Integrity Operating WindowWindowPräsentiert von: Marion Janus-Uebelhör
TÜV SÜD Industrie Service GmbH Folie 115.09.2016 TÜV SÜD
Asset Integrity Management department – services at a glimpse
Asset Integrity Programs Asset Integrity Programs = Auditing and Supporting implementation of management processes for maintenance at operators of process plantsTÜVTÜV--RoiRoiMM
Process Safety Excellence (PSE)= Supporting implementation of a holistic approach for process safety and a KPI-systems for monitoring effectiveness
Risk Based Inspection (RBI)= Creation of inspection concepts based on a risk assessment
and= Supporting implementation of RBI management processes within clients organization
Fitness for Service Assessments (FFS)= Assessment of flaws – outside of commonly accepted limits – found during inspections / turn-arounds
TÜV SÜD Industrie Service GmbH Folie 215.09.2016 TÜV SÜD
RBI – Risiko Basierte Instandhaltung
Nur eine Risikomatrix? RBI ist eine strukturierte Vorgehensweise um Nur eine Risikomatrix? RBI ist eine strukturierte Vorgehensweise um ein OPTIMIERTE Antwort zu erhalten auf:
WAS? ist zu prüfen– z.B. auf welche kritischeSysteme konzentrieren, was sind die Prioritäten usw.
WIE?Ist zu prüfen – z.B. welche Methode istgeeignet
WANN? I t üf llt d ti lIst zu prüfen – was sollte der optimaleZeitraum bis zur nächsten Inspektion sein
IN WELCHEM UMFANG?IN WELCHEM UMFANG?z.B. Lokal oder 100%?
TÜV SÜD Industrie Service GmbH Folie 315.09.2016 TÜV SÜD
Integrity Operating WindowFallbeispiel– Woher kommt der Gedanke?
Schaden in einem Wärmetauscher einer Raffinerie
Schadensbeschreibung• Starke Korrosion in einem Wärmetauscher festgestellt, die einen Raffinerie Starke Korrosion in einem Wärmetauscher festgestellt, die einen
ungeplanten Austausch noch während des Stillstands zur Folge hat und zur Verlängerung des Stillstands führt
• Im RBI-Projektes war die restliche Lebensdauer aus dem Abtrag in der Vergangenheit bestimmt worden und als Schadensmechanismus Naphthensäurekorrosion definiert Ein Austausch war erst im Naphthensäurekorrosion definiert. Ein Austausch war erst im übernächsten Stillstand geplant.
• Die erwartete Korrosionsrate lag jedoch viel niedriger als der nun festgestellte Abtrag
U hUrsache• Chemische Analysen der letzten 5 Jahre wurden
ausgewertet, dabei ergab sich eine Erhöhung des Gehalts an Naphthensäuren in den letzten 4 Jahren (TAN-Zahl)
• Der festgestellte Abtrag entspricht dem aus der Literatur bei • Der festgestellte Abtrag entspricht dem aus der Literatur bei der höheren TAN-Zahl bestimmten Wert
• Die im nachhinein festgestellte TAN-Zahl lag jedoch immer unter dem für die Anlage erlaubten Grenzwert
Folge• Es reicht nicht, zukünftige Inspektionen nur anhand von
vergangenen Instandhaltungsergebnissen zu planen• Inspektionspläne müssen sich dynamisch ändernden Inspektionspläne müssen sich dynamisch ändernden
Betriebsbedingungen anpassen
TÜV SÜD Industrie Service GmbH Folie 415.09.2016 TÜV SÜD
Definition Integrity Operating Window (IOW)
Source: NACE Paper 2227, Corrosion Management of Refinery Process Units by
Source: API 584, Integrity Operating Windows
Using Integrity Operating Window (IOW), Kuwait National Petroleum Company
Definition Integrity Operating Window (IOW) (API 584): Definition von Grenzwerten für betriebliche Parameter, die
Unterschied zwischen Operating Window und IOW: Operating Window Grenzwerte werden gesetzt, um bestimmte Definition von Grenzwerten für betriebliche Parameter, die
die Integrität von Komponenten nachteilig beeinflussen, wenn der Prozess von den gesetzten Grenzen für einen bestimmten Zeitraum abweicht
p g g ,Zielsetzungen, wie Produktqualität, sicheren Betrieb oder Reliability zu erreichen.IOWs: Unterkategorie des Operating Windows, die auf die Integrität und Zuverlässigkeit von Komponenten fokussiert ist.g g p
TÜV SÜD Industrie Service GmbH Folie 515.09.2016 TÜV SÜD
Welche Art von Parameter gibt es im Integrity Operating Window?
Chemische Parameter Physikalische Parameter
Medieneigenschaften die einen Einfluss auf die Mechanische und betriebliche Parameter wie z BMedieneigenschaften, die einen Einfluss auf die Integrität haben, wie z.B. • Konzentrationen an korrosiven und
spannungsrissinduzierenden Komponenten (z B H2S Chloride Schwefel Naphthensäuren
Mechanische und betriebliche Parameter, wie z.B.• Auslegungs- und Betriebsdrücke und -
temperaturen• Durchflusse(z.B. H2S, Chloride, Schwefel, Naphthensäuren,
Carbonate, NaOH)• pH-Werte• Wassergehalt
I hibit K t ti
• Inhibitordosierungsraten• Partialdrücke, Taupunkte• Aufheiz- und Kühlkurven
• Inhibitor Konzentrationen• Sauerstoffgehalt • Temperaturzyklen
TÜV SÜD Industrie Service GmbH Folie 615.09.2016 TÜV SÜD
Integrity Operating Window – Kategorien werden bestimmt durch das Risiko
Risk Category Potential issue Notification type Response
Critical Imminent failure Alarm for boardoperator
Immediatepredetermined
action to return tooperator action to return tosafe operation
StandardFailure over a
specified amountf ti
Alarm/Alert foroperation
Operator intervention or
ti i dof time operation action required
Informational Long termreliability affected Notification
For planning ofSubject Matter
Experty
SME = Subject matter expert
Expert
TÜV SÜD Industrie Service GmbH Folie 715.09.2016 TÜV SÜD
Beispiel für IOW Prozess und Schnittstelle zu RBI Prozess
Review
IOW processReview
• Time/frequency in exceedance• Update of RBI and IOW limits
rieb
Definition Operating window
Definition monitoring and actions Monitoring Action (when
required)Risk ranking
• Informational• Standard
• Operator response• Inspector notification
• Physical limits• Chemical limits
• Monitoring responsibility• Monitoring frequency
Betr
Standard• Critical
Inspector notification• Expert notification
Chemical limits Monitoring frequency• Corrective actions
Inspection plan Inspection activity Action (when required)Risk analysis
Corrosion control docs,degradation mechanism
evaluation
ndha
ltung
Review
Instan
RBI process
TÜV SÜD Industrie Service GmbH Folie 815.09.2016 TÜV SÜD
Example for Integrity Operating Window implementation program
2 31 4 5 6 7 8 9Month
Gap l i IOW Pilot Unit
Procedure & process
Development Installation IOW-PilotAnalysis
Procedure & process
Roll-out
analysis» Identify
existing elements
ct
IOW Pilot Unit» Define operating conditions» Define degradation
mechanisms» Define process variables» Define criticality» Define actions
process development» Creation of IOW
procedures» Software / Tool
requirements defined
pinstalled» Software / Tools
developed and implemented
W P
roje
c
Management system
Management system Installed
Implementation» Install monitoring
ti iti
tuning Fine-tuning of Roll-out
Roll-out
IOW development
» Standard and transparent IOW process with roles & responsibilities designed
» KPI system developed
» Standard and transparent IOW process installed
» Trainings developed and executed
» KPI system installed
activities» Install response
activities» Tracking the results
of the IOW project
» Workshops» Update
planning
developed
0 1 2 3 4
TÜV SÜD Industrie Service GmbH Folie 915.09.2016 TÜV SÜD
Integrity Operating WindowFallbeispiel – Wie hätte es ablaufen können?
Vorbeugen eines Schadens in einem Wärmetauscher einer Raffinerie
Definition IOW-Parameter• Schadensmechanismus: NaphthensäurekorrosionWärmetauscher einer Raffinerie Schadensmechanismus: Naphthensäurekorrosion• TAN-Zahl: Zusätzlich zum Grenzwert für die Anlage
Einführung eines weiteren informativen Grenzwertes für die TAN-Zahl im Bereich des Wärmetauschers
• Erforderliches Monitoring und Aktionen definiertErforderliches Monitoring und Aktionen definiert
MonitoringG t fü TAN Z hl i Wä t h üb d fi i t • Grenzwert für TAN-Zahl im Wärmetauscher über definierten Zeitraum überschritten, daher Information an Instandhaltung zur Neubewertung der Restlebensdauer
Folge• Austausch des Wärmetauschers wird statt im übernächsten
Stillstand bereits für den nächsten geplant und der Werkstoff geändert
• Die Kosten durch einen ungeplanten Austausch wegen eines größeren Schadens und der damit verbundenden größeren Schadens und der damit verbundenden Verlängerung des Stillstand werden vermieden
TÜV SÜD Industrie Service GmbH Folie 1015.09.2016 TÜV SÜD
Integrity Operating Window
• Optimiert den Informationsfluss zwischen dem Betrieb und der zwischen dem Betrieb und der Instandhaltung der Anlagen
• Ermöglicht es durch vorausschauende Instandhaltungsplanung Produktionsausfälle durch ungeplante g pStillstände und Schäden zu verhindern
• Erhöht die Sicherheit der Anlagen • Erhöht die Sicherheit der Anlagen, indem mögliche Schäden identifiziert werden, bevor sie auftreten
• Die Identifikation von IOW-Parametern ist ein Grundbaustein für Industrie 4.0 in der Instandhaltung von Prozessanlagen
TÜV SÜD Industrie Service GmbH Folie 1115.09.2016 TÜV SÜD
Contact
Marion Janus-Uebelhör Dr.-Ing. Jürgen Deininger
Project managerAsset integrity management
TÜV SÜD Industrie Service GmbH
Head of DepartmentAsset Integrity Management
TÜV SÜD Industrie Service GmbHWestendstraße 19980686 München / MunichGermany
Phone: +49 89 5791-1671Mobil: +49 151 2774 5522
Westendstraße 19980686 München / MunichGermany
Phone: +49 89 5791-2859Mobil: +49 151 11315275Mobil: 49 151 2774 5522
mailto:[email protected] 9 5 3 5 5
mailto:[email protected]
TÜV SÜD Industrie Service GmbH Folie 1215.09.2016 TÜV SÜD