8
Installation Instructions Regolo RP13 Pendant V/Indirect, D/Direct, B/Bi-Direct Sheet Rock, Grid, and Surface Structure Mount NULITE Lighting Inc. 10770 East 51st Avenue Denver, CO 80430 Phone (303) 287-9646 www.nulite-lighting.com March 2019 Page 1 WARNINGS: •Do not assemble continuous run on the ground and lift into place. Joints will distort and not create a tight fit. Joining hardware will have to be purchased and replaced. •Risk of electrical shock or fire, disconnect power during installation or servicing. Read all instructions completely before starting installation. Install and wire in accordance to all national and local codes by a certifi ed electrician. Fixture may be sharp, handle with care. Let fixture cool before main- tenance. INDIVIDUAL FIXTURES CONTINUOUS ROW FIXTURES AVERTISSEMENTS •Risque d’électrocution ou d’incendie. Déconnectez l’alimenta- tion durant l’installation ou la maintenance. Lisez attentivement toutes les instructions avant de commencer toute installation. Faites installer et câbler selon les normes Nationales et Lo- cales par un électricien certifi é. Les installations peuvent être coupantes, à manipuler avec précaution. Laissez refroidir les installations avant une opération de maintenance. ADVERTENCIA Riesgo de descarga eléctrica oun incendio, desconecte la alimentación durante la instalación o servicio. Leer todas las instrucciones completas antes de empesar la instalación. Instalar y cablear en acuerdo a las reglas nacionales y códigos locales por un electricista certifi cado. El accesorio puede estar agudo, agarre con cuidado deje que el acessorio. Enfriar antes de mantenimiento. DISTORT JOINT

Installation Instructions Regolo RP13 Pendant V /Indirect, … · Installation Instructions Regolo RP13 Pendant V /Indirect, D/Direct, B/i-Di rect Sheet Rock, Grid, and Surface Structure

  • Upload
    others

  • View
    24

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Installation Instructions Regolo RP13 Pendant V /Indirect, … · Installation Instructions Regolo RP13 Pendant V /Indirect, D/Direct, B/i-Di rect Sheet Rock, Grid, and Surface Structure

Installation InstructionsRegolo RP13 Pendant

V/Indirect, D/Direct, B/Bi-DirectSheet Rock, Grid, and Surface Structure Mount

NULITE Lighting Inc. 10770 East 51st Avenue Denver, CO 80430 Phone (303) 287-9646 www.nulite-lighting.com March 2019 Page 1

WARNINGS:•Do not assemble continuous run on the ground and lift into place. Joints will distort and not create a tight fit. Joining hardware will have to be purchased and replaced.

•Risk of electrical shock or fire, disconnect power during installation or servicing. Read all instructions completely before starting installation. Install and wire in accordance to all national and local codes by a certifi ed electrician. Fixture may be sharp, handle with care. Let fixture cool before main-tenance.

INDIVIDUAL FIXTURES CONTINUOUS ROW FIXTURES

AVERTISSEMENTS •Risque d’électrocution ou d’incendie. Déconnectez l’alimenta-tion durant l’installation ou la maintenance. Lisez attentivement toutes les instructions avant de commencer toute installation. Faites installer et câbler selon les normes Nationales et Lo-cales par un électricien certifi é. Les installations peuvent être coupantes, à manipuler avec précaution. Laissez refroidir les installations avant une opération de maintenance.

ADVERTENCIA Riesgo de descarga eléctrica oun incendio, desconecte la alimentación durante la instalación o servicio. Leer todas las instrucciones completas antes de empesar la instalación. Instalar y cablear en acuerdo a las reglas nacionales y códigos locales por un electricista certifi cado. El accesorio puede estar agudo, agarre con cuidado deje que el acessorio. Enfriar antes

de mantenimiento.

DISTORT JOINT

Page 2: Installation Instructions Regolo RP13 Pendant V /Indirect, … · Installation Instructions Regolo RP13 Pendant V /Indirect, D/Direct, B/i-Di rect Sheet Rock, Grid, and Surface Structure

Installation InstructionsRegolo RP13 Pendant

V/Indirect, D/Direct, B/Bi-DirectSheet Rock, Grid, and Surface Structure Mount

NULITE Lighting Inc. 10770 East 51st Avenue Denver, CO 80430 Phone (303) 287-9646 www.nulite-lighting.com March 2019 Page 2

Lighting SyStem ComponentS

***Every luminaire will have an integral driver.

Package Contents• Luminaire• Includes factory installed 5 conductor

line voltage power cord (48” Aircraft Cable = 78” Power Cord 120” Aircraft Cable = 150” Power Cord)

• Includes factory installed aircraft cable adjuster(s)

1. LUMINAIRE

Grid Ceiling Power Mount Hardware Pack

Grid CeilingNon-Power Mount Hardware Pack

Sheet Rock or Surface Structure CeilingPower Mount Hardware Pack

Sheet Rock or Surface Structure CeilingNon-Power Mount Hardware Pack

Package Contents• Power Canopy Hardware Packet

• (1) 5.5” diameter canopy• (1) Stainless Steel aircraft cable coupler• (1) Stainless Steel bushing• (1) 48” or 120” aircraft cable• (1) Grid ceiling mounting adapter

Package Contents• Non-Power Canopy Hardware Packet

• (1) 3” diameter canopy• (1) Stainless Steel aircraft cable coupler• (1) 48” or 120” aircraft cable• (1) Grid ceiling mounting adapter

3”

5.5”

Package Contents• Power Canopy Hardware Packet

• (1) 5.5” diameter canopy• (1) Bracket bar• (1) Stainless Steel aircraft cable coupler• (1) 1/4-20 stud• (1) 48” or 120” aircraft cable

Package Contents• Non-Power Canopy Hardware Packet

• (1) 3” diameter canopy• (1) Stainless Steel aircraft cable coupler• (1) 48” or 120” aircraft cable

3”

5.5”

Page 3: Installation Instructions Regolo RP13 Pendant V /Indirect, … · Installation Instructions Regolo RP13 Pendant V /Indirect, D/Direct, B/i-Di rect Sheet Rock, Grid, and Surface Structure

Installation InstructionsRegolo RP13 Pendant

V/Indirect, D/Direct, B/Bi-DirectSheet Rock, Grid, and Surface Structure Mount

NULITE Lighting Inc. 10770 East 51st Avenue Denver, CO 80430 Phone (303) 287-9646 www.nulite-lighting.com March 2019 Page 3

inStaLLing an individuaL or row Starter Luminaire For grid CeiLing

Individual Starter

- -

1/2” NPT Fitting by others

Crimp strain relief

Install power mount canopy. Connect wires per local electrical code.

21

Install non-power mount canopy.

3 4

5 6

Thread aircraft cable supports though adjuster on luminaire (level and trim cable as last step).

Page 4: Installation Instructions Regolo RP13 Pendant V /Indirect, … · Installation Instructions Regolo RP13 Pendant V /Indirect, D/Direct, B/i-Di rect Sheet Rock, Grid, and Surface Structure

Installation InstructionsRegolo RP13 Pendant

V/Indirect, D/Direct, B/Bi-DirectSheet Rock, Grid, and Surface Structure Mount

NULITE Lighting Inc. 10770 East 51st Avenue Denver, CO 80430 Phone (303) 287-9646 www.nulite-lighting.com March 2019 Page 4

inStaLLing an individuaL or row Starter Luminaire For SheetroCK

Individual Starter

Bracket bar mounting screws by others

1 2

5 6

Thread aircraft cable supports though adjuster on luminaire (level and trim cable as last step).

Attach non-power canopy, aircraft cable and coupler to structure, ¼ -20 hardware by others.

3 4

Connect wires per local electrical code. Install power mount canopy.

Page 5: Installation Instructions Regolo RP13 Pendant V /Indirect, … · Installation Instructions Regolo RP13 Pendant V /Indirect, D/Direct, B/i-Di rect Sheet Rock, Grid, and Surface Structure

Installation InstructionsRegolo RP13 Pendant

V/Indirect, D/Direct, B/Bi-DirectSheet Rock, Grid, and Surface Structure Mount

NULITE Lighting Inc. 10770 East 51st Avenue Denver, CO 80430 Phone (303) 287-9646 www.nulite-lighting.com March 2019 Page 5

inStaLLing an individuaL or row Starter Luminaire For SurFaCe StruCture

Individual Starter

Bracket bar mounting screws by others

1 2

5 6

Thread aircraft cable supports though adjuster on luminaire (level and trim cable as last step).

Attach non-power canopy, aircraft cable and coupler to structure, ¼ -20 hardware by others.

3 4

Connect wires per local electrical code. Install power mount canopy.

Page 6: Installation Instructions Regolo RP13 Pendant V /Indirect, … · Installation Instructions Regolo RP13 Pendant V /Indirect, D/Direct, B/i-Di rect Sheet Rock, Grid, and Surface Structure

Installation InstructionsRegolo RP13 Pendant

V/Indirect, D/Direct, B/Bi-DirectSheet Rock, Grid, and Surface Structure Mount

NULITE Lighting Inc. 10770 East 51st Avenue Denver, CO 80430 Phone (303) 287-9646 www.nulite-lighting.com March 2019 Page 6

Starter Mid End

Power Side Power Side Power SideNon-Power Side Non-Power Side Non-Power Side

Non-Power Side

Step 2Step 1 Step 3

***2 cable mounts in first fixture, only one cable mount in each subsequent fixture***

inStaLLing a row-mid or row-end

Repeat steps 3-6 from pages 3, 4, or 5 to install the next non-power hanging point in the row.

Page 7: Installation Instructions Regolo RP13 Pendant V /Indirect, … · Installation Instructions Regolo RP13 Pendant V /Indirect, D/Direct, B/i-Di rect Sheet Rock, Grid, and Surface Structure

Installation InstructionsRegolo RP13 Pendant

V/Indirect, D/Direct, B/Bi-DirectSheet Rock, Grid, and Surface Structure Mount

NULITE Lighting Inc. 10770 East 51st Avenue Denver, CO 80430 Phone (303) 287-9646 www.nulite-lighting.com March 2019 Page 7

After the“starter” or“ mid” is fully secured with two hanging points, then make power connection and mount the next luminaire, then join them together as shown below and secure with two torsion spring latches that are integrated into the luminaire.

11 12

SNAP!

Connect the strap to the hole in the catch tray. Collapse the alignment strap back to its original position to lock the two fixtures together.

109

Insert alignment tabs from the next fixture into the slots on the current fixture.

Release the alignment strap from the current fixture and extend the catch tray from the next fixture.

7 8

Dislodge the lens/LED board assembly from the bottom of the luminaire and let it hang by the support chains.

Connect male electrical connector from next fixture to female connector on the current fixture.

inStaLLing a row-mid or row-end (aFter Starter haS been inStaLLed, Step 1 -6 From page 3, 4, or 5)

Page 8: Installation Instructions Regolo RP13 Pendant V /Indirect, … · Installation Instructions Regolo RP13 Pendant V /Indirect, D/Direct, B/i-Di rect Sheet Rock, Grid, and Surface Structure

Installation InstructionsRegolo RP13 Pendant

V/Indirect, D/Direct, B/Bi-DirectSheet Rock, Grid, and Surface Structure Mount

NULITE Lighting Inc. 10770 East 51st Avenue Denver, CO 80430 Phone (303) 287-9646 www.nulite-lighting.com March 2019 Page 8

13 14

inStaLLing a row-mid or row-end (aFter Starter haS been inStaLLed, Step 1 -6 From page 3, 4, or 5)

Replace the lens/LED board assembly from the bottom of the luminaire. Repeat for all fixture in the row.