City of Richmond New Justice Center Introduction of Proposed PPEA Team to The Richmond City Council by: Mayor Dwight C. Jones June 9, 2011

Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

City of Richmond New Justice Center

Introduction of Proposed PPEA Team to

The Richmond City Council by:

Mayor Dwight C. Jones June 9, 2011

Page 2: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Site Location and Understanding

Eastview

Presence in the Community

Page 3: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice CenterProposed Justice Center

Community

Inmates

Staff

Cost & Time

Page 4: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Existing Jail Site

Page 5: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Construction of New Jail in a single phase

Page 6: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Conversion of Female Unit into Community CustodyDemolition of Existing Jail Final Site Work

Page 7: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Community Image

Page 8: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

City Jail Parking - Summer

Page 9: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice CenterProposed Justice Center

Page 10: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

City Jail Parking - Winter

Page 11: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

City Jail Parking - Winter

Page 12: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Neighborhood

Site Cross Section

Page 13: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Neighborhood – Mosby Court - Evergreen Infill

Page 14: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

New Covenant Apostolic Church - Ford Ave - Summer

Page 15: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

East View Neighborhood Studies

NEW RICHMOND CITY JAIL SHOWN IN REDVIEW FROM N1 LOCATION LOOKING AT NEW RICHMOND CITY JAIL (SHOWN IN RED)

SITE PHOTO TAKEN AT N1 LOCATION

N1

Page 16: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

East View Neighborhood Studies

NEW RICHMOND CITY JAIL SHOWN IN RED

N2

VIEW FROM N3 LOCATION LOOKING AT NEW RICHMOND CITY JAIL (SHOWN IN RED)

SITE PHOTO TAKEN AT N3 LOCATION

Page 17: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

East View Neighborhood Studies

NEW RICHMOND CITY JAIL SHOWN IN RED

N3

VIEW FROM N2 LOCATION LOOKING AT NEW RICHMOND CITY JAIL (SHOWN IN RED)

SITE PHOTO TAKEN AT N2 LOCATION

Page 18: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Aerial View from East

Page 19: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Housing Floor Plan

Chapel Centralized Inmate Programs

Indoor

recreation

Housing

Pod

Dormitory

Housing

Pod

Dormitory

Housing

PodHousing

Pod

Page 20: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Housing Units

Page 21: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Inmate Cells

Page 22: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Building Section

Roof 101’- 4”

Page 23: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Level 1 Floor Plan

Public Parking

Staff Parking

Service Vehicles

Staff

Com. Cust.

Public

Intake

Page 24: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Security

Perimeter

Public, Visiting, Intake, Pre-trail, Processing

Staff

Intake

Pre-trial

Open

seating

Holding

Classification

Change-up

Page 25: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Page 26: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Staff Entry, Break Area, Training and Courtyard

CC

Master Control

Staff

Community

Page 27: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

View from Oliver Hill Way

Page 28: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Social & Economic Impact

Work Force DevelopmentEmployment Opportunities

Local Businesses

Page 29: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Tompkins’ MBE Past Performance

PROJECT FINAL

CONTRACT

VALUE

MBE GOAL (%) MBE ACTUAL

(%)

New Beginnings Youth Development CenterLaurel, MD

$42,069,219 $14,724,227 (35%) $15,565,611 (37%)

Unified Communications CenterWashington, DC

$43,536,432 $15,237,751 (35%) $15,672,550 (36%)

Martin Luther King, Jr. MemorialWashington, DC

$52,000,000 $18,720,000 (36%) $31,000,000 (57%)

St. ElizabethsHospitalWashington, DC

$161,400,000 $56,490,000 (35%) $63,294,006 (39%)

Gaylord National Resort and Convention CenterNational Harbor, MD

$845,000,000 $169,000,000 (20%) $196,040,000 (23.2%)

Page 30: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Tompkins’ MBE Past Performance(Without Required Goals)

PROJECT FINAL

CONTRACT

VALUE

MBE ACTUAL

(%)

Beauregard CondominiumWashington, DC

$17,570,735 $2,155,922 (12%)

Floridian CondominiumWashington, DC

$27,469,566 $2,610,471 (10%)

Monarch CondominiumArlington, VA

$52,392,768 $5,362,405 (10%)

Bethesda View CondominiumsBethesda, MD

$49,974,674 $6,358,806 (13%)

Hampton Roads Naval HousingNorfolk, VA

$138,200,000 $16,688,676 (12%)

American Veterans Disabled for Life MemorialWashington, DC

$8,553,000 $2,900,000 (34%)

Page 31: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

S.B. Ballard MBE Past PerformancePROJECT FINAL CONTRACT

VALUEMBE GOAL (%) MBE ACTUAL (%)

Distributed Common Ground Station (DGS) Langley Air Force Base, VA

$39,737,383 $29,803,037.25 (74%) $29,935,172.96 (75%)

Powhatan Sports Complex, Old Dominion University - Norfolk, VA

$18,039,961.29 $7,215,984.52 (40%) $7,215,984.51 (46%)

Tidewater Community College Student Center - Norfolk, VA

$14,890,941.77 $5,956,376.71 (40%) $9,530,202.73 (64%)

Norfolk State University Brooks Library - Norfolk, VA

$37,408,567 $14,963,426.80 (40%) $23,567,397.21 (63%)

Old Dominion University DragasHall - Norfolk, VA

$5,221,734.64 $2,088,693.60 (40%) $3,341,910.17 (64%)

Tidewater Community College Manning BuildingPortsmouth, VA

$675,000 $270,000 (40%) $371,250 (55%)

Veterans Care FacilityRichmond, VA

$20,413,902 $4,082,780.40 (20%) $9,696,603.45(48%)

P-859 Joint Deployment Center –Fleet Forces Command CenterNorfolk, VA

$13,421,394.60 $9,931,832 (74%) $9,394,976.22 (70%)

Main Street CentreRichmond, VA

$18,372,151.58 $7,348,860.40 (40%) $3,858,151.83 (20%)

Page 32: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

S.B. Ballard MBE Past Performance(Without Required Goals)

PROJECT FINAL

CONTRACT

VALUE

MBE ACTUAL

(%)

Sentara Norfolk GarageNorfolk, VA

$13,572,680 $4,886,164.80 (36%)

11th Street Hampton Inn Virginia Beach, VA

$18,666,192 $8,586,448.32 (46%)

Northrop Grumman Building 4894 Newport News, VA

$34,875,661.78 $18,832,857.36(54%)

Page 33: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

MBE’sBusiness Name and Address Subcontract(s) % of Contract

Prion Compliance Services, Inc.1624 Hull Street, Suite 100Richmond, VA 23234

Abatement & Mitigation 2%

TDU Concrete, Inc.245 Granite SpringRichmond, VA 23225

Cast-in-place Concrete 3%

T.K. Davis Construction, Inc.711 Dawn StreetRichmond, VA 23222

Precast Cells & Project Management 21%

Royal Construction & Design, Inc.2307 Victoria Crossing LaneMidlothian, VA 23113

Roofing & Waterproofing 1.5%

CHN, Inc., Incorporated2005 Roane StreetRichmond, VA 23222

Drywall & Ceilings 1.5%

Bullock Painting Contractors1415 Hull StreetRichmond, VA 23224

Painting 1.5%

James C. Pemberton CorporationP.O. Box 206Sandston, VA 23150

Hoists / Chutes / Scaffold Rental .75%

ReStl Designers, Inc.702 Russell Avenue, Suite 400Gaithersburg, MD 20872

Structural Engineering .5%

Page 34: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

MBE’sBusiness Name and Address Subcontract(s) % of Contract

B&M Hitech Electrical3352 Old Poole RoadAlberta, VA 23821

Low Voltage Electrical 2.5%

Old Dominion Electrical Supply Co., Inc.1904 E. Main Street, PO Box 25644Richmond, VA 23260

Electrical Equipment and Supply 2.5%

Lighting Concepts International, Inc.620 North BoulevardRichmond, VA 23220

Lighting Fixture Supply 1%

Dwight Snead Landscaping and Paving Company11255 Washington HighwayGlen Allen, VA 23059

Excavation, Site Utilities, Paving, Demolition

3.5%

Kelso & Easter, Inc.101 W. Broad Street, Suite 101 BRichmond, VA 23224

Interior Architecture 1%

The Kleane Kare Team, Inc.400 Commerce RoadRichmond, VA 23224

Construction Cleaning 1%

Goode Tile Company8201 Whistler RoadRichmond, VA 23227

Ceramic Tile .5%

Wilder Mechanical CorporationPO Box 4115Hampton, VA 23664

Mechanical .5%

Page 35: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

MBE’sBusiness Name and Address Subcontract(s) % of Contract

JHP Industrial Supply Company, Inc.321 W. Taylor StreetSyracuse, NY 13202

Plumbing and Heating Supplier 3%

World Wide Corporation2126 Asquith StreetBaltimore, MD 21218

Plumbing and Heating Supplier / Mechanical Contractor

2%

The PNC Companies14214 Washington HighwayAshland, VA 23005

Glass and Glazing 1%

TOTAL 50.25%

Page 36: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

MBE’s

• 50.2% Participation already identified• Alternative solutions for MBE Bonding• Turner School of Construction Management• Community outreach events such as open houses, etc.

Page 37: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Workforce Development

• Projected 400 new hires for this project• Goal is to maximize City of Richmond residents hired• Apprentice and Intern opportunities• Community Addendum

Page 38: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

City of Richmond New Justice Center

Introduction of Proposed PPEA Team to

The Richmond City Council by:

Mayor Dwight C. Jones June 9,

Page 39: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Level 2 Floor Plan

Staff

Dining

Laundry

Admin.

Sheriff

Medium/Classification

Food Service

Staff

MusterStaff Lockers

Intake Records

Medical

Page 40: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Level 2 Floor Plan

Staff

Dining

Laundry

Admin.

Sheriff

Medium/Classification

Food Service

Staff

MusterStaff Lockers

Intake Records

Medical

Page 41: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Level 3 Floor PlanMaximum Pods

Additional Program Space

Housing

Support

Center

Clustered

Inmate

Programs

Page 42: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Level 4 Floor Plan Special Housing

Additional Program Space

Housing

Support

Center

Clustered

Inmate

Programs

Page 43: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Level 6 Floor PlanMedium Pods

Library

Housing

Support

Center

Centralized Inmate Programs

Page 44: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Architectural Program / Concept Design Beds Provided

Maximum Custody Beds 108 108 216

Medium Custody Beds 432 768 864

Minimum Custody Beds 288 288 288

Special Management Beds 108 108 216

Community Custody Beds 100 100 100

Total 1036 1372 1684

* 7 medium custody pods double bunked

Ultimate

Capacity (full

double bunk)

Capacity at

Opening *

DOC Rated

CapacityBeds by Custody Level

Architectural Program

Concept Design

1032 1368 1680

*7 Medium Pods

Double Bunked

Page 45: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

City Jail Parking - Winter

Page 46: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Mosby Court (South Area) - Summer

Page 47: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Mosby Court (South Area) - Summer

Page 48: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Mosby Court (South Area) - Summer

Page 49: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Sussex St. & Ford Ave. - Summer

Page 50: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Blessed Hope Baptist Church - Ford Ave - Summer

Page 51: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Blessed Hope Baptist Church - Ford Ave - Summer

Page 52: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Ford Ave - Summer

Page 53: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Mosby Court (North Area) - Ford Ave. & Raven St. - Summer

Page 54: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Ford Ave. & Fairfield Way - Summer

Page 55: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Building Section

TOP OF SLAB 101’- 4”

Page 56: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Housing Units

48 Bed Minimum Security Dorm &

12 Bed Special Management Pod

Page 57: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Landscape/Site Plan

Page 58: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center

Page 59: Introduction of Proposed PPEA Team to The Richmond City ...€¦ · JUSTICE CENTER June 9, 2011. Proposed Justice Center. Tompkins’ MBE Past Performance (Without Required Goals)

JUSTICE CENTER June 9, 2011Proposed Justice Center