstalled so that the through the electric heater doesnot stop. In closed installations an approved safety valveand pressure expansion vessel must be used.

NOTEThe pipe work must be before the electricheater is so that any contaminants not

the component parts.

Pressure drop diagram ELK 42

0000100080003000200010 4000 5000 6000 7000 9000l/h

kPa9

8

7

6

5

4

0

1

2

3

Flow

7ELK 42

For the Installer

Pipe installation

Page 10: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit

Electrical installationELK 42must be installed via a circuit breakerwith aminim-um breaking gap of 3 mm.

NOTEElectrical installation and service must be carried outunder the supervision of a qualified electrician. Elec-trical installation and wiring must be carried out in

accordance with the stipulations in force.

NOTEReset the overheat protection, it may have tripped

during transport.

Power supplyThe cable for power supply must be selected for the de-sired power and connected to terminal block 9.

NOTEIn the event of any servicing all electrical suppliesmust be checked and disconnected. The immersionheater can be suppliedwith voltage from connected

heat pump.

ELK 428

For the Installer

Electrical installation

Page 11: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit

Service

DrainingThe system is most easily drained by installing a drainagevalve at the lowest point on the pipe installation. Drainingthrough such a valve leaves a small amount of water inthe electric heater, which must therefore be drainedthrough the drain connection (71).

NOTESwitch off the electric heater before emptying.

9ELK 42

Miscellaneous

Service

Page 12: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit

Electrical circuit diagram

ELK 42

ELK 4210

Miscellaneous

Electrical circuit diagram

Page 13: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit

Technical specifications

Dimensions

710 35

021

0

85

350

7510

0

405

11ELK 42

Miscellaneous

Technical specifications

Page 14: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit

Component positions

LEK

35

6

10

7

11

12

9

81

1

6

71

78

70

13

14

List of components

Immersion heater (-R1)1

Overheat protection (-B1)6

Miniature circuit-breaker7

Terminal block (-X9)9

Contactor (-K1)10

Contactor (-K2)11

Contactor (-K3)12

Contactor (-K4)13

Contactor (-K5)14

Emergency mode thermostat (-B2)35

Connection, supply line, G 4070

Connection, return line, G 4071

Cable grommet78

Venting81

Serial number plate95

ELK 4212

Miscellaneous

Technical specifications

Page 15: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit

Technical specifications

IP 44

560mmHeight

240mmWidth

135mmDepth

30kgWeight

10.0litreVolume

400 V 3AC 50HzSupply voltage

42kWOutput immersion heater

63ARecommended fuse ratingimmersion heater

IP 44Enclosure class

0.7/7MPa/barMaxpermittedpressure in theboiler

1800l/hMin flow

5400l/hMax flow

SIS 2333 EN 1.4301Material immersion heater

SIS 2333 EN 1.4301Material tube

067 075Part No.

13ELK 42

Miscellaneous

Technical specifications

Page 16: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit
Page 17: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit
Page 18: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit
Page 19: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit
Page 20: INSTALLATION AND MAINTENANCE …Dealing with malfunctions In the event of a malfunction or disruption to normal operation, first check the points below: Low room temperature Circuit

231253

PL

NL

FI

DK

DE

CZ

NIBE Energy Systems OY, Juurakkotie 3, 01510 Vantaa

3C Broom Business Park, Bridge Way, Chesterfield S41 9QG

Puh: 09-274 697 0 Fax: 09-274 697 40 E-mail: [email protected] www.nibe.fi

FRAIT France, 10 rue des Moines, 67500 HaguenauTel : 03 88 06 24 10 Fax : 03 88 06 90 15 E-mail: [email protected] www.nibe.fr

NIBE-BIAWAR Sp. z o. o. Aleja Jana Pawła II 57, 15-703 BIAŁYSTOKTel: 085 662 84 90 Fax: 085 662 84 14 E-mail: [email protected] www.biawar.com.pl

RU © "EVAN" 17, per. Boynovskiy, Nizhny NovgorodTel./fax +7 831 419 57 06 E-mail: [email protected] www.nibe-evan.ru

NIBE Energietechniek B.V., Postbus 634, NL 4900 AP OosterhoutTel: 0168 477722 Fax: 0168 476998 E-mail: [email protected] www.nibenl.nl

Vølund Varmeteknik A/S, Member of the Nibe Group, Brogårdsvej 7, 6920 VidebækTel: 97 17 20 33 Fax: 97 17 29 33 E-mail: [email protected] www.volundvt.dk

NIBE Systemtechnik GmbH, Am Reiherpfahl 3, 29223 CelleTel: 05141/7546-0 Fax: 05141/7546-99 E-mail: [email protected] www.nibe.de

CHNIBE Wärmetechnik AG, Winterthurerstrasse 710, CH-8247 FlurlingenTel: (52) 647 00 30 Fax: (52) 647 00 31 E-mail: [email protected] www.nibe.ch

ATKNV Energietechnik GmbH, Gahberggasse 11, 4861 SchörflingTel: +43 (0)7662 8963-0 Fax: +43 (0)7662 8963-44 E-mail: [email protected] www.knv.at

NIBE AB Sweden, Box 14, Hannabadsvägen 5, SE-285 21 MarkarydTel: +46-(0)433-73 000 Fax: +46-(0)433-73 190 E-mail: [email protected] www.nibe.eu

GBNIBE Energy Systems Ltd,Tel: 0845 095 1200 Fax: 0845 095 1201 E-mail: [email protected] www.nibe.co.uk

NOABK AS , Brobekkveien 80, 0582 Oslo, Postadresse: Postboks 64 Vollebekk, 0516 OsloTel. sentralbord: +47 23 17 05 20 E-mail: [email protected] www.nibeenergysystems.no

Druzstevni zavody Drazice s.r.o, Drazice 69, CZ - 294 71 Benatky nad JizerouTel: +420 326 373 801 Fax: +420 326 373 803 E-mail: [email protected] www.nibe.cz