68
Instrumentation Development Laboratory: An Introduction Gary S. Varner For the gang June 2003

Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

Instrumentation Development Laboratory: An Introduction

Gary S. VarnerFor the gangJune 2003

Page 2: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

1Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

Page 3: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

2Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

Page 4: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

3Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

Page 5: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

4Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

Page 6: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

5Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

Page 7: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

6Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

Page 8: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

7Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

We are essentially nothing!

Page 9: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

8Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

Page 10: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

9Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

Page 11: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

10Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

Page 12: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

11Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

Page 13: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

12Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

Page 14: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

13Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

Page 15: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

14Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

Page 16: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

15Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

Electro-Magnetism

Strong

Weak

Page 17: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

16Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

seen

Page 18: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

17Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

E = mc2

Page 19: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

18Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

Page 20: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

19Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

Page 21: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

20Instrumentation Dev. Lab Meeting – June, 2003

Why are we here?

From symmetry, must produce an equal

amount of matter and anti-matter:

So why areare we here?

E = mc2

Page 22: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

21Instrumentation Dev. Lab Meeting – June, 2003

Main Projects

Accelerator based:Precision Measurement

Non-accelerator:Highest energies

Search for new physics:Cutting-edge of exploring our universe

Page 23: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

22Instrumentation Dev. Lab Meeting – June, 2003

And everything between…

Page 24: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

23Instrumentation Dev. Lab Meeting – June, 2003

Belle Experiment at KEK

• Tsukuba Science City– About 60km from Tokyo/airport

Page 25: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

24Instrumentation Dev. Lab Meeting – June, 2003

Belle Experiment at KEK

• KEK:– Kou-Enerugii

butsuri-gaku Kenkyuu-jyou (now even longer)

Page 26: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

25Instrumentation Dev. Lab Meeting – June, 2003

KEK-B Accelerator

Page 27: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

26Instrumentation Dev. Lab Meeting – June, 2003

Belle Experiment at KEK

• Belle isn’t an acronym:– Beauty in French – studying b quarks

(also called bottom)

Page 28: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

27Instrumentation Dev. Lab Meeting – June, 2003

The BelleBelle CollaborationSVD GroupFrankfurtU. HawaiiKanagawa U.KEKKrakow INPU. MelbourneNational Taiwan U.Niigata U.Osaka U.Princeton U.U. SydneyTohoku U.U. TokyoTokyo Inst. Tech.Tokyo Metropolitan U.U. TsukubaVienna

KEK

Hawaii

A World-Wide Activity Involving ~50 Institutions

~300 members

Page 29: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

28Instrumentation Dev. Lab Meeting – June, 2003

Proper-time difference (∆t)

e− e+e−: 8.0 GeVe+: 3.5 GeV

BCP

∆z

Btag

ϒ(4S)βγ ~ 0.425

fCPfCP

∆z ≅ cβγτB ~ 200 µm

Flavor tagFlavor tag tzc βγ∆

∆=

resolution

Page 30: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

29Instrumentation Dev. Lab Meeting – June, 2003

Example Event

Rare decay: B0 π+π-

Page 31: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

30Instrumentation Dev. Lab Meeting – June, 2003

World’s highest Luminosity Collider!!

Integrated luminosity

Daily luminosity: still increasing !

Just exceeded 150fb-1

yesterday!

Page 32: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

31Instrumentation Dev. Lab Meeting – June, 2003

Many Important Results!

• Discovery (w/BaBar) of CP-violation in the B-system– Expected, but large and clean

– CP-violation in Kaon system tiny

• Recent first observation in B ππ

– Detector working well, but already starting to think of the future

– Incremental Detector improvements

– Seriously higher luminosity needed to probe non Standard-model effects – upgrade of accelerator and detector

>60 papers in

last 2+ years

& morepending

Page 33: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

32Instrumentation Dev. Lab Meeting – June, 2003

Belle Mission

• Observation of CP violation in B decays– Achieved in 2001

• Observation of direct CP violation in B decays and other parameters of CKM matrix– by 2006 with the gradual improvement of KEKB

• Explore New Physics beyond the Standard Model– off-diagonal elements (e.g. study of SUSY breaking)

– need much higher luminosity

Page 34: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

33Instrumentation Dev. Lab Meeting – June, 2003

PID Cross-section

Hawaii built

Page 35: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

34Instrumentation Dev. Lab Meeting – June, 2003

TOF: Systematics Limited

BelleNoteDraftV

Study of Hadron Systematics Using the Belle TOF System

M Jones

University of Hawaii Honolulu Hawaii USA

Dated March

Abstract

The Belle TOF system gives a time resolution of about ps for highmomentum muons in

dimuonev entsbutpsforpionsandk aonsinhadronev ents Thisnoteexaminesv ariouseects

responsible for the poorer resolution for hadrons Three eects are found to be associated with

biasesinmeantimesandwithbroadeningof thetimeresolutions trac kshittingneargapsbet ween

TOFcoun terstrac kswithinconsisten tpredictedandcalculatedzpositionsandtrac ksforwhic h

adjacent TOFcoun tersha vehits

PACSn umbers

Core part ~100ps

But tails!!!RMS ~150ps

New!!

Page 36: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

35Instrumentation Dev. Lab Meeting – June, 2003

Why Such A Variance???

• Intrinsic Performance:– Tough to get– Beam tests don’t require

sustained operation– Hadronic Calibration!

• Very important – details omitted due to space limitations

• Much work, no fundamental understanding

• Velocity dependent (dE/dx?) fudge• Systematic, so no SQRT(2) • May be TWC technique dependent

– Sad history of underperformance:

• CLEO, CPLEAR, BESII, …

– Error Budget!!

Page 37: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

36Instrumentation Dev. Lab Meeting – June, 2003

Time Walk Correction

• Reasonable functional form– But as background increases…

tFixed threshold

V

T0

Twc

ADCGate

Q

Sensitive to “3 Effects”

• Many ideas: e.g. direct digitization at high speed? Peter Grach

Page 38: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

37Instrumentation Dev. Lab Meeting – June, 2003

Limitations

DIRC + MDC

Page 39: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

38Instrumentation Dev. Lab Meeting – June, 2003

TOP Counter

• Looks good, though Time-of-Propagation depends on photon wavelength

Page 40: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

39Instrumentation Dev. Lab Meeting – June, 2003

Cherenkov Ring folding

CCT is limit as X small

Not so different from DIRC partial ring reconstruction

Page 41: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

40Instrumentation Dev. Lab Meeting – June, 2003

Electronics – scenarios

Bar TOP

~5mm pos. resolution: 40 Ch/counter

Butterfly TOP

*200 counters = 1440 channelsMulti-hit (hidden cost) >1440 channels

Focusing DIRC

~few mm x few mm: few kCh/counter

*~100 counters: few 100k channels

~1mm pos. resolution: 200 Ch/counter

*180 counters = 36,000 channels

Page 42: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

41Instrumentation Dev. Lab Meeting – June, 2003

Time Stretcher Module

• Designed

with LRS

– R&D 100 Award

VIPA StandardModule

16 Channels/1 per DC

Stretch factor20x

RF clockReference

Page 43: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

42Instrumentation Dev. Lab Meeting – June, 2003

MTS1 Silicon (1)

Page 44: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

43Instrumentation Dev. Lab Meeting – June, 2003

Evaluation Board

CPLD (programmable

logic)MTS1 chip

Bottom view

Top view TTL-LVDS translator

• Quick and simple test board – Hulya to design/build and test a proper test board

Page 45: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

44Instrumentation Dev. Lab Meeting – June, 2003

MTS1 Timing Residuals

σ ~ 49ps

RMS ~ 51ps

• However, this value includes the (large) system jitter Gordon - readout Jim – NTS32

Page 46: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

45Instrumentation Dev. Lab Meeting – June, 2003

Occupancy issuesO ccupancy vs. DSSD radius

1

10

100

1000

0 2 4 6 8

radius (cm )

occu

panc

y (%)

V A1(Tp=1us)

VATA(Tp=0.5us)

Pipeline(150nswindow)

Pixel for R < 3cmPipeline for R < 10cm

Large ambiguity even with dedicated simulation.Need to be conservative.

Trigger simulation study desirable

Page 47: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

46Instrumentation Dev. Lab Meeting – June, 2003

Pixel Detector

•Board here (Fang working on)

•Test SNR vs. frame rate, etc.

•New board (student opportunity)

Page 48: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

47Instrumentation Dev. Lab Meeting – June, 2003

High Luminosity!

At L = 1035 cm-2/s :• Pipelined readout: 128k channels equiv., 40MHz x 2bytes

10 Tera-bytes per second! (10,000 CDs per second)

Global Decision logic trigger: 10kHz• FIFO: 128k channels equiv., 16 bytes

20 Giga-bytes per second! (200 GbE links)

COPPER, online Farm

200 Mega-bytes per second! (max. data rate to tape)

Page 49: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

48Instrumentation Dev. Lab Meeting – June, 2003

Common Electronics

• COPPER (COmmon Pipelined Platform for Electronics Readout)

• Card ~ crate – aid in data reduction

• On board data reduction

FIFOFIFO

FIFOFIFO

FIFOFIFO

FIFOFIFO

MemoryMemory

CPUCPU

Bridge

Local Bus PCI BusD

etec

tor S

igna

ls

FINESSEFINESSE

FINESSEFINESSE

FINESSEFINESSE

FINESSEFINESSE

Trigger inputTrigger interrupt

BridgeBridge

Mezzanine Cards

PCI Mezzanine Cards

ControlControl BridgeBridge

(Yangheng,Doug

working on )

Page 50: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

49Instrumentation Dev. Lab Meeting – June, 2003

CuEval FINESSE

• Front-end INstrumentation Entity for Sub-detector Specific Electronics

Dual 128kB RAM480 Mbps USB2.0

COPPER Interface

Hardware “ready” – Yangheng working on USB drivers

Page 51: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

50Instrumentation Dev. Lab Meeting – June, 2003

ANITA

Page 52: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

51Instrumentation Dev. Lab Meeting – June, 2003

The Flux Problem

• At E>10^21…

• Life is tough

∫∫∫θφ

θφ,,r

ddrd

Page 53: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

52Instrumentation Dev. Lab Meeting – June, 2003

Antarctic Impulsive Transient Antenna (ANITA)

M. R

osen, Univ. of H

awaii

ANITAGondola &

Payload

Antenna arrayCover (partially cut away)

Solar Panels

• ANITA Goal: Pathfinding mission for GZK neutrinos

• NASA SR&T funded since October 2002, launch in 2006

Page 54: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

53Instrumentation Dev. Lab Meeting – June, 2003

ANITA concept

Antarctic Ice at f<1GHz, T<-20C :

• ~Lossless RF transmission

• Minimal scattering

• largest homogenous, RF-transmissive solid mass in the world

Page 55: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

54Instrumentation Dev. Lab Meeting – June, 2003

ANITA Payload

Simulated pulse—multiple antennas

Dan Yi:Simulations

• ANITA antennas view ~2pi sr with 60 deg overlapping beams• Beam intensity gradiometry, interferometry, polarimetry used to determine pulse

direction & thus original neutrino track orientation

Page 56: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

55Instrumentation Dev. Lab Meeting – June, 2003

STRAW2 Chip Self-Triggered Recorder Analog Waveform (STRAW)

32x256 SCA bank

DACs ADC

Trigger

scalers

16 Channels of256 deep SCA buckets

Optimized for RF inputMicrostrip 50Ω

Record length:128-256ns

Target input Bandwidth:>700MHz

-LL and HL (adj.) for each channel

Sampling Rate:1-3GSa/s (adj.)

-Multiplicity triggerfor LL hits

On-chip ADC:12-bit, >2MSPS

External option:MUXed Analog out

Sampling Rates>~8GSa/s possiblew/ 0.25µm process

8192 analog storage cells

Die:~2.5mm2

Self-Triggering:

Under Test

Page 57: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

56Instrumentation Dev. Lab Meeting – June, 2003

STRAW2 Evaluation

• RF signal input

• Adjustable: 0.6 –3.4 GSa/s

• 256 samples (70 –300ns)

Page 58: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

57Instrumentation Dev. Lab Meeting – June, 2003

RF Response

• Sub-ns transient ping: <= 100ps leading edge

Scope ET sampling:100 Gsa/s equiv.

Page 59: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

58Instrumentation Dev. Lab Meeting – June, 2003

RF Response (2)• Low Power! (250mW/16 channels -- < 20mW/channel @ 3.3

GSa/s)

STRAW3 target:f3dB ~ 1.2GHz

STRAW2 already useable for NaCl

applications

STRAW2 TDS scope

Page 60: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

59Instrumentation Dev. Lab Meeting – June, 2003

ANITA-lite (prototype)

RF test flight in December –equipment to Texas in July

Jim, Mary & David assy.

Page 61: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

60Instrumentation Dev. Lab Meeting – June, 2003

Antenna testing and development

• Anechoic test chamber• Up to 400 lb embedded

salt stack

• PCB antenna development– Muon test chamber– SLAC T460

Page 62: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

61Instrumentation Dev. Lab Meeting – June, 2003

Horn Antenna Prototype

Antarctic Ice at f<1GHz, T<-20C :

• ~Lossless RF transmission

• Minimal scattering

• largest homogenous, RF-transmissive solid mass in the world

Dan Yi

Page 63: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

62Instrumentation Dev. Lab Meeting – June, 2003

Cosmic-ray Radio TestbedTestbed goals:• Detect first Askaryan signals

of cosmic origin– Use (rare) multi-TeV muon

or single hadron showers– Scintillation counter trigger

provides particle tag– 48 channel digitization via

time-multiplexing

• Development of large-scale DAQ needed for full-scale detector

– ~200 total antenna signals present

Operational since early August!– Data analysis underway

• Foreground: electronics rack & cable delay

• Background: salt chamber with amplifiers

DALI upgrade – Jim/Mary assy, Justin & Johnson readout

Page 64: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

63Instrumentation Dev. Lab Meeting – June, 2003

Natural Salt Domes: Potential PeV-EeVNeutrino Detectors

3-8 km

Qeshm Island, Hormuzstrait, Iran, 7km diameter salt dome

Salt domes: found throughout the world…

• Natural salt can be extremely low RF loss: ~ as radio clear as Antarctic ice• ~2.4 times as dense

• typical salt dome: 50-100 km3 water equivalent in top ~3km

Caprock visible from space

Isacksen salt dome, Elf Ringnes Island, Canada 8 by 5km 5-10km

Page 65: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

64Instrumentation Dev. Lab Meeting – June, 2003

GEISER

• Gigabit Ethernet Instrumentation for SalSA Electronic Readout

•David, Laine & Justin

•Prototype of real system – what better way to gain experience

•Much better than some bogus R&D (Research and Disposal)

•If works, may actually be deployed

http://www2.hawaii.edu/~ridley/

Page 66: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

65Instrumentation Dev. Lab Meeting – June, 2003

Documentation

• With so much going on – critical to document

•Kim has done a nice start, opportunities to expand

•Plan to expand the “People” section to include bios and work experience

•This can be a very nice pointer to work experience in your future

•I routinely get asked for recommendations and it is useful to have something in the public domain

http://www.phys.hawaii.edu/~idlab

Page 67: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

66Instrumentation Dev. Lab Meeting – June, 2003

Cross-Training

• Lab Interaction– Encourage you to learn about what each other working on

– Very useful to be able to share ideas

• Lab Basic Training– General Lab procedures (notebook, documentation)

– Electronics (handling, reading schematics,parts id)

– Soldering and hand wiring

– Computer usage

– Clean room (wire-bonding, materials handling)

I will be away July 17 I will be away July 17 –– August 11:August 11:If stuck on a project, good time to receive additional training

and learn new tools and skills

Page 68: Instrumentation Development Laboratory: An Introduction › ~idlab › presentations › Lab_Intro.pdf · Instrumentation Dev. Lab Meeting – June, 2003 47. High Luminosity! At L

67Instrumentation Dev. Lab Meeting – June, 2003

Preview of Coming Attractions

• Ongoing projects– Student Opportunities!! Tell your friends– Success depends on you

• Other opportunities– Jr./Sr. research projects [GEISER interesting]– Directed study– Publications (NIM/IEEE articles for MTS1 and STRAW2)– Board/firmware/chip design (this summer)– Many designs in queue; CDF, COW, MTS2, SalSA, and pixel

chips• Design, layout, simulation and test opportunities

Thoughts on how to improve things always welcome