13
Stakeholders’ Forum Belgrade, 26062012 Project funded by the European Union Introduction to the Project Dr Jasna Muskatirovic Head of Survey and Design Department of Stakeholders of the Project Forum “Preparation of Documentation for River Training and Dredging Works on Critical Sectors of the Danube River in Serbia” Directorate for Inland Waterways Belgrade, 26062012 Project Funded by the European Union

Introduction to the Project...Fundedby Directorate for Inland Waterways Title Microsoft PowerPoint - 02 SHF01 - project introduction, ENG (20120626).ppt [Compatibility Mode] …

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • Stakeholders’ ForumBelgrade, 26‐06‐2012

    Project funded bythe European Union

    Introduction to the Project

    Dr Jasna MuskatirovicHead of Survey and Design Department

    of Stakeholders of the ProjectForum

    “Preparation of Documentation for River Training and Dredging Workson Critical Sectors of the Danube River in Serbia”

    Directorate for Inland WaterwaysBelgrade, 26‐06‐2012

    Project Funded bythe European Union

  • Stakeholders’ ForumBelgrade, 26‐06‐2012

    Project funded bythe European Union

    Content

    Range of the project

    What’s next?

    Strategic and legal framework

    Basic project data

    Critical sectors

    Dissemination

  • Stakeholders’ ForumBelgrade, 26‐06‐2012

    Project funded bythe European Union

    Strategic and legal framework

    Water management:

    • Law on waters• Relevant bylaws• WFD (EU)• Danube River Basin management plan (ICPDR)

    Environment:

    • ESPOO convention• Law on nature protection• Law on environment protection• Law on EIA• Law on SEA• Regulation on ecological network• Specific spatial plans• Relevant bylaws

    Law on construction and spatial planning

    Protection of cultural monuments

    • Law on cultural heritage• Bylaws

    Inland navigation:

    • DC Recommendations• AGN (UNECE)• SRB‐CRO bilateral agreement on inland navigation and  fairway maintenance (2009)• Law on navigation and ports on inland waterways (2010)• Bylaws

    Strategic framework:

    • Master plan for IWW transport in Serbia(2006)• Serbian transport development strategy  for the period 2008‐2015 (2007)• General transport master plan (2009)• Spatial plan of the corridor VII (drafted)• EU strategy for the Danube region (2010)

  • Stakeholders’ ForumBelgrade, 26‐06‐2012

    Project funded bythe European Union

    Basic project data

    • EU funding programme: IPA 2010• EU funding rate: 100%• Value: EUR 1.85 Mill• Timeframe: 2011‐2013• Beneficiaries:

    • Ministry of Infrastructureand Energy

    • Directorate for Inland Waterways

    • Goal: Improvement of navigation safety

    • Measure: removal of navigation bottlenecks

  • Stakeholders’ ForumBelgrade, 26‐06‐2012

    Project funded bythe European Union

    Critical sectors

    Master Plan (2006)18 critical sectors40 km total length

    IPA 2010 project (2011)24 critical sectors70 km total length

  • Stakeholders’ ForumBelgrade, 26‐06‐2012

    Project funded bythe European Union

    Project 1: Documentation for River Training Works20062011

  • Stakeholders’ ForumBelgrade, 26‐06‐2012

    Project funded bythe European Union

    Project 1: Documentation for River Training Works20062011

  • Stakeholders’ ForumBelgrade, 26‐06‐2012

    Project funded bythe European Union

    Project 1: Documentation for River Training Works20062011

  • Stakeholders’ ForumBelgrade, 26‐06‐2012

    Project funded bythe European Union

    • hydraulic models (1D and 2D)• Feasibility study and conceptual 

    designs for all critical sectors• CBA• EIA• main designs and tender 

    documentation for 7 critical sectors

    • IPA Major project application form

    • Documentation is being prepared in accordance to national legislation, as well as EU legislation

    Range of the Project

  • Stakeholders’ ForumBelgrade, 26‐06‐2012

    Project funded bythe European Union

    • Following the good practice in terms of design and environmental protection• Making project adequately visible

    – Project info on web site– Newsletters– Presentations– Stakeholders workshops– Info days– Stakeholders’ Forum

    Dissemination

  • Stakeholders’ ForumBelgrade, 26‐06‐2012

    Project funded bythe European Union

    • Applying for EU funding  for the works on 7 critical sectors for which main designs are being prepared

    What’s next?

  • Stakeholders’ ForumBelgrade, 26‐06‐2012

    Project funded bythe European Union

    Summary

    Range of the project

    What’s next?

    Strategic and legal framework

    Basic project data

    Critical sectors

    Dissemination

  • Stakeholders’ ForumBelgrade, 26‐06‐2012

    Project funded bythe European Union

    Thank youfor your kind attention

    of Stakeholders of the ProjectForum

    “Preparation of Documentation for River Training and Dredging Workson Critical Sectors of the Danube River in Serbia”

    Dr Jasna MuskatirovicHead of Survey and Design Department

    Directorate for Inland WaterwaysBelgrade, 26‐06‐2012

    Project Funded bythe European Union