Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
INVESTMENT POTENTIAL
Gross regional product4.1 bln USD
Investmetns structure
Investments into equity of manufacturing
1,3 bln USD
2-nd year in row Pavlodarregion takes the 1 place ofinvestments volume in theRepublic of Kazakhstan
Taxes and fees SEZ resident
CORPORATE INCOME TAX 0 %
PROPERTY TAX 0 %
LAND TAX 0 %
RENTAL FOR EARTH 0 %
Investment fields
Special economic zone “Pavlodar”
5acting
companies 138 mln USD
6Companies
at the implementation
stage
Industrial zones of Pavlodar region
GRES1 GRES2
Industrial zone “Ekibastuz”
0,02 $ per kw/h
Ansa Silicon 121 mln USD Production of technical silicon with a capacity of 35,000 tons
“Kazakhstan tractor” zone
Custom, tax and other discounts
Bayanaul Industrial zone(Common minerals extraction)
PRIORITY DIRECTIONS OF DEVELOPMENT
METALLURGYTRANSPORT – LOGISTIC CENTER
MINING CHEMISTRY
FerroalloysAluminum alloySteel productsCastings from non-ferrous metals
Unique locationNeeds of large industrial enterprisesPotential increase in turnoverAvailability of railway, car andwater infrastructure
Total cost of solid minerals 460 bln USDA large number of free deposits of coal, precious and non-ferrous metals, incl. 17 large ones.44 free deposits of common minerals
PetrochemistryCarbon ChemistryChlorine-consuming productiongeneral chemistry
USED LANDS
RESERVED LANDS
7,6 mln hа
4,9 mln hа
MAJOR CULTURES
Cereals Potato Oilseeds
Great potential for sugar production
TOURISM
Natural area BAYANAUL
IRTYSH RIVER
SHERBAKTY SALT LAKES
GiessenhausAlloy aluminum
Aluminum Extrusion
Automobile wheels
Aluminum foil
Metallurgy
- Ferroalloy articles;- Primary aluminum, alloy aluminum;- Steel articles;- Non-ferrous casting.
Aluminum sheetsAluminum profile
Containers and packaging
«CAUSTIC» Co., Ltd«AGROCHIMPROGRESS»
PLC
CHLORINE PRODUCTION
Up to 60 kilotons
per annum
Further development:
GLYPHOSATE PRODUCTION
PHOSPHORUS TRICHLORIDE PRODUCTION
PRODUCTION OF 2-4D ACIDS CARBOXYMETHYL
ESTER PRODUCTION
LAUNCH OF 2nd STAGE OF “CAUSTIC” Co., Ltd PROJECT - PRODUCTION CAPACITY UPGRADE UP TO 60 KILOTONS PER ANNUM
EXPANSION OF CHEMICAL ARTICLES PRODUCTION LINE
LAUNCHES OF NEW DEEP CONVERSION PRODUCTIONS
RESULTS:
Chemical industry
CHLORINE BASEDINDUSTRIAL COOPERATION
NEW PRODUCTIONS
PRODUCTION CAPACITY INCREASE
Agriculture
12 thousand hectares of irrigated agricultural land
Irtysh-Uspenka Canal
Development of Horticulture
New agriculture's growing and processing opportunities
Irtysh-Karaganda Canal
Export of potato from Pavlodar Region736 tons93 thousand $
Why Pavlodar Region?
● 600-1200 kilotons of potato output per annum● Relative cheapness of electricity● Relative cheapness of labour force● Access to Chinese and the Eurasian Customs Union
markets
2016 year
Import of potato starch in the Republic of Kazakhstan634 tons480 thousand $
Production of potato starch in Pavlodar Region
60thousand
hectares of irrigated
agricultural land
Solid mineral deposits of Pavlodar Region
Mining Volumes (kilotons)
CoalMetal ore
61942,7
28,5
35 mineral deposits
14 undeveloped:
-4 coal;-10 non-ferrous metals
Commonly occurring mineral deposits of Pavlodar Region
104 mineral deposits45 contracts executed59 undeveloped fields37 registered enterprises
Mining Volumes (in thousands of м3)
Natural stone 2 573,3
Limestone 801,3
Gravel sand mixture 345,0
Masonry sand 300,9
Salt 172,6
Clay 51,5
Overall 4 244,6
Subsoil Resources
Tourism
Maraldy, Moyaldy, Kalatuz salines have medical qualities
“Ertyc Ormani” State Forest Nature Reserve - belongs to special protection natural territory under the category of «outstanding
forest areas»
Irtysh River -the largest river of Kazakhstan
Bayanaul National Park - unique natural beauty local of landscape attracts thousands of tourists
every year
LOGISTICS DEVELOPEMENT
Present Future
Building of Logistic center
Travel time from the Southern part ofKazakhstan (Almaty) to Irkutsk via Moscow isabout 230 hours or 9500 kilometers by roadtransport, excluding stops on this route
Construction of the sorting and logistics centeron the territory of SEZ "Pavlodar" willsignificantly reduce transport costs byreducing the distance and time requiredfor shipping loads at least twice
Redirecting of transport streams from theSouth-East direction of delivery of the goodsacross the sea for a shorter cost-effective routewill happen due to the improvement ofcustoms and transport-logistics administration.
Location of SEZ "Pavlodar" near the big citiesof Siberia and Kazakhstan will allow to carryout goods from China, Kyrgyzstan, Uzbekistanto Russia and Europe
State Investment Support Policies
The Ministry of Investment and Development of the Republic of KazakhstanState Investment Support
Tax remissions
corporate income tax
0 %land tax
property tax
customs duties
Capital Investment Grant reimbursement of construction and erection works
and equipment
up to 30%
Land grant
land property up to 30%
of investmentbuildings, facilities and structures
equipment and machinery
«Productivity 2020» - technical modernization of in-service productions operating in priority industries
«Business RoadMap 2020» enlargement of entrepreneurs business-ventures; increase in manufactured goods production volumes of processing industry; launch of new competitive productions
«Agrobusiness 2020» program - Assistance in industrialisation and diversification of agricultural industry
NATD - "National Agency for Technological Development" Co., Ltddesigned to assist in coordination and facilitation of innovational processes development, and provision of state support measures.
✓ Area - 150 м2
✓ Private entrance, parking
✓ 500 m away from EXPO 2017
All member is staff are fluent in
foreign languages
SHOW CENTER of Pavlodar Region Invest Attractiveness in Astana
ЖК «Promenade EXPO"
53 Orynbor St., Astana
«Investment Attraction Agency» LLC6/2 Lunacharsky St., Pavlodar
Tel.: +7 (7182) 65-12-00, 65-12-03
Email:[email protected]
THANKS FOR ATTENTION!
PROCESSING OF ALUMOSILICATE RAW MATERIALS
APPLICANT Dmitriev Leonod Nikolayevich
PLACE OF PROJECT IMPLEMENTATION Ekibastuz; SEZ PAVLODAR
PERIOD OF IMPLEMENTATION 2017 – 2020
FINANCIAL INDICATORS THE TOTAL COST OF THE
PROJECT
54 474 000 USD
AREA OF INDUSTRIAL PREMISES Rented for 49 years
TOTAL AREA, hectares 10
CURRENT CONDITION BUSINESS PLAN, FEASIBILITY STUDY
RAW MATERIALS COAL ASH ЭКИБАСТУЗСКИХ ГРЭС
ВЫПУСКАЕМАЯ ПРОДУКЦИЯ И ЕГО
ПРИМЕНЕНИЕ
аморфный кремнезем - в производстве стекла, керамики ,
абразивов, бетонных изделий;
глинозем – в производстве алюминия , в качестве
катализатора, адсорбента;
железный концентрат – при выплавке чугунав доменном
процессе .
ПОТРЕБИТЕЛИ АО «КАЗАХСТАНСКИЙ ЭЛЕКТРОЛИЗНЫЙ ЗАВОД»
PERIOD OF RETURN, years 3
NUMBER OF EMPLOYEE 298
MANUFACTURE OF REFRACTORY MATERIALS
APPLICANT LLP "KEMERTUZ-18"
PLACE OF PROJECT IMPLEMENTATION Maiskii region, Koktobe village
PERIOD OF IMPLEMENTATION 1 year
FINANCIAL INDICATORS THE TOTAL COST OF THE
PROJECT
10 000 000 USD
AREA OF INDUSTRIAL PREMISES,
hectares
2
TOTAL AREA, hectares 10
CURRENT CONDITION BUSINESS PLAN, FEASIBILITY STUDY
СЫРЬЕ СОБСТВЕННОЕ МЕСТОРОЖДЕНИЕ ГЛИН
ИМПОРТ 31 000 000 USD
ВЫПУСКАЕМАЯ ПРОДУКЦИЯ И ЕГО
ПРИМЕНЕНИЕ
Огнеупорный и кислотоупорный шамотный
кирпич, безобжиговые огнеупорные изделия,шамотный
товарный песок, алюмосиликатные мертели применяется в
промышленном строительстве
ПОТРЕБИТЕЛИ ПРОМЫШЛЕННЫЕ ПРЕДПРИЯТИЯ МЕТАЛЛУРГИЧЕСКОЙ,
ХИМИЧЕСКОЙ ОТРАСЛИ,
ТЭЦ, ГРЭС
PERIOD OF RETURN, years 5
NUMBER OF EMPLOYEE 20
CONSTRUCTION OF THE FACTORY FOR DEEP PROCESSING OF WHEAT ON DRY KLEIKOVINUM, STARCH, COMBINE AND
DISCRIMINATED ALCOHOL FOR FUELS (ETHANOL)
APPLICANT “Zhana ondiris” LLC
PLACE OF PROJECT IMPLEMENTATION Uspenskii region
PERIOD OF IMPLEMENTATION 2017 –2018
FINANCIAL INDICATORS THE TOTAL COST OF THE PROJECT 42 500 000 USD
AREA OF INDUSTRIAL PREMISES Rented for 49 years
TOTAL AREA, ha 10
CURRENT CONDITION Business-plan
СЫРЬЕ ПРЕДПРИЯТИЯ, ОСУЩЕСТВЛЯЮЩИЕ ВЫРАЩИВАНИЕ ЗЕРНОВЫХ КУЛЬТУР
ВЫПУСКАЕМАЯ ПРОДУКЦИЯ И ЕГО
ПРИМЕНЕНИЕ
Сухая пшеничная клейковина – в пищевой промышленности;Пшеничный крахмал – в пищевой,целлюлозно-бумажной,
фармацевтической, нефтегазовой отрасли,Обезвоженный спирт для топлив (этанол) -
ИМПОРТ 62 700 USD
ПОТРЕБИТЕЛИ Пищевая промышленность РК
PERIOD OF RETURN, years 3,7
NUMBER OF EMPLOYEE 50
"FACTORY OF REFRACTORY MIXTURES" CONSTRUCTION
APPLICANT PAVLODAR STATE UNIVERSITY
PLACE OF PROJECT IMPLEMENTATION PAVLODAR CITY, SEZ PAVLODAR
PERIOD OF IMPLEMENTATION 2017-2018
THE TOTAL COST OF THE PROJECT 4 000 000 USD
CURRENT CONDITION Innovative patent of the Republic of Kazakhstan № 22399 for the invention "composition
for the production of refractory concrete" (published on June 25, 2009); Innovative patent
of the Republic of Kazakhstan No. 22400 for the invention "self-caking refractory shotcrete"
(published on June 25, 2009); Innovative patent of the Republic of Kazakhstan No. 22766 for
the invention "composition for the production of refractory concrete"
RAW MATERIALS алюминий АПВ-1; магнезитовый порошок П-9 ; лигносульфонат;
мертель шамотный МШ-39; сульфат магния - поставщики –металлургические и
химические предприятия РК,РФ
ВЫПУСКАЕМАЯ ПРОДУКЦИЯ И ЕГО
ПРИМЕНЕНИЕ
Самоспекающаяся огнеупорная торкрет-масса, состав для изготовления огнеупорного
бетона применяется для горячего ремонта и футеровки высокотемпературных
агрегатов цветной и черной металлургии.
ИМПОРТ 5 829 000 USD
ПОТРЕБИТЕЛИ Металлургические предприятия
PERIOD OF RETURN, years 3
NUMBER OF EMPLOYEE 32
CONSTRUCTION OF THE FARM ON THE MANUFACTURE OF BUTYLED KUMYS, ROOMS FOR CATTLE AND SHRINK.
ACQUISITION OF MILES
APPLICANT “Sahyp” farm
PLACE OF PROJECT IMPLEMENTATION Pavlodar city
PERIOD OF IMPLEMENTATION 1 year
FINANCIAL INDICATORS THE TOTAL COST OF THE PROJECT 700 000 USD
AREA OF INDUSTRIAL PREMISES 250 sq.m
TOTAL AREA, ha 3 hа
CURRENT CONDITION Business-plan
RAW MATERIALS Собственная откормочная площадка и поголовье лошадей
ВЫПУСКАЕМАЯ ПРОДУКЦИЯ Бутилированный кумыс
ПОТРЕБИТЕЛИ Население Республики Казахстан
PERIOD OF RETURN, years 2
NUMBER OF EMPLOYEE 15
PRODUCTION OF CARBAMIDE-FORMALDEHYDE RESIN AND EAF
APPLICANT LLP "PAVLODAR WOODWORKING PLANT"
PLACE OF PROJECT IMPLEMENTATION Pavlodar city
PERIOD OF IMPLEMENTATION 2017-2022
FINANCIAL INDICATORS THE TOTAL COST OF THE PROJECT 5 800 000 USD
AREA OF INDUSTRIAL PREMISES AVAILABILITY OF THE MATERIAL AND TECHNICAL BASE, TECHNOLOGICAL EQUIPMENT
TOTAL AREA, ha 40 000 sq m.
CURRENT CONDITION Business-plan
RAW MATERIALS древесина - поставки из Челдайского лесного массива и
леспромхозы РФ
ВЫПУСКАЕМАЯ ПРОДУКЦИЯ И ЕГО
ПРИМЕНЕНИЕ
карбамидоформальдегидная смола используется в качестве
связующего компонента в производстве древесно-стружечных и
древесно-волокнистых плит;
древесно-стружечные плиты, межкомнатные двери – в
строительной и мебельной промышленности
ИМПОРТ ДСП – 4 373 100 USD
Двери – 21 991 000 USD
ПОТРЕБИТЕЛИ Строительная и мебельная промышленность
PERIOD OF RETURN, years 3
NUMBER OF EMPLOYEE 65
CONSTRUCTION OF DAIRY AND COMMERCIAL FARM AND PACKAGE
APPLICANT Daneker farm
PLACE OF PROJECT IMPLEMENTATION Pavlodar region, beskaragai village
PERIOD OF IMPLEMENTATION 2017-2018
FINANCIAL INDICATORS THE TOTAL COST OF THE
PROJECT
5 000 000 USD
AREA OF INDUSTRIAL PREMISES 3000 sq,m
TOTAL AREA, ha 600 ha
CURRENT CONDITION Business-plan
RAW MATERIALS Собственная откормочная площадка и поголовье КРС
ВЫПУСКАЕМАЯ ПРОДУКЦИЯ Мясо (говядина),молоко
ИМПОРТ -
ПОТРЕБИТЕЛИ Население Павлодарской области и ближние регионы РК,
ТОО «Молком», ТОО «Фуд мастер»
PERIOD OF RETURN, years 5-7 years
NUMBER OF EMPLOYEE 27
FERTILIZERS. PRODUCTION OF POTASSIUM HUMATE, SODIUM HUMATE, DYNAMICS (CARBON REAGENT)
APPLICANT “Apatit” LLP
PLACE OF PROJECT IMPLEMENTATION Ekibastuz city
PERIOD OF IMPLEMENTATION 2017-2018
THE TOTAL COST OF THE PROJECT 180 000 USD
AREA OF INDUSTRIAL PREMISES 5 000 м2
TOTAL AREA, ha 6 ha
CURRENT CONDITION Pilot line is working
RAW MATERIALS Бурый уголь марки Б-3Сарыкольского месторождения
ВЫПУСКАЕМАЯ ПРОДУКЦИЯ И ЕГО
ПРИМЕНЕНИЕ
Углещелочной реагент (УЩР) гумата натрия применяется
качестве стабилизатора буровых растворов при добыче нефти и
газа (УЩР); гумийные удобрения - стимулятор роста и развитий
растений
ИМПОРТ -
ПОТРЕБИТЕЛИ ООО «Кристалл», Казань; ТОО «Бона», Павлодар; Агрофирма
«Заречная» Краснодар;
PERIOD OF RETURN, years 3
NUMBER OF EMPLOYEE 54
CONSTRUCTION OF MULTIFUNCTIONAL SPORTS ENTERTAINMENT COMPLEX
APPLICANT “Belyalov” company
PLACE OF PROJECT IMPLEMENTATION Ekibastuz
PERIOD OF IMPLEMENTATION 2017 – 2018
THE TOTAL COST OF THE PROJECT 600 000 USD
AREA OF INDUSTRIAL PREMISES Rented for 49 years
TOTAL AREA, ha 10 hА
CURRENT CONDITION Business-plan
ВИД ОКАЗЫВАЕМЫХ УСЛУГ Аренда торговых площадей, прокат роликовых коньков,
посещение детской игровой площадки, семейное кафе,
минимаркет, мини гольф-клуб
ПОТРЕБИТЕЛИ Население города Экибастуз
PERIOD OF RETURN, years 3,7
NUMBER OF EMPLOYEE 50
GROWING SUGAR BEET AND CONSTRUCTION OF SUGAR FACTORY
APPLICANT “Kostomar” farm
PLACE OF PROJECT IMPLEMENTATION Irtysh region
PERIOD OF IMPLEMENTATION 2017-2018
THE TOTAL COST OF THE PROJECT 41 400 000 USD
AREA OF INDUSTRIAL PREMISES 800 М2
TOTAL AREA, ha 20 000 hА
CURRENT CONDITION Business-plan
RAW MATERIALS ПЛАНИРУЕТСЯ ВЫРАЩИВАНИЕ САХАРНОЙ СВЕКЛЫ НА
СОБСТВЕННЫХ ПОЛЯХ
ВЫПУСКАЕМАЯ ПРОДУКЦИЯ САХАР
ИМПОРТ -
ПОТРЕБИТЕЛИ НАСЕЛЕНИЕ РЕСПУБЛИКИ КАЗАХСТАН, ПИЩЕВАЯ
ПРОМЫШЛЕННОСТЬ РК
PERIOD OF RETURN, years 2
NUMBER OF EMPLOYEE 40
PRODUCTION OF POTATO AND MODIFIED STARCH
APPLICANT LLP "Zhana-ONDIRIS PV"
PLACE OF PROJECT IMPLEMENTATION Koryskov village
PERIOD OF IMPLEMENTATION 2017-2018
THE TOTAL COST OF THE PROJECT 55 000 000 USD
AREA OF INDUSTRIAL PREMISES 2 800 М2
TOTAL AREA, ha 3000 hА
CURRENT CONDITION Business-plan
RAW MATERIALS ПЛАНИРУЕТСЯ ВЫРАЩИВАНИЕ КАРТОФЕЛЯ
ВЫПУСКАЕМАЯ ПРОДУКЦИЯ И ЕГО
ПРИМЕНЕНИЕ
КАРТОФЕЛЬНЫЙ МОДИФИЦИРОВАННЫЙ КРАХМАЛ
ПРИМЕНЯЕТСЯ
ИМПОРТ 1 129 000 USD
ПОТРЕБИТЕЛИ Пищевая промышленность РК
PERIOD OF RETURN, years 3
NUMBER OF EMPLOYEE 50
PROCESSING OF VEGETABLE PRODUCTS AND DEVELOPMENT OF OWN PRODUCTION OF VEGETABLES
APPLICANT “Agrounoin” farm company
PLACE OF PROJECT IMPLEMENTATION Chernoyarka village
PERIOD OF IMPLEMENTATION 2017-2018 ГГ
THE TOTAL COST OF THE PROJECT 4 000 000 USD
AREA OF INDUSTRIAL PREMISES 800 М2
TOTAL AREA, ha 430 hА
CURRENT CONDITION Business-plan
RAW MATERIALS ОВОЩНАЯ ПРОДУКЦИЯ С СОБСТВЕННЫХ ПОЛЕЙ
ВЫПУСКАЕМАЯ ПРОДУКЦИЯ СУШЕННЫЕ ОВОЩИ, СУХОЕ КАРТОФЕЛЬНОЕ ПЮРЕ, СВЕЖИЕ
ОВОЩИ
ИМПОРТ 298 200 USD
ПОТРЕБИТЕЛИ НАСЕЛЕНИЕ РЕСПУБЛИКИ КАЗАХСТАН
PERIOD OF RETURN, years 3
NUMBER OF EMPLOYEE 35
MANUFACTURE FOR PROCESSING OF WEARED AUTOMOBILE TIRES AND OTHER RUBBER-TECHNICAL PRODUCTS IN
HIGH-QUALITY RUBBER RUBBER
APPLICANT "ARTEL PW“LLP
PLACE OF PROJECT IMPLEMENTATION Pavlodar city, SEZ Pavlodar
PERIOD OF IMPLEMENTATION 2017-2018
THE TOTAL COST OF THE PROJECT 350 000 USD
AREA OF INDUSTRIAL PREMISES 300 М2
TOTAL AREA, ha 3 ha
CURRENT CONDITION Business-plan
RAW MATERIALS изношенные автомобильные шины с металлическим и текстильным кордом, любого диаметра и отходы РТИ
ВЫПУСКАЕМАЯ ПРОДУКЦИЯ И ЕГО ПРИМЕНЕНИЕ
резиновая крошка, металлический корд,текстильный корд применяется строительными компаниями, в
производстве спортивных покрытии, в производстве дорожных покрытии на основе модификаторов с использованием
резиновой крошки, в производстве РТИИМПОРТ -
ПОТРЕБИТЕЛИ Компания «АЛЬФА-СПК» способствует реализации всей выпускаемой продукции по территории России
PERIOD OF RETURN, years 2
NUMBER OF EMPLOYEE 16
ORGANIZATION OF MANUFACTURE OF STEEL INDUSTRIAL RIBBONS OF MIDDLE DIAMETER Ø 273 - 630 MM
APPLICANT LLP "PAVLODARSKY TUBE-ROLLING PLANT"
PLACE OF PROJECT IMPLEMENTATION PAVLODAR city , NORTH PROMZONE
PERIOD OF IMPLEMENTATION 2017 – 2019
FINANCIAL INDICATORS THE TOTAL COST OF THE
PROJECT
22 000 000 USD
AREA OF INDUSTRIAL PREMISES 4 ha
TOTAL AREA 16 ha
CURRENT CONDITION BUSINESS-PLAN
RAW MATERIALS МЕТАЛЛУРГИЧЕСКИЕ ПРЕДПРИЯТИЯ РК
ВЫПУСКАЕМАЯ ПРОДУКЦИЯ И ЕГО
ПРИМЕНЕНИЕ
стальные прямошовные трубы применяются в транспортировке
нефти и газа по магистральным трубопроводам
ИМПОРТ 1 375 000 USD
ПОТРЕБИТЕЛИ АО «КАЗТРАНСОЙЛ», АО «КАЗМУНАЙГАЗ»
PERIOD OF RETURN, years 1,6
NUMBER OF EMPLOYEE 3 52