Intelligent Transport SystemKSRTC, Mysore

N. Manjunatha Prasad, IAS

Managing Director, KSRTC

Page 2: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

Project Scope and Solution

� Application / Database Servers

� Network Firewall / Routers / Switches

� Video Wall

� ITS

� ETA

� MIS Reports

� GIS

� EMS

� Commuter Portal

� SMS

� IVRS

� Shelters - 2” 2 Line – 59

� Shelters – 2” 4 Line - 63

� Platforms – 4” 4 Line – 45

� Terminals – 10 Line – 20

� Terminals – 16 Line – 6

� TOTAL - 193

� Vehicle Mounted Units (VMU) - 500

� In-Bus Displays – 500

� Voice Announcement System

� DG Set – 82.5 KVA

� UPS – 20 KVA x 2

CCS / Data Centre PIS Display Boards

Commuter Benefits

Applications

Power

In-Bus Equipments

� Crew Training

� Officials Training

Training

Page 3: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

• Data Centre

• Servers

• Communication Server

• Database Server

• Application Server

• All Servers are configured in Cluster mode for fault tolerance

• Network & Firewall components

• 5 Mbps Internet Connectivity x 2 for redundancy

• 2 x 20 KVA online UPS for failover

• 85 KVA Diesel Generator Backup

• Central Control Station

• Video Wall in Control Room

• Dispatcher Workstations

• Access Control

Project Progress : Data Centre and Control Station

Completed & Operational

Video Wall

Servers

Page 4: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

Project Progress– Applications • Core Applications

• ITS & GIS - Tested & Deployed

• Commuter Related applications

• SMS & IVRS – Tested & Deployed

SMS – 98700 11012

IVRS - 18004255220

• Commuter Portal – Tested & Deployed – http://mitra.ksrtc.in

• EMS – System Factory Acceptance Testing (SFAT) in Progress

Kannada Portal English Portal Dynamic Status Report

GIS Map with Buses

Page 5: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

Project Progress– Field Equipments• In-Bus Equipments – Installation completed in 420 buses

• VMUs, In-Bus Display and Audio Announcements

• 10 line & 16 line Display Boards

• 24 out of 26 Installations Completed

• 2 line & 4 line Display boards

• 157 out of 161 installations Completed

• 6 boards reserved for Environment Tests

10 line Display Board 16 line Display Board

2 line Display Board

VMU Screen

Page 6: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

Project Progress– Deployment• Training

- 1493 crew members Trained

- Depot Managers and Traffic Inspectors Trained

- Includes Class Room Training, In-Bus demonstration and a visit to Control Room with informative Training Manual

Class Room Training

In-Bus Equipment Demonstration

Training Slide - Sample

• Route Deployment – Geo Fencing, field survey and validation completed for all 342 routes

• ETA – Enabled for all the routes.

• ETA Algorithm is under observation and SFAT in progress

• Audio recording of Bus Stop names completed for 2400 bus stops in English & Kannada

Page 7: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

Project inauguration

Sri. R. Ashoka, Hon’ble Dy.Chief Minister and

Minister for Home and Transport, Govt. of

Karnataka inaugurated the ITS system on

17-November-2012 at Mysore City.

Page 8: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

� Introduction of ITS in KSRTC for the first time� Lack of domain Knowledge & dependence on consultants� Multi-level monitoring, co-ordination and correspondences� World bank procurement practices – Goods and Services,

Consultancy Services� Financial Management – Different funding agencies, JnNURM and

GEF, Formalities, Utilization Certificates, Auditing Norms, Fund Flows etc

� Infrastructural Assistance – Bus shelters and CCS.� Acceptance by Bus Drivers – Drivers are feared that they are being

scrutinized� Meeting commuter expectations - Real Time PIS Display, SMS

queries, Commuter friendly website, Help Desk Management etc.� Synchronizing Technology and Consulting domains� 20% of the buses already had the in-bus display board. They were

replaced by ITS in-bus display boards.

Implementation ChallengesImplementation Challenges

GIS Software

Page 9: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

Implementation ChallengesImplementation Challenges� Availability of buses for installation of equipments – Available only in

Night Time � Installation of In-bus equipments – different types of buses,

placement of batteries / VMU / cabling issues� Route Validation – Form 4 v/s. Actual Stops are different which lead

to multiple iterations of validation� Trip non-Adherence to the last stop by drivers – Welcome and

Thank You announcements are added for commuters which can also help drivers to identify trip start and end

� Security of Equipments at bus stops – Additional measures taken to ensure safety of equipments, Insurance

� Ambiguity in RFP – PIS fonts, GIS map requirements, UPS capacity, Location of PIS

� Time gap between DPR preparation, RFP Preparation and Contract Award – Many developments & changes

� Availability of GPRS signal throughout the city to get the real time information from buses.

Page 10: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

Implementation ApproachImplementation Approach� Building Knowledge Base – In-depth study, thread-bear discussions,

consultations� Multi-lateral Co-ordination – City Administration, PMU, WB,

Consultants, State Govt. etc.� Acquaintance with WB Procedures – Finance, Procurement� Team Work – KSRTC, Vendor, Consultants etc� Detailed Project Planning and Documentation� Sound Management Review Techniques – Weekly Meetings,

Monthly Steering Committee Meetings, Field visits, Adhoc meetings, consultations with PMC etc.

� Comprehensive Training Program

Crew taking a Quiz during training

Page 11: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

Lessons LearntLessons Learnt� Acquaintance with World Bank Procedures

� Identification and Construction of bus shelters

� Ensuring power supply at bus shelters

� Placement of PMC and M&E services in time

� Exposure to the crew about the system in advance

� Location and designing of CCS

� Budgeting of project components should have practical approach

� Value of detailed implementation plan and in-depth documentation

� Practical approach to installations, software development, processes and solutions etc.

� Constant filed visits and continuous improvements

� Scope clarity from different stakeholder perspectives needs to be finalized at the beginning of the project

Video wall in CCS

Page 12: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

User Satisfaction Survey• The M&E Consultants of KSRTC carried out baseline Commuters’

Survey comprising of 2960 commuters on random sampling in Mysore

City

• Survey was conducted at 180 locations across Mysore city

• The parameters analyzed in this survey are:

• commuters’ socio-economic background

• usage segmentation

• information availability

• travel time and cost

• perception of safety of using KSRTC buses and

• commuters’ shift reasons.

Page 13: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

Ratings of KSRTC bus services

User Satisfaction Survey

Page 14: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

• 62.9 % of say that travel time of the bus was good without much

delay in reaching the destination commuters use KSRTC buses all

the days of a week and 65 % of them walk to bus stops

• 43.1 % of commuters get information on bus schedules from

other people and 37.9 % of commuters rely on their own

experiences

• The information regarding the bus fares is not provided

anywhere. The only source from which the commuters get the

information is the conductor.

• 95% of commuters are aware of environment pollution

User Satisfaction Survey

Page 15: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

• 85 % of commuters wait for more than 2 minutes at the bus stop

out of which 36 % wait for 2-5 minutes 40 % wait for 5-15 minutes,

and 9 % wait more than 15 minutes

• 84 % of commuters say that travel time of the bus was good

without much delay in reaching the destination

• 45 % of commuters say that use of environment friendly vehicles

will minimize the environment pollution and 36 % of commuters

say that travelling by public vehicles will minimize the pollution

• 72 % of commuters indicated that they notice bunching of buses

at bus stops sometimes

User Satisfaction Survey

Page 16: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

•34% of commuters use private buses, 25 % use tempo, 23% use

auto, 7 % use taxi and 4% ask for lift as an alternate mode of

travel to KSRTC bus service.

•25.8 % and 23.9 % of commuters’ trip purposes are work and

education respectively

• 62.8 % of commuters would like to get bus schedule information

at bus stops

•62 % of commuters are using KSRTC buses for more than 3

years and 8 % of commuters are using KSRTC bus from less than

6 months.

User Satisfaction Survey

Page 17: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

User Satisfaction Survey

Page 18: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

Monitoring and Evaluation – Plan of ActionSl. No

Description Timeline

1 Compare Performance of KSRTC before

ITS and after ITS

Continuous and intermittent input till end of February 2015

2 Compare socio-economic parameters of

KSRTC commuters before and after ITS

Continuous and intermittent input till end of October 2014

3 Perform impact assessment using

performance indicators

Intermittent input till end of January 2015

4 Conduct temporal surveys March 2013, September 2013, March 2014 and September 2014

5 Compare with benchmark and previous

temporal surveys

Half Yearly

Page 19: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

Sl. No

Description Timeline

6 Analyze the data, test hypothesis and draw

inference

Half Yearly

7 Compare with service level benchmark, and

suggest policy implications

Half Yearly

8 Prepare temporal study report Half Yearly

9 Prepare comprehensive M&E report March 2015

Monitoring and Evaluation – Plan of Action

Page 20: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

Financial Progress

Financial Progress

������������� ��������������������� ��������

�������������� ������ ������� ���������������������������� �������� ����

����� �������������� �� ��! ����"�� �� ��������! ���#

����� ��������������� �����

(in Rs. Crore)

Page 21: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

Financial Progress

��� ���������� ���������� ��� ��� �� �!��

� ��$��% ������ &�'#� ����� '�&�� �

����������"

� "��(� �)����������� � ��#�� ��#�� � � �

� )�����������%����*����� ����� ����� � ���'� �����

� � +�� ��, � ��� � ����� ����� � ����� �

-�+��

� "��(� �"������������ � ����� ����� � � �

' ."/0/1"2��%������*����� ����� ����� � � �

�#�$% �&���� �&�'&� &���& '�&�� &�&&�

(in Rs. Crore)(��)����)�(��)����)�** ������ ��������� ���

Page 22: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

Financial Progress

Financial Progress(in Rs. Crore)������)�������������!��������

������)�$)���" ��� �� ����� !������� (������

$�����3��%�� ���#� ���� ����# ���� ���#

$�����34������5� ���� ���� ���� ��'# ���'

$�1�6���%7��5� #��� #��� ���' ��'�

������(�������� �&��+� ����� ������ '�,�� ���,��

4�/� ���' ��&� ��'#

����� ������ �&���� ������

-.���������/�$�������0�&0�&��1 '��� ���� '�,��

Page 23: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

Financial Progress

� The amount received also includes the payment of Rs.

3.10 Crore towards complete implementation of Innovative

Environment System (IES) Project as part of JnNURM

scheme.

� KSRTC has submitted third installment claim to MoUD

� KSRTC has sought release of balance funds from World

Bank

� KSRTC expects major payments in this quarter as bills

have been raised from ITS Vendor, M&E and PMC

Services

Page 24: Intelligent Transport System KSRTC, Mysore - Sutp · Intelligent Transport System KSRTC, Mysore ... IVRS - 18004255220 ... Project inauguration Sri. R. Ashoka,

Requests from KSRTC for Consideration

• Consultancy services- budget v/s financial proposal

KSRTC has already procured Consultancy Services for Project

Management Consultancy and Monitoring and Evaluation Consultancy.

KSRTC will be engaging CSOA consultancy services. We request to

release funds to the extent of contracts finalised.