Introduction of Airspace Management Center(AMC) of ATMB

23‐25 May 2018

Airspace Management Center

• New location, new building & facility • Organization structure• Major working area• Means of work and new application• Working responsibility• Recent work plan(New entry/exit point)

– New location: Nearby the Beijing Capital International Airport

ATMB HQ Building

PEK

AMC, ATMB of CAAC

New Location of AMC

New Building & New Facility of AMC

– Moved to the new building on Dec.08, 2017:

New Building & New Facility of AMC

– New building & facility :

Organization Structure of AMC

Integrated Office 综合办公室

Planning & Research Office规划研究室

Flight Procedure Designing Office 飞行程序设计室

Airspace Management Office 空域管理室

Director and Deputy Directors 中心领导

Major Working AreaPolicy and recommendations for the use of national

airspace, airspace planning, air routes/airways technical standards

Delignating of Flight Information Region of air routes/airways planning

Orchestration of organizing civil aviation flight routes and conditional routes management

Monitor and evaluate airspace operations environment

Major Working Area

Simulation for evaluating Airspace capacity and safety performance

Means of Work and New Tech Application

Technical tool: TAAM (Boeing & Jeppesen) – Terminal and Enroute IDS (Italy) AirTop (Belgium) – Terminal Airspace data management system

New technology application: CCO/CDO RNP/AR

Continuous research on advanced airspace management technology of foreign countries CCO/CDO ADS-B ARINC-424 Static data processing Flexible use of entry/exit points and air routes

Working Responsibility

Planning & Research

Office

Research and propose the planning schemes of all kinds of national airspace and air routes

Research and propose the policy and recommendations for the use of national airspace

Organize the work of national airspace experiment, simulation and verification

Conduct airspace operations statistics and analysis

Working Responsibility

Airspace Management

Office

Organize and coordinate for the management and use of civil aviation airspace in the whole country

Undertake the establishment and adjustment of air routes/airways and flight routes

Organize and implement the national boundary points and transnational route adjustment, and leading the construction of the Asia Pacific air routes network

Organize and implement the professional technical training for airspace management staff

Working Responsibility

Flight Procedure Designing Office

Organize and implement the professional technical training for flight procedure designers

Coordinate and manage the flight procedure designing work for civil aviation airport and provide technical support

Organize, work out, evaluate and proof the special project of major airspace involved in the flight procedure planning scheme

Organize and develop the new technology research, launch a pilot project and application and promotion for ATM system

Recent work plan(new entry/exit point)

New entry/exit point between: 1.China and Mongolia2. China and Russia