Cape Ann
Gloucester
Boston
Scituate
Plymouth
New Bedford
Provincetown
Falmouth
Martha'sVineyard
Nantucket
Buzzards Bay
NantucketSound
Cape CodBay
MassachusettsBay
IpswichBay
BostonHarbor
Stellwagen Bank
Jeffrey
s Led
ge
Race Point Channel
Sandwich
Mashpee
Chatham
Lynn
Salem
Newburyport
CapeCod
Maine
New Hampshire
Rhode Island
213000
213000
233000
233000
253000
253000
273000
273000
293000
293000
313000
313000
333000
333000
353000
353000
373000
373000
393000
393000
413000
413000
433000
433000
7100
00
7100
00
7300
00
7300
00
7500
00
7500
00
7700
00
7700
00
7900
00
7900
00
8100
00
8100
00
8300
00
8300
00
8500
00
8500
00
8700
00
8700
00
8900
00
8900
00
9100
00
9100
00
9300
00
9300
00
9500
00
9500
00
9700
00
9700
00
9900
00
9900
00
1010
000
1010
000
1030
000
1030
000
1050
000
1050
000
0 105
Miles
NOTES:1. The work is a result of a state funded MassachusettsCoastal Zone Management Project.2. For further information about this map, refer to the CZM report titled "Existing and Potential Ocean-Based Energy Facilities and Associated Infrastructure in Massachusetts."3. Map shows all reasonably foreseeable siting locations for the proposed technology within the project study area.4. Information included in this project’s written report, geodatabase, map products, or other associated items are for general planning purposes only. Information contained in project deliverables should not be considered as official or legal guidance. For site-specific proposals, additional studies and data must be completed.
MASSACHUSETTSCOASTALZONEMANAGEMENT
FIGURE D-5INVENTORY OF REASONABLY
FORESEEABLE ENERGY SITING:OFFSHORE LNG
JUNE 2006
Maps Prepared by:
Major HighwayMajor StreamShoreline
Landuse
OpenspaceUrban
Canopy
WaterbodyState SeawardBoundary
Bedrock
Depth Criteria (Meters) Technology15 - 30 GBS Based Terminal Configuration
15 - 100 Fixed Structure Platform15 - 30 Floating Storage and Re-gasification Unit
70 - 1000 Floating Storage and Re-gasification Unit - Deeper Technology (less favorable)70 - 100 Submerged Turret Loading Buoy System
100+ Submerged Turret Loading Buoy System (less favorable)
Bathymetry (Meters)< -15-15 to -20-20 to -30-30 to -70-70 to -100-100 to -1000
Optimal Depth for Siting Offshore LNG Based on Technology