2
I-432SC-1112 Installation Instructions for Soft-Close Base Filler with Slides Note: Do not remove front shipping strap prior to installation! Step 1. Measure scribe rail thickness and length per your specific cabinetry. (See Fig 1a and 1b) Step 2. Install upper and lower scribe rails to filler pullouts being careful not to split the wood. If using screws to attach, be sure to pre-drill first. Align scribe rails with front edge of filler pullouts. Align scribe rail to upper section of base cabinet lower mounting. (See Fig 2) Note: If installing pullout in a frameless application, it is recommended to that a 1/16” thick scribe rail be used to space the filler unit properly. Step 3. Pre-drill 3/16” holes 3/8” down from top of cabinet and also 27-3/4” down from top of cabinet. (See Fig 3) Repeat with adjacent cabinet. Step 4. Mount filler cabinet pullout to adjacent cabinet. Make sure filler is flush with the top of the cabinet wall and behind the face-frame if applicable. Fig 1a Fig 1b Cabinet Wall Scribe rail measurements Front of Cabinet Scribe Rail width dimension Front of Cabinet Scribe Rail Length Top Scribe Rail is nailed to edge of top section Bottom scribe rail is nailed to edge of bottom section Fig 2 Screw 432 to cabinet top from above adjacent cabinet. From inside and above the adjacent the 432 to cabinet bottom. Fig 3 TOOLS REQUIRED: ESTIMATED ASSEMBLY TIME: 20 MIN CARE AND MAINTENANCE: CLEAN WITH A DAMP CLOTH AND WIPE PARTS DRY 3/16” Shipping Strap Step 5. Mount filler cabinet pullout to remaining adjacent cabinet. 2409 Plantside Drive • Jeffersontown • KY • 40299 800.626.1126 • FAX: 502.491.2215 www.rev-a-shelf.com

Installation Instructions for Soft-Close Base Filler with

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Installation Instructions for Soft-Close Base Filler with

I-432SC-1112

Installation Instructions for Soft-Close Base Filler with SlidesNote: Do not remove front shipping strap prior to installation!

Step 1. Measure scribe rail thickness and length per your specific cabinetry. (See Fig 1a and 1b)

Step 2. Install upper and lower scribe rails to filler pullouts being careful not to split the wood. If using screws to attach, be sure to pre-drill first. Align scribe rails with front edge of filler pullouts. Align scribe rail to upper section of base cabinet lower mounting. (See Fig 2) Note: If installing pullout in a frameless application, it is recommended to that a 1/16” thick scribe rail be used to space the filler unit properly.

Step 3. Pre-drill 3/16” holes 3/8” down from top of cabinet and also 27-3/4” down from top of cabinet. (See Fig 3) Repeat with adjacent cabinet.

Step 4. Mount filler cabinet pullout to adjacent cabinet. Make sure filler is flush with the top of the cabinet wall and behind the face-frame if applicable.

Fig 1aFig 1b

Cabinet Wall

Scribe rail measurements

Front of CabinetScribe Rail

width dimensionFront of Cabinet

Scribe Rail Length

Top Scribe Rail is nailed to edge of top section

Bottom scribe rail is nailed to edge of bottom section

Fig 2

“Changing the way you think about cabinet organization!”“Cambiamos su percepción sobre la organización de armarios”

“Nous changeons votre conception de l’aménagement des armoires”

www.rev-a-shelf.com1-800-626-1126

432 Series Filler Pullout Instructions

Instrucciones del armario de relleno deslizante – Serie 432

Directives de montage du module coulissant série 432

I-432-TRI-1012

Fig 1

Step 1. Measure scribe rail thickness and length per your See Fig 1

Fig 2

Step 2. Install upper and lower scribe rails

or brads. See Fig 2. Note: Align scribe rails

scribe rail to upper section of base cabinet lower mounting strap or lower section of wall cabinet lower mounting strap. See Figs. 3a-b.

Top Scribe Rail is nailed to bottom edge of top section

Fig 3aWall Cabinet

Bottom Scribe Rail is nailed to edge of bottom section

Top Scribe Rail is nailed to edge of

top section

Fig 3bBase Cabinet

Bottom Scribe Rail is nailed to edge of bottom section

Fig 4a Fig 4b

Step 3. (Base Cabinets). Pre-drill 3/16 inch holes 3/8 inch down from top of cabinet and also 27-3/4” down from top of cabinet. (See Fig 4a-d). Repeat with other adjacent cabinet.

Fig 5a Fig 5b

Step 4. See Fig. 5a-b

Fig 6

Step 5. to adjacent cabinet 2. See Fig. 6

Fig 8 Fig 9

Step 7. Attach face frame and onlays (not provided) See Fig. 8-9Fig 7

Step 6. Remove front mounting strap. See Fig 7.

Filler CabinetBase Cabinet Scribe Rail Meets Face Frame

From inside the adjacent cabinet screw the 432 to cabinet top.

Fig 4c Wall Cabinet

Screw 432 to cabinet bottom from below adjacent cabinet.

Screw 432 to cabinet top from above adjacent cabinet.

Fig 4d Base Cabinet

From inside and above the adjacent

the 432 to cabinet bottom.

Filler CabinetBase Cabinet Scribe Rail Meets Face Frame

p

Fig 3

TOOLS REQUIRED: ESTIMATED ASSEMBLY TIME:

20 MIN

CARE AND MAINTENANCE:

CLEAN WITH A DAMP CLOTH AND WIPE PARTS DRY

3/16”

Shipping Strap

Step 5. Mount filler cabinet pullout to remaining adjacent cabinet.

2409 Plantside Drive • Jeffersontown • KY • 40299800.626.1126 • FAX: 502.491.2215

www.rev-a-shelf.com

Page 2: Installation Instructions for Soft-Close Base Filler with

Note: Your pullout unit does not need to be removed for installation. If you encounter an issue that requires the unit to be removed, the release levers for the Blum Tandem slides are located as shown. (See Fig 6a-b).

Step 6. Remove front shipping strap. (See Fig 4) Step 7. Attach onlays or door panels. (not provided). (See Fig 5)

Fig 4

Shipping Strap

Fig 5

Back of pullout

Fig 6a

Fig 6b

Top slide release lever

Install onlay using slots for side to side adjustment

Use micro adjustment screw for door tilt adjustment

Bottom slide release lever

Front slide height adjustment

1

2

Step 1. Press up on adjustment tab.Step 2. Push toward back of unit. Maximum 1/8” rise of filler. (See Fig 7a-c)

Fig 7a Fig 7b

Fig 7c

Adjustable Tab

1

2

1

2

Adjustable Tab

Disassembling the pullout from the chassis