12
Ground Fixed Freechimes Alto/ Soprano Page 1 of 4 Components: 1. Carefully lay 2 x legs on a level surface and check distance between legs is equal . Line up pre drilled holes in the backboards with the holes in legs and ensure the instrument is aligned square with the legs. Fix in place using M8x40mm screws supplied (see installation guide) 3.Excavate 2 holes on site of installation minimum 500mm deep ( adjust depth according to age range for intended players) 4. Carefully raise the instrument from the ground with legs attached and locate (lower) legs into holes making sure they are vertical and level prior to concreting in place. (See Ground Fix Sheet) Installation Instructions 5. Once happy with location and levels, fill holes using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines 6. Beaters can be fixed to Steel posts with fixings provided KS1,2, KS1 – 900mm KS2 – 1100mm Ground Surface Pair Small Beaters X1 16 Kg BS EN 1176 1.5m Weight of heaviest part 8.35kg (Freechimes) 1.5m 500mm Install Instrument with 1.5m free space (from widest point) around it. M6x20mm Secure Screw X4 Eye Straps X2 M8x40mm Secure Screw X4 M10x200 Threaded Bar x4 M10 Nut x8 Ground Fix Components: Metric Conversion: 500mm/ 1 ft 7 11 / 16 900mm/ 2 ft 11 7 / 16 1100mm/ 3 ft 7 5 / 16 1.5m/ 59” 2. Attach Ground Fixings to base of legs (See Ground Fix Post Installation Sheet) Spares available from percussionplay.com or from your local distributor

Installation Instructions... · Ground Fixed Duo Page 1 of 3 KS2 - 400mm Ground Surface KS1,2 KS1 - 550mm KS1 –700mm KS2 –850mm Installation Instructions (1.1) (1.2) (1.3) Instrument

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Installation Instructions... · Ground Fixed Duo Page 1 of 3 KS2 - 400mm Ground Surface KS1,2 KS1 - 550mm KS1 –700mm KS2 –850mm Installation Instructions (1.1) (1.2) (1.3) Instrument

Ground FixedFreechimes

Alto/ SopranoPage 1 of 4

Components:

1. Carefully lay 2 x legs on a level surface and check distance between legs is equal. Line up pre drilled holes in the backboards with the holes in legs and ensure the instrument is aligned square with the legs. Fix in place using M8x40mm screws supplied (see installation guide)

3.Excavate 2 holes on site of installation minimum 500mmdeep ( adjust depth according to age range for intended players)

4. Carefully raise the instrumentfrom the ground with legs attached and locate (lower) legs into holes making sure they are vertical and level prior to concreting in place. (See Ground Fix Sheet)

Installation Instructions

5. Once happy with location and levels, fill holes using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines

6. Beaters can be fixed to Steel posts with fixings provided

KS1,2,

KS1 – 900mmKS2 – 1100mm

Ground Surface

Pair Small Beaters X1

16 Kg

BS EN 1176

1.5m

Weight of heaviest part 8.35kg (Freechimes)

1.5m

500mm

Install Instrument with 1.5m free space (from widest point)

around it.

M6x20mmSecure Screw

X4

Eye StrapsX2

M8x40mmSecure Screw

X4

M10x200 Threaded Bar

x4

M10 Nut

x8 Ground Fix Components:

Metric Conversion:500mm/ 1 ft 7 11/16”900mm/ 2 ft 11 7/16”1100mm/ 3 ft 7 5/16”1.5m/ 59”

2. Attach Ground Fixings to base of legs (See Ground Fix Post Installation Sheet)

Spares available from percussionplay.com or from your

local distributor

Page 2: Installation Instructions... · Ground Fixed Duo Page 1 of 3 KS2 - 400mm Ground Surface KS1,2 KS1 - 550mm KS1 –700mm KS2 –850mm Installation Instructions (1.1) (1.2) (1.3) Instrument

COMPONENTS LIST:

Saddle Strap X2

M8 Lock washer X4

M8x40 Pin torx X4

M10 Nut X8

M10x200 Threaded Bar X4

M6x20 Pin torx X4

Ground Fixed

Assembly Guide PPFREC

16 Kg

BS EN 1176

FreechimesAlto/ Soprano

Page 2 of 4

Pair Small Beaters X1

TX 30 Driver Bit

x1 TX 40 Driver Bit

x1

Tools:

Components:

M6x20mmSecure Screw

X4

Eye StrapsX2

M8x40mmSecure Screw

X4

Ground Fix Components:

Thread Lock Solution

Required (Not Supplied)

Thread Lock Solution

Required (Not Supplied)

M10x200 Threaded Bar

x4

M10 Nut

x8 Spares available from

percussionplay.com or from your local distributor

Page 3: Installation Instructions... · Ground Fixed Duo Page 1 of 3 KS2 - 400mm Ground Surface KS1,2 KS1 - 550mm KS1 –700mm KS2 –850mm Installation Instructions (1.1) (1.2) (1.3) Instrument

Ground Fixed

Ground Fix Post Installation

(1.1)

1 2 3

56

500mm min depth

7

4

M10x200 Threaded Bar

x4

M10 BZP Nut

x8

Components:Ground fix tube protrudes 300mm from ground surface that inserts into the base of the chime post

BS EN 1176

Thread Lock Solution

Required (Not Supplied)

Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of BS EN 1176.

Metric Conversion:50mm/ 2”100mm/ 4”250mm/ 10”350mm/ 14”500mm/ 1 ft 7 11/16”550mm/ 1 ft 9 21/32

FreechimesAlto/ Soprano

Page 3 of 4

Insert M10x 150 Threaded

bar into pre drilled holes

in Ground Fixing Post

Fix M10x 150 Threaded

bar in place using M10

Nuts

Excavate 7 holes with a

250mm diameter tapering

down to 350mm diameter

and 650mm depth

Compact base of hole with

50mm of aggregate.

Lower ground Fix post

attached to instrument

into hole (check

instrument straight and

level before filling with

concrete)

Fix hole with fast drying

concrete to manufacturers

specifications.

650

50

350

250

Aggregate

Concrete

55 0

Page 4: Installation Instructions... · Ground Fixed Duo Page 1 of 3 KS2 - 400mm Ground Surface KS1,2 KS1 - 550mm KS1 –700mm KS2 –850mm Installation Instructions (1.1) (1.2) (1.3) Instrument

Excavate 2 holes with a 250mm diameter

tapering down to 350mm diameter and

minium 650mm depth

Compact base of hole with 50mm of

aggregate. Lower ground Fix posts

attached to instrument into hole (check

instrument straight and level, and at

correct height before filling with

concrete)

Carefully lay 2 x legs on a level surface.

Line up pre drilled holes in the

backboards with the legs and ensure the

instrument is aligned square with the

legs. Fix in place using 8x70mm screws

supplied

Fill holes with fast drying concrete to

manufacturers specifications. If posts

protrude above instrument they can be

cut down

650

350

250

50

600

Ground Fix Installation

(1.1)

1

2 3 4

Ground Fixed

BS EN 1176

FreechimesAlto/ Soprano

Page 4 of 4

Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of BS EN 1176.

Minimum installation depth required 650mm, to set height of instrument bury deeper until optimum playing height is achieved.

Metric Conversion:50mm/ 2”250mm/ 10”350mm/ 14”500mm/ 1 ft 7 11/16”472mm/ 1 ft 6 37/64

“709mm/ 2 ft 3 29/32

55 0 50 0

Page 5: Installation Instructions... · Ground Fixed Duo Page 1 of 3 KS2 - 400mm Ground Surface KS1,2 KS1 - 550mm KS1 –700mm KS2 –850mm Installation Instructions (1.1) (1.2) (1.3) Instrument

Ground FixedDuo

Page 1 of 3

KS2 - 400mm

Ground Surface

KS1,2

KS1 - 550mm

KS1 – 700mmKS2 – 850mm

Installation Instructions

(1.1)(1.2)

(1.3)

Instrument Components:

M8 Nyloc Nut

x8

M6x20 Security Screw

x4

M6 Saddle Strap

x2

2 Part Cover

Cap

x8

M10x200 Bolt

x4

M10 Nut

x8

6. Attach the 1 pair of beater to the saddle strap on the leg. (1.3)

Ground Fix Components:

28 Kg

2. Attach Ground Fixing posts to legs(1.2) (See Ground Fix Post Installation Sheet)

1. Attach the steel legs to the base of the instrument with the M8 Nyloc Nuts and 2 part security caps. (1.1) (See Assembly Guide)

5. Once happy with location of the Instrument, fill holes using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.

3.Excavate 2 holes for the Steel legs 250mm diameter by 400-550mm deep depending on Key stage, in desired location upon decision from customer.

4. Locate (lower) legs into holes making sure they are vertical and level prior to concreting in place.

Install Instrument with 1.5m free space (from widest point)

around it.

1.5m

1.5m

Pair Small RedBeaters X2

Weight of heaviest part 14kg (Duo)

BS EN 1176

Metric Conversion:250mm/ 10”400mm/ 15 3/4”550mm/ 21 21/32”700mm/ 27 9/16”850mm/ 33 15/32”1.5m/ 59”

Spares available from percussionplay.com or from your

local distributor

Page 6: Installation Instructions... · Ground Fixed Duo Page 1 of 3 KS2 - 400mm Ground Surface KS1,2 KS1 - 550mm KS1 –700mm KS2 –850mm Installation Instructions (1.1) (1.2) (1.3) Instrument

Ground Fixed

Assembly Guide PPDUO

(1.1)

M10x200 Bolt

x4

M10 Nut

x8 Ground Fix Components:

28 KgPair Small RedBeaters X2

DuoPage 2 of 3

BS EN 1176

Thread Lock Solution

Required (Not Supplied)

Thread Lock Solution

Required (Not Supplied)

2 Part Cover Cap X8

M10 Nut X8

M10x200 Threaded Bar X4

COMPONENTS LIST:

Saddle Strap X2

M6x20 Pin torx X4

PPDUO FRONT PPDUO SIDE

M8 Nyloc nut X8

Instrument Components:

M8 Nyloc Nut

x8

M6x20 Security Screw

x4

M6 Saddle Strap

x2

2 Part Cover

Cap

x8

TX 30 Driver Bit

x1 TX 40 Driver Bit

x1

Tools:

Spares available from percussionplay.com or from your

local distributor

Page 7: Installation Instructions... · Ground Fixed Duo Page 1 of 3 KS2 - 400mm Ground Surface KS1,2 KS1 - 550mm KS1 –700mm KS2 –850mm Installation Instructions (1.1) (1.2) (1.3) Instrument

Insert M10x 150 Threaded

bar into pre drilled holes

in Ground Fixing Post

Fix M10x 200 Threaded bar

in place using M10 Nuts

Excavate 6 holes with a

250mm diameter tapering

down to 350mm diameter

and 450mm depth

Compact base of hole with

50mm of aggregate.

Lower ground Fix post

attached to instrument

into hole (check

instrument straight and

level before filling with

concrete)

Fix hole with fast drying

concrete to manufacturers

specifications.

450

50

350

250

Aggregate

Concrete

Ground Fixed

Components:

Ground Fix Post Installation

(1.1)

M10x200 Bolt

x4

M10 Nut

x8

1 2

3

Duplicate points 1-5. Duo requires 2 Ground Fix Posts 400mm min depth

DuoPage 3 of 3

BS EN 1176

4

Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of BS EN 1176.

Metric Conversion:50mm/ 2”250mm/ 10”350mm/ 14”400mm/ 16”450mm/ 18”

5

Page 8: Installation Instructions... · Ground Fixed Duo Page 1 of 3 KS2 - 400mm Ground Surface KS1,2 KS1 - 550mm KS1 –700mm KS2 –850mm Installation Instructions (1.1) (1.2) (1.3) Instrument

Ground Fixed

5. Once happy with location of the Instrument, fill hole using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.

2. Attach Ground Fixings to legs(1.2) (See Ground Fix Post Installation Sheet)

3.Excavate1 hole for the Steel leg 250mm diameter by 300mm deep, in desired location upon decision from customer.

4. Locate (lower) legs into hole making sure they are vertical and level prior to concreting in place.

1. Attach the steel leg to each of the congas with the M10x50 security screws, square washers and PU mounts. (1.1) (See Assembly Guide)

300mm

Ground Surface

S,M,L

Small – 850mmMedium – 850mmLarge- 850mm

Installation Instructions

(1.1) (1.2)Instrument Components:

M10x50 Security Screw

x4

M10x50x3 Square washer

x4

M10x200 Bolt

x2

M10 Nut

x4 Ground Fix Components:

PU 200 Mount

PU 250 Mount

x2

x2

Install Instrument with 1.5m free space (from widest point)

around it.

1.5m1.5m

Played with hands

CongasPage 1 of 3

Weight of heaviest part 3.8kg (Large drum Small Congas)

Weight of heaviest part 4.5kg (Large drum Medium Congas)

Weight of heaviest part 5.2kg (Large drum Large Congas)

BS EN 1176

14.8 Kg15 Kg20 Kg

Metric Conversion:250mm/ 10”400mm/ 16”850mm/ 33”1.5m/ 59”

Spares available from percussionplay.com or from your

local distributor

Page 9: Installation Instructions... · Ground Fixed Duo Page 1 of 3 KS2 - 400mm Ground Surface KS1,2 KS1 - 550mm KS1 –700mm KS2 –850mm Installation Instructions (1.1) (1.2) (1.3) Instrument

PPCONG FRONT PPCONG SIDE

PPCONG PLAN

M10x50 Pin torx X4

M10x50x3 square washer X4

M10 Nut X4

M10x200 Threaded Bar X2

COMPONENTS LIST:

PU MOUNT 200 X2

PU MOUNT 250 X2

Ground Fixed

Instrument Components:

Assembly Guide PPCONG

(1.1)

Ground Fix Components:

M10x50 Security Screw

x4

M10x50x3 Square washer

x4

M10x200 Bolt

x2

M10 Nut

x4

PU 200 Mount

PU 250 Mount

x2

x2

Played with hands

CongasPage 2 of 3

TX 45 Driver Bit

Tools:

x1

BS EN 1176

14.8 Kg15 Kg20 Kg

Thread Lock Solution

Required (Not Supplied)

Thread Lock Solution

Required (Not Supplied)

Thread Lock Solution

Required (Not Supplied)

Spares available form percussionplay.com or from your

local distributor

Page 10: Installation Instructions... · Ground Fixed Duo Page 1 of 3 KS2 - 400mm Ground Surface KS1,2 KS1 - 550mm KS1 –700mm KS2 –850mm Installation Instructions (1.1) (1.2) (1.3) Instrument

Insert M10x 200 Threaded

bar into pre drilled holes

in Ground Fixing Post

Fix M10x 200 Threaded

bar in place using M10

Nuts

Fill hole with fast drying

concrete to manufacturers

specifications.

350

50

350

250

Aggregate

Concrete

Excavate a hole with a

250mm diameter tapering

down to 350mm diameter

and 350mm depth

Compact base of hole with

50mm of aggregate.

Lower ground Fix post

attached of instrument

into hole (check

instrument straight and

level before filling with

concrete)

Ground Fixed

Components:

Ground Fix Post Installation

M10x200 Bolt

x2

x4

300mm min depth

BS EN 1176

1 2 3

4 5

Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of BS EN 1176.

Metric Conversion:50mm/ 2”250mm/ 10”350mm/ 14”400mm/ 16”450mm/ 18”

CongasPage 3 of 3

Page 11: Installation Instructions... · Ground Fixed Duo Page 1 of 3 KS2 - 400mm Ground Surface KS1,2 KS1 - 550mm KS1 –700mm KS2 –850mm Installation Instructions (1.1) (1.2) (1.3) Instrument

Ground Fixed

2.Excavate 6 holes for Emperor chimes 250mm diameter by 600mm deep in desired location upon decision from customer.

3. Locate (lower) legs into holes making sure they are vertical and level prior to concreting in place. Chimes should be 100mm from ground surface.

4. Once happy with location of the chimes, fill holes using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.

600mm

100mm

1785mm

2490mm

Ground

Surface

Installation Instructions

M10x150 Bolt

x12

M10 Nut

x24

M10 Barrel Nut

x6

M10x50 Security Screw

x6 Ground Fix Components:

1. Attach Ground Fixing posts to legs(1.2) (See Ground Fix Post Installation Sheet)

117 Kg

Install Instrument with 1.5m free space (from widest point)

around it.

1.5m1.5m

1.5m

Played with hands

InstrumentComponents:

Emperor Chimesare pre-assembled

Emperor ChimesPage 1 of 2

Weight of heaviest part 25kg (XL Chime)

BS EN 1176

Metric Conversion:100mm/ 4”250mm/ 10”600mm/ 24”1.5m/ 59”1785mm/ 70”2490mm/ 98”

Spares available from percussionplay.com or from your

local distributor

Page 12: Installation Instructions... · Ground Fixed Duo Page 1 of 3 KS2 - 400mm Ground Surface KS1,2 KS1 - 550mm KS1 –700mm KS2 –850mm Installation Instructions (1.1) (1.2) (1.3) Instrument

Ground Fixed

Ground Fix Post Installation

(1.1)

Insert M10x 150 Threaded

bar into pre drilled holes

in Ground Fixing Post

Fix M10x 150 Threaded

bar in place using M10Nuts

Excavate 6 holes with a

250mm diameter tapering

down to 350mm diameter

and 650mm depth

Compact base of hole with

50mm of aggregate.

Lower ground Fix post

attached to instrument

into hole (check

instrument straight and

level before filling with

concrete)

Fix hole with fast drying

concrete to manufacturers

specifications.

Locate the Ground fix Post

into the leg of the

instrument.

Fix instrument to Ground

fix post using M10 bolt

and Barrel Nut and use

thread locking solution

to prevent fixings working

loose.

Chime base is 100mm

from ground surface100

650

50

350

250

Aggregate

Concrete

1 2 3

56

600mm max depth

7

4

M10x150 Threaded Bar

x12

M10 BZP Nut

x24

M10 Barrel Nut

x6

M10x50 Security Screw

x6

Components:

Emperor ChimesPage 2 of 2

Ground fix tube protrudes 300mm from ground surface that inserts into the base of the chime post

TX 45 Driver Bit

Tools:

x2

BS EN 1176

Thread Lock Solution

Required (Not Supplied)

Thread Lock Solution

Required (Not Supplied)

Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 7 of BS EN 1176.

Metric Conversion:50mm/ 2”100mm/ 4”250mm/ 10”350mm/ 14”600mm/ 24”650mm/ 26”