© 2009-2012 Copyright Energy, Inc. All rights reserved Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not a substitute for reading the detail installation instructions In the Instruction Manual. Before installation, read the Installation and Instruction Manuals and understand fully the Safety requirements.

Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

Installation of TED 5000

The following images are simply a visual for the steps taken for the installation of TED. This is not a substitute

for reading the detail installation instructions In the Instruction Manual.

Before installation, read the Installation and Instruction Manuals and understand fully the Safety requirements.

Page 2: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

Three components of TED 5000 mount in the electrical panel:

MTU Power Cable

MTU(Measuring Transmitting Unit)

CTs (Current Transformers)

Page 3: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

MTU Power Cable

Black Lead connects to a 15/20/30 amp breaker

Molex plug fits into MTU

White connects to Neutral Bus

Red lead is capped off as shown on next slide

Page 4: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

Cap off Red Conductor on Power Cable as shown

Page 5: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

Typical Combination Electrical Panel

200Amp

Page 6: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

Turn OFF the Main Breaker

Page 7: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

There is a RED Dot on one side of the CTs. Note them when installing CTs.

Page 8: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

Danger - AVOID

Note RED polarity dot facing power SOURCE

Page 9: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

Clip CT completely over conductor

Danger - AVOIDDanger - AVOIDDanger - AVOID

Page 10: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

Correctly connected CT – (it does not need to be snug on conductor)

Danger - AVOIDDanger - AVOIDDanger - AVOID

Page 11: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

Connect 2nd CT the same as the 1st. NOTE that the RED polarity dotsare both facing the source of power

Danger - AVOIDDanger - AVOIDDanger - AVOIDDanger - AVOIDDanger - AVOIDDanger - AVOID

Page 12: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

Correctly connected CTs

Danger - AVOIDDanger - AVOIDDanger - AVOID

Page 13: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

Connect the WHITE lead of the MTU Power Cable to any

available position in the Neutral Bus

Danger - AVOID

Page 14: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

ABABABABABA

ABABABABABA

It is best to connect the MTU black lead to the breaker that controls the circuit you will have the Gateway plugged into.

Any 15/20/30 amp breaker is OK.

“A” – “B” are the typical

layout of the PHASES

Page 15: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

Turn the breaker OFF on the circuit as a precaution

Page 16: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

Connect the BLACK lead from the MTU Power Cable to the selected circuit breaker

Page 17: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

EXTREMELY IMPORTANT: Write down the Serial Number indicated below. You will need this number later to set up the communication to the Gateway

Page 18: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

Note the ‘guides’ on the end of the CT connector. They fit snugly in theslot of the MTU

Page 19: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

The CT connector will fit snugly into the MTU – note the 4 grooves in the top of the CT connector (the 2 “guides” are on the bottom side)

Page 20: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

The last connection is the Power Cable base. There is only 1 way it can be connected. Line up the connector and snap it in to the MTU.

Page 21: Installation Pictorial 5000 - The Energy Detective (TED)Installation of TED 5000 The following images are simply a visual for the steps taken for the installation of TED. This is not

© 2009-2012 Copyright Energy, Inc. All rights reserved

After all the connections are made and the MTU Power Cable is connected to the MTU, turn on the Main Breaker and branch circuit breakers. The green LED on the MTU should light up at this point.

For troubleshooting purposes, you may want to leave the panel cover off until you connect the Gateway to be sure the system is operating properly.