10
re Teehno Architecture Interior Design 29- 31 Pothdowne Street Corks's] 3053 Australia .61[0) 3 9600 0222 [email protected] techneicorn.ou PROJECT: TRIBE HOTEL COLLINGWOOD 14.12.18 TOWN PLANNING SUBMiSSION_REV LIST OF CHANGES TO A3 TP DOCUMENT: pg 16 (Design Response - Bose Principles - Top levels), pg 27 (Proposed Level M10) S pg 28 (Proposed Level M11) from TP document 24.08.18 have been removed as no longer applicable. * changes to Al documentation set are as clouded Page: 2 Contents Development Schedule updated 14 Design Response - Base Principles - Podium Item 17 - Additional windows Item 18 - Additional views and seating to façade 16 Design Response - Bose Principles - Section Item 8 - Reduction in overall building height New overshadowing path shown vs previous 17 Design Response - Proposed Massing New building mass shown 19 TP01- Site Analysis & Existing Conditions Lot Key Plan & clearer Title Boundary 20 TP10 - Demolition Plan Lot Key Plan & clearer Title Boundary 23 TP23 - Design Response Updated roof plan shown Lot Key Plan & clearer Title Boundary 24 TP40 - Proposed Streetscape Views Neighbouring proposal S pedestrian link removed 25 TP20 - Proposed Ground Floor Plan Lot Key Plan & clearer Title Boundary New seating niche to façade additional windows to open dining area facade Lobby & corridor widths shown 26 TP21 - Proposed Level M1 Plan Updated skylight to Open dining Area Lobby S Corridor widths shown Lot Key Plan S clearer Title Boundary 27 TP22 - Proposed Levels M2-M8 Plan Updated skylight to Open dining Area Lobby & Corridor widths shown Lot Key Plan & clearer Title Boundary 28 TP28 - Proposed Roof Plan New Roof Plan with reduction in overall building height 29 TP26 - Typical Module Plans Internal room dimensions shown 31 TP41- Proposed Elevations - Sheet 1 Overall building height reduced New seating niche to façade Additional windows to Open Dining Area facade Podium wall heights shown Materials updated to reflect Materials Legend 32 TP42 - Proposed Elevations - Sheet 2 Overall building height reduced Materials updated to reflect Materials Legend Title Boundary setbacks shown 33 TP43 - Proposed Elevations - Sheet 3 Overall building height reduced Podium wall heights shown Materials updated to reflect Materials Legend 34 TP44 - Proposed Elevations - Sheet 4 Overall building height reduced Materials updated to reflect Materials Legend Title Boundary setbacks shown 35 TP45 - Proposed Section Overall building height reduced Podium wall heights shown New overshadowing path shown vs previous application 36-42 TP5O-TP56 - Shadow Diagrams Additional Hours of shadows shown. gam, 10am, llam, 12pm, 1pm, 2pm, 3pm Shadow extent of Town Planning Submission (24.08.12) shown 43-46 Design Response - Perspective Renders V1, V2, V3, V4 Overall building height reduced New seating niche to facade Additional windows to Open Dining Area façade Neighbouring proposalS pedestrian link removed V4 Perspective render from Wellington Street 48 Tribe Hotels - Initiatives New Diagrams and descriptions 49-50 Tribe Hotels - Construction Methodology New Diagrams and descriptions 52 Tribe Hotels - Aesthetics New facade image to demonstrate facade articulation

Interior Design 29- 31 Pothdowne Street Corks's] 3053 ... · Interior Design 29- 31 Pothdowne Street Corks's] 3053 Australia .61[0) 3 9600 0222 [email protected] techneicorn.ou

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Interior Design 29- 31 Pothdowne Street Corks's] 3053 ... · Interior Design 29- 31 Pothdowne Street Corks's] 3053 Australia .61[0) 3 9600 0222 info@nechne.consiau techneicorn.ou

re Teehno Architecture

Interior Design 29- 31 Pothdowne Street Corks's] 3053 Australia

.61[0) 3 9600 0222 [email protected] techneicorn.ou

PROJECT: TRIBE HOTEL COLLINGWOOD 14.12.18

TOWN PLANNING SUBMiSSION_REV

LIST OF CHANGES TO A3 TP DOCUMENT: pg 16 (Design Response - Bose Principles - Top levels), pg 27 (Proposed Level M10) S pg 28 (Proposed Level M11)

from TP document 24.08.18 have been removed as no longer applicable.

* changes to Al documentation set are as clouded

Page: 2 Contents Development Schedule updated

14 Design Response - Base Principles - Podium

•Item 17 - Additional windows

• Item 18 - Additional views and seating to

façade

16 Design Response - Bose Principles - Section • Item 8 - Reduction in overall building height

• New overshadowing path shown vs previous

17 Design Response - Proposed Massing New building mass shown

19 TP01- Site Analysis & Existing Conditions Lot Key Plan & clearer Title Boundary

20 TP10 - Demolition Plan Lot Key Plan & clearer Title Boundary

23 TP23 - Design Response • Updated roof plan shown

• Lot Key Plan & clearer Title Boundary

24 TP40 - Proposed Streetscape Views Neighbouring proposal S pedestrian link removed

25 TP20 - Proposed Ground Floor Plan

• Lot Key Plan & clearer Title Boundary

• New seating niche to façade

additional windows to open dining area

facade

• Lobby & corridor widths shown

26 TP21 - Proposed Level M1 Plan

• Updated skylight to Open dining Area

• Lobby S Corridor widths shown

• Lot Key Plan S clearer Title Boundary

27 TP22 - Proposed Levels M2-M8 Plan

• Updated skylight to Open dining Area

• Lobby & Corridor widths shown

• Lot Key Plan & clearer Title Boundary

28 TP28 - Proposed Roof Plan New Roof Plan with reduction in overall building height

29 TP26 - Typical Module Plans Internal room dimensions shown

31 TP41- Proposed Elevations - Sheet 1

• Overall building height reduced

• New seating niche to façade

• Additional windows to Open Dining Area

facade

• Podium wall heights shown

• Materials updated to reflect Materials

Legend

32 TP42 - Proposed Elevations - Sheet 2

• Overall building height reduced

• Materials updated to reflect Materials

Legend

• Title Boundary setbacks shown

33 TP43 - Proposed Elevations - Sheet 3

• Overall building height reduced

• Podium wall heights shown

• Materials updated to reflect Materials

Legend

34 TP44 - Proposed Elevations - Sheet 4

• Overall building height reduced

• Materials updated to reflect Materials

Legend

• Title Boundary setbacks shown

35 TP45 - Proposed Section

• Overall building height reduced

• Podium wall heights shown

• New overshadowing path shown vs previous

application

36-42 TP5O-TP56 - Shadow Diagrams

• Additional Hours of shadows shown. gam,

10am, llam, 12pm, 1pm, 2pm, 3pm

• Shadow extent of Town Planning

Submission (24.08.12) shown

43-46 Design Response - Perspective Renders V1, V2, V3, V4

• Overall building height reduced

• New seating niche to facade

• Additional windows to Open Dining Area

façade

•Neighbouring proposalS pedestrian link

removed

•V4 Perspective render from Wellington

Street

48 Tribe Hotels - Initiatives New Diagrams and descriptions

49-50 Tribe Hotels - Construction Methodology New Diagrams and descriptions

52 Tribe Hotels - Aesthetics New facade image to demonstrate facade articulation

Page 2: Interior Design 29- 31 Pothdowne Street Corks's] 3053 ... · Interior Design 29- 31 Pothdowne Street Corks's] 3053 Australia .61[0) 3 9600 0222 info@nechne.consiau techneicorn.ou

Tribe Hotels

PROJECT Tribe Collingwood PROJECT NO 18016

ADDRESS 60-62 Langridge Street & 23-1+5 Waterloo Road, Collingwood (Proposed Lot A)

CLIENT 60 Langridge Street Pty Ltd

DRAWING N/A SCALE DATE 19/12/2018 PAGE NO 1+7 Ta Techne Architecture + Interior Design 29-31 Rathdowne Street Carlton 3053 Australia +61 (0) 3 9600 0222 techne.com.au

Page 3: Interior Design 29- 31 Pothdowne Street Corks's] 3053 ... · Interior Design 29- 31 Pothdowne Street Corks's] 3053 Australia .61[0) 3 9600 0222 info@nechne.consiau techneicorn.ou

Image: TRIBE MODULAR Image: TRIBE PROCUREMENT & FIT-OUT

London

Paris manic!,

Barcelona . Newyork

Washington DC .

Stockholm

N

... ••• ... .......

Los Angeles •

PRO OFFICE

Tokyo

PRC San Francisco •

HEAD OFFICE

Jakarta

Sydney 1.1 w Melbourne

•Hobart • Auckland

Cape Town

Moscow

. ...... ..... ... ..

........ ...... ................ .... .... .................. ...... ...... '7"" ..... . "" ............................ : . ............

Tribe Design Principles

re Techne Architecture + Interior Design 29-31 Rathdowne Street Carlton 3053 Australia +61 (0) 3 9600 0222 techne.com.au

Tribe Hotels

Initiatives

Each module is capable of intermodal freight, via road, rail or skip enabling delivery anywhere across the globe.

Mark Peters, Founder, CEO rribe Hotel Group

The Tribe modules have been designed and engineered to ensure that there are no geographical boundaries. Ensuring cost effective intermodal transport of the modules was a fundamental principle applied to the concept. The modules can be easily transported via road, rail or ship to any hotel location across the globe.

Our established team in China delivers a consolidated approach to module manufacture and procurement of ancillary materials and building supply for our hotels. This central supply hub enables us to achieve a consistent level of quality, regardless of the hotel's location around the globe. Consistency and conformance to our quality benchmarks can be achieved regardless ofthe contractor's ability in any respective market that we wish to enter.

All manufacturing is conducted with stringent manufacturing processes and experienced personnel. The model provides significant cost savings and reduced construction times when compared with a traditional build method. Once construction commences, a Tribe Hotel may be operational within 12 months.

With economies of scale and a controlled factory environment, the manufacturing process ensures a higher level of quality and significant reductions in material wastage when compared with a traditional build method. All these benefits help to promote an affordable, cost efficient and sustainable outcome.

Tribe also provides an extensive procurement option for supply of fit-out solutions that facilitate high end Tribe environments at affordable prices. Including, but not limited to, common area fit-out, joinery, stone, signage, FF&E and artwork.

PROJECT Tribe Collingwood PROJECT NO 18016

ADDRESS 60-62 Langridge Street & 23-45 Waterloo Road, Collingwood (Proposed Lot A)

CLIENT 60 Langridge Street Pty Ltd

DRAWING N/A SCALE DATE 19/12/2018 PAGE NO 48

Page 4: Interior Design 29- 31 Pothdowne Street Corks's] 3053 ... · Interior Design 29- 31 Pothdowne Street Corks's] 3053 Australia .61[0) 3 9600 0222 info@nechne.consiau techneicorn.ou

STAGE1. CONSTRUCTED IN SITU

STAGE 2. MODULE INSTALL

STAGE 3. MODULE COMMISSIONING & BUILDING COMPLETION

Tribe Hotels

Construction Methodology

Modular and prefabricated construction allows for greater efficiency, less wastage of natural materials and better quality control.

What is special about our buildings is that the fabrication has been so seamlessly integrated that it is difficult to find where the modular components start and stop.

■ Podium - Standard construction - Site responsive - Activated frontage - Authority compliant services

■ Transfer Slab - Standard construction - Engineered solution isolating module grid from FOH/BOH structure

111 Service Zone - Coordination zone and reticulation of services through consolidated transfer slab penetrations

- Fire rated - Service access to module risers

11 Modules - Modular hotel rooms components - Self-supporting structure - Fully fitted out with services and interiors

■ Roof Structure & Plant - Allows for reticulation space of module services - Integral screened plant platform

Core/Vertical Transportation - Standard construction - Tracing' element to modules

PROJECT Tribe Collingwood PROJECT NO 18016

ADDRESS 60-62 Langridge Street S 23-1+5 Waterloo Road. Collingwood (Proposed Lot A)

CLIENT 60 Langridge Street Pty Ltd

DRAWING N/A SCALE DATE 19/12/2018 PAGE NO 49 Te Techn8 Architecture + Interior Design

29-31 Rathdowne Street Carlton 3053 Australia +61 (0) 3 9600 0222 techne.com.au

Page 5: Interior Design 29- 31 Pothdowne Street Corks's] 3053 ... · Interior Design 29- 31 Pothdowne Street Corks's] 3053 Australia .61[0) 3 9600 0222 info@nechne.consiau techneicorn.ou

PROJECT ADDRESS CLIENT DRAWING Te

Tribe Collingwood PROJECT NO 18016

60-62 Langridge Street G 23-145 Waterloo Road, Collingwood (Proposed Lot A)

60 Langridge Street Pty Ltd

N/A SCALE DATE 19/12/2018 PAGE NO 50 Techne Architecture + Interior Design 29-31 Rathdowne Street Carlton 3053 Australia +61 (0) 3 9600 0222 techne.com.au

Diagram Customisable Opportunities

Room Module

Build Type: Purpose Built (Pre-fabricated)

Customisation Opportunities: External - 0% Internal - Aesthetic only

Room Window Shrouds

Build Type: Purpose Built (Pre fabricated)

Customisation Opportunities: - Limited variations - Material opportunities for complimentatyfascia surfaces/ local environments

Ground Floor / Podiums

Build Type: Traditional

Customisation Opportunities: External -100% Internal - 100%

Tribe Hotels

Construction Methodology

The hotel module comprises a purpose designed and factory built steel framed unit. The modules are fully fitted out and completed to a signature Tribe specification inclusive ofwindows, doors, floor and wall coverings and full bathroom hardware, prior to leaving the factory. All structural plumbing and electrical components are compliant to the applicable building standard.

Each module is capable of intermodal freight, making them easily deliverable to any destination worldwide. The rigidity in the steel framing and freight packing system allows for the finished hotel room modules to be delivered straight to site, locked into place, connected to services and opened as a complete hotel room, ready for use.

The ground floor (common area of the hotel) is constructed using traditional building methods and forms the base structure from which the modules are stacked. All lifts and stairwells also follow the traditional construction method. Common areas are fitted our through Tribe's established procurement platform.

The modules themselves form the structure and support of the building for each level over and above the ground floor. The modules are self-supporting with no additional infrastructure required. Consequently, concrete slabs are no longer needed to support and form the foundation of each floor, providing large savings to the overall build time and cost. The Tribe modules have been developed by combining the services ofleading architects, structural, mechanical and fire engineers, building surveyors and a group of award-winning interior designers.

Page 6: Interior Design 29- 31 Pothdowne Street Corks's] 3053 ... · Interior Design 29- 31 Pothdowne Street Corks's] 3053 Australia .61[0) 3 9600 0222 info@nechne.consiau techneicorn.ou

Tribe Perth Entry

Tribe Perth

Typical shroud facade treatment

Tribe Hotels

Aesthetic

PROJECT Tribe Collingwood PROJECT NO 18016

ADDRESS 60-62 Langridge Street & 23-45 Waterloo Road, Collingwood (Proposed Lot A)

CLIENT 60 Langridge Street Pty Ltd

DRAWING N/A SCALE DATE 19/12/2018 PAGE NO 51 To Techne Architecture + Interior Design

29-31 Rathdowne Street Carlton 3053 Australia +61 (0) 3 9600 0222 techne.com.au

Page 7: Interior Design 29- 31 Pothdowne Street Corks's] 3053 ... · Interior Design 29- 31 Pothdowne Street Corks's] 3053 Australia .61[0) 3 9600 0222 info@nechne.consiau techneicorn.ou

Tribe Perth

PROJECT Tribe Collingwood PROJECT NO 18016

ADDRESS 60-62 Langridge Street & 23-1+5 Waterloo Road, Collingwood (Proposed Lot A)

CLIENT 60 Langridge Street Pty Ltd

DRAWING N/A SCALE DATE 19/12/2018 PAGE NO 52 Te Techne Architecture + Interior Design

29-31 Rathdowne Street Carlton 3053 Australia +61 (0) 3 9600 0222 techne.com.au

Page 8: Interior Design 29- 31 Pothdowne Street Corks's] 3053 ... · Interior Design 29- 31 Pothdowne Street Corks's] 3053 Australia .61[0) 3 9600 0222 info@nechne.consiau techneicorn.ou

Ta Techne Architecture + Interior Design 29-31 Rathdowne Street Carlton 3053 Australia +61 (0) 3 9600 0222 techne.com.ou

PROJECT Tribe Collingwood PROJECT NO 18016

ADDRESS 60-62 Langridge Street & 23-45 Waterloo Road, Collingwood (Proposed Lot A)

CLIENT 60 Langridge Street Pty Ltd

DRAWING N/A SCALE DATE 19/12/2018 PAGE NO 53

Tribe Hotels

Common Areas

Entry r444,44444000,444444444.4 A Al AA• IAA ordirdriord

1

1

Perth Lounge

Dining

Page 9: Interior Design 29- 31 Pothdowne Street Corks's] 3053 ... · Interior Design 29- 31 Pothdowne Street Corks's] 3053 Australia .61[0) 3 9600 0222 info@nechne.consiau techneicorn.ou

Design Accents

Corridor

Hotel Room

ti iv- .1.

ti As. ■••• +Yr •a-

Tribe Hotels

Hotel rooms

PROJECT Tribe Collingwood PROJECT NO 18016

ADDRESS 60-62 Langridge Street S 23-45 Waterloo Road, Collingwood (Proposed Lot A)

CLIENT 60 Langridge Street Pty Ltd

DRAWING N/A SCALE DATE 19/12/2018 PAGE NO 54 Te Techne Architecture • Interior Design

29-31 Rathdowne Street Carlton 3053 Australia .61 (0) 3 9600 0222 techne.com.au

Page 10: Interior Design 29- 31 Pothdowne Street Corks's] 3053 ... · Interior Design 29- 31 Pothdowne Street Corks's] 3053 Australia .61[0) 3 9600 0222 info@nechne.consiau techneicorn.ou

1 I I I I I 1 1 1 1 I I 1 I 1 1 1 I 1 1

Techne Architecture + Interior Design Pty Ltd 29-31 Rathdowne Street Carlton 3053 Australia +61 (0) 3 9600 0222 [email protected] techne.com.au

A B N 40 127 720 745