Upload
others
View
5
Download
0
Embed Size (px)
Citation preview
Investors Briefing
Notes
Listed on Bursa Malaysia on 8th August 2003.
Protasco 5070 (Construction)
A diversified group specialising in Engineering & Infrastructure
CONSTRUCTION MAINTENANCE PROPERTY
DEVELOPMENT
ENGINEERING &
CONSULTANCY
SERVICES
EDUCATION TRADING &
MANUFACTURING
HCM Engineering
Sdn Bhd (100%)
Roadcare (M)
Sdn Bhd (51%)
Protasco
Development Sdn
Bhd (100%)
Kumpulan Ikram
Sdn Bhd (100%)
Infrastructure
University
Kuala Lumpur
(100%)
Protasco Trading
Sdn Bhd (100%)
KPS-HCM Sdn
Bhd (49%)
DAL HCM Sdn
Bhd (Sarawak)
(30%)
(Managed by Ikram
Education Sdn Bhd)
Empayar Indera
Sdn Bhd (51%)
HCM Kijang Sdn
Bhd (60%)
Permint Granite –
HCM Sdn Bhd
(70%)
^ % Equity owned by
Protasco Bhd
CLEAN ENERGY
Ikram Greentech
Sdn Bhd (100%)
I2 Energy Sdn Bhd
(51%)
I2 Solarpark One
Sdn Bhd (44%)
2
CONSTRUCTION
CONSTRUCTION
ROADS & BRIDGES
PREMIX OVERLAYING
PAVEMENT RECYCLING
PAVEMENT
RECYCLING
WORKS
PPA – PUTRAJAYA PHASE 1
BUILDINGS
ROAD CONSTRUCTION
FLYOVER CONSTRUCTION
CONSTRUCTION -
OUTSTANDING ORDER BOOK
CONSTRUCTION PROJECTS RM Million RM Million*
Building Projects:
PPA Putrajaya (Precinct 16), Phase 2 (Total: RM301 m) 253
PPA Putrajaya (Precinct 5), Phase 3 (Total: RM120 m)** 120
PPA Putrajaya (Precint 19), Phase 4 (Total: RM443 m/RM434 m) - awarded on 21 Dec 2017 434
Sub- Total 807
Road & Bridge Projects :
Road construction in Sibu & Bintulu, Sarawak (Total: RM77 m) 40
Road connection work at Old Klang Road-New Pantai Expressway (Total: RM58 m) 6
Construction of Sungai Besi – Ulu Klang Elevated Expressway (Total : RM316 m/ RM158 m) 152
Infrastructure Works for Development of Pulau Indah Industrial Park, Phase 3C (Total: RM174
m/RM86m) –awarded in Jun 2017
60
Sub-Total 258
Total 1,065
* As at 30/6/2018
** LOI received, pending LOA
5
MAINTENANCE
ROAD MAINTENANCE WORKS
ROUTINE
MAINTENANCE
Maintenance of
Drainages
Maintenance of
Road Signages
Bridge
Maintenance
Grass Cutting
Maintenance of
Road Shoulder
“Pothole”
Patching
PERIODIC
MAINTENANCE
Premix overlaying
Milling of worn
course
Reconstruction
work
Pavement
recycling work
EMERGENCY
MAINTENANCE
Clearing of
landslide
Clearing of fallen
tree
Traffic
management due
to collapsed
bridge
Remedial work at
soil settlement
spot
Warning of water
level rising
Slope repair and
protection
Replacement of
road signages
FEDERAL, STATE & RURAL ROADS MAINTENANCE
Roadcare (M) Sdn Bhd
Kelantan
Terengganu
Pahang
Selangor
DAL HCM Sdn
Bhd
Kuching to Lawas
HCM Kijang Sdn
Bhd
Kelantan State
Roads
Empayar Indera
Sdn Bhd
Perak State Roads
Empayar Indera
Sdn Bhd
Perak Agriculture
Roads
Permint Granite -
HCM
Terengganu Rural
Roads
A 10-year FRM concession of 7,263km commencing from February 2016
• 51% equity
• Routine maintenance – recurring RM130
million per annum.
• Periodic maintenance and emergency works
– based on actual work carried out (estimated to
be RM100 – RM120 million per annum).
• Covering the states of Selangor, Pahang,
Kelantan and Terengganu.
This concession expires in February
2026
CONCESSIONS Federal Road Maintenance (FRM)
Renewal: A 10-year FRM concession of
751km commencing from September 2018
• DAL HCM JV
• Routine maintenance – recurring RM24 million
per annum.
• Periodic maintenance and emergency works
• Covering federal roads from Kuching to Lawas
in Sarawak
This concession expires in August 2028
1. A 7-year contract for 1,959 km, State Road Maintenance for the State of Perak.
Awarded by State Government Perak
Contract sum: RM120 million
Date of commencement 1 Jan 2013 & expires in Dec. 2019.
Empayar Indera Sdn Bhd (51% equity) Extension of new contract 5 + 2 years (1 Jan 2020 to Dec. 2024 +2) Contract sum: RM126.1 million for 2 years and to
be reviewed every 2 years.
2. A 2-year contract for 13,084 km, Agriculture Road Maintenance for the State of
Perak.
Awarded by State Government Perak
Contract sum: RM90.1 million for 2 years
Date of commencement 20 Feb 2017 & expires in Feb. 2019.
Empayar Indera Sdn Bhd (51% equity) Extension of new contract 5 + 2 years (March 2019 to Feb. 2024 +2) Contract sum: RM90.1 million for 2 years and to
be reviewed every 2 years.
LONG TERM CONTRACTS – State/Agriculture Roads
3. A 10-year contract of State Road Maintenance for the State of Kelantan.
Awarded by Kijang Kuari Sdn Bhd/ JKR Kelantan
Contract Sum: RM25.7 million for 2 years or 129 million for 10 years (contract
sum is reviewed every 2 years)
HCM Kijang Sdn Bhd (60% Equity)
This LTC expires in August 2026
4. A 5-year contract of Rural Road Maintenance for the State of Terengganu.
Awarded by JKR Terengganu
Contract Sum: RM49.9 million for 5 years
Permint Granite-HCM Sdn Bhd (70% Equity)
This LTC expires in April 2022
LONG TERM CONTRACTS – State/Rural Roads
EVELOPMENT
ROPERTY
P
D
Artist’s impression for
illustration purposes only
Project Duration : 20 – 25
Years
Land Area : 100 Acres
Mix Development comprising:
- High Rise Apartments
- Shop Offices
- SOHO
- Convention Centre
- Hotel
- Office Suites
- Retail Lots
- Hypermart / Cineplex
DE CENTRUM CITY
3
2
2 – Phase 2A Unipark GDV RM220 Million. Completed in July 2017
4 – De Centrum Phase 3A & 3B Estimated GDV RM550 Million Unit size about 450-650 sf Price Range: 260K – 397K Expected Launching 2H2018
DE CENTRUM CITY MASTER PLAN
1 – De Centrum Phase 1 GDV RM280 Milllion. Completed in Dec 2015
1
4
De Centrum
Mall
Hotel
5 Star
Hotel Office
Signature Tower
+ Retail
Signature Tower
+ Retail
Convention Centre
Retail
Entertainment
Unipark Condo
Luxury Villas
& Suites
Signature Tower
+ Retail
Signature Tower
+ Retail Luxury Condominium
Wisma Protasco
+ Retail
Mosque Ser. Apt
Ser. Apt
Office B
A C
D
Infrastructure University
Kuala Lumpur (IUKL)
3 – De Centrum Phase 2B GDV RM350 Milllion.
Lifestyle Studio
3A
3B
Types Units % Sold
Apartments 320
100% SOHO 192
Shop Lots 54
Retail Mall 1 Retained
PERSPECTIVE
De Centrum Phase 1
GDV : RM280 Million Completion in Dec.
2015
Shops at the Mall – Super7 Supermarket, KFC,
Pizza Hut, Watsons, Penang Nasi Kandar,
Middle East Restaurants, 7-11, TM Dealer,
Bookstore, Singlock Locksmith, 1957 Malaysia
Coffee, F&B Kiosks, Money Changer, Mr DIY,
Electronics Store, etc.
Best Mixed Development
Award 2015
By Property Insight
SUCCESSFULLY COMPLETED PHASE 1
Block D – Fully Sold
Block C - 83% Sold
Phase 2A Unipark 240 units apartments
80 units duplex
GDV : RM220 Million.
Completed (CCC Obtained)
SUCCESSFULLY COMPLETED PHASE 2A
GDV : RM350 Million.
De Centrum Phase 2B - Luxury Villas & Suites
Preview in November 2015
Official launching to be decided
based on market conditions
De Centrum Phase 2B (Rimbawan)
Luxury Villas & Suites
Best Boutique Lifestyle Development
Award 2016
By Property Insight
YET TO BE LAUNCHED
GDV : RM66 Million.
Land size: 6 Acres
Soft Launch in Sept. 2017
Sentrio (2 to 3-Storey Shop Office)
Pasir Gudang, Johor
GDV : RM160 Million.
Land size: 1.85 Acres
Launched: August 2018
TELIPOT Apartment
Kota Bharu, Kelantan ~JV with Pekan Bistari (60:40)
De Centrum Phase 3A & 3B
-Lifestyle Suites
GDV : RM550 Million
1,600 units suites
Land size: 6.9 acres
Tentative Launching 2H2019
ONSULTANCY
&
ERVICES
NGINEERING
E
C
S
Engineering Services &
Consultancy
• Site Investigations
• Laboratory Testing
• Slope Studies
• Pavement Evaluation & Data
Collection
• Geotechnical & Structural
• Forensic Engineering
• Design Works
• Materials Certification
• Product Listing
• Research & Development
• Quality Control & Assurance.
1. Forensic Engineering Services (Slopes & Slope Related Structures) Kumpulan Ikram Sdn Bhd & Government of Malaysia
Agreement period : 3+2 years (January 2016 – January 2021)
Scope of work: Forensic engineering services on slopes and slope related structures. Area covered :
For all slopes failure throughout Malaysia except for Federal roads, privatised concession toll roads and those pending completion by the Government or Government agencies
2. Engineering Services & Capacity Building
Kumpulan Ikram Sdn Bhd & Datuk Bandar Kuala Lumpur
Agreement period: 3+2 years (November 2017 – November 2022)
Scope of work : Engineering Services & Capacity Building (Geotechnical, Pavement & Structural Services)
3. Engineering Services & Capacity Building
Kumpulan Ikram Sdn Bhd & Tenaga Nasional Berhad (TNB)
Agreement period: Yearly renewal of contract (2017-2018)
Scope of work : Engineering Services & Capacity Building (Geotechnical, Pavement & Structural Services)
MASTER SERVICE AGREEMENT
With the Government of Malaysia & Local Authorities
24
Road Scanner (with laser technology and GPS)
PAVEMENT EVALUATION
Asphalt Coring Compressive Strength Test
Long Term Pavement Condition Assessment & Consultancy Services with
.Roadcare, FRM Sarawak, Empayar Indera
Agreement period : Period up to 5 years (2016 – 2021)
Scope of work for Pavement data collection & evaluation, road inventory data collection, road asset management system and consultancy.
STRUCTURAL CONSULTANCY, AUDIT & LAB TEST
IKRAM ENGINEERING
Stadium Sultan Mizan Zainal Abidin,Kuala
Terengganu - Steel Roof Collapsed
Jaya Supermarket, Petaling Jaya
-Structure Collapsed
KLIA 2
- Safety Checks at Runway & Parking Bay
KLIA 2
IKRAM ENGINEERING
(STRUCTURAL CONSULTANCY & MATERIAL TESTING)
UMNO BUILDING, PENANG – Lighting Arrestor Collapsed
ANUFACTURING
&
RADING
T
M
related materials
• Building Construction Materials
• Pavement Related Materials &
Machinery
• Highway Safety Products
• Bridge-Joints
• Cold-Mix
Trading of construction
SWEDSUN BRIDGE EXPANSION JOINT SYSTEM
INSTALLATION PROCESSES
DUCATION
E
FACULTIES • Engineering & Technology Infrastructure
• Architecture & Built Environment
• Business & Accounting
• Arts, Communication & Education
• Creative Media & Innovative Technology
• Applied Science & Foundation Studies
Established in 1998 as a college
Upgraded to full fledged university in 2012
Population: > 3,000 students, from 50 countries
Offer programs from foundation to postgraduate
Campus in Unipark Suria (within De Centrum City)
ENERGY
CLEAN
CLEAN ENERGY
Newly embark division
Focus on solar energy and mini hydropower in
Malaysia as owner, co-owner or EPC contractor
Developing a 6.8MW solar farm in Malacca
HIGHLIGHTS
FINANCIAL
Year 2012 2013 2014 2015 2016 2017
Issued and paid up
capital (‘000 units) 381,589 392,928 417,662 412,845 422,181 424,209
EPS (sen) 9.82 12.26 (11.12) 16.17 10.04 6.62
* FY2016: Issued & paid up capital and EPS had been adjusted from bonus issues which was completed on 25 November 2016.
* FY2014: before impairment of investment in Indonesia for RM104M.
696
792
970
1,062
1,305
1,110
939
91 135 122 139
149 100 103
32 37 48 57 67 42 28
-
200
400
600
800
1,000
1,200
1,400
2011 2012 2013 2014 2015 2016 2017
RM
'mil
Year
Past 5 Years Track Records
Turnover EBITDA Operating profit
(Revenue Contributions by Sectors for FY2017 )
OUR
BUSINESS
CONSTRUCTION , 9%
MAINTENANCE, 60%
PROPERTY DEVELOPMENT,
1%
ENGINEERING, 10%
TRADING, EDUCATION &
CLEAN ENERGY, 20%
(Profit Contribution by Sectors for FY 2017)
OUR
BUSINESS
CONSTRUCTION , 5%
MAINTENANCE, 68%
PROPERTY DEVELOPMENT, 1%
ENGINEERING, 17%
TRADING, EDUCATION & CLEAN
ENERGY, 9%
DIVIDENDS (Net)
FINANCIAL YEAR SEN PER SHARE
YE 2017 5.5 #
YE 2016 6.0**
YE 2015 13.0
YE 2014 5.0
YE 2013 10.0
YE 2012 14.0*
YE 2011 8.0
YE 2010 10.0
YE 2009 9.0
YE 2008 7.0
YE 2007 8.0 # 2nd dividend 2.5 sen based on enlarged share capital after bonus (1 for 6 shares);
* Include a special dividend of 6.0 sen per share
** Based on enlarged share base after bonus 1 for 4 shares
THANK YOU