Investment Project

Construction of corn transloading terminal in the port Yuzhny

Page 2: Investment Project Construction of corn transloading terminal in the port Yuzhny

www.titul.net.ua2

Location Area

Location – Ukraine, Odessa region, port Yuzhny.

Platform of the supposed construction of marine corn terminal is located on the west coast of Small Adzhalycksky Basin in 25 km to north-east of Odessa on seaside of the Black sea.

Page 3: Investment Project Construction of corn transloading terminal in the port Yuzhny

www.titul.net.ua3

Project Description

Marine corn terminal will be intended for receiving of corn cargos from automobile, railway transport, also intended for corn cleaning, drying, short-term storage and marine vessels shipping. Export of corn cargos will be carried out in countries of Mediterranean basin and Middle East, countries of the Indian Ocean and Southeast Asia. Shipment of corn cargos for export is provided by marine specialized vessels – bulk cargo ships.

Page 4: Investment Project Construction of corn transloading terminal in the port Yuzhny

www.titul.net.ua4

Advantages of the considered plot for construction

Possible connection to operating transportation lines and utility networks;

Possibility to use existent water areas, water approaches, outer roads and means of navigation situation with necessity of dredging works only for creation of operational water and water approach;

Possibility to use existent objects to provide all-inclusive services for fleet and vessels for duty assistant purpose;

Availability of skilled manpower.

Page 5: Investment Project Construction of corn transloading terminal in the port Yuzhny

www.titul.net.ua5

Key indicators of the project

Construction cost, including equipment – 56 mln. $, Equipment cost – 8 mln. $ Construction period – 3,5 years Receiving of vessels – Bulk cargo ship СН – 100 Number of workers/ max. shift – 34/10 Project cargo turn-over – 4,4 mln.t per year Capacity – 5,6 mln.t per year Corn warehouse – 499 200 thousand t. Projected vessel traffic – 93 vessels per year Berthing cargo front, berth (length/width) – 300/17 m Number of workers (including water and on-shores) – 187 people

Page 6: Investment Project Construction of corn transloading terminal in the port Yuzhny

www.titul.net.ua6

Project visual representation

Page 7: Investment Project Construction of corn transloading terminal in the port Yuzhny

www.titul.net.ua7

Project visual representation

Page 8: Investment Project Construction of corn transloading terminal in the port Yuzhny

www.titul.net.ua8

Project visual representation

Page 9: Investment Project Construction of corn transloading terminal in the port Yuzhny

www.titul.net.ua9

Project visual representation

Page 10: Investment Project Construction of corn transloading terminal in the port Yuzhny

www.titul.net.ua10

Project visual representation

Page 11: Investment Project Construction of corn transloading terminal in the port Yuzhny

www.titul.net.ua11

Project visual representation

Page 12: Investment Project Construction of corn transloading terminal in the port Yuzhny

www.titul.net.ua12

Project visual representation

Page 13: Investment Project Construction of corn transloading terminal in the port Yuzhny

www.titul.net.ua13

INVESTMENT- REAL ESTATE DEVELOPMENT COMPANY “TITUL”

CONTACTS:

President of the company: Telman AbbasovTel.: +38 0487155551, +38 0674899222Email: [email protected], [email protected]: www.titul.net.ua