Installation Instructions Models ZZXX0081 and ZZXX0081S PA 1191 Page 1 of 8 Installation Instructions Playworld Systems ® Models XX0081 and XX0081S Revo In-Ground and Surface Mount Installation Preparation Recommended Crew: ........................... Four (4) adults Installation Time (in-ground):................. 2 installation-hours Installation Time (surface mount): ......... 1 installation-hour Concrete Required:(in-ground models) .... 0.26 cubic yard (0,20 cubic meters) Use Zone: .............................................. Refer to the information below User Group Age (years): ....................... ASTM/CSA: 5-12, EN: 6-14 Assembly View (representative structure) Equipment Use Zone A - (ASTM): 72 in. (1830 mm) (CSA): 1800 mm (EN): 1540 mm Refer to the Elevation View for the specific Critical Fall Height for the component. ICON KEY Fully Tighten Hardware Add 1 Drop of Thread Locking Adhesive Do Not Fully Tighten Hardware Pour Concrete Drill Dig Footing Holes Hammer Critical Fall Height A A

Installation Instructions Playworld Systems Models XX0081 ... · a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Installation Instructions Playworld Systems Models XX0081 ... · a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials

Installation Instructions

Models ZZXX0081 and ZZXX0081SPA 1191

Page 1 of 8

Installation InstructionsPlayworld Systems®

Models XX0081 and XX0081SRevo

In-Ground and Surface Mount

Installation Preparation Recommended Crew: ...........................Four (4) adultsInstallation Time (in-ground): .................2 installation-hoursInstallation Time (surface mount): .........1 installation-hourConcrete Required:(in-ground models) ....0.26 cubic yard (0,20 cubic meters) Use Zone: ..............................................Refer to the information belowUser Group Age (years): ....................... ASTM/CSA: 5-12, EN: 6-14

Assembly View (representative structure)

Equipment Use ZoneA - (ASTM): 72 in. (1830 mm) (CSA): 1800 mm (EN): 1540 mm

Refer to the Elevation View for the specifi c Critical Fall Height for the component.

ICON KEYFully Tighten

HardwareAdd 1 Drop of

Thread Locking Adhesive

Do Not Fully Tighten Hardware Pour Concrete

Drill Dig Footing Holes

Hammer Critical Fall Height

A

A

Page 2: Installation Instructions Playworld Systems Models XX0081 ... · a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials

Installation Instructions

Models ZZXX0081 and ZZXX0081SPA 1191

Page 2 of 8

Top View

Elevation ViewsZZXX0081

Footing Diagram

EN: 1555 mm

KEYPosition Unit of Measurement

Top # InchesBottom # [Millimeters]

Page 3: Installation Instructions Playworld Systems Models XX0081 ... · a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials

Installation Instructions

Models ZZXX0081 and ZZXX0081SPA 1191

Page 3 of 8

Top ViewFooting Diagram

KEYPosition Unit of Measurement

Top # InchesBottom # [Millimeters]

Elevation ViewsZZXX0081S

EN: 1555 mm

Page 4: Installation Instructions Playworld Systems Models XX0081 ... · a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials

Installation Instructions

Models ZZXX0081 and ZZXX0081SPA 1191

Page 4 of 8

Follow the details in alphabetical order. For clarifi cation, each detail references the step description. The step descriptions start on page 5.

Detail AStep 4

Attach the anchor legs to Revo(in-ground model only)

Anchor LegAFR0844

(2 Total)

1" O.D. Flat WasherBAE0600(16 Total)

RevoAMA0001

(1 Total)

3/8" x 1-1/4"Button Head BoltBAE0666(8 Total)

3/8" Lock NutBAE0620

(8 Total)

Page 5: Installation Instructions Playworld Systems Models XX0081 ... · a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials

Installation Instructions

Models ZZXX0081 and ZZXX0081SPA 1191

Page 5 of 8

Notes Before You Begin: Do not over tighten bolts during assembly, only snug tighten them until assembly is complete.

Carefully read and understand these installation instructions before you begin.Step 1: Before attempting to assemble your equipment, please review all installation information carefully. Should you experience any diffi culty during the installation process, please call us at the phone number shown on the last page of these instructions.

Step 2: Separate and identify all components and hardware.

Step 3: Excavate / prepare footings as shown in the Support Post Footing Detail / Surface Mount Footing Detail in the Annex at the end of this document.

Step 4: (In-ground model only) Attach the anchor legs to the Revo. See Detail A. Position the legs against the mounting plates on the Revo and attach as shown. Fully tighten the connections.

Final Details.Step 5: Place the Revo in or on it's footing. Plumb and level the component. Fully tighten all fasteners according to tightening torque specifi cations.Torque Specifi cations: Bolts and nuts - Snug tighten and then tighten an additional one half turn. In-ground: Block and brace for concrete. Pour concrete after all equipment has been assembled. Allow 72 hours for concrete to completely cure.

Surface Mount: Bolt down all surface mount supports in accordance with specifi cations provided by your registered structural engineer.Important Note: Surface mount hardware is not supplied. Customer is responsible for concrete base and for providing surface mount hardware as specifi ed by a registered structural engineer for each specifi c project application.

Page 6: Installation Instructions Playworld Systems Models XX0081 ... · a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials

Installation Instructions

Models ZZXX0081 and ZZXX0081SPA 1191

Page 6 of 8

Bill of Materials

XX0081 - REVO

PART NO. DESCRIPTION QTY.AFR0844 LEG - 34.00" x 15.00" x 8.00" 2 AMA0001 REVO 1 BAE0600 WASHER - 1" O.D. FLAT 16 BAE0620 NUT - 3/8"-16 LOCK w/NYLON CAP 8 BAE0666 BOLT - 3/8"-16 x 1-1/4" BUTTON HEAD - SS 8 BAE0902 TOOL - 7/32" SHORT HEX KEY WRENCH 1

XX0081S - REVO SURFACE MOUNT

PART NO. DESCRIPTION QTY.AMA0001 REVO 1

1000 Buffalo Road • Lewisburg, PA 17837www.playworldsystems.com

For Customer Service, Call 800-233-8404 or

570-522-9800 OUTSIDE U.S.

Page 7: Installation Instructions Playworld Systems Models XX0081 ... · a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials

Installation Instructions

Models ZZXX0081 and ZZXX0081SPA 1191

Page 7 of 8

Fasteners• Inspect for loose fasteners. Tightening torque specifi cations are: Bolts and Nuts: Snug tighten and tighten an additional

one-half turn.• If during the maintenance process a bolt needs to be

removed from a part or parts, it will be necessary to apply a drop of liquid thread lock / loctite to the bolt before reinstallation.

• Inspect for missing, worn or broken fasteners. If any missing, worn or broken fasteners are found, refer to the installation instructions for proper replacement fastener. If any damage is detected, barricade equipment to prevent use until repair is completed. Contact your sales representative immediately for a replacement part.

Plastic Parts• Inspect all plastic surfaces for sharp points, cracks

or jagged edges. If any damage is detected and is determined to be unsafe, barricade equipment to prevent use until repair is completed. Minor burrs or sharp edges may be removed by using a sharp utility knife or block plane to remove sharp burr.

Finish• Inspect metal parts for fi nish damage. To repair painted surfaces, sand damaged area with

sandpaper and wipe clean. Mask area and paint with primer and allow to dry. Paint primed area with color-matching paint and allow to dry. Recoat area with color-matching paint if required. Drying time is approximately 8 hours between coats.

Footings• Inspect component to be solid in, or on, the footing and

secure. If any damage is detected, barricade equipment to prevent use until repair is completed.

Equipment Maintenance Playworld Systems®

Models XX0081 and XX0081SRevo

In-Ground and Surface Mount

Surfacing• Refer to the specifi c surfacing maintenance detail sheet

for additional information.

Replacement Parts• Refer to your installation instructions to obtain replacement

part number.• Contact your sales representative or call Playworld

Systems’ Customer Service for a replacement part.

1000 Buffalo Road • Lewisburg, PA 17837www.playworldsystems.com

For Customer Service, Call 800-233-8404 or

570-522-9800 OUTSIDE U.S.

Page 8: Installation Instructions Playworld Systems Models XX0081 ... · a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials

Installation Instructions

Models ZZXX0081 and ZZXX0081SPA 1191

Page 8 of 8

Inspection Form• Be sure that you are using a copy of this Inspection Form and not your original. • Use the Inspection Codes listed below and record condition of equipment at time of

examination on the Inspection Checklist.• Document any item from the Inspection Checklist that will require maintenance along with

any corrective action on the Maintenance Schedule.• Be sure to include appropriate dates and signatures on each section to properly document

maintenance procedure.

Preventive Maintenance . . . for Safety's Sake!

Repairer: Name (Please Print) __________________________________ Signature:________________________________________ Date:___ /___ /___

MAINTENANCE SCHEDULEItem in Question Description of Problem Corrective Action Date

Inspector: Name (Please Print) __________________________________ Signature:_________________________________________ Date:___ /___ /___

Inspection CodesP = Pass F = FailNA = Not Applicable

INSPECTION CHECKLIST FrequencyInspection

Code DateDate Repairs Completed

Inspect plastic parts for damage. Medium

Inspect for loose, missing, worn, or broken fasteners. High

Inspect metal parts for structural and fi nish damage. Medium

Inspect surfacing to insure proper depth and distribution. High

Inspect footing to insure support is secure and footing is not damaged. Low

Page 9: Installation Instructions Playworld Systems Models XX0081 ... · a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials

Guidelines & Information (fs SPE_noslide) Annex Page 1 of 7

Guidelines

Important ! Please Read Completely Before Beginning Installation. According to a report published by the U. S. Consumer Product Safety Commission (C.P.S.C.) 72% of all playground injuries result from accidental falls. With this in mind, this equipment is designed to fill the need for safe yet challenging play. In conjunction with design efforts to reduce the possibilities of injuries, this equipment must be installed "Step by Step" per our installation instructions. As a new owner you are responsible for the correct installation, safe use, and maintenance of your equipment.

Installation Guidelines• Identify all parts and thoroughly read the assembly instructions before beginning construction.

• Refer to your playground equipment plan and footing diagram to assure the equipment purchased will fit into your selected site area. The use and no-encroachment zones around the play equipment shall be obstacle-free areas designated for unrestricted circulation.

• ASTM compliance: The overall use zone measurements for stationary play equipment should extend a minimum of 72 inches (1829 mm) from its perimeter; dimensions and configuration of the use zone are dependent upon the types of included play equipment. The use zone of stationary play equipment may be overlapped by the use zone of adjacent stationary play equipment if the adjacent designated play surfaces are no greater than 30 inches (762 mm) above the protective surfacing level. They should be a minimum of 72 inches (1829 mm) apart. If the adjacent designated play surfaces are greater than 30 inches (762 mm) above the protective surfacing level, the pieces of equipment should be a minimum of 108 inches (2743 mm) apart.

• CSA compliance: The overall use zone measurements for stationary play equipment should extend a minimum of 1800 mm from its perimeter; dimensions and configuration of the use zone are dependent upon the types of included play equipment. The use zone of stationary play equipment may be overlapped by the use zone of adjacent stationary play equipment if the adjacent designated play surfaces are no greater than 700 mm above the protective surfacing level. They should be a minimum of 1800 mm apart.

• EN compliance: The overall use zone measurements for stationary play equipment are dependent upon the fall height of the equipment. For a fall height exceeding 1500 mm a formula is applied to determine the use zone (impact zone) of the equipment. There is a minimum of 1500 mm from its perimeter; dimensions and configuration of the use zone are dependent upon the types of included play equipment. Refer to the Use Zone diagram or master structure drawing.

• Site layout is a critical part of the overall installation. Footings must be measured and marked accurately according to the footing diagram. A level and clear installation site is ideal.

• Good drainage around the structure and its supports is important. Inquire with local contractors for appropriate recommendations.

• After laying out all footings and before digging holes, be sure to inquire about underground utilities that may exist.

• Do not leave the job site unattended without making sure that all fastening hardware on all components are tightened according to tightening torque specifications listed on every installation guide. We also recommend roping off construction area and covering all holes that do not contain a piece of equipment with plywood or other suitable material.

• Excavate holes as shown in the footing detail. If a level and clear site cannot be obtained, adjust the depth of footing to maintain a level footing base. If soil conditions are loose or unstable, a larger diameter footing may be required. Inquire with local contractors for appropriate recommendations. Be sure concrete that might have splashed onto the unit is washed off before it dries. Allow concrete to harden 72 hours before allowing your structure to be used. Assemble the entire structure before pouring concrete unless specifically instructed to do so in the installation instructions.

• Insure that Age Appropriate and Hard Surface Warning/Playworld Systems identification labels are properly affixed to the play equipment. Labels are to be plainly visible according to current playground equipment guidelines.

Page 10: Installation Instructions Playworld Systems Models XX0081 ... · a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials

Guidelines & Information (fs SPE_noslide) Annex Page 2 of 7

• IMPORTANT! Because accidental falls around your playground equipment can occur, Playworld Systems recommends that the area under and around the structure be covered with a resilient material such as sand, bark mulch, or wood chips. If loose fill surfacing materials are used, Playworld Systems recommends a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials can become compacted due to weather and use, which reduces their shock absorbency. It is strongly recommended that the surfacing be checked weekly and material added or replaced as necessary. Hard surfaces, such as asphalt, concrete and packed earth are not acceptable for use under playground equipment.

• The entire area, under and around the playground equipment, must be covered with protective surfacing material. The impact attenuation of the protective surfacing under and around playground equipment should be rated to have a critical height value of at least the height of the highest accessible part of the equipment. The critical height for surfacing is to be rated in accordance with A.S.T.M. standard, designated F1292, A Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment. Critical fall heights for Europe and Canadian compliance shall be listed on the elevation page or master structure drawing if they differ from the ASTM standard. Contact the manufacturer of unitary surfacing materials (rubber matting) for the critical height rating for their products.

Tools Required: Playworld Systems supplies a service kit that contains commonly used hex key wrenches required to assemble your equipment. You may also need: shovel, digging iron, post hole digger, steel rake, wheelbarrow, garden hoe, water hose, tape measure, level, alignment tool, 3/8" ratchet with 9/16" socket, and 9/16" combination wrench.

Maintenance• Inadequate maintenance of equipment has resulted in injuries on the playground. Because the safety of playground equipment and its stability depends on good inspection and maintenance, a comprehensive maintenance program must be developed for each playground and strictly followed. All equipment must be inspected frequently for any potential hazards. Special attention must to be given to moving parts and other components that can be expected to wear. Inspections must to be carried out in a systematic manner by trained personnel. Any damaged or worn parts, or any other hazards identified during inspections must be repaired or replaced immediately. Complete documentation of all maintenance inspections and repairs must be retained.

Supervision Guidelines• Playworld Systems strongly recommends close supervision of the children as they play as well as intensive classroom and home instruction about safe behavior on playground equipment.

• Playground supervisors should be aware that not all playground equipment is appropriate for all children who may use the playground. Signs should be posted near the equipment indicating the recommended age of the users. Supervisors should direct children to equipment appropriate for their age.

• It is important that playground supervisors recognize that preschool-age children require more attentive supervision on playgrounds than older children.

• Do not permit the use of wet playground equipment. Wet equipment will inhibit necessary traction and gripping capabilities. Slips or falls could occur.

• Do not permit too many children on the same piece of equipment at the same time. It is suggested that children take turns.

• Constantly observe play patterns to discover possible hazardous play and suggest changes in equipment use or play patterns.

Guidelines

Page 11: Installation Instructions Playworld Systems Models XX0081 ... · a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials

Guidelines & Information (fs SPE_noslide) Annex Page 3 of 7

Footing Details (in ground)

2" (51 mm)

18"(457 mm)Diameter

Varies

42"(1067 mm) Varies

36"(914 mm)

Support Post Footing Detail (ASTM/CSA)

Ground Level

Concrete

Protective Surfacing Level Factory-Applied Protective Surfacing Level Sticker

Support Post

2b Stone End Cap fromPost Shipping Tube(Drill holes in cap to allow for water drainage)

2" (51 mm)

12"(305 mm)Diameter

Varies

30"(762 mm) Varies

24"(610 mm)

Component Footing Detail (ASTM/CSA)

Ground Level

Concrete

Protective Surfacing Level Factory-Applied Protective Surfacing Level Sticker

Component

2b Stone End Cap fromPost Shipping Tube(Drill holes in cap to allow for water drainage)

400 mm>200 mm

610 mm

760 mm

Footing Detail Component Post (EN)

Ground Level

Concrete

Protective Surfacing

Component

2b Stone

Factory Applied Surfacing Label

Soil

300 mmDiameter

400 mm

915 mm

1065 mm

Footing Detail Support Post (EN)

Ground Level

Concrete

Protective Surfacing

Support Post

2b Stone

Factory Applied Surfacing Label

Soil

460 mmDiameter

>200 mm

Page 12: Installation Instructions Playworld Systems Models XX0081 ... · a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials

Guidelines & Information (fs SPE_noslide) Annex Page 4 of 7

Footing Notes (in ground)

2" (51 mm)

18"(457 mm)Diameter

Varies

54"(1372 mm) Varies

48"(1219 mm)

GroundZerO® Support Post Footing Detail ASTM/CSA

Ground Level

Concrete

Protective Surfacing Level Factory-Applied Protective Surfacing Level Sticker

End Cap fromPost Shipping Tube(Drill holes in cap to allow for water drainage)

Support Post

2b Stone

2" (51 mm)

12"(305 mm)Diameter

Varies

30"(762 mm) Varies

24"(610 mm)

Component Footing Detail (ASTM/CSA)Block Option

Ground Level

Concrete

Protective Surfacing LevelFactory-Applied Protective Surfacing Level Sticker

Component

BlockPorous Material

2" (51 mm)

18"(457 mm)Diameter

Varies

42"(1067 mm) Varies

36"(914 mm)

Ground Level

Concrete

Protective Surfacing LevelFactory-Applied Protective Surfacing Level Sticker

Support Post

BlockPorous Material

Support Post Footing Detail (ASTM/CSA)Block Option

IN GROUND FOOTING DIAGRAMS-BLOCK OPTION

400 mm

1220 mm

1375 mm

Footing Detail GroundZerO® Support Post (EN)

Ground Level

Concrete

Protective Surfacing

GroundZerO® Support Post

2b Stone

Factory Applied Surfacing Label

Soil

460 mmDiameter

>200 mm

Page 13: Installation Instructions Playworld Systems Models XX0081 ... · a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials

Guidelines & Information (fs SPE_noslide) Annex Page 5 of 7

FOOTING NOTES (IN GROUND)• Support post footing depth equals 42 in. (1067 mm) minus the depth of the

protective surfacing material. The posts are designed to have 24" (610 mm) in concrete.

Example: If 12 in. (305 mm) of wood mulch is used for surfacing, the footing depth would be 30 in. (762 mm).

GroundZerO® posts are footed 12 in. (305 mm) deeper than the regular support posts, and will be marked as such on the master footing diagram.

• Component footing depth equals 30 in. (762 mm) minus the depth of the protective surfacing material. The posts are designed to have 12" (305 mm) in concrete.

Example: If 12 in. (305 mm) of wood mulch is used for surfacing, the footing depth would be 18 in. (457 mm).

• Most support posts and component support legs will have either a factory-applied sticker with a line, or factory-applied mark designating the level of protective surfacing on a clear and level installation site. The footing depth measurements are based on this line/mark.

• If the play equipment is installed on uneven terrain, maintain support post mark for the protective surfacing level at the lowest grade. Adjust other footings accordingly. Support posts and all attaching decks and play components must be plumb and level.

• Do not encase the bottom of the support post in concrete. Place the post directly on packed stone or other porous material.

• The footings shown on Playworld Systems’ documentation are recommendations based on historical performance in average soil conditions. Footing dimensions may be modified by the owner based on actual soil conditions.

For example: - If local soil is loose or unstable, a larger footing may be required. - If local soil is considered stable, such as bedrock, clay or hard packed earth, a

smaller footing may be used. Before changing footing dimensions, we strongly recommend that the footings be reviewed and approved by a registered engineer.

• The base of the footing must be below the frost line.

• Assemble the entire structure before pouring concrete unless specifically instructed to do so in the installation instructions.

2" (51 mm)

18"(457 mm)Diameter

Varies

54"(1372 mm) Varies

48"(1219 mm)

GroundZerO® Support Post Footing Detail ASTM/CSABlock Option

Ground Level

Concrete

Protective Surfacing LevelFactory-Applied Protective Surfacing Level Sticker

Support Post

BlockPorous Material

IN GROUND FOOTING DIAGRAMS-BLOCK OPTIONFooting Notes & Details (in ground)

Page 14: Installation Instructions Playworld Systems Models XX0081 ... · a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials

Guidelines & Information (fs SPE_noslide) Annex Page 6 of 7

Footing Notes & Details (surface mount)FOOTING NOTES (SURFACE MOUNT)• Most support posts and component support legs will have either a factory-applied

sticker with line, or factory-applied mark designating protective surfacing level on a clear and level installation site.

• If the play equipment is installed on uneven terrain, maintain support post mark for the protective surfacing level at the lowest grade. Adjust other footings accordingly. Support posts and all attaching decks and play components must be plumb and level.

• The footing size may vary due to local soil and weather conditions.

• Base of footing must be below frost line.

Surface mount hardware is not supplied. Customer is responsible for concrete base and providing surface mount hardware as specified by a registered structural engineer for each specific project application.

Surface Mount Footing Detail

Concrete Base Anchor Bolts Supplied By Customer

Protective Surfacing Level

Surface Mount Post

Page 15: Installation Instructions Playworld Systems Models XX0081 ... · a depth of 12 in. (305 mm). An approved rubber safety matting can also be used. Many protective surfacing materials

Guidelines & Information (fs SPE_noslide) Annex Page 7 of 7

FINAL INSPECTION• Playworld Systems® insists on the installation of protective surfacing within the

use zone of each play structure in accordance with the applicable standard or specifications appropriate for the fall height of each structure.

• Playworld Systems® strongly recommends close supervision of children as they play. The owners of playground equipment and the parents or guardians of children are responsible for this proper supervision.

• As the owner of playground equipment, you are responsible for the maintenance of the equipment and surrounding play area. A comprehensive maintenance and inspection schedule must be developed and all equipment inspected frequently. Refer to the inspection and maintenance schedule in the back of this booklet.

• Perform a thorough final check on the installed equipment to insure all equipment is installed as specified by manufacturer’s installation instructions.

• Review all Installation Instructions for specified dimensions. Make sure dimensions called for in instructions agree with actual installation.

• Double check height dimensions. Height measurements are taken from the top of the protective surfacing material.

• Insure all fasteners are tightened according to tightening torque specifications listed on your installation instructions.

• Insure all exposed pipe ends have properly installed end caps. Insure that drive rivets are secure.

• Clean dried concrete off of components and any other affected surface.

• Touch-up any scratches or installation damage to powder coated finish with color-matched spray paint.

• Allow adequate time for proper curing, both for concrete and urethane cement if rubber safety surfacing tiles have been installed.

• Insure that protective surfacing is properly installed according to C.P.S.C. (or other appropriate body) recommendations. Footings must not be exposed.

• Insure that hard surface warning/Playworld Systems® identification labels are

properly affixed to the play equipment. Labels are to be plainly visible according to current playground equipment guidelines. For locations complying with ASTM F1487 or CSA Z-614, Age Appropriate labels must also be applied in a visible location.

• Dispose of all packaging material properly. These materials which include large plastic bags and sheets can be a suffocation hazard. Dispose of these materials out of reach or contact of small children.

Surfacing Warning Label