UNIVERSITY TENAGA NASIONAL (UNITEN) INTERNSHIP STUDENT PROGRAM AT IJM CONSTRUCTION Oral Presentation Name : Mohd Qazar Bin Yusop Id : Ce090758 Program : Bachelor of Civil Engineering (Hons.) Duration : 9 March 2015- 31 May 2015 Date Presentation : 15 May 2015 Host. Supervisor : Mr Rosli Yunus, Sr.Supervisor IJMC Visiting Lecturer : Dr. Mohd Hafiz Bin Zawawi

INTERNSHIP STUDENT PROGRAM

Embed Size (px)

DESCRIPTION

UNIVERSITY TENAGA NASIONAL (UNITEN) INTERNSHIP STUDENT PROGRAM AT IJM CONSTRUCTION

Citation preview

PowerPoint Presentation

UNIVERSITY TENAGA NASIONAL (UNITEN)INTERNSHIP STUDENT PROGRAMATIJM CONSTRUCTION

Oral Presentation

Name: Mohd Qazar Bin YusopId: Ce090758Program : Bachelor of Civil Engineering (Hons.)Duration: 9 March 2015- 31 May 2015Date Presentation: 15 May 2015Host. Supervisor: Mr Rosli Yunus, Sr.Supervisor IJMCVisiting Lecturer: Dr. Mohd Hafiz Bin ZawawiContent

IntroductionDesign & Construction.I.Steel bar.II.Foundation.III.Structural.IV.Architecture. V.Infrastructure.SOP. (Standard Operation Procedure).I.Method of statement.II.Stage of completion.Testing.I.Slump test.II.Cube test.III.Hammer test.IV.Concrete Coring test.II.Construction Site.Checking & Inspection.I.Progress Inspection.II.Pre Inspection.III.Final Inspection.Project Management.I.Organization chart.II.Work flow.III.On Site organization.IV.Monthly progress report.Safety & Health.Labor.Construction SiteIntroduction

Main activities of Company. The result of a merger between three medium-sized local construction companies - IGB Construction Sdn Bhd, Jurutama Sdn Bhd and Mudajaya Sdn Bhd, IJM was formed in 1983 to compete more effectively against bigger foreign rivals.In April 2007, IJM acquired the Road Builder Group ("RBH"), and known as IJM Construction. At Negeri Sembilan state, IJM Land & IJM Construction managed construction & development of Seremban 2. Suddenly, the cooperation of IJM Land & IJMC are the main player of development Negeri Sembilan.

Design & Construction.

Reinforced concrete.

Designed on the principle that steel and concrete act together in resisting force.

II.Foundation.

Foundations are designed to have an adequate load capacity depending on the type of subsoil supporting the foundation by a geotechnical engineer, and the footing itself may be designed structurally by a structural engineer. The primary design concerns are settlement and bearing capacity

Structural.

The structural design for a building must ensure that the building is able to stand up safely, able to function without excessive deflections or movements which may cause fatigue of structural elements, cracking or failure of fixtures, fittings or partitions, or discomfort for occupants. It must account for movements and forces due to temperature, creep, cracking and imposed loads. It must also ensure that the design is practically buildable within acceptable manufacturing tolerances of the materials. It must allow the architecture to work, and the building services to fit within the

6IV.Architecture.

The process and the product of planning, designing, and constructing buildings and other physical structures. Architectural works, in the material form of buildings, are often perceived as cultural symbols and as works of art.

Architecture has to do with planning, designing and constructing form, space and ambience to reflect functional, technical, social, environmental and aesthetic considerations. It requires the creative manipulation and coordination of materials and technology, and of light and shadow.

Infrastructure.

Technical structures such as roads, bridges, tunnels, water supply, sewers, electrical grids, telecommunications, and so forth, and can be defined as "the physical components of interrelated systems providing commodities and services essential to enable, sustain, or enhance societal living conditions.

SOP. (Standard Operation Procedure).

I.Method of statement.A Method Statement is a document detailing how a particular task or activity will be carried out.

II.Stage of completion.Stage of completion, also known as percentage of completion, is a measure of the extent of work that has been completed in respect of a contract and is usually expressed in percentage terms.Testing.

Slump test.

The slump test is a means of assessing the consistency, workability & plasticity of fresh concrete. It is used, indirectly, as a means of checking that the correct amount of water has been added to the mix.

Cube test.

Compression test.

III.Hammer test.

The rebound hammer test method is used for the following purposes:(a) To find out the likely compressive strength of concrete with the help of suitable co-relations between rebound index and compressive strength.(b) To assess the uniformity of concrete.(c) To assess the quality of concrete in relation to standard requirements.(d) To assess the quality of one element of concrete in relation to another.

Concrete Coring test.

This test method provides standardized procedures for obtaining and testing specimens to determine the compressive, splitting tensile, and flexural strength of in-place concrete.

13Checking & Inspection.I.Progress InspectionII.Pre Inspection.III.Final Inspection.Project Management.

I. Organization chart.

I.Operation Director : Ir Tong Wai YongII.Project Director: Thomas FooIII.Sr. Construction Manager : Kum Chee KongIV.Construction Manager (Building) : Tee Tiong GuanV.Asst. Manager M&E: ParameswaranVI.Senior Engineer: Mr. Rakesh Kumar.VII.Sr. Safety Officer: N.Kunalan.VIII.Admin Executive: Adzlindar.

II.Work flow.III.On Site organization.

Example 2M Site.TITLE: CONSTRUCTION AND COMPLETION OF MAIN BUILDING WORKS FOR 43 UNITS D/S TERRACE HOUSE & 2 UNITS SEMI-D HOUSE (TYPE SD-1), PHASE 2M.

CLIENT: IJM LAND.MAIN CONTRACTOR:IJM CONSTRUCTION.SUBCONTRACTOR:PEMBINAAN DUTA IDAMAN SDN BHDARCHITECT:KUMPULAN SENIREKA SDN BHD.CONSULTANT:VIRGO JURUTERA PERUNDING.PLUMBING WORKS:SYP SDN BHD.ELECTRICAL WORKS:Y.U ENTERPRISE.SITE AGENTS PDI:KEN NG HANG KEAT.Sr.SUPERVISOR IJMC:MR ROSLI YUNUS.SUPERVISOR IJMC:NORAZLAILIIV.Monthly progress report.

At the end of every month, site clerk of subcontractor submits to the main contractor a report outlining all the projects - past, present and future.

Contents of monthly progress report.i.Contract Detailsii. Executive Summary Reportiii. Site Planiv. Work Programmedv. Work Progressvi. Manpower Recordsvii. Plant & Machinery Recordsviii. Weather Chartix. Project Organization Chartx. Progress Photographxi.List Of Consultant

From the progress report, the main contractor can evaluate the progress of project. If any, work did not achieve the date duration, the main contractor will take action. Among the causes of delay work progress.i.Weathering.ii.Plant & machinery.iii.Material.iv.Man powerv.Award project.

Safety & Health.I.Labor.II.Construction Site.

To prevent death, injury and ill health of labor & site.Management of hazard and risk at site.