  • Integration of IEC 61850 GSE andSampled Value Services toReduce Substation Wiring

    Copyright SEL 2010

    Dave Dolezilek, Dave Whitehead,and Veselin Skendzic

    Schweitzer Engineering Laboratories, Inc.

    Grid-Interop 2010

  • Replacing Copper WithDigital Communication

    Copper Conductors

    Fiber-Optic Cable

    Grid-Interop 2010

  • Yard Wiring Reduction Yields Benefits

    Grid-Interop 2010

  • AuxiliaryRelays AddComplexity

    Grid-Interop 2010

  • IEC 61850 ReducesComplexity With

    Streamlined Design

    Grid-Interop 2010

  • 1. Traditional Approach

    Grid-Interop 2010

  • 2. Relays in Yard No Communication

    PhysicalEquipment

    TerminalBlock /

    Test PlugRelay

    44 Wires 44 Wires

    Yard

    Grid-Interop 2010

  • 3. I/O Modules in Yard

    Grid-Interop 2010

  • 4. Merging Unit Topology

    PhysicalEquipment

    TerminalBlock / Relay

    Merging Unit

    Switch or Processor

    Yard House

    EquipmentBlock /

    Test PlugRelay

    Unit Processor

    44 Wires 44 Wires 1 Cable 1 Cable

    Grid-Interop 2010

  • IEC 61850 StandardDigitizes Information

    Substation Configuration Language (SCL) dictionary of terms; vendors use same dialect

    Object-oriented database structures

    Combination of protocols for different needs

    Client / server replaces traditionalmaster / slave

    Publish / subscribe multicasts Grid-Interop 2010

  • Replace Field Wiring WithEthernet LANs

    Move data from each manufacturers devices using same method

    Signal List

    Object List

    Circuit Breaker

    LN XCBR

    method

    Group data logically

    Create, find, use data with standardized methods

    Station HMI

    Switch Controller

    LN IHMI

    LN CSWI

    Grid-Interop 2010

  • SCL Provides Dictionary, Descriptions

    Scientific Classification

    http://en.wiktionary.org/wiki/taxonomy

    Scientific Classification

    Kingdom: Animalia

    Phylum: Chordata

    Class: Mammalia

    Order: Carnivora

    Family: Felidae

    Genus: Puma

    Species: concolor Grid-Interop 2010

  • SCL Includes Processes for Finding,Describing, Classifying, Naming Data

    SCL Classification

    Station: Oasis

    Voltage level: 220 kV

    Bay: Bay 1Bay: Bay 1

    Apparatus: Circuit breaker

    Physical Device: Relay

    Logical Device:* Meter (MET)

    Logical Node (LN):* Measurements (MMXU)

    LN Instance:* First measurement group (1)

    Function:* Analog measurement (MX)

    Data Object:* Frequency (HZ)*Dictated by the standard.Data name = MET.MMXU1.MX.HZ

    Grid-Interop 2010

  • Process Bus Protocols Move AnalogValues, Discrete Status, and Alarms

    IEC 61850 GOOSE, Sampled Value (SV)

    IEEE C37.118 synchrophasors

    IEEE 15882008: precision time IEEE 15882008: precision time synchronization (in progress at PSRC)

    Grid-Interop 2010

  • Constant Repetition Serves SampledData and GOOSE Integrity Heartbeat

    Predictable receipt

    Constant bandwidth utilizationutilization

    GOOSE heartbeat messages, SV, time synchronization

    Grid-Interop 2010

  • Faster Repetition Increases LikelihoodChange Noticed Quickly

    Increased bandwidth use only after change

    Interrupt-driven Interrupt-driven GOOSE data change messages

    Slows toconstantrepetition

    Grid-Interop 2010

  • Merging Unit ConceptAggregates Data Onto

    Digital Link

    Dis

    cret

    e S

    tatu

    s an

    d A

    larm

    Pow

    er S

    uppl

    y

    Clo

    ck In

    put

    Grid-Interop 2010

  • SVs Publish at Fixed Rate

    Sampling physically separate from

    Measurement

    Metering Metering

    Calculation

    Multiple subscribers to each SV

    Grid-Interop 2010

  • IEC 61850-9-2 LE SV Fixed-RatePublication Requirements

    Sampling

    Protection: 4, 4.8 kHz

    Quality metering: 12.8, 15.36 kHz

    Publication

    Protection: 4, 4.8 kHz (one sample per message)

    Quality metering: 1.6, 1.92 kHz (eight samplesper message)

    Grid-Interop 2010

  • MMS Client Server Applications UnaffectedWhen Transport Layers Restore Lost Data

    TCP retransmission and reassembly

    Workstation Server

    O

    L

    L

    E

    H

    Data O Data L Data E Data H HELO

    Workstation Server

    Retransmitted

    H

    E

    L

    O

    Data LX

    LData L

    Grid-Interop 2010

  • GOOSE and SV ApplicationsSurvive When Data Are Lost

    No resend; next message already on its way

    Workstation Serveralready on its way

    Achieved by having no network layer, thus noWAN routing

    5

    4

    3

    2

    1

    Data 5 Data 4 Data 2 Data 1Data With

    Segment #3 Lost

    1

    2

    4

    5

    Data 3X Grid-Interop 2010

  • IEC 61850 GOOSE and SV CustomEthertypes Registered by IEEE

    UseEthertype Value(hexadecimal)

    IEC 61850-8-1 GOOSE 88-B8

    IEC 61850-8-1 GSE Management 88-B9

    IEC 61850-9-2 SV 88-BA

    IEC 61850-8-1 MMS via IP 08-00 [Ethertype for all IP traffic]

    Grid-Interop 2010

  • Transfer Time Includes Time toDetect, Transfer, and Process Change

    Grid-Interop 2010

  • Merging Unit With Breaker Control

    Grid-Interop 2010

  • Merging Unit, Breaker Control,Deterministic TDM Transport of

    Mission-Critical Synchronous SV

    Grid-Interop 2010

  • Full-Featured Merging Unit WithLocal Protection and Control

    Grid-Interop 2010

  • Advantages of Distributed Approach

    Continued primary protection if communication fails

    Minimum number of devices

    Subscription, publication of IEC 61850-9-2 Subscription, publication of IEC 61850-9-2

    Fixed-rate sampling, publication

    Absolute time reference per IEEE 1588

    Shared analog data among devices

    Grid-Interop 2010

  • What Affects Ethernet Reliability?Streaming Data Applications

    Synchrophasors

    Security video

    Sampled Values

    IEC 61850 GOOSE

    Time synchronization

    Grid-Interop 2010

  • Solution: Packets Over Pipes (POP)Ethernet Over SONET/SDH

    OC-48 SONET multiplexer

    Gb or fast Ethernet multiplexer

    Gb or fast Ethernet switch Gb or fast Ethernet switch

    Grid-Interop 2010

  • Wide-Area Networking Components

    Grid-Interop 2010

  • IntegratedCommunicationsOptical Network

    Intersubstation

    Site BLocal User

    Site D

    Site A System Manager

    Multiplexer

    MultiplexerMultiplexer

    SNMP Manager

    Site B

    Intrasubstation

    Local UserSite C

    USBEthernet

    Multiplexer

    Multiplexer Multiplexer

    Multiplexer

    Grid-Interop 2010

  • TeleprotectionTransmission Line Protection

    Grid-Interop 2010

  • Wide-Area ControlUsing Synchrophasors

    Grid-Interop 2010

  • Security Solution

    Intersubstation

    Site B

    Site D

    Site A Video Monitoring

    Station

    Multiplexer

    Multiplexer MultiplexerIntersubstation

    Site C

    SCADA

    Automation Controller

    Multiplexer

    Multiplexer

    Automation Controller

    Ethernet

    Power Over Ethernet

    CabinetAlarms

    FenceAlarms

    CabinetAlarms

    FenceAlarms

    Multiplexer

    Grid-Interop 2010

  • Precise Time Distribution PermitsReal-Time Performance Indicators

    Absolute 1 s accuracy maintained between all stations

    Relative 1 s accuracy maintained between all stations

    Grid-Interop 2010

  • Prefabricated SubstationControl Enclosures

    Grid-Interop 2010

  • SignificantOpportunity to

    ReduceFootprint / Cost

    Grid-Interop 2010

  • Grid-Interop 2010

  • Grid-Interop 2010

  • IEC 61850 Solutions forElektro Eletricidade e Servios

    Grid-Interop 2010

  • Second Stage of Modernization: 2006

    Complete modernization of 30 substations ranging from 13.8 kV to 138 kV

    Grid-Interop 2010

  • Removal of Copper Wiring

    Grid-Interop 2010

  • Fiber Optics Replace Copper

    Grid-Interop 2010

  • Initial Results

    Fault occurred in transformer after modernization

    Automation scheme reestablished energy to 17,000 customers in seconds to 17,000 customers in seconds

    Customer interruption time would have been ~1.5 hours without logic

    Grid-Interop 2010

  • Automation Communication

    Grid-Interop 2010

  • Breaker Failure

    Bay Controller

    Failed to Open

    Trip

    Ifault+load

    Ifault

    Switch B

    Switch A

    Bay Controller

    Trip

    Breaker Failure Trip Bus

    Grid-Interop 2010

  • Ethernet Failure

    Bay Controller

    Failed to Open

    Trip

    Ifault+load

    Ifault

    Switch B

    Switch A

    Bay Controller

    Trip

    Cable or Switch Failure

    GOOSE (Breaker Failure)

    GOOSE

    Grid-Interop 2010

  • Feeder Fault

    Grid-Interop 2010

  • ConclusionUse Global, Standardized Methods

    Offer choice of installation method / location

    Provide most reliable protection

    Achieve lowest system / installation cost

    Use existing protection

    Design for interoperability

    Provide system-wide protection and synchrophasor data

    Grid-Interop 2010