Introduction to Project Management
June 12, 2014
Table of contents
I. Introduction to Project Management
II. Project Management Tools
3
Ⅰ. Introduction to Project Management
WAY4U (Information Planning Reengineering)
Background and purpose
Birth of WAY4U Methodology
To meet the changing client needs and New IT environments
To have a standard methodology Based on Real Practices
To overcome new IT Project’s Issues and Risks
Ⅰ- 1. What is Project Management?
An independent project management methodology of LG CNS based on PMBok, CMMI, ISO 12207.
Project management is the application of knowledge, skills, tools, and techniques to project activities to meet the project requirements - PMboK
Note 1) PMBoK: Project Management Body of Knowledge
WAY4U based on PMBoK, a Project Management Concept of the Project
Management Institute (PMI) that provides International Project Management Standards
Integration Management
Scope Management
Schedule Management
Cost Management
Quality Management
Communication Management
Risk Management
Resource Management
Procurement Management
Process Improvement based on Capability Maturity Model Integration (CMMI)
Experience from Many Overseas Projects and Large-scale Pubic Projects in Korea and
Repository Utilization
KMS
PAL
• To refine and utilize project management methodology based on lessons learned from many projects over the years LG CNS using stored
• internal KMS and Process Asset Library (PAL)
4
Ⅰ. Introduction to Project Management Ⅰ- 1. What is WAY4U?
Field Proven Project management methodology based on International Standards
WAY4U, a project management methodology developed by LG CNS, is based on PMBoK1) and meets international standards such as CMMI and ISO 12207.
Systematic Project
Management
Scope m
anagement
Schedule m
anagement 위 험 관 리
의 사 소 통 관 리
Procurem
ent managem
ent
Integration managem
ent
Scope m
anagement
Schedule m
anagement
Cost m
anagement
Quality m
anagement
Resource m
anagement
Com
munication m
anagement
Risk m
anagement
Procurem
ent managem
ent
Integration managem
ent
PMBoK
CMMI
KMS and Process Asset Library (PAL)
5
Ⅰ. Introduction to Project Management Ⅰ- 2. Framework of Project Management
5 Management Stage
Project management • To improve execution
capability of project participants
• To execute project planning elements
• To collect related metrics
5 Managem
ent Stage
Commence -ment
Planning
Control Execution
completion
• To define project objectives, standards, and procedures
• To define resources and responsibilities
• To identify risks in the initial stage and develop management plan
• To review project plans and set criteria
• To end the scope, schedule, cost, and quality control • To end project risk management • To end business agreement with suppliers • To end the project finally
• To define the project management framework
• To define tasks and activities for project
• To secure communications channel
• To define the project organization
• To control the project scope • To control project progress
(costs, schedule, etc.) • To control project quality and risks • To transfer progress information
and communicate • To manage partners and
suppliers • To monitor and re-plan project
planning elements
6
Ⅰ. Introduction to Project Management Ⅰ- 2. Framework of Project Management
9 Project Management Areas
9 Project Managem
ent Areas
• To forecast project finance • To secure and control budget • To develop and manage
budgeting procedures
• To develop quality plan • To validate whether
plans and procedures are met
• To check whether requirements are met
• To develop and adjust schedule • To evaluate schedule feasibility
Schedule
Finance
Scope Quality
Communi cation
Risks
Procure ment
Integration
Resources
• To identify requirements and deliverables
• To break-down tasks • To set the baseline
• To define whom to communicate • To develop communication plan • To control and manage
communication
• To track and manage contracts
• To adjust tasks • To track and review
results
• To adjust total configuration elements
• To control integration changes
• To develop resource plan • To fund resources • To motivate and educate
• To identify and evaluate risks • To develop actions to deal with risks • To develop contingency plan
9 project management
areas
Project management
Table of contents
I. Introduction to Project Management
II. Project Management Tools
8
Ⅱ. Project Management Tools Ⅱ- 1. Utilize Automation Tools
Utilize various automation tools
To present more easily and supports all stakeholders in project
To reduce errors in project management by using systematic tool
Higher efficiency and effectiveness
Pms-F DMS G-AMS4)
Note 1) WAY4U : LG CNS’s standard methodology which means method/procedure/approach of system development for the client and user (U-You) Note 2) pms-F(Project Management for Field) : LG CNS’s web-based automatic project management tools Note 3) DMS(Development Management System) : LG CNS’s application development/management tools Note 4) G-AMS(Global Account Management System) :LG CNS’s web-based system operation/management tools * Whether to use tools listed above 2)~4) will be determined through consultation with the client considering environment of project.
PM Project team member
LG CNS executives/
Quality supporting org,
Client Local partners
Project management using various management tools with application of WAY4U methodologies
9
Ⅱ. Project Management Tools Ⅱ- 1. Utilize Automation Tools
Utilize various automation tools
Category Tool Benefits Features How to Use
Project Management Tool pms-F
•To provide comprehensive project management functions covering all stages including commencement, planning, execution, and completion. •To manage information on inspection support, purchasing, and post-review
•To manage all project-related information on scheduling, resources, and risks •To enable clients and supervisors who are educated for a short period of time to access the tool
•To analyze project progress using project planning and performance information in connection with MS Project •To manage project risks, issues, budget, and purchasing information
Schedule Management Tool
MS Project
•To provide various functions to optimize the project schedule, resource allocation, and budget management •To support various presentation formats such as Gantt Chart, Pert Chart, and graphs
•To enable upload to and download from pms-F •To be the best tool to utilize project management tools
•To manage scheduling and performance •To provide data to manage progress and analyze the project in connection with pms-F
Document Management Tool
MS Office
•To utilize easy and powerful documentation functions •To support various formula calculation and charts •To support various diagrams and documentation functions
•To be the most widely used document management tool •To be the most common and powerful tool for presentation
•To develop various presentation and data shared with clients •To maximize efficiency in document sharing and management by avoiding the use of other document management tools such as Hangul •To maximize business efficiency by actively utilizing various figures and analysis data on workforce and resource budget management
10
How to Manage Progress?
Ⅱ. Project Management Tools Ⅱ- 2. Process Management
Category Features Merits Demerits
0 or 100 % • Not to evaluate
performance until a task is completed
• To be objective and simple
• To encourage completion of tasks
• To have chances of performance exaggeration
• To require plans at the lowest level
Commencement- Completion (50%-50%)
• To evaluate the performance of a task started as 50%
• To evaluate the performance of a task completed as 100%
• To be objective and simple
• To partially admit the performance of a task not yet finished
• To encourage completion of tasks
• To have chances of performance underestimation and exaggeration
• To require plans at the lowest level • To require lots of time and efforts for
validation
Milestone • To partially admit the
performance of a task meeting the milestone
• To be objective • To provide a more
accurate description for tasks executed
• To be relatively complicate • To require plans at the lowest level • Not to encourage completion of tasks
WAY4U Methodology
How to Measure Progress
11
Ⅱ. Project Management Tools
Connection with Scheduling
Progress Status Monitoring
• To use automated progress management tools
• To send a regular report on project progress
Accurate Forecasting of Schedule Delays
• To forecast a possible schedule delay using system management
Schedule Delay Prevention
• To develop actions to deal with schedule delays based on consultation (schedule or scope adjustment)
Schedule Planning
Progress Evaluation
and Analysis
Schedule Control
• To define task list, order, and relations • To develop schedule plan • To review and approve schedule
planning
• To measure progress against the schedule
• To report on progress evaluation and the gap between progress and the schedule
• To develop troubleshooting measures
• To analyze the impact of schedule changes
• To prepare changed schedule plan • To review and approve changes
How to Manage Progress?
Ⅱ- 2. Process Management
12
Ⅱ. Project Management Tools P
reve
ntio
n of
pro
gres
s de
lay
Systematic monitoring
Accurate forecast of schedule delay
Prevention of schedule delay
Continued monitoring of schedule in task unit using pms-F Regular report on project performance (internal report within
the project team) To encourage activities in progress
To forecast potential schedule delay preliminarily by analyzing earned progress against plan registered in Pms-F
Possible to accurately forecast potential schedule delay through schedule simulation by the system.
To devise ways to eliminate schedule delay if it’s forecast (overtime work, mobilization of additional manpower, schedule
adjustment, work priority adjustment, devise potential preventive measures)
Elimination measures shall be discussed with Client according to attributable causes of the schedule delay.
Delay equal to or less than 5%1)
To resolve internally by the project team
Minor
Delay equal to or less than 10%
To perform risk management after registering to risk management
Warning
Delay equal to or greater than 10%
To control and devise countermeasure through discussion with Client after registering to risk management
Danger
In case progress delay occurs
Progress Delay Management
How to Manage Progress?
Ⅱ- 2. Process Management
13
How to Manage Requirement?
Ⅱ. Project Management Tools Ⅱ- 3. Requirement Management
Requirement Identification Procedures
Identification Plan Analysis Formalization Validation and Approval
To collect requirements using various methods and identify accurate requirements
To develop requirement management plan to define and agree on requirements
– Offer education on requirements – Select requirement identification source – Collect requirements and prepare requirement definition – Define quality features – Develop a general test plan
– Select employees who should identify requirements – Define requirements identification methods and procedures – Develop requirement tracking plan – Review requirement management plan
14
Identification Plan Analysis Formalization Validation and Approval
To change requirements into formal and standardized forms
To review requirements, and set and approve the baseline in consultation with users
To identify detailed requirements and complement requirement definition based on business analysis
– Complement requirement definition – Record requirement tracking – Develop quality objectives and evaluation method – Develop plans to validate and confirm requirements
– Review requirements together with users – Set the baseline for requirements – Register configuration management system – Approve
Ⅱ. Project Management Tools
Requirement Identification Procedures
How to Manage Requirement?
Ⅱ- 3. Requirement Management
Ⅱ. Project Management Tools
How to Manage Organization?
Ⅱ- 4. Organization Management
LG CNS Project Team Organization
Ensuring Effective Communication
Taking Into Account Future Technology Transfer
Utilizing LG CNS Local Companies
Utilizing Experts in Each Field
Application Team
Operation-Relate Team
GIS Team
Project Management Team
Project Management
Quality Management Team
Quality Management Support
from Korea or overseas
Support from Korea
Project Manager
LG CNS Development Center
• Make an program of operation-related application
LG CNS Support Organization
• Technical Service Dept. • Infrastructure Service Dept.
Establishing Organization Chart
Infrastructure Team
Network
H/W, System S/W
TRS
PABX/CTI
Center Display
CCTV
Integration Team1)
Test
Deploy
Building Construction Team
Construction team
Design Team
Interior Team
15
16
Role Company Responsibility
Project Manager LG CNS • To manage project issues and risks • To manage Korean and foreign suppliers • To be responsible for local business in general
Project Management Team/Quality Management Team
LG CNS • To manage schedule, quality, scope, issues, and risks • To contact with related organizations
Application Team
Operation-related Team LG CNS • To Implementation Operation-related application
(analysis & Design) GIS Team LG CNS/KSIC • To Implementation GIS application
Infrastructure Team
H/W, S/W, N/W LG CNS • To install hardware, software, network • To develop application architecture & modeling • To provide database administration
Command Centre display LG CNS/CPI • To implementation command centre display system
TRS LG CNS/Teltronic • To install and integration TRS system
IP Telephony LG CNS/ RodemTech • To install and integration IP Telephony system
CCTV LGCNS/ • To install CCTV system of Security in the urban and fire monitoring Network Construction LG CNS/ • To install network cabling
Command Center Building Construction Team MCS • To build an Command Center
LG CNS Support Team
Integration Team LG CNS • To make a test plan and test the hole systems • To make a deploy plan and deploy the hole systems
LG CNS development center LG CNS • To make an application program (coding) of operational-related system
LG CNS Support Team LG CNS • To review quality and performance of system implementation
Ⅱ. Project Management Tools
How to Manage Organization?
Ⅱ- 4. Organization Management
Roles and Responsibilities
17
Ⅱ. Project Management Tools
How to Manage Resource?
Ⅱ- 5. Resource Management
• To establish staffing plan by team and month considering project schedule and scope • Select personnel to mobilize focused on experiences in same type of projects
• Project control manager shall collect manpower status of the project team • Project control manager shall prepare periodic staffing mobilization status and report it
to project manager.
• Changes such as mobilization and de-mobilization of additional key personnel shall be confirmed after obtaining Client’s approval through team meeting.
• To collect resumes of personnel mobilized and confidentiality pledges • Once changes in staff is confirmed, organization chart and changes will be periodically
reported to Client • To give training to staff mobilized
• To form and operate staff by work/role/function • To carry out operational support for the completed stage and work activities being in
progress simultaneously in regards to staged progress schedule.
To establish staffing plan
To check & report mobilized
staff status
To mobilize or de-mobilize
additional staff
To operate manpower by roles
and functions
Human resource management approach
18
Ⅱ. Project Management Tools
How to Manage Resource?
Ⅱ- 5. Resource Management
Management target
• Office area • Development device and tools: network, server, PC for development, software
for development, etc • Office furniture : copy machine, desks/chairs, phones/fax, etc
Management
method It is possible to track status and change history coherently by registering all
hardware, software and office furniture to be used while performing the project on the Control Log.
Physical resource management approach
Resource management tools
Human Skill
Human resource development system
Subcontractor management system
19
Ⅱ. Project Management Tools
How to Manage Communication?
Ⅱ- 5. Communication Management
Communication management procedures
Completion
Commence ment
Planning
Execution/ control
Stage
Official work approval and communication
completion
To determine project participating organization
To obtain organization information and fix
relationship
To establish communication plan
Major work
Performance report and meeting
To renew communication
planning
• To accept Client’s official deliverables • To survey customer satisfaction level • To announce project completion
• To communicate with the project team and relevant organizations • To share project status information and take follow-up measures • Senior management report and take follow-up measures • To monitor communication management plan and take corrective measures
• To review requirements and report in detail • To refine other communication • To improve customer relationship continuously
• To identify all interested parties affecting execution of the project • Persons, organizations, concerned agencies, etc
• To obtain and understand information required or each participating organization
• To fix interrelationship between each organization, major functions and roles
Detailed Task
• To preliminary plan all the effective communication methods, medium, timing, participants, contents, etc
20
Ⅱ. Project Management Tools
How to Manage Communication?
Ⅱ- 5. Communication Management
Communication management deliverables
Organization chart
• To provide a chart showing all organization participating in the project including Client, LG CNS, and local partners
Responsibility/role chart
• To provide a chart describing managers, functions and critical roles by each organization
• Communication media – reports, meetings, seminars, e-mail, verbally, etc
• Communication method – officially/unofficially
• Communication timing – Periodically/ frequently
• Communication target – project participants
Communication plan
21
Ⅱ. Project Management Tools
How to Manage Communication?
Ⅱ- 5. Communication Management
Communication techniques
Communication activities
Communication
techniques
Communication item through
web-channel
• To identify communication targets
• To establish communication plan
• To control and manage communication
• Work report and meetings
• To form communication committee • To use web-channel
Pms-F DMS IMS-F1) KMS
Major communicat
ion target
Korean subcontractors Client Local Partners
LG CNS Concerned
departments
• System construction progress
• Staff mobilization status
• Issues and risks • Periodic report
• Program development schedule
• Program development status
• Program testing status
• Issues/support requested items
• System link schedule
• System link progress rate
• System link change control
• Issues/support requested items
• Technical inquires and references
• Technical trend inquiry
• FAQ/Q&A
22
Communication management Tools
Project Dashboard
• To show total status of the project on the situation or project dashboard
• To inquire detailed information per each discipline (schedule/cost/logistics/requirements/quality/issues)
Note 1) IMS-F : Interface Management for Field
Regular Report
• To provide Client management and PM with periodic reports
• To provide performance data updated on a real-time basis in graph format
• Possible to add relevant risks and issues
Ⅱ. Project Management Tools
How to Manage Communication?
Ⅱ- 5. Communication Management
23
Ⅱ. Project Management Tools
How to Manage Reporting?
Ⅱ- 6. Report Management
Effective Communication and Coordination
Task implementation
Review and monitoring
Reporting performance against the plan
Task plan by phase
Progress Reporting Reporting Procedure
Client Project Team
Reporting
Feedback
Project Commencement
• Project overview • Scheduling • Resource allocation plan
Project Implementation/Control
• Progress and schedule management • Change and quality management • Workforce management
Project Completion
• Completed installation history • Task manual and operation manual Monthly report
Non-regular Reporting Occasional report Progress report
Commencement Report
Mid-term report by project phase
Implementation
Design
Approval Completion Report
Objectives of Reporting and Review Meeting
24
Ⅱ. Project Management Tools
How to Manage Reporting?
Ⅱ- 6. Report Management
Regular and Occasional reporting
Notification of report review and issues
Analysis of severity of issues
Feedback
Severe issues
Less-severe issues
Regular and Occasional reporting
Notification of review result
Risk Management
Regular Monitoring
Issue and Problem Identification
Issue and Problem Registration
Collaborative Meeting of Related Teams
Reporting on Issue and Problem Resolution
Issue and Problem Resolution
Completion Report
Scope Management (Handling issues and
problems)
Quality Diagnosis Team
PM
Client
Project Team
LG CNS Support Team
Application Teams 1 and 2
Infrastructure Team
Project Management
Team
Command Center Team
Integration Team
Project Reporting Principles
• LG CNS prepares a regular report on project progress and sends the report to Client
• LG CNS submits a report to Client and holds a review meeting both on a regular basis and at the request of Client
• Discussion and review meetings are attended by concerned employees of Client, LG CNS, and partners
• LG CNS gets an approval from Client in advance in case of addition, change, and removal of plans.
• Content and format of the report to be decided following discussions with Client
Project Reporting Target and Procedure
25
Project Reporting
• To submit detailed plans in accordance with Client regulations after the contract is closed and project is commenced
• To describe project scope, implementation and management methodologies, schedule, and resource allocation plan
Commencement Report
• To submit report in case of emergency - In case of failures or system errors - Failure resolution and history - Report at the request of Client
Occasional Report
• To prepare and submit completion report on the final deliverables included in the project scope specified in service design and contracts after the end of project - Project history and significance - Task history
Completion Report
- Quality review result - Future project orientation and plan
Mid-term Report (Deliverables by Phase)
- Quality review result - Future project orientation and plan
• To submit regular progress report on the current process and progress and problems and remediation in accordance with project procedures - Plan vs. performance - Requirements and consultation
Regular Report
- Progress and deliverables by phase - Decision-making on problems and issues
Reporting1
Reporting 5
Reporting 4
Reporting 3
Reporting 2
• To submit reports on project progress and performance by phase - Performance against plan - Issues, problems, and remediation
Ⅱ. Project Management Tools
How to Manage Reporting?
Ⅱ- 6. Report Management
Project Reporting Plan
26
Ⅱ. Project Management Tools
How to Manage Review?
Ⅱ- 6. Report Management
Review Plan-How to Hold Review Meeting
Review Meeting Objectives
Project Management
• Project plan/performance management • Schedule management • Effective communication management
Quality Improvement
• Project change review • Standard guideline evaluation • Effectiveness of deliverable content
Risk Evaluation In Advance
• Risk factor identification in advance and risk impact analysis
• Risk mitigation measures • Project change review
How to Operate Review Meeting
Participants • Client managers • Project manager • Project team manager
Time • Right after each project stage ends • When Client request
Review Result Reporting
• Review meeting result report • Continuous monitoring of problems • Risk management
Ⅱ- 2. Steps of establishing ISP
Step 1. Identifying to-be scope and direction
3) To-be modeling
Issue and Problem Resolution
Reflected to Completion Report
Issue and Problem Identification
Issue and Problem Registration
Joint Meeting of Related Teams
Issue/Problem Resolution Method Report
Issue and Problem Resolution
Review Meeting
Risk
Management Communication
Means
User Requirement Identification
Issue/ Problem
Resolution
Opinion coordination
Identification of what should be changed and
complemented
Progress check
Quality status check Quality
Goal Achieved
Walk through
Joint Review Meeting
27
Ⅱ. Project Management Tools
How to Manage Review?
Ⅱ- 6. Report Management
Review Plan - Review Meeting Activity and Types
1 To develop plan for review meeting on the schedule and give notification on data and plan
2 To prepare quality check list and issue list and review deliverables
3 To develop issue list based on review content, feedback, and opinions, and analyzed issues
4 To develop remedies and schedule for problems identified
5 To complement deliverables, apply remedies, and check the effectiveness of remedies
6 To submit reports, get approval, and give notification on review meeting result
Major Responsibilities of Review Meeting
28
Ⅱ. Project Management Tools
How to Manage Review?
Ⅱ- 6. Report Management
Review Plan - Review Meeting Activity and Types
(O: required, X: not required△: conditionally required)
Review Meeting Time Review Content Participants
PM/ Manager Project Team
Commencement Report Meeting
After the contract closing
• Effectiveness of implementation plan - Effectiveness of project scope and implementation period - Effectiveness of schedule, resource allocation, and budget
allocation - Project goal achievement probability - Effectiveness of specifications and functions
O △
Deliverable Review Meeting by Stage
After the end of each stage
• Validity of end user requirement analysis • Requirements- effectiveness of design details • How to apply system change requirements
O O
Completion Report Meeting
After the end of the project
• Whether the original goals are met - Whether user requirements and goals are met - Validation of the performance of workforce and resources
allocated - Whether users accept the system built
O △
Regular Report Meeting (Monthly)
At the end of every month
• Review on plan vs. progress analysis • Risk factor review • Measures to resolve problems
O △
Occasional Consultation
When an issue is raised
• Analysis of issue status, conditions, and sources • Consultation on how to resolve issues O △
Major Review Meeting and Review Items
29
Ⅱ. Project Management Tools
How to Manage Risk?
Ⅱ- 7. Risk Management
Contingency Plan - Objective of Contingency Planning
Guaranteeing Successful Business by Detecting and Responding to Potential Risk Factors Early and Minimizing Risk Occurrence
Risk Management
Regular risk diagnosis
• Diagnosing risks at the initial phases of the project • Tapping into experiences and know-how from risk
cases and responses in similar projects • Regular risk diagnosis
Building an early risk warning framework
• Early detection of and response to potential risks • Risk prediction using accumulated repository • Enterprise-wide support for addressing risk factors
Eliminating risk factors in advance • Quantitative risk management for advance defect
prevention • Utilizing success/failure cases accumulated in LG
CNS’s PM DB
Continued risk tracking/control • High-level risk assessment and detailed risk
diagnosis • Risk assessment at functional levels • Plans for continued tracking, control and response
toward risk factors
Execution
Risk Management Procedure
Regular Quality Check
※ Abnormality detection: LG CNS’s project management system provides information on abnormalities (regarding cost, schedule and quality)
Occurrence Probability Analysis
Impact Analysis
Risk Grade Determination
Prioritization
Tracking/ Control
Response Planning
Identifi cation
Analysis/ Assessment
Systematic/ Continued
Risk Management
Planning
Risk Prevention Risk Occurrence
Abnormality Detection
Project Repository
LG CNS
Planning risk diagnosis Constant monitoring
Identifying risk factors
Measuring risk levels
Suggesting risk response plans
Risk factor analysis/response
plans
Enterprise-wide support system
Supporting and evaluating risk response plans
30
Ⅱ. Project Management Tools
How to Manage Risk?
Ⅱ- 7. Risk Management
Contingency Plan - Contingency Planning Procedure
Method Procedure
• Defining management-related risk factors (e.g. delivery, scope modification, delayed decision-making) • Defining technical risk factors • Defining risk factors regarding external environment (e.g. difficulties in business collaboration)
Risk Factor Identification
Impact Assessment
Impact assessment done using the method of risk rating toward
risk factors
Analysis
Selecting and rating items to be under focused management
Focused Management
Risk factors in monitoring cycles A and B to be under focused
management
• Before initiating the project, predictable risk factors to come under focused management are identified and their impacts are analyzed
• Led by the project manager, possible situations are analyzed and responses are prepared; if needed, joint response plans are formulated through consultations with staff members in charge
• Based on the response plans, time and needed resources are committed to eliminating risk factors, formulating reoccurrence prevention plans and sharing them with relevant Client officials
Monitoring Cycle Grade A Intermediately or daily
B Weekly
C Biweekly
D Monthly Impact Level
High: 3
Medium: 2
Low: 1
Low: 1 Medium: 2 High: 3
RR 3 C
RR 3
C RR 4
C
RR 9 A
RR 6 B
RR 6 B
RR 2 D
RR 2 D
RR 1 D
A B
B
C
C
C D D
D
Risk Rating Need for Formulating Risk Management Plan Impact Level Probability RR High
3 High × 3 = 9 • Yes
• Risk factor management and emergency response plans High 3(2)
Medium × 2(3) = 6 • Yes
• Risk factor management plan Medium
2 Medium
× 2 = 4 • Yes/No depending on the situation
1 2 1
× 3 × 1 × 1
= 3 = 2 = 1
• No
Ⅱ. Project Management Tools
How to Manage Risk?
Ⅱ- 7. Risk Management
Major Risk Factors Risk Grade Impact Prevention Plan Response Plan
Errors arising when various solutions are
interfaced/integrated High Schedule delayed
• Reviewing technology feasibility from the phase of pilot system building
• Leveraging experiences from similar projects and experienced staff
• The technical support organization forming a cooperation and support system in advance to respond to possible problems immediately
Delayed finalization of new ERD High Data migration
delayed
• Finalizing new ERD for the implemented system as early as possible
• Data migration conducted by the time when system development begins
• Implementing data from the latest year first if ERD is yet to be finalized in the development phase
Errors occurring while various data are migrated High Delivery delayed • Early commitment of professional DBA • Developing a data migration program in
consideration of table locking
Migration of list-type data High Degraded
performance; increased data size
• Excluding explanation and other OLTP tasks from data migration
• Limiting migration of list-type data to a minimum level
• Consulting with Client and excluding tasks that can be supported by the production system from migration (performance levels considered)
Longer-than-expected lead time for equipment ordering High Schedule delayed • Implementing administrative measures for
equipment purchasing in advance • Ordering hardware in advance to secure
enough lead time for ordering
Additional requirements and delayed consultation High Schedule delayed
• Finalizing specific user requests and scope within the planned schedule before approval
• Finding optimal plans in advance based on development experiences
• Business tasks, whose detailed development scope has not been finalized, are conducted after priority is set
Errors arising from newly introduced equipment High Schedule delayed
• Identifying causes and suggesting solutions through error diagnosis by key technology
• Building a close support system with suppliers
Contingency Plan - Expected Core Risk Factors and Prevention Plan
31
Ⅱ. Project Management Tools
How to Manage Quality?
Ⅱ- 8. Quality Management
Quality Assurance Procedures and Implementation
32
review
Quality Assurance Plan Development
Post-management
Quality Review
Quality Assurance Activities
Remediation
Delivery
Remediation • To suggest troubleshooting measures • To record and manage remediation history
Product Quality Assessment • To evaluate whether quality objectives are met
Develop Quality Assurance Plan
Deliverable Management
Quality Education
• To identify quality assurance requirements • To prepare quality assurance plan and request an approval of
the plan
• To identify configuration items for deliverables • To record and manage change control and status
Post-Review • To conduct a post-review on the system handed over after the
end of the project
• To provide project team members with quality education
Project Audit • To check whether deliverables and processes meet standards
Deliverable Review • To objectively review project deliverables • To improve the quality of deliverables Internal Quality Audit
To identify customer requirements and complaints during or after the project period, explore corrective and remediation measures, and present how to improve quality
To conduct an audit in accordance with LG CNS’s internal quality inspection regulations to improve quality and provide remediation
To have standardized quality management system that meets ISO 9001 quality management certification
Standards and Regulations < ISO Certification>
To make the project meet the CMM standard in order to eliminate defects of processes developed based on customer requirements
< CMM Application>
Quality Assurance Activities Check
Customer Satisfaction Survey
Quality assurance team gets regular quality assurance activities report, and reviews and assesses efficiency and effectiveness of quality assurance activities
Quality Education