Catalyst Metals LtdCatalyst Metals Ltd
Company ObjectivesCompany Objectives
To create shareholder value by pursuing
advanced gold and metals projects
Goal is to generate cashflows from operations
within 2 years
Flagship Four Eagles Gold Project in Victoria
provides potential for early exploration success
For
per
sona
l use
onl
y
Current ProjectsCurrent Projects
Four Eagles Gold Project (Victoria)Four Eagles Gold Project (Victoria)
Joint venture exploration for a potential new of
Bendigo‐style goldfield below shallow cover
Minnie Springs Project (Western Australia)Minnie Springs Project (Western Australia)
Molybdenum and Tungsten mineralisation
in the Gascoyne Mineral Field
Everton Project (Victoria)Everton Project (Victoria)
Historical high‐grade Molybdenum mine
For
per
sona
l use
onl
y
Four Eagles Gold ProjectFour Eagles Gold Project
Located along major fault
extension from Bendigo
goldfield
Prospective rocks concealed
by shallow cover
Broad spaced Providence
drilling shows high‐grade gold
in Bendigo sequence rocks
Tenements cover
25kmstrike length of
prospective corridorFor
per
sona
l use
onl
y
North Bendigo TenementsNorth Bendigo Tenements
230,000mE 250,000mE 270,000mE 290,000mE
FostervilleGoldfield
BendigoGoldfield
5,960,000mN
5,920,000mN
5,940,000mN
5,980,000mN
Fosterville
Bendigo
EL4525
EL4525Raywood
Mitiamo
Tandarra Project
Whitelaw
Fault
Tandarra F
Four EaglesProspective
Target
V I C T O R I A N S W
0
kilometres
20
NORTH
EL5295Echuca
Rochester
Lockington
Sebastian
6,000,000mN
CatalystDrummond /Unity JV
Gold deposit/occurrenceTown / cityMain Road
Castlemaine Navarre /NorthgateNorthgate
Timpetra
Exploration Licence Holding Companies
For
per
sona
l use
onl
y
Bendigo: a world-class gold targetBendigo: a world-class gold target
BENDIGO
URBAN
AREA
His
ato
ricl
Prdo
uctio
n Z
one
Hustlers Line1.6mt @17.6g/t Au(918,000oz)
Garden Gully Line4.6mt @14.1g/t Au(2,080,000oz)
New Chum Line7.3mt @14.5g/t Au(3,390,000oz)
Deborah Line0.46mt @14.7g/t Au(217,000oz)
Sheepshead Line1.7mt @11.7g/t Au(634,000oz)
Nell Gwynne
Line
Napoleon Line
NORTH
0
kilometres
2
Lines of Lode
Bendigo Goldfield
Total Production(1851 - 1954)
• 18 million ounces reef gold (14g/t Au)
• 4 million ounces alluvial gold
• Minimum 200,000 ounces per year for 60 years
For
per
sona
l use
onl
y
Quartz Reef Structural SchematicQuartz Reef Structural Schematic
Associated with
anticlinal
axis
Importance of
slate beds
Difficult drilling
targets
Bendigo GoldfieldQuartz Reef Structural Schematic
Sy
nc
l i ne
An
t i cl i n
e
Modified Saddle Reefwith Spurs in footwall
West Dipping Fault Reef with associatedSpurs in footwall
False Saddle
Saddle Reef
Saddle Reefwith Neck Reef
Saddle Reef
Leg Reef
Stratabound Spursassociated withminor faults
Spurs associated with Leg Reef
Slate beds
For
per
sona
l use
onl
y
Actual Cross SectionActual Cross Section
Bendigo Goldfield
(after Boucher et al)
Sheepshead Anticline‘Big Blue Shale’‘R
owes
Sha
le’
‘Rowes Shale’
‘Big Blue Shale’
‘Big
Blue
Sha
le’‘Railway Shale’
Deborah Syncline
Deborah Anticline
NeckReef
0
Metres
100
Laminated quartz vein (LQV)
Axial plane
Limb Thrust
Quartz / gold
Slate beds
For
per
sona
l use
onl
y
Bendigo Target SizeBendigo Target Size
0
Metres
1000
Sheepshead Anticline (South) Line of LodeBendigo
PRODUCTIONApprox. 1.4 million tonnes @ 12 g/t Au (550,000 ozs)
NORTHSOUTH
Mineralised ribbonHistoric Stoping
LEGEND
123500mN 124500mN 125500mN 126500mN
-1000RL
-1500RL
-500RL
For
per
sona
l use
onl
y
Bendigo Target SizeBendigo Target Size
NorthDeborahDeborah
CentralDeborah Central
MonumentHill
KingsleyLode
Deborah Fault
“New Formation”
Reef No. 1
0
Metres
600
Deborah Anticline Line of LodeBendigo
PRODUCTION460,000tonnes @ 14.7g/t Au
(216,000 ozs)
NORTHSOUTH
Reef No. 5Reef No. 6No. 7No. 8
Data source: Mines Department unpublished plan by Chambers, 1947 & Deborah manager’s book.
Pitch of reefStoped areas
LEGEND
For
per
sona
l use
onl
y
Bendigo Target SizeBendigo Target SizeBendigo Target Size
0
Metres
500
New Chum Line of ReefBendigo
PRODUCTION7.3 million tonnes
@ 14.5 g/t Au (3.4 million ozs)
NORTH
SOUTH
ShaftHistoric StopingLEGEND
-1000mRL
-1000mRL
-500mRL
-500mRL
0mRL
0mRL
For
per
sona
l use
onl
y
Four Eagles Gold ProjectFour Eagles Gold Project
EL4525
EL5295
Mitiamo
0
kilometres
4
NORTH
5,985,000mN
5,995,000mN
5,990,000mN
Drillholes0.2 to 0.5 g/t Au0.5 to 1.0 g/t Au1.0 to 5.0 g/t Au> 5.0 g/t AuGold ZoneArsenic ZoneRailwayMain Road
250,000mE240,000mE Drillhole Intersections
38
7 12 13
61
10
4
5
9
1. FE380 3m @ 9.71g/t Au from 120m2. FE379 3m @ 0.2g/t Au from 120m3. FE331 3m @ 0.59g/t Au from 126m
6m @ 82.7g/t Au from 123mand 6m @ 1.85 g/t Au from 135m
6. FE299 3m @ 0.39g/t Au from 126m7. FE320 3m @ 0.33g/t Au from 87m8. FE319 3m @ 0.2g/t Au from 57m
6m @ 0.66g/t Au from 135m3m @ 0.26g/t Au from 81m 3m @ 0.38g/t Au from 75m
12. FE326 13.5m @ 0.45g/t Au from 102m13. FE343 3m @ 3.34g/t Au from 111m14. FE316 3m @ 0.27g/t Au from 102m
4. FE297 6m @ 0.45g/t Au from 78m5. FE328
9. FE33310. FE33911. FE305
14
2
11
Four Eagles Cross
SectionFor
per
sona
l use
onl
y
Four Eagles Gold ProjectFour Eagles Gold ProjectF
or p
erso
nal u
se o
nly
Four Eagles Gold ProjectFour Eagles Gold Project
No outcrop of prospective rocksNo outcrop of prospective rocks
Catalyst drills first ever diamond Catalyst drills first ever diamond drillholedrillhole
on the property in March 2011on the property in March 2011
Previously only aircore drillingPreviously only aircore drilling
For
per
sona
l use
onl
y
Four Eagles Drill Cross SectionFour Eagles Drill Cross Section
FE300 FE299
3m @ 1.0g/t Aufrom 126m
FE328 FE298 FE329 FE297 FE330 FE296 FE331 FE295 FE294
6m @ 82.7g/t Au, from 123m6m @ 1.9g/t Au, from 135m
3m @ 0.51g/t Au, from 78m3m @ 0.29g/t Au from 81m 3m @ 0.59g/t Au
from 123m
0
Metres
250
Four Eagles Cross Section5988925mN
Clay - Shepparton FmSandCarbonaceous ClaySaprolite ZoneBasement Castlemaine Gp
244000mE 244250mE 244500mE 244750mE
-250m
0m
For
per
sona
l use
onl
y
Four Eagles Gold ProjectFour Eagles Gold Project
Drillhole
FE328,
123m to 129m
depth
5mm
For
per
sona
l use
onl
y
Proposed Program 2011Proposed Program 2011
Minimum expenditure $450,000
Further aircore drilling over entire strike length
Phase 1: March to April 2011
–
7,913 metres completed
Phase 2: September to October 2011
Angled diamond drilling of gold zones and structure
Phase 1: March to April 2011
–
867 metres completed
Four Eagles Gold ProjectFour Eagles Gold ProjectF
or p
erso
nal u
se o
nly
Four Eagles Gold ProjectFour Eagles Gold Project
EL4525
EL5295
Mitiamo
0
kilometres
4NORTH
5,985,000mN
5,995,000mN
5,990,000mN
Drillholes0.2 to 0.5 g/t Au0.5 to 1.0 g/t Au1.0 to 5.0 g/t Au> 5.0 g/t AuGold ZoneArsenic ZoneRailwayMain Road
250,000mE240,000mE
Phase 1 Aircore DrillingPhase 2 Aircore Drilling
Drillhole Intersections
38
7 12 13
61
10
4
5
9
1. FE380 3m @ 9.71g/t Au from 120m2. FE379 3m @ 0.2g/t Au from 120m3. FE331 3m @ 0.59g/t Au from 126m
6m @ 82.7g/t Au from 123mand 6m @ 1.85 g/t Au from 135m
6. FE299 3m @ 0.39g/t Au from 126m7. FE320 3m @ 0.33g/t Au from 87m8. FE319 3m @ 0.2g/t Au from 57m
6m @ 0.66g/t Au from 135m3m @ 0.26g/t Au from 81m 3m @ 0.38g/t Au from 75m
12. FE326 13.5m @ 0.45g/t Au from 102m13. FE343 3m @ 3.34g/t Au from 111m14. FE316 3m @ 0.27g/t Au from 102m
4. FE297 6m @ 0.45g/t Au from 78m5. FE328
9. FE33310. FE33911. FE305
14
2
11
Four Eagles Cross
SectionFor
per
sona
l use
onl
y
Four Eagles Gold ProjectFour Eagles Gold Project
Bendigo P yram id R oad
0
kilometre
1NORTH
Bendigo Pyramid Road
Whitelaw
Fault
242,000mE 244,000mE246,000mE
5,992,000mN
5,990,000mN
5,988,000mN
387
12
13
6
1
10
45
9
2
11
18
19
1617
15
?
?
?
14 (3.85km north) Drillhole Intersections1. FE380 3m @ 9.71g/t Au from 120m2. FE379 3m @ 0.2g/t Au from 120m3. FE331 3m @ 0.59g/t Au from 126m
6m @ 82.7g/t Au from 123mand 6m @ 1.85 g/t Au from 135m
6. FE299 3m @ 0.39g/t Au from 126m7. FE320 3m @ 0.33g/t Au from 87m8. FE319 3m @ 0.2g/t Au from 57m
6m @ 0.66g/t Au from 135m3m @ 0.26g/t Au from 81m 3m @ 0.38g/t Au from 75m
12. FE326 13.5m @ 0.45g/t Au from 102m13. FE343 3m @ 3.34g/t Au from 111m14. FE316 3m @ 0.27g/t Au from 102m
15. FEDD001 3.7m @ 4.7g/t Au from 170minc. 0.8m @ 17.5g/t Au from 173m
16. FE415 6.0m @ 2.4g/t Au from 45mand 3.0m @ 14.7g/t Au from 57m
17. FE402 3.0m @ 0.9g/t Au from 90m18. FE391 3.0m @ 0.45g/t Au from 66m19. FE399 6.0m @ 1.0g/t Au from 66m
4. FE297 6m @ 0.45g/t Au from 78m5. FE328
9. FE33310. FE33911. FE305
RECENT INTERSECTIONS
2011 Aircore programDrillholes 0.2 to 0.5 g/t Au
0.5 to 1.0 g/t Au1.0 to 5.0 g/t Au> 5.0 g/t Au
Drillhole grades
Gold ZoneArsenic ZoneMain Road
FOUR EAGLES2011 Aircore
Drilling
For
per
sona
l use
onl
y
Four Eagles Drill Cross SectionFour Eagles Drill Cross Section
FEDD001 356m
FEDD002 511m
FE300 FE299
3m @ 1.0g/t Au from 126m
FE328 FE298 FE329 FE297 FE330 FE296 FE331 FE295 FE294
6m @ 82.7g/t Au from 123m; 6m @ 1.9g/t Au from 135m
3m @ 0.51g/t Au, from 78m3m @ 0.29g/t Au from 81m
3m @ 0.59g/t Au from 123m
0.7m @ 4.83g/t Au0.8m @ 17.5g/t Au0.4m @ 2.08g/t Au
from 170-176m
0
Metres
250
Four Eagles Cross Section5988925mN
Clay - Shepparton FmSandCarbonaceous ClaySaprolite ZoneBasement Castlemaine Gp
244000mE 244250mE 244500mE 244750mE
-250m
0m
no assays yet available
For
per
sona
l use
onl
y
Heads of AgreementHeads of AgreementPhase 1$450,000 exploration spend over 12 months$150,000 cash750,000 CYL shares
Phase 2$2,100,000 exploration spend (inclusive of Phase 1 exploration)
over 3 years to earn 50% interest in project$100,000 cash750,000 CYL shares
Phase 3$2,100,000 exploration spend to earn up to 75% interest in project2,500,000 CYL sharesBoard position for Tom Burrowes
Final PhaseProvidence Gold free carried until decision to mine
Four Eagles Gold ProjectFour Eagles Gold ProjectF
or p
erso
nal u
se o
nly
Minnie Springs Project, W.A.Minnie Springs Project, W.A.
E0901303
E0901776 E0901174
E0801174
Nina Tungsten Project
Minnie CreekMolybdenum Project
0
kilometres
10
NORTH
380,000mE 400,000mE 420,000mE
7,340,000mN
7,320,000mN
>0.5%0.05 - 0.5%<0.05%
Tungsten in Rock (%W)
0 200Metres
389,400mE 389,800mE
7,335,800mE
7,336,200mE
45 - 14215 - 455- 15
Molydenum in Soil & drilling
7,320,000mN
7,318,000mN 395,000mE393,000mE
62m @ 0.15% MoS2
23m @ 0.16% & 17m @ 0.1% MoS2
31m @ 0.18% MoS2 14m @ 0.10% MoS2
92m @ 0.04% MoS2
11m @ 0.1% MoS2
4
6
7
1
8
5
Gascoyne Mo-WProject
Catalyst Metals
For
per
sona
l use
onl
y
Everton Project, VictoriaEverton Project, Victoria
0
kilometres
10
EL4866
Wangaratta
Everton
Myrtleford
Beechworth
Canberra
Melbourne
EvertonVICTORIA
NORTH
0
metres
100
Visible MolybdenumRock sample points 5,000 to 18,400 1,000 to 5,000
500 to 1,000
0 to 500Mine adit Historic workingsFelsic IntrusiveSediments
Historic Molybdenum Production 1917–1944
21,000 tonnes @ 1.4% MoS2
quarry limit
quarry limit
462,200mE
462,100mE
462,300mE
9,570,000mN
5,969,800mN
5,969,700mN
5,969,600mNFor
per
sona
l use
onl
y
Catalyst Capital StructureCatalyst Capital Structure
Capital Structure (ASX:CYL)Capital Structure (ASX:CYL)
39,088,226 fully paid ordinary shares–
1,000,000 unlisted 20 cent options expiring 30/06/2014
–
1,000,000 unlisted 30 cent options expiring 30/06/2015
Top 40 control approximately 81% of issued capital
Cash in handCash in hand
A$2.6 million (at 31 March 2011)
Market Market CapitalisationCapitalisation
A$9.2 million (at 23.5 cents per share)
For
per
sona
l use
onl
y
Stephen Boston – Non‐executive ChairmanThe principal of a Perth‐based private investment group specialising
in the
Australian resources sector. Previously worked as a Stockbroker from 1984 to 1998
in Perth and Sydney.
Bruce Kay–
Non‐executive Director
Bruce was previously responsible for global exploration for Newmont
Mining
Corporation and Normandy Mining Limited. Prior to this he held senior positions
within Western mining Corporation. Bruce has been a director and chairman of
several other Australian listed companies and has over 30 years’
experience in
international gold, base metals, and nickel exploration.
Robin Scrimgeour – Non‐executive Director The principal of a Singaporean‐based Private Investment Company. Previously
worked for an International Bank providing structured hybrid financing for Asian
based Clients.
Gary Schwab – Non‐executive DirectorOver 40 years business experience, including 20 years in the resources sector.
Previously Executive Director of a privately owned bulk commodities group
responsible for managing long term wealth creation strategy (in conjunction with
the principal and owner) which culminated in the creation of one
of Australia’s
wealthiest unlisted private bulk commodities companies.
Corporate Structure - DirectorsCorporate Structure - DirectorsF
or p
erso
nal u
se o
nly
AdvisorsAdvisorsJohn Arbuckle – Corporate Advisor
John is an accountant with extensive experience in the resources
industry in
Australia and overseas. Currently he operates a corporate advisory business that
provides corporate and capital financing advice to resource industry companies.
Previously he was the Chief Financial Officer of Mount Gibson Iron Limited and
Perilya
Limited, where he guided both companies through difficult operational
start up phases. Prior to this he held senior financial management roles with
Rio Tinto
Limited, North Limited and Anaconda Nickel Limited.
Competent Person’s StatementThe information in this report that relates to Exploration Results is based on
information compiled by Mr Bruce Kay, who is a Fellow of the Australasian
Institute of Mining and Metallurgy and is a consultant to Catalyst Resources
Limited. Mr Kay has sufficient experience that is relevant to the style of
mineralisation, type of deposit under consideration and to the activity that he
is undertaking to qualify as a Competent Person as defined in the 2004 edition
of the ‘Australasian Code for Reporting of Exploration, Results, Mineral
Resource
and Ore Reserves’. Mr Kay consents to the inclusion in this report of the matters
based on his information in the form and context in which it appears.
Corporate StructureCorporate StructureF
or p
erso
nal u
se o
nly
This presentation has been prepared by Catalyst Metals Limited (“Catalyst”). This document contains background
information about Catalyst current at the date of this presentation. The presentation is in summary form and does
not purport to be all inclusive or complete. Recipients should conduct their own investigations and perform their
own analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and
opinions contained in this presentation.
This presentation is for information purposes only. Neither this
presentation nor the information in it constitutes an
offer, invitation, solicitation or recommendation in relation to
the purchase or sale of shares in any jurisdiction.
This presentation may not be distributed in any jurisdiction except in accordance with the legal requirements
applicable in such jurisdictions. Recipients should inform themselves of the restrictions that apply in their own
jurisdiction. A failure to do so may result in a violation of securities laws in such a jurisdiction.
This presentation does not constitute investment advice and has been prepared without taking into account the
recipient’s investment objectives, financial circumstances or particular needs and the opinions and
recommendations in this presentation are not intended to represent recommendations of particular investments to
particular persons. Recipients should seek professional advice when deciding if an investment is appropriate. All
securities transactions involve risks, which include (among others) the risk of adverse or unanticipated market,
financial or political developments.
To the fullest extent permitted by law, Catalyst and its officers, employees, agents and advisers do not make any
representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of any
information, statements, opinions, estimates, forecasts or other
representations contained in this presentation. No
responsibility for any errors or omissions from this presentation arising out of negligence or otherwise is accepted.
This presentation may include forward looking statements. Forward looking statements are only predictions and are
subject to risks, uncertainties and assumptions which are outside the control of Catalyst. Actual values, results or
events may be materially different to those expressed or implied
in this presentation. Given these uncertainties,
recipients are cautioned not to place reliance on forward looking statements. Any forward looking statements in this
presentation speak only at the date of issue of this presentation. Subject to any continuing obligations under any
applicable law and the ASX Listing Rules, Catalyst does not undertake any obligation to update or revise any
information or any of the forward looking statements in this presentation of any changes in events, conditions or
circumstances on which any such forward looking statement is based.
Disclaimer and Forward Looking StatementsDisclaimer and Forward Looking StatementsF