Intelligent Design & Construction (IDC)

Delivery of 3D Projects

What is IDC?

3D engineered modeling is a relatively new and developing technology that can provide

numerous benefits to owners, engineers, contractors, and the general public.

Intelligent Design and Construction

Also known as

Model Based Design for Construction

Why Use 3D Engineered Models ?

• Safety

• Save Time and Money

• Increased Efficiency In Design (no plan sheets)

• Increased Efficiency In Construction

• Clash Detection

• Asset Management

• Reduction in unforeseen conditions & change orders

• Improved Bid Prices

• A complete 3D engineered model includes the base

survey data, proposed horizontal and vertical

alignments, and proposed features and structures

model

• A complete 3D engineered model includes the base

survey data, proposed horizontal and vertical alignments,

and proposed features and structures model.

• The use of 3D engineered modeling has a major

benefit during early design stages versus traditional

2D methods because 3D technologies can easily

make alignment and profile modifications without the

need to manually compute earthwork, right-of-way

impacts, and other design elements.

• Establishing a life cycle project workflow should always be

the starting point for IDC Delivery.

Use By Project TeamsPreconstruction and Design

Using a the CMGC delivery method for

the first project allows the department

to gain the insight of contractors,

supplier and subs.

Clash detection greatly

improves the designer’s ability to detect utility conflicts and

clashes early, allowing for avoidance or greater time to relocate

utilities.

General Public/Property and Utility Owners

3D engineered models provide a convenient way for the

general public and affected property and utility owners to visualize

the project prior to construction.

Use By Project Teams

Requiring the contractors to provide the

department construction crews with the

use and training of the survey equipment

provides onsite education

• Contractors will embrace the 3D project delivery, as

this allows them preform qty take off and

verifications. Contractors build models anyway• As with all AMG-equipped machinery, the contractor

will need to upload the 3D engineered model into the

AMG systems

• A fully designed 3D engineered model contains the

proposed grading surface and proposed features, and

it is able to guide grading machines and excavators

when they are referenced to control points set up on or

near the project site.

• Contractors have been using this technology for years,

creating a 3D Design model streamlines the

construction process and contributes to better pricing

on bid day due to early phasing and mot planning.

• Risk mitigation is a key result of 3D Project

delivery. Contractors do not take risk, they price

them

Contractors, Subs and Suppliers

• Introduction to

industry is

important

• Project Preview

Sites

• Contractor

Training

• I-Pad Plan Room

Use By Project Teams

Industry Outreach / Training / Delivery

Innovation: Utilizing 3D Models as the

Legal Document

George Lukes,

Utah Department of Transportation

[email protected]

Timeline2014 – 2017

2014INVESTIGATION & PLANNING

IDC: UDOT names the effort Intelligent Design and Construction

Trip to Iowa: UDOT investigated how electronic files are made available to contractors

Workshop: FHWA 3D Engineered Models for Construction Workshop held

2014INVESTIGATION & PLANNING

3D Engineered Model for Construction Workshop goals :

IDC Implementation Plans• Short-term (May-Dec '14) - Investigation and

Planning

• Mid-term (Jan-Dec '15) - Award Model as Legal Document on one project (MALD)

• Final (Coming soon) - Award MALD on all projects with models

“For information only” electronic design files provided on 15 projects

2014INVESTIGATION & PLANNING

Follow-up on 15 projects for lessons-learned:

Risk Workshop followed by Brainstorm Workshop

• UDOT senior leaders, construction, IT, survey, local & national contractors, consultants, academia, software & hardware vendors, local technology companies

• 20 risks identified to awarding MALD

2014INVESTIGATION & PLANNING

Brainstorm Workshop focus: 2 major risks, 6 other risks• Major Risks: Lack of construction hardware and

software

• Other risks: survey control, design review, modelQC/QA, data compatibility between owner & contractors, small contractors, missing learning opportunities.

2015AWARD MODEL as LEGAL DOCUMENT

SR 20 selected to award MALD• Low-risk passing lane project• Limited ROW, utilities, rural, low ADT• In-house design, Bentley OpenRoads• CMGC delivery to address MALD risk• Developed RFP for CMGC contract

ATTACHMENT A: ELECTRONIC DESIGN NAMES AND DESCRIPTIONS

CONTRACTUAL ELECTRONIC DATA FILES

FILE NAME DESCRIPTION DATE & TIME

14277_Extopo_WB.dgn Existing topography for WB lane 1/10/2017 10:36

14277_ EB Corridor_1300_S_On_Ramp_ADV.dgn Contains corridor and civil design data 2/1/17 11:07 AM

14277_WB_ALG_ADV.dgn Contains horizontal and vertical aligment data 1/18/2017 11:07

14277_WB_NMAIN_OFFRAMP_ADV.dgn Contains corridor and civil design data 2/1/2017 14:16

14277_WB_MAINLINE_CORRIDOR_A_ADV.dgn Contains corridor and civil design data 2/1/2017 14:11

14277_EB Corridor_ADV.dgn Contains corridor and civil design data 2/1/2017 11:13

14277_WB_1300S_Corridor_ADV.dgn Contains corridor and civil design data 2/1/2017 14:13

14277_RELEASE EB ALG_ADV.dgn Contains horizantal and vertical aligment data 2/1/2017 11:24

14277_WB_NMAIN_ONRAMP_ADV.dgn Contains corridor and civil design data 2/1/2017 15:18

14277_WB_MAINLINE_CORRIDOR_B_ADV.dgn Contains corridor and civil design data 2/1/2017 14:00

F-I70_1(88)37_Adv_Set CFR, Specifications, DBE and EEO goals

F-I70-1(88)27_Plans_Adv.pdf (SC ,DT, Drainage, ATMS, and Structure Sheets only)

Contains survey control , details, drainage, ATMS, and Structure sheets and applicable non-modeled data.

FOR INFORMATION ONLY FILES

FILE NAME DESCRIPTION DATE & TIME

F-I70-1(88)37_Plans_Adv.pdf (Title, 1A &1B, CR,HC,RD, SS Sheets)Contains title, abbreviations and legend, index to sheets, cross reference to sheets,horizantal aligment data, roadway plan, and signing and striping data.

14277_SC_Sheets.pdf This file has the survey control sheets and data for this project 1/11/2017 8:07

14277-I-70 verification report.pdf This document reports a 3rd party survey verification and reivew 2/1/2017 13:28

I-70 EARLY RELEASE EB ALG.dxf Contains horizantal aligment data 2/1/2017 11:19

I-70 EARLY RELEASE_WB_ALG.dxf Contains horizantal aligment data 2/1/2017 13:00

I-70 EARLY RELEASE EB 1300 S RAMP TOP MESH.dtm Surface data file 2/1/2017 10:33

I-70 EARLY RELEASE WB 1300 S TOP.dtm Surface data file 1/31/2017 14:45

I-70 EARLY RELEASE WB NMAIN OFF RAMP TOP.dtm Surface data file 1/31/2017 14:49

I-70 EARLY RELEASE WB MAINLINE A TOP.dtm Surface data file 1/31/2017 14:23

I-70 EARLY RELEASE WB NMAIN OFF RAMP BOT.dtm Surface data file 2/1/2017 12:35

I-70 EARLY RELEASE WB MAINLINE A BOT.dtm Surface data file 2/1/2017 12:38

I-70 EARLY RELEASE WB 1300 S BOT.dtm Surface data file 2/1/2017 12:40

I-70 EARLY RELEASE WB MAINLINE B BOT.dtm Surface data file 2/1/2017 12:31

I-70 EARLY RELEASE EB MAINLINE BOTTOM MESH.dtm Surface data file 2/1/2017 10:54

I-70 EARLY RELEASE 14277 I70 EB EXTOPO.dtm Surface data file 2/1/2017 11:42

I-70 EARLY RELEASE 14277 I70 WB EXTOPO.dtm Surface data file 1/31/2017 14:51

I-70 EARLY RELEASE WB NMAIN ON RAMP TOP.dtm Surface data file 1/31/2017 14:48

I-70 EARLY RELEASE EB 1300 S RAMP BOTTOM MESH.dtm Surface data file 2/1/2017 10:37

I-70 EARLY RELEASE EB MAINLINE TOP MESH.dtm Surface data file 2/1/2017 10:30

I-70 EARLY RELEASE WB MAINLINE B TOP.dtm Surface data file 1/31/2017 14:25

I-70 EARLY RELEASE WB NMAIN ON RAMP BOT.dtm Surface data file 2/1/2017 12:36

I-70 EARLY RELEASE WB MAINLINE CORRIDOR A.icm.dgn Houses Surface, alignment, and 3D feature data. Compatable with Trimble Business Center 2/1/2017 14:13

I-70 EARLY RELEASE EB Corridor.icm Houses Surface, alignment, and 3D feature data. Compatable with Trimble Business Center 2/1/2017 11:09

I-70 EARLY RELEASE WB MAINLINE CORRIDOR B.icm.dgn Houses Surface, alignment, and 3D feature data. Compatable with Trimble Business Center 2/1/2017 14:18

I-70 EARLY RELEASE EB ALG.icm Houses Surface, alignment, and 3D feature data. Compatable with Trimble Business Center 2/1/2017 11:22

I-70 EARLY RELEASE EB EXTOPO1.icm Houses Surface, alignment, and 3D feature data. Compatable with Trimble Business Center 2/1/2017 12:49

I-70 EARLY RELEASE WB ALG.icm.dgn Houses Surface, alignment, and 3D feature data. Compatable with Trimble Business Center 2/1/2017 13:53

I-70 EARLY RELEASE WB NMAIN OFF RAMP TOP.xml Surface data file 1/31/2017 14:49

I-70 EARLY RELEASE WB MAINLINE B BOT.xml Surface data file 2/1/2017 12:33

I-70 EARLY RELEASE EB MAINLINE BOTTOM MESH.xml Surface data file 2/1/2017 10:55

I-70 EARLY RELEASE WB MAINLINE A BOT.xml Surface data file 2/1/2017 12:39

I-70 EARLY RELEASE WB MAINLINE B TOP.xml Surface data file 1/30/2017 17:37

I-70 EARLY RELEASE 14277 I70 WB EXTOPO.xml Surface data file 1/31/2017 14:52

I-70 EARLY RELEASE WB 1300 S TOP.xml Surface data file 1/31/2017 14:46

I-70 EARLY RELEASE EB MAINLINE TOP MESH.xml Surface data file 2/1/2017 10:32

I-70 EARLY RELEASE EB 1300 S RAMP TOP MESH.xml Surface data file 2/1/2017 10:34

I-70 EARLY RELEASE WB NMAIN ON RAMP TOP.xml Surface data file 1/31/2017 14:47

I-70 EARLY RELEASE EB 1300 S RAMP BOTTOM MESH.xml Surface data file 2/1/2017 15:09

I-70 EARLY RELEASE WB NMAIN OFF RAMP BOT.xml Surface data file 2/1/2017 12:35

I-70 EARLY RELEASE 14277 I70 EB EXTOPO.xml Surface data file 2/1/2017 11:46

I-70 EARLY RELEASE WB NMAIN ON RAMP BOT.xml Surface data file 2/1/2017 12:36

I-70 EARLY RELEASE WB MAINLINE A TOP.xml Surface data file 1/31/2017 14:23

I-70 EARLY RELEASE WB 1300 S BOT.xml Surface data file 2/1/2017 12:40

I-70 EARLY RELEASE QUANTITY CHECK.xlsx Quantity or major items 2/1/2017 16:54

2016MALD AWARD & CONSTRUCTION

UDOT and contractor collaborate on OpenRoads and Trimble models

• Bentley, Trimble, Contractor, UDOT begin bi-weekly meetings to resolve issues

• Three months for Trimble Business Center to match UDOT’s model

2016MALD AWARD & CONSTRUCTION

Contractors survey had differences with UDOT’s survey:

• Model is updated same day & Contractor loses no time due to electronic file transfer and stakeless/stringlessconstruction

• UDOT Crews & Contractor use OpenRoads Navigator app on mobile devices. Shortcoming: app didn't support cross sections.

• UDOT inspectors use Contractor supplied rovers.

2016MALD AWARD & CONSTRUCTION

How to convey information to contractor without plans:

• Annotation in 3D

• Embed information in element• SUDA• ECX Attributes/Item

Types• Links

• Saved views for iModel

2016MALD AWARD AND CONSTRUCTION

90-day project completed in 74 days - almost four weeks earlyProject receives UDOT Annual Conference Award and

WASHTO Innovative Project Award

2017AWARDING MALD ON DBB

Next step: Design-Bid-Build : • UDOT has awarded two projects with MALD• Projects under construction now• Anticipated completion, end of construction season

2017AWARDING MALD ON DBB, CMGC

UDOT will award the MALD on:• Three active CMGC projects• Two Design-Bid-Build projects• More CMGC and DBB projects to be selected in 2018

Design Bid-Build Projects (I-70, SR-193):• The .icm main driver – direct import of OpenRoads• model to Trimble Business Center (TBC)

• Spent significant resources to ensure TBC model matched design intent of .dgn

• Legal documents were .dgn files. All other files For • Information Only including: iModels,XML, .alg, .dtm• and .icm• 3rd party survey verification, written report and • statistical analysis• Specs required contractor to train UDOT field crews on • use of rover

• Basic use• Data collection• Surface model (for various grades) verification by

designer

2017AWARDING MALD on DBB, CMGC

Design Bid-Build Projects:

• Pre-release of model files and survey information at PS&E on Google Sites

• At award, mandatory sit down with pre-con survey and contractor’s survey

• Using mobile devices in the field in lieu of plan sheets: OpenRoads Navigator and UPLAN/Collector

• Proof of concept on as-builts and existing condition database layering

2017

AWARDING MALD on DBB, CMGC

Four CMGC Projects:

1. SR-68 In construction (2017/2018) Urban setting• Discovered .icm issue. Bentley Trimble fixing• Contractor/UDOT crews using OpenRoads Navigator• UDOT GIS being used with Collector

2017AWARDING MALD on CMGC

Four CMGC Projects:

2. I-80 Climbing Lanes (RLW) • PS&E • Lochner developing virtual review tool• ORN use• Likely will incorporate UDOT GIS through Collector

2017AWARDING MALD on CMGC

Four CMGC Projects:

3. SR-10 (Kiewit)• Construction 2018

4. I-80 Blackrock BrIM (Granite)• Initial phases• Project team developing workflows

2017

AWARDING MALD on CMGC

Objective: How to move forward with IDC/elimination of plan sheets

• Seven contractors, Internal UDOT design, consultant designers, UDOT construction crews, GIS, Facilitator (Greg Evans SiTech)• Informal discussion for contractor feedback.

• Takeaways: • Trimble/Bentley very appreciative of

information gathered

2017BENTLEY/ TRIMBLE CONTRACTOR SUMMIT

Quick Collector/GIS demo

Life Cycle 3D Project Delivery

Implementation Plan

Design and Requirements

Industry Introduction and

Training

Construction Implementation

Data Collection Asset

Management

Understanding the current tools

available for your 3D project

delivery is important.

Consideration for internal

reviews and how they will be

conducted without plan sets is

important.

The model does allow for

standard details or

specifications to be placed in the

model associated with an

element.

Review of current standards and

specification will need to take

place prior to delivery. These will

need to be modified to address

3D survey requirements, as build

recording and construction

delivery expectations and

training.

Workflows

Where to Start ?There are numerous grants and funds

available through

FHWA Every Days Counts Program.

Model Elements

Software and

Tools

Education

Project Selection

Design and

Document

Deliver

Construct and

Collect

Record and

Repeat

How can we SHARE best practices