 1Machai Hydropower Project Review Report on Integrated Plant Operation

TABLE OF CONTENTS

1. GENERAL ......................................................................................................................................... 4

1.1. PROPOSED LAYOUT (PRESENT STUDY) ................................................................................... 4

2. INTEGRATED POWER & ENERGY PRODUCTION WITH EXISTING HPP DOWNSTREAM................... 5

2.1. INTRODUCTION....................................................................................................................... 5

2.2. MODE OF PLANT OPERATION................................................................................................. 6

2.2.1. Variable Tail Water Levels................................................................................................... 6

2.2.2. Constant Tail Water Levels.................................................................................................. 6

2.2.3. Selected Mode .................................................................................................................... 7

2.3. CALCULATION OF HEAD ACROSS ............................................................................................ 8

2.3.1. Gross Head.......................................................................................................................... 8

2.3.2. Head Losses......................................................................................................................... 8

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 3/85

 2Machai Hydropower Project Review Report on Integrated Plant Operation

LIST OF FIGURES 

Figure 2.2 ................................................................................................................................................ 7

Figure 2.3 ................................................................................................................................................ 9

Figure 2.4.1 ........................................................................................................................................... 10

Figure 2.4.2 ........................................................................................................................................... 11

Figure 2.5.1 ........................................................................................................................................... 14

Figure 2.5.2  ........................................................................................................................................... 15

 

LIST OF TABLES 

Table 1………………………………………………………………………………………………  …5

Table 2…………………………………………………………………………………………  ………..13

 

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 4/85

 3Machai Hydropower Project Review Report on Integrated Plant Operation

LIST OF ABBREVIATIONS

ATL Associated Technologies (Pvt.) Ltd.

B Bed Width of Canal

SHYDO Sarhad Hydel Development Organization

KPK Khyber Pakhtunkhwa

CFD Computational Fluid Dynamics

cumecs cubic meter per secondcusecs cubic feet per second

D/S Down Stream

El. Elevation

E&M Electrical and Mechanical

FSL Full Supply Level

ft3/sec cubic feet per second

GWh Giga Watt Hour

HPP Hydropower Project

HWL Head Water Level

km Kilometer

kW Kilo Watt

L-Section Longitudinal Section

masl meters above sea level

MW Mega Watt

m3/sec cubic meter per second

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 5/85

 4Machai Hydropower Project Review Report on Integrated Plant Operation

STUDY OF INTEGRATED OPERATION OF MACHAI HYDROPOWER

PROJECT WITH EXISTING DOWNSTREAM HPP

1.  GENERAL

The Upper Swat Canal off-takes from Amandara headwork and trifurcates at its tail near

Dargai Town. Two canals and one escape off-take from the tail of Upper Swat canal which

are Machai Branch (latest design discharge: 68.67 m³/s), Abazai Branch (design discharge:

18.9 m³/s) and Dargai Escape. The Machai Branch head regulator was remodeled in 1999

by increasing its designed capacity from 48.71 m³/sec to 68.67 m³/sec.

The Machai Branch has a number of fall structures. Out of these falls, three falls at RD

47+010, RD 51+272 & RD 51+786 were allocated to Associated Technologies (Pvt) Limited

(ATL) and LOI was issued by SHYDO on 16 January 2009. However, based on directives

issued by the Khyber Pakhtunkhwa Government, it was decided to utilize only two falls i.e.

RD 51+272 & RD 51+786. The canal is perennial and closed during month of January and

first 10 daily of February for annual maintenance purposes. For the proposed hydropower

station, the fall structures of RD 51+272 and RD 51+786 are used.

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 6/85

 5Machai Hydropower Project Review Report on Integrated Plant Operation

2.  INTEGRATED POWER & ENERGY PRODUCTION WITH EXISTING

HPP DOWNSTREAM

2.1. 

An existing hydropower project is situated just 310m downstream of the Machai hydropower

project. Although the flows available for the Machai HPP would remain same but the head

across the Machai HPP would be adversely affected by the operation of existing HPP at d/s.

Under the integrated operation of the two (02) hydropower projects, the basis for selection of

installed capacity for Machai Hydropower Project and corresponding estimated annual

energy production has been explained in detail in this section. The daily discharge data used

for calculations is derived from the remodeled canal Longitudinal-section acquired from the

relevant Irrigation and Power Department. Different design parameters (existing) related tothe related two falls have been tabulated as following Table 3.1:

INTRODUCTION

Table 1

Design Parameters Fall at RD 51+272 Fall at RD 51+786

Design Discharge 51.00 cumec 51.00 cumec

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 7/85

 6Machai Hydropower Project Review Report on Integrated Plant Operation

2.2. 

The design head across for the proposed powerhouse depends on the difference of HeadWater Level (HWL) and Tail Water Level (TWL). In the detail report on “POWER & ENERGY

OPTIMIZATION”, it has been described in detail that Head Water Level (HWL) has been

taken at its maximum and constant throughout to get highest energy benefits.

MODE OF PLANT OPERATION

Broadly speaking, the Tail Water Level (TWL) in downstream reach of a powerhouse is not

controlled and tail water rating curve is used to assess the tail water level corresponding torange of discharges. However, considering the integrated operation of Machai hydropower

project along with the operation of existing hydropower project situated d/s of the Machai

HPP, the tail water levels (TWL) of Machai HPP will be controlled by existing HPP. The

operation of the existing HPP situated at d/s is based on keeping the Head Water Level

(HWL) at maximum most of the times to get highest benefits from the existing HPP. Under

these conditions, two scenarios for HWL have been analyzed and briefly described below.

2.2.1.  Variable Tail Water Levels

This scenario is based on the daily fluctuation of TWL based on observed flows; that means

no ponding is considered in the tailrace canal. This scenario represents the case when the

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 8/85

 7Machai Hydropower Project Review Report on Integrated Plant Operation

2.2.3.  Selected Mode

It is quite obvious that power potential and corresponding annual energy production can be

achieved more by keeping the tail water level variable but due to the presence of the existing

hydropower project d/s of the Machai HPP, it is impossible to control the d/s flow levels. To

 judge the worst effect on the energy production of Machai HPP, it has been decided to use

the maximum tail water level of canal at this location for project sizing and energy generation

calculations under integrated study. The net head across variations keeping the TWL

variable is in the range of 5.88 m to 8.13 m to as shown in Figure below. However by

considering the constant TWL, it remains as 5.48 m throughout the year i.e. the worst case

of energy production.

Figure 2.2

9.00

Machai Hydropower Project

Head Availability Corresponding to Time

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 9/85

 8Machai Hydropower Project Review Report on Integrated Plant Operation

2.3.  CALCULATION OF HEAD ACROSS

The methodology for gross and net head estimation for power generation of Machai

hydropower project under integrated operation of two hydropower projects is described in

the sections below.

2.3.1.  Gross Head

In order to generate energy the head available at two falls need to be combined. For the

calculation of daily gross head a constant HWL and TWL are calculated as 446.582 masl

and 440.624 masl. Details of plant / HWL & TWL operation modes have been briefly

described earlier. By considering this scenario, the gross head remains 5.96 m throughout

the time.

2.3.2.  Head Losses

The head losses have been estimated for the entire water way upto the turbines. These

include the local losses at ends and transitions in headrace, in trashracks, in gate / stoplog

l t t Th f i ti l i th h d h l h b bt t d f th

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 10/85

 9Machai Hydropower Project Review Report on Integrated Plant Operation

Figure 2.3

5.00

6.00

7.00

8.00

9.00

        1        4        1

        8        1

        1        2        1

        1        6        1

        2        0        1

        2        4        1

        2        8        1

        3        2        1

        3        6        1

   H   e   a   d   A   c   r   o   s   s    (   m    )

Time (Days)

Machai Hydropower Project

Daily Net Head Across

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 11/85

 10Machai Hydropower Project Review Report on Integrated Plant Operation

Figure 2.4.1

0

10

20

30

40

50

        1        4        1

        8        1

        1        2        1

        1        6        1

        2        0        1

        2        4        1

        2        8        1

        3        2        1

        3        6        1

   A   v   e   r   a   g

   e   D   a   i    l   y   F    l   o   w   s    (   c   u   m   e   c   s    )

Ti (D )

Machai Hydropower Project

Historical Average Daily Flows

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 12/85

 11Machai Hydropower Project Review Report on Integrated Plant Operation

Figure 2.4.2

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

0 20 40 60 80 100

   D   i   s   c    h   a   r   g   e    (   c   u   m   e   c   s    )

Percentage Excedence (%)

Machai Hydropower Project

Historical Flow Duration Curve

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 13/85

 12Machai Hydropower Project Review Report on Integrated Plant Operation

2.5. 

2.5.1. 

OPTIMIZATION OF INSTALLED CAPACITY 

Optimization Criteria

While selecting the design discharge, it is decided to tap the full energy potential of Machai

Canal at this site. The power potential and corresponding annual energy production has

been calculated at a range of discharge as described below.

2.5.2.  Power and Energy Calculations

The calculations for power potential and annual energy production of Machai HPP under

integrated operation have been performed on average daily data using a spreadsheet

model. The model takes into account the variation in turbine efficiency with daily discharge

availability. A range of turbines from one (01) to three (03) have been considered withoptimized result for the two (02) number of turbines. Turbine, generator and transformer

efficiencies are taken conservative on lower side as 85%, 96% & 98% respectively with the

combined efficiency of the system as 80%.

2.5.3.  Selected Installed Capacity

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 14/85

 13Machai Hydropower Project Review Report on Integrated Plant Operation

Table 2

Selection of Optimized Designed Discharge (Integrated Operation)

Sr.

No.

Q Available

for % of

Time

FlowTurbine

Discharge

Rated

Head

No. of

Turbine

Units

Total

Power

Potential

Energy

Production

Plant

Factor

cumecs (cumecs) (m) (No.) MW GWh %

1 1.00 48.45 24.23 5.48 2 2.08 13.10 71.78

2 2.0 46.52 23.26 5.48 2 2.00 12.94 73.84

3 3.0 45.97 22.99 5.48 2 1.98 12.83 74.11

4 5.0 45.63 22.82 5.48 2 1.96 12.79 74.38

5 7.0 44.73 22.37 5.48 2 1.92 12.60 74.79

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 15/85

 14Machai Hydropower Project Review Report on Integrated Plant Operation

Figure 2.5.1

71.0

72.0

73.0

74.0

75.0

12.50

12.70

12.90

13.10

13.30

44 45 46 47 48 49

   P    l   a   n   t   F   a   c   t   o   r    (   %    )

   A   n   n   u

   a    l   E   n   e   r   g   y   P   r   o   d   u   c   t   i   o   n

    (   G   W    h    )

Design Discharge (cumec)

Machai Hydropower Project

Optimization of Design Discharge (Integrated Operation)

A l E P d ti Pl t F t

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 16/85

 15Machai Hydropower Project Review Report on Integrated Plant Operation

Figure 2.5.2

64.5

67.0

69.5

72.0

74.5

11.0

11.5

12.0

12.5

13.0

1 2 3

   P    l   a   n   t   F   a   c   t   o   r    (   %    )

   A   n   n   u

   a    l   E   n   e   r   g   y   P   r   o   d   u   c   t   i   o   n

    (   G   W    h    )

No. of Turbine Units

Machai Hydropower ProjectOptimization of No. of Turbine Units (Integrated

Operation)

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 17/85

 

Associated Technologies (Pvt) Ltd

16Machai Hydropower Project Project Layout Review Report

ENERGY COMPUTATION AT DESIGNED DISCHARGE Q1 (Integrated Operation)

Designed Discharge, Q1 = 48.45 cumecs

Designed Q Available for % Time of year = 1.00 %

Total No. of Turbines = 2

Designed Discharge of Each Turbine = 24.23 cumecs

Min. Operating Discharge of Each Unit = 12.11 cumecs 50%

Rated Net Head Available = 5.48 m

Turbine Efficiency = 85%

Generator Efficiency = 96%

Transformer Efficiency = 98%

Overall Efficiency = 79.97%

Installed Power Potential of Each Unit = 1.04 MW

Total Installed Power Potential = 2.08 MW

Annual Energy Production (Actual) = 13.10 GWh

Annual Energy Production (Theoretical) = 18.25 GWh

Plant Factor = 71.78 %

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 18/85

 

Associated Technologies (Pvt) Ltd

17Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

Day of

Year

Average

Discharge

Average

Net

Head

Turbines Discharges Turbines Power Potential Total

Energy

Production

Q H Qnet QA TotalB P PA TotalB 

(cumecs) (m) (cumecs) (cumecs) (cumecs) (MW) (MW) (MW) (GWh)

1 2.66 7.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2 2.71 7.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3 2.71 7.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4 0.63 8.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5 0.69 8.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00

6 0.61 8.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

7 0.71 8.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8 0.72 8.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00

9 0.44 8.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00

10 0.59 8.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

11 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

12 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

13 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 19/85

 

Associated Technologies (Pvt) Ltd

18Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

14 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

15 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

16 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

17 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

18 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

19 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

20 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

21 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

22 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

23 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

24 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

25 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

26 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

27 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

28 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

29 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

30 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

31 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 20/85

 

Associated Technologies (Pvt) Ltd

19Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

32 1.84 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

33 2.63 7.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

34 2.45 7.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

35 2.45 7.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

36 2.54 7.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00

37 3.89 7.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00

38 6.60 7.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00

39 5.19 7.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00

40 6.36 7.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00

41 5.61 7.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00

42 5.45 7.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00

43 5.30 7.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00

44 5.21 7.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00

45 3.73 7.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00

46 3.03 7.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00

47 1.61 8.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00

48 4.26 7.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00

49 4.06 7.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 21/85

 

Associated Technologies (Pvt) Ltd

20Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

50 1.79 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

51 1.68 8.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00

52 4.08 7.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00

53 5.95 7.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00

54 8.20 7.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00

55 10.13 7.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00

56 10.28 7.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00

57 11.65 7.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00

58 12.70 7.28 12.70 0.00 12.70 1.04 0.00 1.04 0.03

59 12.38 7.30 12.38 0.00 12.38 1.04 0.00 1.04 0.03

60 14.28 7.18 14.28 0.00 14.28 1.04 0.00 1.04 0.03

61 12.72 7.28 12.72 0.00 12.72 1.04 0.00 1.04 0.03

62 12.57 7.29 12.57 0.00 12.57 1.04 0.00 1.04 0.03

63 9.72 7.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00

64 8.94 7.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00

65 10.71 7.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00

66 11.04 7.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00

67 12.03 7.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 22/85

 

Associated Technologies (Pvt) Ltd

21Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

68 12.48 7.29 12.48 0.00 12.48 1.04 0.00 1.04 0.03

69 16.40 7.06 16.40 0.00 16.40 1.04 0.00 1.04 0.03

70 16.48 7.05 16.48 0.00 16.48 1.04 0.00 1.04 0.03

71 17.33 7.00 17.33 0.00 17.33 1.04 0.00 1.04 0.03

72 21.51 6.77 21.51 0.00 21.51 1.04 0.00 1.04 0.03

73 23.57 6.66 23.57 0.00 23.57 1.04 0.00 1.04 0.03

74 24.85 6.60 12.11 12.74 24.85 1.04 1.04 2.08 0.05

75 25.68 6.55 12.11 13.56 25.68 1.04 1.04 2.08 0.05

76 26.35 6.52 12.11 14.24 26.35 1.04 1.04 2.08 0.05

77 24.09 6.63 24.09 0.00 24.09 1.04 0.00 1.04 0.03

78 23.93 6.64 23.93 0.00 23.93 1.04 0.00 1.04 0.03

79 23.03 6.69 23.03 0.00 23.03 1.04 0.00 1.04 0.03

80 21.39 6.78 21.39 0.00 21.39 1.04 0.00 1.04 0.03

81 22.39 6.72 22.39 0.00 22.39 1.04 0.00 1.04 0.03

82 22.85 6.70 22.85 0.00 22.85 1.04 0.00 1.04 0.03

83 21.79 6.76 21.79 0.00 21.79 1.04 0.00 1.04 0.03

84 20.53 6.82 20.53 0.00 20.53 1.04 0.00 1.04 0.03

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 23/85

 

Associated Technologies (Pvt) Ltd

22Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

85 24.03 6.64 24.03 0.00 24.03 1.04 0.00 1.04 0.03

86 24.95 6.59 12.11 12.84 24.95 1.04 1.04 2.08 0.05

87 26.89 6.50 12.11 14.78 26.89 1.04 1.04 2.08 0.05

88 30.05 6.35 12.11 17.94 30.05 1.04 1.04 2.08 0.05

89 31.11 6.30 12.11 19.00 31.11 1.04 1.04 2.08 0.05

90 33.51 6.19 12.11 21.40 33.51 1.04 1.04 2.08 0.05

91 30.58 6.32 12.11 18.47 30.58 1.04 1.04 2.08 0.05

92 28.52 6.42 12.11 16.41 28.52 1.04 1.04 2.08 0.05

93 29.11 6.39 12.11 17.00 29.11 1.04 1.04 2.08 0.05

94 28.86 6.40 12.11 16.75 28.86 1.04 1.04 2.08 0.05

95 27.47 6.47 12.11 15.36 27.47 1.04 1.04 2.08 0.05

96 26.52 6.51 12.11 14.40 26.52 1.04 1.04 2.08 0.05

97 26.93 6.49 12.11 14.82 26.93 1.04 1.04 2.08 0.05

98 27.98 6.44 12.11 15.87 27.98 1.04 1.04 2.08 0.05

99 30.90 6.31 12.11 18.79 30.90 1.04 1.04 2.08 0.05

100 31.90 6.26 12.11 19.79 31.90 1.04 1.04 2.08 0.05

101 32.66 6.23 12.11 20.55 32.66 1.04 1.04 2.08 0.05

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 24/85

 

Associated Technologies (Pvt) Ltd

23Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

102 33.45 6.20 12.11 21.34 33.45 1.04 1.04 2.08 0.05

103 33.10 6.21 12.11 20.98 33.10 1.04 1.04 2.08 0.05

104 34.67 6.15 12.11 22.56 34.67 1.04 1.04 2.08 0.05

105 34.87 6.14 12.11 22.76 34.87 1.04 1.04 2.08 0.05

106 36.06 6.09 12.11 23.95 36.06 1.04 1.04 2.08 0.05

107 35.71 6.10 12.11 23.59 35.71 1.04 1.04 2.08 0.05

108 36.00 6.09 12.11 23.89 36.00 1.04 1.04 2.08 0.05

109 36.08 6.09 12.11 23.97 36.08 1.04 1.04 2.08 0.05

110 36.13 6.09 12.11 24.02 36.13 1.04 1.04 2.08 0.05

111 36.47 6.07 12.24 24.23 36.47 1.04 1.04 2.08 0.05

112 36.52 6.07 12.30 24.23 36.52 1.04 1.04 2.08 0.05

113 36.57 6.07 12.34 24.23 36.57 1.04 1.04 2.08 0.05

114 37.53 6.03 13.31 24.23 37.53 1.04 1.04 2.08 0.05

115 36.75 6.06 12.53 24.23 36.75 1.04 1.04 2.08 0.05

116 38.17 6.01 13.95 24.23 38.17 1.04 1.04 2.08 0.05

117 37.60 6.03 13.37 24.23 37.60 1.04 1.04 2.08 0.05

118 37.80 6.02 13.57 24.23 37.80 1.04 1.04 2.08 0.05

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 25/85

 

Associated Technologies (Pvt) Ltd

24Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

119 37.82 6.02 13.59 24.23 37.82 1.04 1.04 2.08 0.05

120 38.42 6.00 14.19 24.23 38.42 1.04 1.04 2.08 0.05

121 33.40 6.20 12.11 21.29 33.40 1.04 1.04 2.08 0.05

122 34.98 6.13 12.11 22.87 34.98 1.04 1.04 2.08 0.05

123 35.09 6.13 12.11 22.98 35.09 1.04 1.04 2.08 0.05

124 33.56 6.19 12.11 21.45 33.56 1.04 1.04 2.08 0.05

125 33.43 6.20 12.11 21.32 33.43 1.04 1.04 2.08 0.05

126 33.43 6.20 12.11 21.32 33.43 1.04 1.04 2.08 0.05

127 33.34 6.20 12.11 21.22 33.34 1.04 1.04 2.08 0.05

128 33.99 6.17 12.11 21.88 33.99 1.04 1.04 2.08 0.05

129 34.56 6.15 12.11 22.45 34.56 1.04 1.04 2.08 0.05

130 34.78 6.14 12.11 22.66 34.78 1.04 1.04 2.08 0.05

131 34.47 6.15 12.11 22.35 34.47 1.04 1.04 2.08 0.05

132 35.94 6.09 12.11 23.83 35.94 1.04 1.04 2.08 0.05

133 38.06 6.01 13.83 24.23 38.06 1.04 1.04 2.08 0.05

134 38.64 5.99 14.41 24.23 38.64 1.04 1.04 2.08 0.05

135 39.37 5.96 15.15 24.23 39.37 1.04 1.04 2.08 0.05

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 26/85

 

Associated Technologies (Pvt) Ltd

25Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

136 39.37 5.96 15.15 24.23 39.37 1.04 1.04 2.08 0.05

137 39.37 5.96 15.15 24.23 39.37 1.04 1.04 2.08 0.05

138 40.02 5.94 15.80 24.23 40.02 1.04 1.04 2.08 0.05

139 40.33 5.93 16.10 24.23 40.33 1.04 1.04 2.08 0.05

140 40.35 5.92 16.13 24.23 40.35 1.04 1.04 2.08 0.05

141 40.27 5.93 16.05 24.23 40.27 1.04 1.04 2.08 0.05

142 40.27 5.93 16.05 24.23 40.27 1.04 1.04 2.08 0.05

143 40.09 5.93 15.86 24.23 40.09 1.04 1.04 2.08 0.05

144 39.21 5.97 14.99 24.23 39.21 1.04 1.04 2.08 0.05

145 40.59 5.92 16.36 24.23 40.59 1.04 1.04 2.08 0.05

146 40.51 5.92 16.28 24.23 40.51 1.04 1.04 2.08 0.05

147 40.53 5.92 16.31 24.23 40.53 1.04 1.04 2.08 0.05

148 40.53 5.92 16.31 24.23 40.53 1.04 1.04 2.08 0.05

149 40.43 5.92 16.21 24.23 40.43 1.04 1.04 2.08 0.05

150 40.63 5.91 16.41 24.23 40.63 1.04 1.04 2.08 0.05

151 40.77 5.91 16.54 24.23 40.77 1.04 1.04 2.08 0.05

152 40.98 5.90 16.75 24.23 40.98 1.04 1.04 2.08 0.05

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 27/85

 

Associated Technologies (Pvt) Ltd

26Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

153 41.11 5.90 16.89 24.23 41.11 1.04 1.04 2.08 0.05

154 40.94 5.90 16.71 24.23 40.94 1.04 1.04 2.08 0.05

155 41.01 5.90 16.78 24.23 41.01 1.04 1.04 2.08 0.05

156 41.24 5.89 17.01 24.23 41.24 1.04 1.04 2.08 0.05

157 38.73 5.98 14.51 24.23 38.73 1.04 1.04 2.08 0.05

158 41.01 5.90 16.78 24.23 41.01 1.04 1.04 2.08 0.05

159 41.32 5.89 17.09 24.23 41.32 1.04 1.04 2.08 0.05

160 41.32 5.89 17.09 24.23 41.32 1.04 1.04 2.08 0.05

161 41.31 5.89 17.08 24.23 41.31 1.04 1.04 2.08 0.05

162 41.73 5.88 17.50 24.23 41.73 1.04 1.04 2.08 0.05

163 41.14 5.90 16.92 24.23 41.14 1.04 1.04 2.08 0.05

164 40.52 5.92 16.30 24.23 40.52 1.04 1.04 2.08 0.05

165 40.82 5.91 16.60 24.23 40.82 1.04 1.04 2.08 0.05

166 41.30 5.89 17.07 24.23 41.30 1.04 1.04 2.08 0.05

167 41.63 5.88 17.41 24.23 41.63 1.04 1.04 2.08 0.05

168 39.15 5.97 14.92 24.23 39.15 1.04 1.04 2.08 0.05

169 39.16 5.97 14.93 24.23 39.16 1.04 1.04 2.08 0.05

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 28/85

 

Associated Technologies (Pvt) Ltd

27Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

170 39.37 5.96 15.14 24.23 39.37 1.04 1.04 2.08 0.05

171 36.64 6.07 12.42 24.23 36.64 1.04 1.04 2.08 0.05

172 39.69 5.95 15.47 24.23 39.69 1.04 1.04 2.08 0.05

173 39.83 5.94 15.60 24.23 39.83 1.04 1.04 2.08 0.05

174 39.98 5.94 15.76 24.23 39.98 1.04 1.04 2.08 0.05

175 39.77 5.95 15.55 24.23 39.77 1.04 1.04 2.08 0.05

176 38.95 5.98 14.72 24.23 38.95 1.04 1.04 2.08 0.05

177 39.17 5.97 14.95 24.23 39.17 1.04 1.04 2.08 0.05

178 39.83 5.94 15.60 24.23 39.83 1.04 1.04 2.08 0.05

179 40.40 5.92 16.17 24.23 40.40 1.04 1.04 2.08 0.05

180 38.76 5.98 14.53 24.23 38.76 1.04 1.04 2.08 0.05

181 38.63 5.99 14.40 24.23 38.63 1.04 1.04 2.08 0.05

182 38.87 5.98 14.64 24.23 38.87 1.04 1.04 2.08 0.05

183 40.20 5.93 15.98 24.23 40.20 1.04 1.04 2.08 0.05

184 39.82 5.94 15.59 24.23 39.82 1.04 1.04 2.08 0.05

185 40.28 5.93 16.06 24.23 40.28 1.04 1.04 2.08 0.05

186 40.17 5.93 15.95 24.23 40.17 1.04 1.04 2.08 0.05

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 29/85

 

Associated Technologies (Pvt) Ltd

28Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

187 39.12 5.97 14.89 24.23 39.12 1.04 1.04 2.08 0.05

188 39.16 5.97 14.94 24.23 39.16 1.04 1.04 2.08 0.05

189 39.63 5.95 15.41 24.23 39.63 1.04 1.04 2.08 0.05

190 40.86 5.91 16.64 24.23 40.86 1.04 1.04 2.08 0.05

191 38.86 5.98 14.63 24.23 38.86 1.04 1.04 2.08 0.05

192 39.77 5.95 15.54 24.23 39.77 1.04 1.04 2.08 0.05

193 40.04 5.94 15.81 24.23 40.04 1.04 1.04 2.08 0.05

194 37.69 6.02 13.46 24.23 37.69 1.04 1.04 2.08 0.05

195 36.96 6.05 12.74 24.23 36.96 1.04 1.04 2.08 0.05

196 36.04 6.09 12.11 23.93 36.04 1.04 1.04 2.08 0.05

197 36.94 6.05 12.71 24.23 36.94 1.04 1.04 2.08 0.05

198 35.01 6.13 12.11 22.90 35.01 1.04 1.04 2.08 0.05

199 34.95 6.13 12.11 22.83 34.95 1.04 1.04 2.08 0.05

200 35.25 6.12 12.11 23.14 35.25 1.04 1.04 2.08 0.05

201 35.12 6.13 12.11 23.01 35.12 1.04 1.04 2.08 0.05

202 34.58 6.15 12.11 22.47 34.58 1.04 1.04 2.08 0.05

203 34.21 6.16 12.11 22.10 34.21 1.04 1.04 2.08 0.05

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 30/85

 

Associated Technologies (Pvt) Ltd

29Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

204 35.14 6.13 12.11 23.03 35.14 1.04 1.04 2.08 0.05

205 34.48 6.15 12.11 22.37 34.48 1.04 1.04 2.08 0.05

206 31.85 6.27 12.11 19.74 31.85 1.04 1.04 2.08 0.05

207 31.38 6.29 12.11 19.27 31.38 1.04 1.04 2.08 0.05

208 30.51 6.33 12.11 18.40 30.51 1.04 1.04 2.08 0.05

209 31.06 6.30 12.11 18.95 31.06 1.04 1.04 2.08 0.05

210 29.74 6.36 12.11 17.63 29.74 1.04 1.04 2.08 0.05

211 30.50 6.33 12.11 18.39 30.50 1.04 1.04 2.08 0.05

212 30.90 6.31 12.11 18.79 30.90 1.04 1.04 2.08 0.05

213 28.02 6.44 12.11 15.91 28.02 1.04 1.04 2.08 0.05

214 31.75 6.27 12.11 19.64 31.75 1.04 1.04 2.08 0.05

215 31.25 6.29 12.11 19.14 31.25 1.04 1.04 2.08 0.05

216 29.56 6.37 12.11 17.45 29.56 1.04 1.04 2.08 0.05

217 29.93 6.35 12.11 17.81 29.93 1.04 1.04 2.08 0.05

218 30.16 6.34 12.11 18.05 30.16 1.04 1.04 2.08 0.05

219 30.07 6.35 12.11 17.96 30.07 1.04 1.04 2.08 0.05

220 30.28 6.34 12.11 18.17 30.28 1.04 1.04 2.08 0.05

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 31/85

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 32/85

 

Associated Technologies (Pvt) Ltd

31Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

238 29.13 6.39 12.11 17.02 29.13 1.04 1.04 2.08 0.05

239 29.07 6.39 12.11 16.95 29.07 1.04 1.04 2.08 0.05

240 28.42 6.42 12.11 16.31 28.42 1.04 1.04 2.08 0.05

241 29.81 6.36 12.11 17.69 29.81 1.04 1.04 2.08 0.05

242 27.49 6.47 12.11 15.38 27.49 1.04 1.04 2.08 0.05

243 26.35 6.52 12.11 14.24 26.35 1.04 1.04 2.08 0.05

244 32.00 6.26 12.11 19.89 32.00 1.04 1.04 2.08 0.05

245 31.51 6.28 12.11 19.40 31.51 1.04 1.04 2.08 0.05

246 35.46 6.11 12.11 23.34 35.46 1.04 1.04 2.08 0.05

247 33.98 6.17 12.11 21.87 33.98 1.04 1.04 2.08 0.05

248 33.01 6.21 12.11 20.90 33.01 1.04 1.04 2.08 0.05

249 34.62 6.15 12.11 22.50 34.62 1.04 1.04 2.08 0.05

250 34.88 6.14 12.11 22.76 34.88 1.04 1.04 2.08 0.05

251 36.72 6.06 12.50 24.23 36.72 1.04 1.04 2.08 0.05

252 36.85 6.06 12.62 24.23 36.85 1.04 1.04 2.08 0.05

253 38.84 5.98 14.62 24.23 38.84 1.04 1.04 2.08 0.05

254 38.74 5.98 14.52 24.23 38.74 1.04 1.04 2.08 0.05

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 33/85

 

Associated Technologies (Pvt) Ltd

32Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

255 35.35 6.12 12.11 23.24 35.35 1.04 1.04 2.08 0.05

256 39.82 5.94 15.59 24.23 39.82 1.04 1.04 2.08 0.05

257 36.86 6.06 12.63 24.23 36.86 1.04 1.04 2.08 0.05

258 36.62 6.07 12.39 24.23 36.62 1.04 1.04 2.08 0.05

259 37.13 6.05 12.90 24.23 37.13 1.04 1.04 2.08 0.05

260 36.41 6.07 12.18 24.23 36.41 1.04 1.04 2.08 0.05

261 37.20 6.04 12.98 24.23 37.20 1.04 1.04 2.08 0.05

262 38.80 5.98 14.58 24.23 38.80 1.04 1.04 2.08 0.05

263 39.57 5.95 15.35 24.23 39.57 1.04 1.04 2.08 0.05

264 35.71 6.10 12.11 23.60 35.71 1.04 1.04 2.08 0.05

265 37.74 6.02 13.51 24.23 37.74 1.04 1.04 2.08 0.05

266 37.25 6.04 13.03 24.23 37.25 1.04 1.04 2.08 0.05

267 35.62 6.11 12.11 23.51 35.62 1.04 1.04 2.08 0.05

268 32.35 6.24 12.11 20.24 32.35 1.04 1.04 2.08 0.05

269 30.65 6.32 12.11 18.54 30.65 1.04 1.04 2.08 0.05

270 32.78 6.22 12.11 20.67 32.78 1.04 1.04 2.08 0.05

271 31.05 6.30 12.11 18.94 31.05 1.04 1.04 2.08 0.05

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 34/85

 

Associated Technologies (Pvt) Ltd

33Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

272 31.34 6.29 12.11 19.22 31.34 1.04 1.04 2.08 0.05

273 30.09 6.34 12.11 17.98 30.09 1.04 1.04 2.08 0.05

274 29.56 6.37 12.11 17.45 29.56 1.04 1.04 2.08 0.05

275 28.23 6.43 12.11 16.12 28.23 1.04 1.04 2.08 0.05

276 28.10 6.44 12.11 15.99 28.10 1.04 1.04 2.08 0.05

277 29.75 6.36 12.11 17.64 29.75 1.04 1.04 2.08 0.05

278 30.86 6.31 12.11 18.75 30.86 1.04 1.04 2.08 0.05

279 29.67 6.36 12.11 17.56 29.67 1.04 1.04 2.08 0.05

280 30.74 6.31 12.11 18.63 30.74 1.04 1.04 2.08 0.05

281 31.13 6.30 12.11 19.01 31.13 1.04 1.04 2.08 0.05

282 33.00 6.22 12.11 20.89 33.00 1.04 1.04 2.08 0.05

283 33.37 6.20 12.11 21.25 33.37 1.04 1.04 2.08 0.05

284 31.76 6.27 12.11 19.64 31.76 1.04 1.04 2.08 0.05

285 27.06 6.49 12.11 14.95 27.06 1.04 1.04 2.08 0.05

286 30.04 6.35 12.11 17.93 30.04 1.04 1.04 2.08 0.05

287 27.51 6.47 12.11 15.40 27.51 1.04 1.04 2.08 0.05

288 26.80 6.50 12.11 14.69 26.80 1.04 1.04 2.08 0.05

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 35/85

 

Associated Technologies (Pvt) Ltd

34Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

289 25.59 6.56 12.11 13.48 25.59 1.04 1.04 2.08 0.05

290 24.17 6.63 24.17 0.00 24.17 1.04 0.00 1.04 0.03

291 24.01 6.64 24.01 0.00 24.01 1.04 0.00 1.04 0.03

292 28.34 6.43 12.11 16.23 28.34 1.04 1.04 2.08 0.05

293 28.57 6.41 12.11 16.45 28.57 1.04 1.04 2.08 0.05

294 24.89 6.59 12.11 12.78 24.89 1.04 1.04 2.08 0.05

295 24.46 6.62 12.11 12.35 24.46 1.04 1.04 2.08 0.05

296 24.09 6.64 24.09 0.00 24.09 1.04 0.00 1.04 0.03

297 25.86 6.55 12.11 13.75 25.86 1.04 1.04 2.08 0.05

298 27.85 6.45 12.11 15.74 27.85 1.04 1.04 2.08 0.05

299 25.64 6.56 12.11 13.53 25.64 1.04 1.04 2.08 0.05

300 25.69 6.55 12.11 13.58 25.69 1.04 1.04 2.08 0.05

301 25.22 6.58 12.11 13.11 25.22 1.04 1.04 2.08 0.05

302 24.85 6.60 12.11 12.74 24.85 1.04 1.04 2.08 0.05

303 24.10 6.63 24.10 0.00 24.10 1.04 0.00 1.04 0.03

304 23.42 6.67 23.42 0.00 23.42 1.04 0.00 1.04 0.03

305 19.53 6.88 19.53 0.00 19.53 1.04 0.00 1.04 0.03

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 36/85

 

Associated Technologies (Pvt) Ltd

35Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

306 24.06 6.64 24.06 0.00 24.06 1.04 0.00 1.04 0.03

307 20.65 6.82 20.65 0.00 20.65 1.04 0.00 1.04 0.03

308 22.14 6.74 22.14 0.00 22.14 1.04 0.00 1.04 0.03

309 21.97 6.75 21.97 0.00 21.97 1.04 0.00 1.04 0.03

310 16.83 7.03 16.83 0.00 16.83 1.04 0.00 1.04 0.03

311 20.97 6.80 20.97 0.00 20.97 1.04 0.00 1.04 0.03

312 21.77 6.76 21.77 0.00 21.77 1.04 0.00 1.04 0.03

313 24.98 6.59 12.11 12.87 24.98 1.04 1.04 2.08 0.05

314 25.11 6.58 12.11 13.00 25.11 1.04 1.04 2.08 0.05

315 25.42 6.57 12.11 13.31 25.42 1.04 1.04 2.08 0.05

316 24.80 6.60 12.11 12.69 24.80 1.04 1.04 2.08 0.05

317 22.71 6.71 22.71 0.00 22.71 1.04 0.00 1.04 0.03

318 24.80 6.60 12.11 12.69 24.80 1.04 1.04 2.08 0.05

319 22.93 6.69 22.93 0.00 22.93 1.04 0.00 1.04 0.03

320 21.01 6.80 21.01 0.00 21.01 1.04 0.00 1.04 0.03

321 17.54 6.99 17.54 0.00 17.54 1.04 0.00 1.04 0.03

322 16.41 7.06 16.41 0.00 16.41 1.04 0.00 1.04 0.03

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 37/85

 

Associated Technologies (Pvt) Ltd

36Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

323 18.80 6.92 18.80 0.00 18.80 1.04 0.00 1.04 0.03

324 18.18 6.95 18.18 0.00 18.18 1.04 0.00 1.04 0.03

325 19.23 6.89 19.23 0.00 19.23 1.04 0.00 1.04 0.03

326 18.42 6.94 18.42 0.00 18.42 1.04 0.00 1.04 0.03

327 21.08 6.79 21.08 0.00 21.08 1.04 0.00 1.04 0.03

328 21.32 6.78 21.32 0.00 21.32 1.04 0.00 1.04 0.03

329 23.55 6.66 23.55 0.00 23.55 1.04 0.00 1.04 0.03

330 23.52 6.66 23.52 0.00 23.52 1.04 0.00 1.04 0.03

331 21.65 6.76 21.65 0.00 21.65 1.04 0.00 1.04 0.03

332 21.51 6.77 21.51 0.00 21.51 1.04 0.00 1.04 0.03

333 19.89 6.86 19.89 0.00 19.89 1.04 0.00 1.04 0.03

334 23.05 6.69 23.05 0.00 23.05 1.04 0.00 1.04 0.03

335 19.74 6.87 19.74 0.00 19.74 1.04 0.00 1.04 0.03

336 19.02 6.91 19.02 0.00 19.02 1.04 0.00 1.04 0.03

337 16.96 7.02 16.96 0.00 16.96 1.04 0.00 1.04 0.03

338 15.76 7.09 15.76 0.00 15.76 1.04 0.00 1.04 0.03

339 15.52 7.11 15.52 0.00 15.52 1.04 0.00 1.04 0.03

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 38/85

 

Associated Technologies (Pvt) Ltd

37Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

340 15.12 7.13 15.12 0.00 15.12 1.04 0.00 1.04 0.03

341 16.38 7.06 16.38 0.00 16.38 1.04 0.00 1.04 0.03

342 15.17 7.13 15.17 0.00 15.17 1.04 0.00 1.04 0.03

343 17.58 6.99 17.58 0.00 17.58 1.04 0.00 1.04 0.03

344 18.07 6.96 18.07 0.00 18.07 1.04 0.00 1.04 0.03

345 18.63 6.93 18.63 0.00 18.63 1.04 0.00 1.04 0.03

346 19.31 6.89 19.31 0.00 19.31 1.04 0.00 1.04 0.03

347 18.79 6.92 18.79 0.00 18.79 1.04 0.00 1.04 0.03

348 19.03 6.91 19.03 0.00 19.03 1.04 0.00 1.04 0.03

349 16.65 7.04 16.65 0.00 16.65 1.04 0.00 1.04 0.03

350 17.41 7.00 17.41 0.00 17.41 1.04 0.00 1.04 0.03

351 16.34 7.06 16.34 0.00 16.34 1.04 0.00 1.04 0.03

352 16.16 7.07 16.16 0.00 16.16 1.04 0.00 1.04 0.03

353 16.10 7.07 16.10 0.00 16.10 1.04 0.00 1.04 0.03

354 16.02 7.08 16.02 0.00 16.02 1.04 0.00 1.04 0.03

355 17.33 7.00 17.33 0.00 17.33 1.04 0.00 1.04 0.03

356 17.36 7.00 17.36 0.00 17.36 1.04 0.00 1.04 0.03

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 39/85

 

Associated Technologies (Pvt) Ltd

38Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

357 18.66 6.93 18.66 0.00 18.66 1.04 0.00 1.04 0.03

358 18.70 6.92 18.70 0.00 18.70 1.04 0.00 1.04 0.03

359 19.74 6.87 19.74 0.00 19.74 1.04 0.00 1.04 0.03

360 19.75 6.87 19.75 0.00 19.75 1.04 0.00 1.04 0.03

361 22.42 6.72 22.42 0.00 22.42 1.04 0.00 1.04 0.03

362 21.17 6.79 21.17 0.00 21.17 1.04 0.00 1.04 0.03

363 19.46 6.88 19.46 0.00 19.46 1.04 0.00 1.04 0.03

364 19.32 6.89 19.32 0.00 19.32 1.04 0.00 1.04 0.03

365 16.74 7.04 16.74 0.00 16.74 1.04 0.00 1.04 0.03

Annual Energy

Production 13.10

max Q 41.73 0.00 turbines operating at full capacity 

0.00 

turbines not operating at full 

capacity  Max. Power Potentail 

0.00 turbines closed  1.04 1.04 2.08 

ENERGY COMPUTATION AT DESIGNED DISCHARGE Q3 (Integrated Operation)

Designed Discharge, Q3 = 45.97 cumecs

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 40/85

 

Associated Technologies (Pvt) Ltd

39Machai Hydropower Project Project Layout Review Report

Designed Q Available for % Time of year = 3.00 %

Total No. of Turbines = 2

Designed Discharge of Each Turbine = 22.99 cumecs

Min. Operating Discharge of Each Unit = 11.49 cumecs 50%

Rated Net Head Available = 5.48 m

Turbine Efficiency = 85%

Generator Efficiency = 96%

Transformer Efficiency = 98%

Overall Efficiency = 79.97%

Installed Power Potential of Each Unit = 0.99 MW

Total Installed Power Potential = 1.98 MW

Annual Energy Production (Actual) = 12.83 GWh

Annual Energy Production (Theoretical) = 17.32 GWh

Plant Factor = 74.11 %

1 2 3 4 5 6 7 8 9 10

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 41/85

 

Associated Technologies (Pvt) Ltd

40Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

Day of

Year

Average

Discharge

Average

Net

Head

Turbines Discharges Turbines Power Potential Total

Energy

Production

Q H Qnet QA TotalB P PA TotalB 

(cumecs) (m) (cumecs) (cumecs) (cumecs) (MW) (MW) (MW) (GWh)

1 2.66 7.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2 2.71 7.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3 2.71 7.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4 0.63 8.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5 0.69 8.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00

6 0.61 8.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

7 0.71 8.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8 0.72 8.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00

9 0.44 8.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00

10 0.59 8.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

11 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

12 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

13 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 42/85

 

Associated Technologies (Pvt) Ltd

41Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

14 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

15 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

16 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

17 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

18 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

19 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

20 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

21 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

22 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

23 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

24 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

25 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

26 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

27 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

28 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

29 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

30 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

31 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 43/85

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 44/85

 

Associated Technologies (Pvt) Ltd

43Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

50 1.79 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

51 1.68 8.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00

52 4.08 7.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00

53 5.95 7.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00

54 8.20 7.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00

55 10.13 7.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00

56 10.28 7.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00

57 11.65 7.34 11.65 0.00 11.65 0.99 0.00 0.99 0.02

58 12.70 7.28 12.70 0.00 12.70 0.99 0.00 0.99 0.02

59 12.38 7.30 12.38 0.00 12.38 0.99 0.00 0.99 0.02

60 14.28 7.18 14.28 0.00 14.28 0.99 0.00 0.99 0.02

61 12.72 7.28 12.72 0.00 12.72 0.99 0.00 0.99 0.02

62 12.57 7.29 12.57 0.00 12.57 0.99 0.00 0.99 0.02

63 9.72 7.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00

64 8.94 7.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00

65 10.71 7.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00

66 11.04 7.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00

67 12.03 7.32 12.03 0.00 12.03 0.99 0.00 0.99 0.02

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 45/85

h i d j j i

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 46/85

 

Associated Technologies (Pvt) Ltd

45Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

85 24.03 6.64 11.49 12.54 24.03 0.99 0.99 1.98 0.05

86 24.95 6.59 11.49 13.46 24.95 0.99 0.99 1.98 0.05

87 26.89 6.50 11.49 15.40 26.89 0.99 0.99 1.98 0.05

88 30.05 6.35 11.49 18.56 30.05 0.99 0.99 1.98 0.05

89 31.11 6.30 11.49 19.62 31.11 0.99 0.99 1.98 0.05

90 33.51 6.19 11.49 22.02 33.51 0.99 0.99 1.98 0.05

91 30.58 6.32 11.49 19.09 30.58 0.99 0.99 1.98 0.05

92 28.52 6.42 11.49 17.03 28.52 0.99 0.99 1.98 0.05

93 29.11 6.39 11.49 17.62 29.11 0.99 0.99 1.98 0.05

94 28.86 6.40 11.49 17.37 28.86 0.99 0.99 1.98 0.05

95 27.47 6.47 11.49 15.98 27.47 0.99 0.99 1.98 0.05

96 26.52 6.51 11.49 15.02 26.52 0.99 0.99 1.98 0.05

97 26.93 6.49 11.49 15.43 26.93 0.99 0.99 1.98 0.05

98 27.98 6.44 11.49 16.49 27.98 0.99 0.99 1.98 0.05

99 30.90 6.31 11.49 19.41 30.90 0.99 0.99 1.98 0.05

100 31.90 6.26 11.49 20.41 31.90 0.99 0.99 1.98 0.05

101 32.66 6.23 11.49 21.17 32.66 0.99 0.99 1.98 0.05

46M h i H d P j t P j t L t R i R t

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 47/85

 

Associated Technologies (Pvt) Ltd

46Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

102 33.45 6.20 11.49 21.95 33.45 0.99 0.99 1.98 0.05

103 33.10 6.21 11.49 21.60 33.10 0.99 0.99 1.98 0.05

104 34.67 6.15 11.68 22.99 34.67 0.99 0.99 1.98 0.05

105 34.87 6.14 11.89 22.99 34.87 0.99 0.99 1.98 0.05

106 36.06 6.09 13.07 22.99 36.06 0.99 0.99 1.98 0.05

107 35.71 6.10 12.72 22.99 35.71 0.99 0.99 1.98 0.05

108 36.00 6.09 13.01 22.99 36.00 0.99 0.99 1.98 0.05

109 36.08 6.09 13.10 22.99 36.08 0.99 0.99 1.98 0.05

110 36.13 6.09 13.14 22.99 36.13 0.99 0.99 1.98 0.05

111 36.47 6.07 13.48 22.99 36.47 0.99 0.99 1.98 0.05

112 36.52 6.07 13.54 22.99 36.52 0.99 0.99 1.98 0.05

113 36.57 6.07 13.58 22.99 36.57 0.99 0.99 1.98 0.05

114 37.53 6.03 14.54 22.99 37.53 0.99 0.99 1.98 0.05

115 36.75 6.06 13.77 22.99 36.75 0.99 0.99 1.98 0.05

116 38.17 6.01 15.19 22.99 38.17 0.99 0.99 1.98 0.05

117 37.60 6.03 14.61 22.99 37.60 0.99 0.99 1.98 0.05

118 37.80 6.02 14.81 22.99 37.80 0.99 0.99 1.98 0.05

47M h i H d P j t P j t L t R i R t

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 48/85

 

Associated Technologies (Pvt) Ltd

47Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

119 37.82 6.02 14.83 22.99 37.82 0.99 0.99 1.98 0.05

120 38.42 6.00 15.43 22.99 38.42 0.99 0.99 1.98 0.05

121 33.40 6.20 11.49 21.91 33.40 0.99 0.99 1.98 0.05

122 34.98 6.13 11.99 22.99 34.98 0.99 0.99 1.98 0.05

123 35.09 6.13 12.11 22.99 35.09 0.99 0.99 1.98 0.05

124 33.56 6.19 11.49 22.07 33.56 0.99 0.99 1.98 0.05

125 33.43 6.20 11.49 21.94 33.43 0.99 0.99 1.98 0.05

126 33.43 6.20 11.49 21.94 33.43 0.99 0.99 1.98 0.05

127 33.34 6.20 11.49 21.84 33.34 0.99 0.99 1.98 0.05

128 33.99 6.17 11.49 22.50 33.99 0.99 0.99 1.98 0.05

129 34.56 6.15 11.57 22.99 34.56 0.99 0.99 1.98 0.05

130 34.78 6.14 11.79 22.99 34.78 0.99 0.99 1.98 0.05

131 34.47 6.15 11.49 22.97 34.47 0.99 0.99 1.98 0.05

132 35.94 6.09 12.95 22.99 35.94 0.99 0.99 1.98 0.05

133 38.06 6.01 15.07 22.99 38.06 0.99 0.99 1.98 0.05

134 38.64 5.99 15.65 22.99 38.64 0.99 0.99 1.98 0.05

135 39.37 5.96 16.39 22.99 39.37 0.99 0.99 1.98 0.05

48Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 49/85

 

Associated Technologies (Pvt) Ltd

48Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

136 39.37 5.96 16.39 22.99 39.37 0.99 0.99 1.98 0.05

137 39.37 5.96 16.39 22.99 39.37 0.99 0.99 1.98 0.05

138 40.02 5.94 17.04 22.99 40.02 0.99 0.99 1.98 0.05

139 40.33 5.93 17.34 22.99 40.33 0.99 0.99 1.98 0.05

140 40.35 5.92 17.37 22.99 40.35 0.99 0.99 1.98 0.05

141 40.27 5.93 17.29 22.99 40.27 0.99 0.99 1.98 0.05

142 40.27 5.93 17.29 22.99 40.27 0.99 0.99 1.98 0.05

143 40.09 5.93 17.10 22.99 40.09 0.99 0.99 1.98 0.05

144 39.21 5.97 16.22 22.99 39.21 0.99 0.99 1.98 0.05

145 40.59 5.92 17.60 22.99 40.59 0.99 0.99 1.98 0.05

146 40.51 5.92 17.52 22.99 40.51 0.99 0.99 1.98 0.05

147 40.53 5.92 17.55 22.99 40.53 0.99 0.99 1.98 0.05

148 40.53 5.92 17.55 22.99 40.53 0.99 0.99 1.98 0.05

149 40.43 5.92 17.45 22.99 40.43 0.99 0.99 1.98 0.05

150 40.63 5.91 17.64 22.99 40.63 0.99 0.99 1.98 0.05

151 40.77 5.91 17.78 22.99 40.77 0.99 0.99 1.98 0.05

152 40.98 5.90 17.99 22.99 40.98 0.99 0.99 1.98 0.05

49Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 50/85

 

Associated Technologies (Pvt) Ltd

49Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

153 41.11 5.90 18.12 22.99 41.11 0.99 0.99 1.98 0.05

154 40.94 5.90 17.95 22.99 40.94 0.99 0.99 1.98 0.05

155 41.01 5.90 18.02 22.99 41.01 0.99 0.99 1.98 0.05

156 41.24 5.89 18.25 22.99 41.24 0.99 0.99 1.98 0.05

157 38.73 5.98 15.74 22.99 38.73 0.99 0.99 1.98 0.05

158 41.01 5.90 18.02 22.99 41.01 0.99 0.99 1.98 0.05

159 41.32 5.89 18.33 22.99 41.32 0.99 0.99 1.98 0.05

160 41.32 5.89 18.33 22.99 41.32 0.99 0.99 1.98 0.05

161 41.31 5.89 18.32 22.99 41.31 0.99 0.99 1.98 0.05

162 41.73 5.88 18.74 22.99 41.73 0.99 0.99 1.98 0.05

163 41.14 5.90 18.16 22.99 41.14 0.99 0.99 1.98 0.05

164 40.52 5.92 17.54 22.99 40.52 0.99 0.99 1.98 0.05

165 40.82 5.91 17.83 22.99 40.82 0.99 0.99 1.98 0.05

166 41.30 5.89 18.31 22.99 41.30 0.99 0.99 1.98 0.05

167 41.63 5.88 18.65 22.99 41.63 0.99 0.99 1.98 0.05

168 39.15 5.97 16.16 22.99 39.15 0.99 0.99 1.98 0.05

169 39.16 5.97 16.17 22.99 39.16 0.99 0.99 1.98 0.05

50Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 51/85

 

Associated Technologies (Pvt) Ltd

50Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

170 39.37 5.96 16.38 22.99 39.37 0.99 0.99 1.98 0.05

171 36.64 6.07 13.66 22.99 36.64 0.99 0.99 1.98 0.05

172 39.69 5.95 16.71 22.99 39.69 0.99 0.99 1.98 0.05

173 39.83 5.94 16.84 22.99 39.83 0.99 0.99 1.98 0.05

174 39.98 5.94 17.00 22.99 39.98 0.99 0.99 1.98 0.05

175 39.77 5.95 16.79 22.99 39.77 0.99 0.99 1.98 0.05

176 38.95 5.98 15.96 22.99 38.95 0.99 0.99 1.98 0.05

177 39.17 5.97 16.19 22.99 39.17 0.99 0.99 1.98 0.05

178 39.83 5.94 16.84 22.99 39.83 0.99 0.99 1.98 0.05

179 40.40 5.92 17.41 22.99 40.40 0.99 0.99 1.98 0.05

180 38.76 5.98 15.77 22.99 38.76 0.99 0.99 1.98 0.05

181 38.63 5.99 15.64 22.99 38.63 0.99 0.99 1.98 0.05

182 38.87 5.98 15.88 22.99 38.87 0.99 0.99 1.98 0.05

183 40.20 5.93 17.22 22.99 40.20 0.99 0.99 1.98 0.05

184 39.82 5.94 16.83 22.99 39.82 0.99 0.99 1.98 0.05

185 40.28 5.93 17.30 22.99 40.28 0.99 0.99 1.98 0.05

186 40.17 5.93 17.19 22.99 40.17 0.99 0.99 1.98 0.05

51Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 52/85

 

Associated Technologies (Pvt) Ltd

51Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

187 39.12 5.97 16.13 22.99 39.12 0.99 0.99 1.98 0.05

188 39.16 5.97 16.18 22.99 39.16 0.99 0.99 1.98 0.05

189 39.63 5.95 16.65 22.99 39.63 0.99 0.99 1.98 0.05

190 40.86 5.91 17.88 22.99 40.86 0.99 0.99 1.98 0.05

191 38.86 5.98 15.87 22.99 38.86 0.99 0.99 1.98 0.05

192 39.77 5.95 16.78 22.99 39.77 0.99 0.99 1.98 0.05

193 40.04 5.94 17.05 22.99 40.04 0.99 0.99 1.98 0.05

194 37.69 6.02 14.70 22.99 37.69 0.99 0.99 1.98 0.05

195 36.96 6.05 13.98 22.99 36.96 0.99 0.99 1.98 0.05

196 36.04 6.09 13.06 22.99 36.04 0.99 0.99 1.98 0.05

197 36.94 6.05 13.95 22.99 36.94 0.99 0.99 1.98 0.05

198 35.01 6.13 12.03 22.99 35.01 0.99 0.99 1.98 0.05

199 34.95 6.13 11.96 22.99 34.95 0.99 0.99 1.98 0.05

200 35.25 6.12 12.26 22.99 35.25 0.99 0.99 1.98 0.05

201 35.12 6.13 12.13 22.99 35.12 0.99 0.99 1.98 0.05

202 34.58 6.15 11.60 22.99 34.58 0.99 0.99 1.98 0.05

203 34.21 6.16 11.49 22.72 34.21 0.99 0.99 1.98 0.05

52Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 53/85

 

Associated Technologies (Pvt) Ltd

52Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

204 35.14 6.13 12.15 22.99 35.14 0.99 0.99 1.98 0.05

205 34.48 6.15 11.50 22.99 34.48 0.99 0.99 1.98 0.05

206 31.85 6.27 11.49 20.36 31.85 0.99 0.99 1.98 0.05

207 31.38 6.29 11.49 19.89 31.38 0.99 0.99 1.98 0.05

208 30.51 6.33 11.49 19.02 30.51 0.99 0.99 1.98 0.05

209 31.06 6.30 11.49 19.57 31.06 0.99 0.99 1.98 0.05

210 29.74 6.36 11.49 18.25 29.74 0.99 0.99 1.98 0.05

211 30.50 6.33 11.49 19.01 30.50 0.99 0.99 1.98 0.05

212 30.90 6.31 11.49 19.41 30.90 0.99 0.99 1.98 0.05

213 28.02 6.44 11.49 16.53 28.02 0.99 0.99 1.98 0.05

214 31.75 6.27 11.49 20.26 31.75 0.99 0.99 1.98 0.05

215 31.25 6.29 11.49 19.75 31.25 0.99 0.99 1.98 0.05

216 29.56 6.37 11.49 18.07 29.56 0.99 0.99 1.98 0.05

217 29.93 6.35 11.49 18.43 29.93 0.99 0.99 1.98 0.05

218 30.16 6.34 11.49 18.67 30.16 0.99 0.99 1.98 0.05

219 30.07 6.35 11.49 18.58 30.07 0.99 0.99 1.98 0.05

220 30.28 6.34 11.49 18.79 30.28 0.99 0.99 1.98 0.05

53Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 54/85

 

Associated Technologies (Pvt) Ltd

53Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

221 28.15 6.43 11.49 16.65 28.15 0.99 0.99 1.98 0.05

222 25.85 6.55 11.49 14.35 25.85 0.99 0.99 1.98 0.05

223 23.76 6.65 11.49 12.27 23.76 0.99 0.99 1.98 0.05

224 25.11 6.58 11.49 13.61 25.11 0.99 0.99 1.98 0.05

225 25.43 6.57 11.49 13.94 25.43 0.99 0.99 1.98 0.05

226 25.74 6.55 11.49 14.25 25.74 0.99 0.99 1.98 0.05

227 27.37 6.47 11.49 15.88 27.37 0.99 0.99 1.98 0.05

228 27.00 6.49 11.49 15.51 27.00 0.99 0.99 1.98 0.05

229 28.26 6.43 11.49 16.77 28.26 0.99 0.99 1.98 0.05

230 27.76 6.45 11.49 16.26 27.76 0.99 0.99 1.98 0.05

231 28.95 6.40 11.49 17.46 28.95 0.99 0.99 1.98 0.05

232 29.43 6.37 11.49 17.94 29.43 0.99 0.99 1.98 0.05

233 30.06 6.35 11.49 18.57 30.06 0.99 0.99 1.98 0.05

234 30.90 6.31 11.49 19.41 30.90 0.99 0.99 1.98 0.05

235 30.43 6.33 11.49 18.94 30.43 0.99 0.99 1.98 0.05

236 27.87 6.45 11.49 16.38 27.87 0.99 0.99 1.98 0.05

237 28.77 6.41 11.49 17.28 28.77 0.99 0.99 1.98 0.05

54Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 55/85

 

Associated Technologies (Pvt) Ltd

54Machai Hydropower Project Project Layout Review Report

1 2 3 4 5 6 7 8 9 10

238 29.13 6.39 11.49 17.63 29.13 0.99 0.99 1.98 0.05

239 29.07 6.39 11.49 17.57 29.07 0.99 0.99 1.98 0.05

240 28.42 6.42 11.49 16.93 28.42 0.99 0.99 1.98 0.05

241 29.81 6.36 11.49 18.31 29.81 0.99 0.99 1.98 0.05

242 27.49 6.47 11.49 16.00 27.49 0.99 0.99 1.98 0.05

243 26.35 6.52 11.49 14.86 26.35 0.99 0.99 1.98 0.05

244 32.00 6.26 11.49 20.51 32.00 0.99 0.99 1.98 0.05

245 31.51 6.28 11.49 20.02 31.51 0.99 0.99 1.98 0.05

246 35.46 6.11 12.47 22.99 35.46 0.99 0.99 1.98 0.05

247 33.98 6.17 11.49 22.49 33.98 0.99 0.99 1.98 0.05

248 33.01 6.21 11.49 21.52 33.01 0.99 0.99 1.98 0.05

249 34.62 6.15 11.63 22.99 34.62 0.99 0.99 1.98 0.05

250 34.88 6.14 11.89 22.99 34.88 0.99 0.99 1.98 0.05

251 36.72 6.06 13.73 22.99 36.72 0.99 0.99 1.98 0.05

252 36.85 6.06 13.86 22.99 36.85 0.99 0.99 1.98 0.05

253 38.84 5.98 15.85 22.99 38.84 0.99 0.99 1.98 0.05

254 38.74 5.98 15.75 22.99 38.74 0.99 0.99 1.98 0.05

55Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 56/85

 

Associated Technologies (Pvt) Ltd

y p j j y p

1 2 3 4 5 6 7 8 9 10

255 35.35 6.12 12.36 22.99 35.35 0.99 0.99 1.98 0.05

256 39.82 5.94 16.83 22.99 39.82 0.99 0.99 1.98 0.05

257 36.86 6.06 13.87 22.99 36.86 0.99 0.99 1.98 0.05

258 36.62 6.07 13.63 22.99 36.62 0.99 0.99 1.98 0.05

259 37.13 6.05 14.14 22.99 37.13 0.99 0.99 1.98 0.05

260 36.41 6.07 13.42 22.99 36.41 0.99 0.99 1.98 0.05

261 37.20 6.04 14.22 22.99 37.20 0.99 0.99 1.98 0.05

262 38.80 5.98 15.82 22.99 38.80 0.99 0.99 1.98 0.05

263 39.57 5.95 16.59 22.99 39.57 0.99 0.99 1.98 0.05

264 35.71 6.10 12.73 22.99 35.71 0.99 0.99 1.98 0.05

265 37.74 6.02 14.75 22.99 37.74 0.99 0.99 1.98 0.05

266 37.25 6.04 14.26 22.99 37.25 0.99 0.99 1.98 0.05

267 35.62 6.11 12.64 22.99 35.62 0.99 0.99 1.98 0.05

268 32.35 6.24 11.49 20.85 32.35 0.99 0.99 1.98 0.05

269 30.65 6.32 11.49 19.16 30.65 0.99 0.99 1.98 0.05

270 32.78 6.22 11.49 21.29 32.78 0.99 0.99 1.98 0.05

271 31.05 6.30 11.49 19.55 31.05 0.99 0.99 1.98 0.05

56Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 57/85

 

Associated Technologies (Pvt) Ltd

y p j j y p

1 2 3 4 5 6 7 8 9 10

272 31.34 6.29 11.49 19.84 31.34 0.99 0.99 1.98 0.05

273 30.09 6.34 11.49 18.60 30.09 0.99 0.99 1.98 0.05

274 29.56 6.37 11.49 18.07 29.56 0.99 0.99 1.98 0.05

275 28.23 6.43 11.49 16.74 28.23 0.99 0.99 1.98 0.05

276 28.10 6.44 11.49 16.61 28.10 0.99 0.99 1.98 0.05

277 29.75 6.36 11.49 18.26 29.75 0.99 0.99 1.98 0.05

278 30.86 6.31 11.49 19.36 30.86 0.99 0.99 1.98 0.05

279 29.67 6.36 11.49 18.18 29.67 0.99 0.99 1.98 0.05

280 30.74 6.31 11.49 19.25 30.74 0.99 0.99 1.98 0.05

281 31.13 6.30 11.49 19.63 31.13 0.99 0.99 1.98 0.05

282 33.00 6.22 11.49 21.50 33.00 0.99 0.99 1.98 0.05

283 33.37 6.20 11.49 21.87 33.37 0.99 0.99 1.98 0.05

284 31.76 6.27 11.49 20.26 31.76 0.99 0.99 1.98 0.05

285 27.06 6.49 11.49 15.57 27.06 0.99 0.99 1.98 0.05

286 30.04 6.35 11.49 18.55 30.04 0.99 0.99 1.98 0.05

287 27.51 6.47 11.49 16.02 27.51 0.99 0.99 1.98 0.05

288 26.80 6.50 11.49 15.31 26.80 0.99 0.99 1.98 0.05

57Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 58/85

 

Associated Technologies (Pvt) Ltd

y p j j y p

1 2 3 4 5 6 7 8 9 10

289 25.59 6.56 11.49 14.10 25.59 0.99 0.99 1.98 0.05

290 24.17 6.63 11.49 12.68 24.17 0.99 0.99 1.98 0.05

291 24.01 6.64 11.49 12.52 24.01 0.99 0.99 1.98 0.05

292 28.34 6.43 11.49 16.85 28.34 0.99 0.99 1.98 0.05

293 28.57 6.41 11.49 17.07 28.57 0.99 0.99 1.98 0.05

294 24.89 6.59 11.49 13.40 24.89 0.99 0.99 1.98 0.05

295 24.46 6.62 11.49 12.97 24.46 0.99 0.99 1.98 0.05

296 24.09 6.64 11.49 12.59 24.09 0.99 0.99 1.98 0.05

297 25.86 6.55 11.49 14.37 25.86 0.99 0.99 1.98 0.05

298 27.85 6.45 11.49 16.36 27.85 0.99 0.99 1.98 0.05

299 25.64 6.56 11.49 14.15 25.64 0.99 0.99 1.98 0.05

300 25.69 6.55 11.49 14.20 25.69 0.99 0.99 1.98 0.05

301 25.22 6.58 11.49 13.73 25.22 0.99 0.99 1.98 0.05

302 24.85 6.60 11.49 13.36 24.85 0.99 0.99 1.98 0.05

303 24.10 6.63 11.49 12.60 24.10 0.99 0.99 1.98 0.05

304 23.42 6.67 11.49 11.92 23.42 0.99 0.99 1.98 0.05

305 19.53 6.88 19.53 0.00 19.53 0.99 0.00 0.99 0.02

58Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 59/85

 

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

306 24.06 6.64 11.49 12.57 24.06 0.99 0.99 1.98 0.05

307 20.65 6.82 20.65 0.00 20.65 0.99 0.00 0.99 0.02

308 22.14 6.74 22.14 0.00 22.14 0.99 0.00 0.99 0.02

309 21.97 6.75 21.97 0.00 21.97 0.99 0.00 0.99 0.02

310 16.83 7.03 16.83 0.00 16.83 0.99 0.00 0.99 0.02

311 20.97 6.80 20.97 0.00 20.97 0.99 0.00 0.99 0.02

312 21.77 6.76 21.77 0.00 21.77 0.99 0.00 0.99 0.02

313 24.98 6.59 11.49 13.49 24.98 0.99 0.99 1.98 0.05

314 25.11 6.58 11.49 13.61 25.11 0.99 0.99 1.98 0.05

315 25.42 6.57 11.49 13.93 25.42 0.99 0.99 1.98 0.05

316 24.80 6.60 11.49 13.31 24.80 0.99 0.99 1.98 0.05

317 22.71 6.71 22.71 0.00 22.71 0.99 0.00 0.99 0.02

318 24.80 6.60 11.49 13.31 24.80 0.99 0.99 1.98 0.05

319 22.93 6.69 22.93 0.00 22.93 0.99 0.00 0.99 0.02

320 21.01 6.80 21.01 0.00 21.01 0.99 0.00 0.99 0.02

321 17.54 6.99 17.54 0.00 17.54 0.99 0.00 0.99 0.02

322 16.41 7.06 16.41 0.00 16.41 0.99 0.00 0.99 0.02

59Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 60/85

 

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

323 18.80 6.92 18.80 0.00 18.80 0.99 0.00 0.99 0.02

324 18.18 6.95 18.18 0.00 18.18 0.99 0.00 0.99 0.02

325 19.23 6.89 19.23 0.00 19.23 0.99 0.00 0.99 0.02

326 18.42 6.94 18.42 0.00 18.42 0.99 0.00 0.99 0.02

327 21.08 6.79 21.08 0.00 21.08 0.99 0.00 0.99 0.02

328 21.32 6.78 21.32 0.00 21.32 0.99 0.00 0.99 0.02

329 23.55 6.66 11.49 12.06 23.55 0.99 0.99 1.98 0.05

330 23.52 6.66 11.49 12.02 23.52 0.99 0.99 1.98 0.05

331 21.65 6.76 21.65 0.00 21.65 0.99 0.00 0.99 0.02

332 21.51 6.77 21.51 0.00 21.51 0.99 0.00 0.99 0.02

333 19.89 6.86 19.89 0.00 19.89 0.99 0.00 0.99 0.02

334 23.05 6.69 11.49 11.56 23.05 0.99 0.99 1.98 0.05

335 19.74 6.87 19.74 0.00 19.74 0.99 0.00 0.99 0.02

336 19.02 6.91 19.02 0.00 19.02 0.99 0.00 0.99 0.02

337 16.96 7.02 16.96 0.00 16.96 0.99 0.00 0.99 0.02

338 15.76 7.09 15.76 0.00 15.76 0.99 0.00 0.99 0.02

339 15.52 7.11 15.52 0.00 15.52 0.99 0.00 0.99 0.02

60Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 61/85

 

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

340 15.12 7.13 15.12 0.00 15.12 0.99 0.00 0.99 0.02

341 16.38 7.06 16.38 0.00 16.38 0.99 0.00 0.99 0.02

342 15.17 7.13 15.17 0.00 15.17 0.99 0.00 0.99 0.02

343 17.58 6.99 17.58 0.00 17.58 0.99 0.00 0.99 0.02

344 18.07 6.96 18.07 0.00 18.07 0.99 0.00 0.99 0.02

345 18.63 6.93 18.63 0.00 18.63 0.99 0.00 0.99 0.02

346 19.31 6.89 19.31 0.00 19.31 0.99 0.00 0.99 0.02

347 18.79 6.92 18.79 0.00 18.79 0.99 0.00 0.99 0.02

348 19.03 6.91 19.03 0.00 19.03 0.99 0.00 0.99 0.02

349 16.65 7.04 16.65 0.00 16.65 0.99 0.00 0.99 0.02

350 17.41 7.00 17.41 0.00 17.41 0.99 0.00 0.99 0.02

351 16.34 7.06 16.34 0.00 16.34 0.99 0.00 0.99 0.02

352 16.16 7.07 16.16 0.00 16.16 0.99 0.00 0.99 0.02

353 16.10 7.07 16.10 0.00 16.10 0.99 0.00 0.99 0.02

354 16.02 7.08 16.02 0.00 16.02 0.99 0.00 0.99 0.02

355 17.33 7.00 17.33 0.00 17.33 0.99 0.00 0.99 0.02

356 17.36 7.00 17.36 0.00 17.36 0.99 0.00 0.99 0.02

61Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 62/85

 

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

357 18.66 6.93 18.66 0.00 18.66 0.99 0.00 0.99 0.02

358 18.70 6.92 18.70 0.00 18.70 0.99 0.00 0.99 0.02

359 19.74 6.87 19.74 0.00 19.74 0.99 0.00 0.99 0.02

360 19.75 6.87 19.75 0.00 19.75 0.99 0.00 0.99 0.02

361 22.42 6.72 22.42 0.00 22.42 0.99 0.00 0.99 0.02

362 21.17 6.79 21.17 0.00 21.17 0.99 0.00 0.99 0.02

363 19.46 6.88 19.46 0.00 19.46 0.99 0.00 0.99 0.02

364 19.32 6.89 19.32 0.00 19.32 0.99 0.00 0.99 0.02

365 16.74 7.04 16.74 0.00 16.74 0.99 0.00 0.99 0.02

Annual Energy

Production 12.83

max Q 41.73 0.00 turbines operating at full capacity 

0.00 

turbines not operating at full 

capacity  Max. Power Potentail 

0.00 turbines closed  0.99 0.99 1.98 

ENERGY COMPUTATION AT DESIGNED DISCHARGE Q5 (Integrated Operation)

Designed Discharge, Q5 = 44.73 cumecs

62Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 63/85

 

Associated Technologies (Pvt) Ltd

Designed Q Available for % Time of year = 7.00 %

Total No. of Turbines = 2

Designed Discharge of Each Turbine = 22.37 cumecs

Min. Operating Discharge of Each Unit = 11.18 cumecs 50%

Rated Net Head Available = 5.48 m

Turbine Efficiency = 85%

Generator Efficiency = 96%

Transformer Efficiency = 98%

Overall Efficiency = 79.97%

Installed Power Potential of Each Unit = 0.96 MW

Total Installed Power Potential = 1.92 MW

Annual Energy Production (Actual) = 12.60 GWh

Annual Energy Production (Theoretical) = 16.85 GWh

Plant Factor = 74.79 %

1 2 3 4 5 6 7 8 9 10

63Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 64/85

 

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

Day of

Year

Average

Discharge

Average

Net

Head

Turbines Discharges Turbines Power Potential Total

Energy

ProductionQ H Qnet QA TotalB P PA TotalB 

(cumecs) (m) (cumecs) (cumecs) (cumecs) (MW) (MW) (MW) (GWh)

1 2.66 7.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2 2.71 7.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3 2.71 7.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4 0.63 8.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5 0.69 8.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00

6 0.61 8.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

7 0.71 8.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8 0.72 8.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00

9 0.44 8.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00

10 0.59 8.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

11 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

12 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

13 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

 64Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 65/85

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

14 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

15 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

16 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

17 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

18 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

19 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

20 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

21 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

22 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

23 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

24 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

25 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

26 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

27 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

28 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

29 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

30 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

31 0.00 8.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

 65Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 66/85

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

32 1.84 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

33 2.63 7.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

34 2.45 7.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

35 2.45 7.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

36 2.54 7.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00

37 3.89 7.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00

38 6.60 7.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00

39 5.19 7.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00

40 6.36 7.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00

41 5.61 7.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00

42 5.45 7.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00

43 5.30 7.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00

44 5.21 7.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00

45 3.73 7.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00

46 3.03 7.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00

47 1.61 8.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00

48 4.26 7.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00

49 4.06 7.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00

 66Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 67/85

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

50 1.79 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

51 1.68 8.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00

52 4.08 7.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00

53 5.95 7.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00

54 8.20 7.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00

55 10.13 7.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00

56 10.28 7.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00

57 11.65 7.34 11.65 0.00 11.65 0.96 0.00 0.96 0.02

58 12.70 7.28 12.70 0.00 12.70 0.96 0.00 0.96 0.02

59 12.38 7.30 12.38 0.00 12.38 0.96 0.00 0.96 0.02

60 14.28 7.18 14.28 0.00 14.28 0.96 0.00 0.96 0.02

61 12.72 7.28 12.72 0.00 12.72 0.96 0.00 0.96 0.02

62 12.57 7.29 12.57 0.00 12.57 0.96 0.00 0.96 0.02

63 9.72 7.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00

64 8.94 7.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00

65 10.71 7.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00

66 11.04 7.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00

67 12.03 7.32 12.03 0.00 12.03 0.96 0.00 0.96 0.02

 67Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 68/85

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

68 12.48 7.29 12.48 0.00 12.48 0.96 0.00 0.96 0.02

69 16.40 7.06 16.40 0.00 16.40 0.96 0.00 0.96 0.02

70 16.48 7.05 16.48 0.00 16.48 0.96 0.00 0.96 0.02

71 17.33 7.00 17.33 0.00 17.33 0.96 0.00 0.96 0.02

72 21.51 6.77 21.51 0.00 21.51 0.96 0.00 0.96 0.02

73 23.57 6.66 11.18 12.39 23.57 0.96 0.96 1.92 0.05

74 24.85 6.60 11.18 13.67 24.85 0.96 0.96 1.92 0.05

75 25.68 6.55 11.18 14.49 25.68 0.96 0.96 1.92 0.05

76 26.35 6.52 11.18 15.17 26.35 0.96 0.96 1.92 0.05

77 24.09 6.63 11.18 12.91 24.09 0.96 0.96 1.92 0.05

78 23.93 6.64 11.18 12.75 23.93 0.96 0.96 1.92 0.05

79 23.03 6.69 11.18 11.85 23.03 0.96 0.96 1.92 0.05

80 21.39 6.78 21.39 0.00 21.39 0.96 0.00 0.96 0.02

81 22.39 6.72 11.18 11.21 22.39 0.96 0.96 1.92 0.05

82 22.85 6.70 11.18 11.67 22.85 0.96 0.96 1.92 0.05

83 21.79 6.76 21.79 0.00 21.79 0.96 0.00 0.96 0.02

84 20.53 6.82 20.53 0.00 20.53 0.96 0.00 0.96 0.02

 68Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 69/85

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

85 24.03 6.64 11.18 12.85 24.03 0.96 0.96 1.92 0.05

86 24.95 6.59 11.18 13.77 24.95 0.96 0.96 1.92 0.05

87 26.89 6.50 11.18 15.71 26.89 0.96 0.96 1.92 0.05

88 30.05 6.35 11.18 18.87 30.05 0.96 0.96 1.92 0.05

89 31.11 6.30 11.18 19.93 31.11 0.96 0.96 1.92 0.05

90 33.51 6.19 11.18 22.33 33.51 0.96 0.96 1.92 0.05

91 30.58 6.32 11.18 19.40 30.58 0.96 0.96 1.92 0.05

92 28.52 6.42 11.18 17.34 28.52 0.96 0.96 1.92 0.05

93 29.11 6.39 11.18 17.93 29.11 0.96 0.96 1.92 0.05

94 28.86 6.40 11.18 17.68 28.86 0.96 0.96 1.92 0.05

95 27.47 6.47 11.18 16.29 27.47 0.96 0.96 1.92 0.05

96 26.52 6.51 11.18 15.33 26.52 0.96 0.96 1.92 0.05

97 26.93 6.49 11.18 15.74 26.93 0.96 0.96 1.92 0.05

98 27.98 6.44 11.18 16.80 27.98 0.96 0.96 1.92 0.05

99 30.90 6.31 11.18 19.72 30.90 0.96 0.96 1.92 0.05

100 31.90 6.26 11.18 20.72 31.90 0.96 0.96 1.92 0.05

101 32.66 6.23 11.18 21.48 32.66 0.96 0.96 1.92 0.05

 69Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 70/85

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

102 33.45 6.20 11.18 22.26 33.45 0.96 0.96 1.92 0.05

103 33.10 6.21 11.18 21.91 33.10 0.96 0.96 1.92 0.05

104 34.67 6.15 12.30 22.37 34.67 0.96 0.96 1.92 0.05

105 34.87 6.14 12.51 22.37 34.87 0.96 0.96 1.92 0.05

106 36.06 6.09 13.69 22.37 36.06 0.96 0.96 1.92 0.05

107 35.71 6.10 13.34 22.37 35.71 0.96 0.96 1.92 0.05

108 36.00 6.09 13.63 22.37 36.00 0.96 0.96 1.92 0.05

109 36.08 6.09 13.72 22.37 36.08 0.96 0.96 1.92 0.05

110 36.13 6.09 13.76 22.37 36.13 0.96 0.96 1.92 0.05

111 36.47 6.07 14.10 22.37 36.47 0.96 0.96 1.92 0.05

112 36.52 6.07 14.16 22.37 36.52 0.96 0.96 1.92 0.05

113 36.57 6.07 14.20 22.37 36.57 0.96 0.96 1.92 0.05

114 37.53 6.03 15.16 22.37 37.53 0.96 0.96 1.92 0.05

115 36.75 6.06 14.39 22.37 36.75 0.96 0.96 1.92 0.05

116 38.17 6.01 15.81 22.37 38.17 0.96 0.96 1.92 0.05

117 37.60 6.03 15.23 22.37 37.60 0.96 0.96 1.92 0.05

118 37.80 6.02 15.43 22.37 37.80 0.96 0.96 1.92 0.05

 70Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 71/85

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

119 37.82 6.02 15.45 22.37 37.82 0.96 0.96 1.92 0.05

120 38.42 6.00 16.05 22.37 38.42 0.96 0.96 1.92 0.05

121 33.40 6.20 11.18 22.22 33.40 0.96 0.96 1.92 0.05

122 34.98 6.13 12.61 22.37 34.98 0.96 0.96 1.92 0.05

123 35.09 6.13 12.73 22.37 35.09 0.96 0.96 1.92 0.05

124 33.56 6.19 11.19 22.37 33.56 0.96 0.96 1.92 0.05

125 33.43 6.20 11.18 22.25 33.43 0.96 0.96 1.92 0.05

126 33.43 6.20 11.18 22.25 33.43 0.96 0.96 1.92 0.05

127 33.34 6.20 11.18 22.15 33.34 0.96 0.96 1.92 0.05

128 33.99 6.17 11.63 22.37 33.99 0.96 0.96 1.92 0.05

129 34.56 6.15 12.19 22.37 34.56 0.96 0.96 1.92 0.05

130 34.78 6.14 12.41 22.37 34.78 0.96 0.96 1.92 0.05

131 34.47 6.15 12.10 22.37 34.47 0.96 0.96 1.92 0.05

132 35.94 6.09 13.57 22.37 35.94 0.96 0.96 1.92 0.05

133 38.06 6.01 15.69 22.37 38.06 0.96 0.96 1.92 0.05

134 38.64 5.99 16.27 22.37 38.64 0.96 0.96 1.92 0.05

135 39.37 5.96 17.01 22.37 39.37 0.96 0.96 1.92 0.05

 71Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 72/85

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

136 39.37 5.96 17.01 22.37 39.37 0.96 0.96 1.92 0.05

137 39.37 5.96 17.01 22.37 39.37 0.96 0.96 1.92 0.05

138 40.02 5.94 17.66 22.37 40.02 0.96 0.96 1.92 0.05

139 40.33 5.93 17.96 22.37 40.33 0.96 0.96 1.92 0.05

140 40.35 5.92 17.99 22.37 40.35 0.96 0.96 1.92 0.05

141 40.27 5.93 17.91 22.37 40.27 0.96 0.96 1.92 0.05

142 40.27 5.93 17.91 22.37 40.27 0.96 0.96 1.92 0.05

143 40.09 5.93 17.72 22.37 40.09 0.96 0.96 1.92 0.05

144 39.21 5.97 16.84 22.37 39.21 0.96 0.96 1.92 0.05

145 40.59 5.92 18.22 22.37 40.59 0.96 0.96 1.92 0.05

146 40.51 5.92 18.14 22.37 40.51 0.96 0.96 1.92 0.05

147 40.53 5.92 18.17 22.37 40.53 0.96 0.96 1.92 0.05

148 40.53 5.92 18.17 22.37 40.53 0.96 0.96 1.92 0.05

149 40.43 5.92 18.07 22.37 40.43 0.96 0.96 1.92 0.05

150 40.63 5.91 18.26 22.37 40.63 0.96 0.96 1.92 0.05

151 40.77 5.91 18.40 22.37 40.77 0.96 0.96 1.92 0.05

152 40.98 5.90 18.61 22.37 40.98 0.96 0.96 1.92 0.05

 72Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 73/85

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

153 41.11 5.90 18.74 22.37 41.11 0.96 0.96 1.92 0.05

154 40.94 5.90 18.57 22.37 40.94 0.96 0.96 1.92 0.05

155 41.01 5.90 18.64 22.37 41.01 0.96 0.96 1.92 0.05

156 41.24 5.89 18.87 22.37 41.24 0.96 0.96 1.92 0.05

157 38.73 5.98 16.36 22.37 38.73 0.96 0.96 1.92 0.05

158 41.01 5.90 18.64 22.37 41.01 0.96 0.96 1.92 0.05

159 41.32 5.89 18.95 22.37 41.32 0.96 0.96 1.92 0.05

160 41.32 5.89 18.95 22.37 41.32 0.96 0.96 1.92 0.05

161 41.31 5.89 18.94 22.37 41.31 0.96 0.96 1.92 0.05

162 41.73 5.88 19.36 22.37 41.73 0.96 0.96 1.92 0.05

163 41.14 5.90 18.78 22.37 41.14 0.96 0.96 1.92 0.05

164 40.52 5.92 18.16 22.37 40.52 0.96 0.96 1.92 0.05

165 40.82 5.91 18.45 22.37 40.82 0.96 0.96 1.92 0.05

166 41.30 5.89 18.93 22.37 41.30 0.96 0.96 1.92 0.05

167 41.63 5.88 19.27 22.37 41.63 0.96 0.96 1.92 0.05

168 39.15 5.97 16.78 22.37 39.15 0.96 0.96 1.92 0.05

169 39.16 5.97 16.79 22.37 39.16 0.96 0.96 1.92 0.05

 73Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 74/85

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

170 39.37 5.96 17.00 22.37 39.37 0.96 0.96 1.92 0.05

171 36.64 6.07 14.28 22.37 36.64 0.96 0.96 1.92 0.05

172 39.69 5.95 17.33 22.37 39.69 0.96 0.96 1.92 0.05

173 39.83 5.94 17.46 22.37 39.83 0.96 0.96 1.92 0.05

174 39.98 5.94 17.62 22.37 39.98 0.96 0.96 1.92 0.05

175 39.77 5.95 17.40 22.37 39.77 0.96 0.96 1.92 0.05

176 38.95 5.98 16.58 22.37 38.95 0.96 0.96 1.92 0.05

177 39.17 5.97 16.81 22.37 39.17 0.96 0.96 1.92 0.05

178 39.83 5.94 17.46 22.37 39.83 0.96 0.96 1.92 0.05

179 40.40 5.92 18.03 22.37 40.40 0.96 0.96 1.92 0.05

180 38.76 5.98 16.39 22.37 38.76 0.96 0.96 1.92 0.05

181 38.63 5.99 16.26 22.37 38.63 0.96 0.96 1.92 0.05

182 38.87 5.98 16.50 22.37 38.87 0.96 0.96 1.92 0.05

183 40.20 5.93 17.84 22.37 40.20 0.96 0.96 1.92 0.05

184 39.82 5.94 17.45 22.37 39.82 0.96 0.96 1.92 0.05

185 40.28 5.93 17.92 22.37 40.28 0.96 0.96 1.92 0.05

186 40.17 5.93 17.81 22.37 40.17 0.96 0.96 1.92 0.05

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 75/85

 75Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 76/85

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

204 35.14 6.13 12.77 22.37 35.14 0.96 0.96 1.92 0.05

205 34.48 6.15 12.12 22.37 34.48 0.96 0.96 1.92 0.05

206 31.85 6.27 11.18 20.67 31.85 0.96 0.96 1.92 0.05

207 31.38 6.29 11.18 20.20 31.38 0.96 0.96 1.92 0.05

208 30.51 6.33 11.18 19.33 30.51 0.96 0.96 1.92 0.05

209 31.06 6.30 11.18 19.88 31.06 0.96 0.96 1.92 0.05

210 29.74 6.36 11.18 18.56 29.74 0.96 0.96 1.92 0.05

211 30.50 6.33 11.18 19.32 30.50 0.96 0.96 1.92 0.05

212 30.90 6.31 11.18 19.72 30.90 0.96 0.96 1.92 0.05

213 28.02 6.44 11.18 16.84 28.02 0.96 0.96 1.92 0.05

214 31.75 6.27 11.18 20.57 31.75 0.96 0.96 1.92 0.05

215 31.25 6.29 11.18 20.06 31.25 0.96 0.96 1.92 0.05

216 29.56 6.37 11.18 18.38 29.56 0.96 0.96 1.92 0.05

217 29.93 6.35 11.18 18.74 29.93 0.96 0.96 1.92 0.05

218 30.16 6.34 11.18 18.98 30.16 0.96 0.96 1.92 0.05

219 30.07 6.35 11.18 18.89 30.07 0.96 0.96 1.92 0.05

220 30.28 6.34 11.18 19.10 30.28 0.96 0.96 1.92 0.05

 76Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 77/85

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

221 28.15 6.43 11.18 16.96 28.15 0.96 0.96 1.92 0.05

222 25.85 6.55 11.18 14.66 25.85 0.96 0.96 1.92 0.05

223 23.76 6.65 11.18 12.58 23.76 0.96 0.96 1.92 0.05

224 25.11 6.58 11.18 13.92 25.11 0.96 0.96 1.92 0.05

225 25.43 6.57 11.18 14.25 25.43 0.96 0.96 1.92 0.05

226 25.74 6.55 11.18 14.56 25.74 0.96 0.96 1.92 0.05

227 27.37 6.47 11.18 16.19 27.37 0.96 0.96 1.92 0.05

228 27.00 6.49 11.18 15.82 27.00 0.96 0.96 1.92 0.05

229 28.26 6.43 11.18 17.08 28.26 0.96 0.96 1.92 0.05

230 27.76 6.45 11.18 16.57 27.76 0.96 0.96 1.92 0.05

231 28.95 6.40 11.18 17.77 28.95 0.96 0.96 1.92 0.05

232 29.43 6.37 11.18 18.25 29.43 0.96 0.96 1.92 0.05

233 30.06 6.35 11.18 18.88 30.06 0.96 0.96 1.92 0.05

234 30.90 6.31 11.18 19.72 30.90 0.96 0.96 1.92 0.05

235 30.43 6.33 11.18 19.25 30.43 0.96 0.96 1.92 0.05

236 27.87 6.45 11.18 16.69 27.87 0.96 0.96 1.92 0.05

237 28.77 6.41 11.18 17.59 28.77 0.96 0.96 1.92 0.05

 77Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 78/85

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

238 29.13 6.39 11.18 17.94 29.13 0.96 0.96 1.92 0.05

239 29.07 6.39 11.18 17.88 29.07 0.96 0.96 1.92 0.05

240 28.42 6.42 11.18 17.24 28.42 0.96 0.96 1.92 0.05

241 29.81 6.36 11.18 18.62 29.81 0.96 0.96 1.92 0.05

242 27.49 6.47 11.18 16.31 27.49 0.96 0.96 1.92 0.05

243 26.35 6.52 11.18 15.17 26.35 0.96 0.96 1.92 0.05

244 32.00 6.26 11.18 20.82 32.00 0.96 0.96 1.92 0.05

245 31.51 6.28 11.18 20.33 31.51 0.96 0.96 1.92 0.05

246 35.46 6.11 13.09 22.37 35.46 0.96 0.96 1.92 0.05

247 33.98 6.17 11.61 22.37 33.98 0.96 0.96 1.92 0.05

248 33.01 6.21 11.18 21.83 33.01 0.96 0.96 1.92 0.05

249 34.62 6.15 12.25 22.37 34.62 0.96 0.96 1.92 0.05

250 34.88 6.14 12.51 22.37 34.88 0.96 0.96 1.92 0.05

251 36.72 6.06 14.35 22.37 36.72 0.96 0.96 1.92 0.05

252 36.85 6.06 14.48 22.37 36.85 0.96 0.96 1.92 0.05

253 38.84 5.98 16.47 22.37 38.84 0.96 0.96 1.92 0.05

254 38.74 5.98 16.37 22.37 38.74 0.96 0.96 1.92 0.05

 78Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 79/85

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

255 35.35 6.12 12.98 22.37 35.35 0.96 0.96 1.92 0.05

256 39.82 5.94 17.45 22.37 39.82 0.96 0.96 1.92 0.05

257 36.86 6.06 14.49 22.37 36.86 0.96 0.96 1.92 0.05

258 36.62 6.07 14.25 22.37 36.62 0.96 0.96 1.92 0.05

259 37.13 6.05 14.76 22.37 37.13 0.96 0.96 1.92 0.05

260 36.41 6.07 14.04 22.37 36.41 0.96 0.96 1.92 0.05

261 37.20 6.04 14.84 22.37 37.20 0.96 0.96 1.92 0.05

262 38.80 5.98 16.44 22.37 38.80 0.96 0.96 1.92 0.05

263 39.57 5.95 17.21 22.37 39.57 0.96 0.96 1.92 0.05

264 35.71 6.10 13.35 22.37 35.71 0.96 0.96 1.92 0.05

265 37.74 6.02 15.37 22.37 37.74 0.96 0.96 1.92 0.05

266 37.25 6.04 14.88 22.37 37.25 0.96 0.96 1.92 0.05

267 35.62 6.11 13.26 22.37 35.62 0.96 0.96 1.92 0.05

268 32.35 6.24 11.18 21.16 32.35 0.96 0.96 1.92 0.05

269 30.65 6.32 11.18 19.47 30.65 0.96 0.96 1.92 0.05

270 32.78 6.22 11.18 21.60 32.78 0.96 0.96 1.92 0.05

271 31.05 6.30 11.18 19.86 31.05 0.96 0.96 1.92 0.05

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 80/85

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 81/85

 81Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 82/85

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

306 24.06 6.64 11.18 12.88 24.06 0.96 0.96 1.92 0.05

307 20.65 6.82 20.65 0.00 20.65 0.96 0.00 0.96 0.02

308 22.14 6.74 22.14 0.00 22.14 0.96 0.00 0.96 0.02

309 21.97 6.75 21.97 0.00 21.97 0.96 0.00 0.96 0.02

310 16.83 7.03 16.83 0.00 16.83 0.96 0.00 0.96 0.02

311 20.97 6.80 20.97 0.00 20.97 0.96 0.00 0.96 0.02

312 21.77 6.76 21.77 0.00 21.77 0.96 0.00 0.96 0.02

313 24.98 6.59 11.18 13.79 24.98 0.96 0.96 1.92 0.05

314 25.11 6.58 11.18 13.92 25.11 0.96 0.96 1.92 0.05

315 25.42 6.57 11.18 14.24 25.42 0.96 0.96 1.92 0.05

316 24.80 6.60 11.18 13.62 24.80 0.96 0.96 1.92 0.05

317 22.71 6.71 11.18 11.53 22.71 0.96 0.96 1.92 0.05

318 24.80 6.60 11.18 13.62 24.80 0.96 0.96 1.92 0.05

319 22.93 6.69 11.18 11.75 22.93 0.96 0.96 1.92 0.05

320 21.01 6.80 21.01 0.00 21.01 0.96 0.00 0.96 0.02

321 17.54 6.99 17.54 0.00 17.54 0.96 0.00 0.96 0.02

322 16.41 7.06 16.41 0.00 16.41 0.96 0.00 0.96 0.02

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 83/85

 83Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 84/85

Associated Technologies (Pvt) Ltd

1 2 3 4 5 6 7 8 9 10

340 15.12 7.13 15.12 0.00 15.12 0.96 0.00 0.96 0.02

341 16.38 7.06 16.38 0.00 16.38 0.96 0.00 0.96 0.02

342 15.17 7.13 15.17 0.00 15.17 0.96 0.00 0.96 0.02

343 17.58 6.99 17.58 0.00 17.58 0.96 0.00 0.96 0.02

344 18.07 6.96 18.07 0.00 18.07 0.96 0.00 0.96 0.02

345 18.63 6.93 18.63 0.00 18.63 0.96 0.00 0.96 0.02

346 19.31 6.89 19.31 0.00 19.31 0.96 0.00 0.96 0.02

347 18.79 6.92 18.79 0.00 18.79 0.96 0.00 0.96 0.02

348 19.03 6.91 19.03 0.00 19.03 0.96 0.00 0.96 0.02

349 16.65 7.04 16.65 0.00 16.65 0.96 0.00 0.96 0.02

350 17.41 7.00 17.41 0.00 17.41 0.96 0.00 0.96 0.02

351 16.34 7.06 16.34 0.00 16.34 0.96 0.00 0.96 0.02

352 16.16 7.07 16.16 0.00 16.16 0.96 0.00 0.96 0.02

353 16.10 7.07 16.10 0.00 16.10 0.96 0.00 0.96 0.02

354 16.02 7.08 16.02 0.00 16.02 0.96 0.00 0.96 0.02

355 17.33 7.00 17.33 0.00 17.33 0.96 0.00 0.96 0.02

356 17.36 7.00 17.36 0.00 17.36 0.96 0.00 0.96 0.02

 84Machai Hydropower Project Project Layout Review Report

8/3/2019 Integrated Operation

http://slidepdf.com/reader/full/integrated-operation 85/85

1 2 3 4 5 6 7 8 9 10

357 18.66 6.93 18.66 0.00 18.66 0.96 0.00 0.96 0.02

358 18.70 6.92 18.70 0.00 18.70 0.96 0.00 0.96 0.02

359 19.74 6.87 19.74 0.00 19.74 0.96 0.00 0.96 0.02

360 19.75 6.87 19.75 0.00 19.75 0.96 0.00 0.96 0.02

361 22.42 6.72 11.18 11.23 22.42 0.96 0.96 1.92 0.05

362 21.17 6.79 21.17 0.00 21.17 0.96 0.00 0.96 0.02

363 19.46 6.88 19.46 0.00 19.46 0.96 0.00 0.96 0.02

364 19.32 6.89 19.32 0.00 19.32 0.96 0.00 0.96 0.02

365 16.74 7.04 16.74 0.00 16.74 0.96 0.00 0.96 0.02

Annual Energy

Production 12.60

max Q 41.73 0.00 turbines operating at full capacity 