INVITATION OF APPLICATION
UNDER
SCHEME FOR DEVELOPMENT OF GRID INTERACTIVE ROOFTOP
AND SMALL SOLAR PV POWER PLANT
(5 KW CAPACITY)
FOR 10 MW CUMULATIVE CAPACITY
ON
FIRST COME FIRST SERVE BASIS
FROM 02-01-2016 ONWARDS TILL 31.03.2016
OR
TILL THE TARGET IS ACHIEVED
Uttarakhand Renewable Energy Development Agency (UREDA) (Department of Renewable Energy, Govt. of Uttarakhand)
Urja Park Campus, Industrial Area, Patel Nagar, Dehradun -248001
Ph. 0135-2521553, 2521387, Fax: 0135-2521386,
Websit: www.ureda.uk.gov.in E-mail: [email protected]
UREDA Suryouday Swarozgar Yozna
1. Background
The Ministry of New and Renewable Energy, Government of India has set an ambitious target
towards achieving 100 GW solar power capacity under the Jawaharlal Nehru National Solar Mission
by 2022. The 60 GW capacity of solar power is targeted from on-ground projects and 40 GW from
grid connected rooftop solar power.
MNRE, GoI has set a target of installation of additional 350 MW capacity Solar Power Plants in
Uttarakhand state by 2022, out of which a target of 44 MW has been sanctioned in first phase. Under
Grid Connected Rooftop and Small Solar Power Plants Programme solar rooftop plants from 1.0
KWp to 500 KWp capacities can be set up for which guidelines vide no. 30/11/2012-13/NSM dated
26-06-2014 shall prevail.
Uttarakhand state has a good potential of Solar Energy. About 300 sunny days are available in the
State which provides an excellent potential for installation of Rooftop and other Small Solar Power
Plants in the State. Keeping the above in view, 5 kW capacity grid interactive rooftop or small SPV
system will be supported under this scheme.
The generated power from such SPV system/project will be first utilized by powering captive loads
during the day time and any surplus power will be fed into the grid as long as grid is available. In
case, where solar power is not sufficient due to cloud cover etc., the captive loads will be served by
drawing power from the grid.
The grid-interactive rooftop system can work on net metering basis wherein the beneficiary pays to
the utility on net meter reading basis only. Alternatively two meters can also be installed to measure
the export and import of power separately. Ideally, grid interactive systems do not require battery
back-up as grid acts as the back-up for feeding excess solar power and vice-versa.
The feed in tariff for the power generated from the Solar Power Plant will be decided by Hon’ble
Uttarakhand Electricity Regulatory Commission (UERC) in such a manner that it provides a
safeguard to all stakeholders including UPCL. The availability of electricity grid near the solar
installation is an essential component which needs to be provided by the concerned agencies i.e.
UPCL/PTCUL.
Therefore, to promote Grid-interactive rooftop and small solar PV power projects in the state, it is
essential to formulate a comprehensive scheme which aims to accelerate growth of Grid-interactive
rooftop and small solar PV power projects in Uttarakhand by providing a favorable environment for
all the stakeholders.
UREDA Suryouday Swarozgar Yozna
2. Definitions
Following expressions used in the scheme would have meanings assigned to them as defined
hereunder:
a. “Act” means the Electricity Act 2003 (36 of 2003)
b. ‘GoI’ Government of India.
c. ‘GoUK’ Government of Uttarakhand
d. ‘CERC’ means the Central Electricity Regulatory Commission of India, constituted under
sub-section (1) of Section 76 of the Electricity Act, 2003, or its successors.
e. ‘UPCL’ means Uttarakhand Power Corporation Ltd Which is the authorized licensee to
operate and maintain a distribution system for supplying electricity to the consumers in
Uttarakhand.
f. “MNRE” means the Ministry of New and Renewable Energy of the Government of India.
g. ‘PTCUL’ means the Power Transmission Corporation of Uttarakhand Ltd.
h. ‘State’ means the State of Uttarakhand, unless stated otherwise.
i. “Commission” means the Uttarakhand Electricity Regulatory Commission
j. ‘UERC’ means Uttarakhand Electricity Regulatory Commission, constituted under sub-
section 1 of section 82 of the Electricity Act 2003, or its successors.
k. ‘UREDA’ means the Uttarakhand Renewable Energy Development Agency, the designated
State Nodal Agency of the Ministry of New & Renewable Energy, Government of India that
owns the mandate for implementation of all renewable energy programmes in the state of
Uttarakhand.
l. ‘DPR’ means Detailed Project Report.
m. ‘GoUK’ means Govt. Of Uttarakhand.
n. ‘Eligible Consumer’ means a consumer of electricity in the area of supply of distribution
licensee, who has a rooftop or small solar system in its premises, to offset part or all of its
electrical requirements.
o. ‘Premises’ means the land, building or infrastructure or part or combination thereof including
the rooftops or/and elevated area owned by eligible consumer.
p. ‘Interconnection point’ shall mean interface point of renewable energy generating facility
with the transmission system or distribution system which shall be line isolator on outgoing
feeder on HV side of generator transformer as defined in UERC (Tariff and Other Terms for
Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-
generating Stations) Regulations, 2013 or as amended from time to time.
UREDA Suryouday Swarozgar Yozna
q. ‘Billing cycle’ or ‘Billing period’ means a period of one month for which electricity bills
shall be prepared for each Eligible Consumers by licensee.
r. ‘Tariff period’ means the period for which tariff is to be determined by the Commission on
the basis of norms specified under these Regulations;
s. ‘LOA’ Letter Of Allotment for the project to be given by UREDA to the successful
developer.
t. ‘Grid Interactive Rooftop and small Solar PV power Project’ means Rooftop Solar PV
power projects with capacity of 5 KW in the state of Uttarakhand.
u. ‘Scheme’ means this scheme for development of Grid Interactive Rooftop and small Solar PV
power project of 5 KW, unless stated otherwise.
v. “Power Purchase Agreement or PPA” means a long term agreement between a generating
company and a distribution licensee for supply of power on the terms and conditions specified
therein and with the provision that the tariff for sale of power shall be as determined by the
Commission from time to time.
w. “Date of commercial operation or Commissioning (CoD)” in relation to a unit means the
date declared by the generator on achieving maximum continuous rating through a successful
trial run and in relation to the generating station, the date of commercial operation means the
date of commercial operation of the last unit or block of generating station and expression
‘commissioning’ shall be construed accordingly
x. ‘Project’ means a generating station and the evacuation system upto inter-connection point
means
y. ‘Generating station’ means Grid Interactive Rooftop and small Solar PV power Project with
capacity of 5 KW in the state of Uttarakhand.
z. ‘Project site’ means the shadow free south facing area in which Solar Power Project is to be
installed and is having UPCL meter connection.
aa. ‘CFA’ means the admissible central financial assistance being provided by MNRE. In case of
revision in the CFA by MNRE it will be admissible accordingly.
bb. ‘State Subsidy’ means the admissible state financial assistance being provided by GoUK. In
case of revision in the state subsidy by GoUK it will be admissible accordingly.
The terms not defined above will have their usual meaning.
UREDA Suryouday Swarozgar Yozna
3. Objective
To create condition conducive to private sector/community participation in Grid Interactive Rooftop
and small Solar PV power Project in the state. In particular:
3.1 To promote the decentralized power generation through small size solar power plants of 5
KW capacity utilising space on the rooftops/ premises
3.2 To harness the environment friendly Solar Energy resources and enhance their contribution to
the socio-economic development of the state.
3.3 To improve quality of life in rural Uttarakhand by addressing access to energy issues through
electricity generated from Solar PV power projects.
3.4 To provide decentralized energy supply to agriculture, industry, commercial & household
sector.
3.5 To create a favourable environment for community ownership and private sector
participation in Solar PV power sector in Uttarakhand.
3.6 To promote the development of Solar PV power projects as a clean source of energy in the
State.
3.7 To promote grid-compatible power generation and strengthen the quality of grid.
3.8 To create employment opportunities in rural areas.
4. Title of the Scheme
This Scheme will be known as “Scheme for Development of Grid Interactive Rooftop and
Small Solar PV Power Plant (5 KW capacity)- 2015”.
5. Nodal Agency
Uttarakhand Renewable Energy Development Agency (UREDA) shall be the Nodal Agency for
implementation of this scheme in the state.
UREDA Suryouday Swarozgar Yozna
6. Eligibility/Incentives
6.1 This scheme is for Hilly Region of Uttarakhand only. The definition of Hilly region is as per
the Industrial Department order no. 2930/VII-II/123-Udyog/08/2011 dated 18/11/2011. The
nodal agency out of the total capacity of 10 MW would allot district wise target.
6.2 Under this scheme, the project of 5 KW capacity shall be allocated to various individuals
having domestic electrical connections and suitable space on the rooftop/premises of the
proposed building located in Uttarakhand.
6.3 Projects under this scheme shall be eligible for 90% CFA (which includes MNRE CFA and
State subsidy) on the benchmark cost of the system. Remaining capital cost shall have to be
borne by the applicant.
6.4 At present the benchmark cost for installation of Solar Power Project is Rs. 0.80 Lack per
KW which can be revised by MNRE. Further UREDA shall also empanel various technically
capable EPC contractors from the channel partners of MNRE on the basis of lowest rates
offered by them for installation of Solar Power Project. In case the rates finalized by
UREDA are lower than the bench mark cost, the subsidy shall be admissible on UREDA
rates.
6.5 The completion period for the projects shall be as per the time frame given by MNRE.
6.6 The benchmark cost applicable for subsidy and completion period for commissioning of the
project shall be defined in the letter of allotment.
6.7 The domestic content requirement (for modules made in India) will be mandatory for those
installations where subsidy will be provided.
6.8 The following benefits shall also be available for installation of Grid Connected Rooftop and
small Solar Power Plants till these are provided by the central Govt.
1. Accelerated depreciation,
2. Custom duty concessions excise duty exemptions
3. 10 years tax holiday.
4. Provision of bank loans as a part of home loan/ home improvement loans.
6.9 The applicable financial support to the projects shall be disbursed after commissioning and
satisfactory inspection report of the project on submission of at least one month generation
data.
6.10 Under this scheme only one project up to the maximum extent of 5 KW shall be allocated to
an applicant.
6.11 Eligible consumers who have already been allotted projects under the earlier floated grid
interactive rooftop scheme by UREDA/ Uttarakhand Govt. will not be eligible for any further
allotment under present scheme.
6.12 30% capacity of the total projects to be allotted under this scheme shall be reserved for BPL
Category applicants in each district.
UREDA Suryouday Swarozgar Yozna
7. Site Requirement
7.1 The applicant should be an existing connection holder of UPCL.
7.2 The area available on rooftops of various buildings and their premises can be utilized for
installation of Grid connected rooftop and small solar PV power project.
7.3 Rooftop systems shall be connected on low voltage single phase supply.
7.4 Export Import meters/two way meters shall be installed with the facility of net metering. Two
way meters can also be used as they are cheaper and give better idea about power exported.
The meter may also be finalized in consultation with the UPCL.
8. Procedure for allotment of projects
8.1 Complete filled in application form (annexure-1) along with the prescribed registration fee
@ Rs. 500/- per application in the form of DD drawn in favor of Director, UREDA, Dehradun
and other documents shall have to be submitted by the applicants through post/courier to
concerned district level officer of UREDA as per the list enclosed at annexure-3. The
application submitted by hand shall not be entertained.
8.2 The application form must be accompanied by the required application fee, a self attested
copy of a photo identity card, copy of recent electricity bill, and a self addressed and Rs.25/-
stamped envelope. Applications without prescribed application fee, required details and other
documents will be summarily rejected.
8.3 District level officer of UREDA shall register the projects on first come first serve basis
(subject to the condition that application is complete in all respects). In the acknowledgement
of the application submitted by applicant, District level officer of UREDA shall allot a
registration number to every application. The registration shall not be transferable to another
beneficiary or site/building and any request in this regard shall not be entertain. In such cases
the application shall be out rightly rejected.
8.4 After registration, District level office of UREDA shall examine the technical feasibility of
the site. Meanwhile applicant shall have to submit NOC from UPCL for grid feasibility within
15 days. On the basis of the technical examination of the site and positive grid feasibility
report the registered project may be selected or rejected. The application fees of the registered
projects which are technically rejected shall be refunded.
8.5 A letter of allotment (LoA) shall be issued by District level officer of UREDA to the selected
projects. The benchmark cost applicable for subsidy and completion period for
commissioning of the project shall be defined in the letter of allotment.
UREDA Suryouday Swarozgar Yozna
8.6 Plants constructed without getting the Allotment Letter from UREDA or without following
the instructions/ specifications contained in the Allotment Letter given by UREDA, will not
be considered for release of subsidy.
8.7 For the purpose of Bank loan, Detail Project Report (DPR) on the prescribed formats
(Annexure-2) shall be prepared by beneficiary with the help of District level officer of
UREDA within 15 days from the date of letter of allotment.
8.8 The terms and conditions mentioned in the scheme shall prevail according to the guidelines of
MNRE and Government of Uttarakhand from time to time.
9. Power Purchase Agreement (PPA)
9.1 Beneficiary shall have to sign the PPA with UPCL for sale of power for 25 years and submit
the copy to UREDA within 1 month of issue of the allotment letter.
9.2 The PPA between UPCL and the owner of building/premise/Solar Project shall be signed on
the net metering basis. Billing cycle and suitable payment security mechanism shall be as per
directions of UERC.
10. Tariff
10.1 For the projects allotted under this scheme, the beneficiary will first consume the power for
self load and then the surplus power (if any) will be sold to UPCL. UPCL is bound to
purchase the surplus electricity generated from the project.
10.2 The Power Purchase Agreement will be executed as per the prevailing tariff order of UERC
and subsequent amendments.
10.3 The tariff for purchase of surplus power by UPCL from solar power project is decided /
revised by UERC on the basis of total cost of the project, admissible subsidy and beneficiary
contribution. The existing tariff at 90% subsidy decided by UERC is Rs. 4.35/KWh for plants
commissioned on or before 31st March, 2016, which may be revised by Hon’ble UERC for
next financial year.
11. Technical Support
UREDA shall empanel various technically capable EPC contractors from the channel partners
of MNRE and shall decide the lowest competitive rates for the installation of Grid Interactive
Rooftop and Small Solar PV Power Projects. Applicants willing to get their projects installed
by the various EPC contractors empanelled by UREDA may get their projects installed
through them.
UREDA Suryouday Swarozgar Yozna
12. Metering of Electricity
Metering arrangement shall be made as per Central Electricity Authority (Installation &
Operation of Meters) Regulations, 2006, the Grid Code, the Metering Code and other relevant
regulations issued by UERC/CERC in this regard.
13. Power Evacuation and Grid Interfacing Facility
Power evacuation and grid interfacing arrangement will be as per the regulation/procedures
defined by UERC and as per subsequent amendments. The point of interconnection for grid
feeding shall be the premises of Solar Power Plant. The necessary transmission line from Solar
Power Plant to nearest substation shall be the responsibility of UPCL however the UPCL may
opt to get it constructed through applicant for which incremental tariff decided by Hon’ble
UERC shall be paid by UPCL to applicant.
14. Insurance
The project under this scheme shall be insured by applicant during its execution and operation
15. Power to remove Difficulties
If any difficulty arises in giving effect to this scheme, Principal Secretary/ Secretary, Renewable
Energy Department, GoUK/ Chairman UREDA is authorized to issue clarification as well as
interpretation to such provisions, as may appear to be necessary for removing the difficulty
either on its own motion or after hearing those parties who have represented for change in any
provision.
16. Amendments/Relaxation/Interpretation/Disambiguation of Provisions of the
Policies
UREDA shall have powers to amend/relax/interpret/disambiguate provisions under the scheme.
17. Applicability
Regulations of UERC shall prevail for the installation of Grid Connected Rooftop and Small
Solar PV Power Plants. The Scheme will come into operation with effect from the date of issue
and will remain in force until superseded or modified by another Scheme.
UREDA Suryouday Swarozgar Yozna
Application Form for Grid Connected Rooftop and Small Solar PV Power Project of 5 KW capacity with 90% subsidy
For Office Use
Reg. No. :…………………………………………………….…….
Date …………………………………………………………... A. Type of Applicant ( in box):- i) BPL Category
ii) APL Category
B. Application details
1 Name of Applicant
2 Address of applicant in full
PIN:
3 Mobile phone No.
4 STD code/Land line No.
5 Email ID 6 Identification details (beneficiary should submit Self attested Copy of-)
a. Voters ID card/Passport/PAN card/any other photo ID card
b. BPL card in case of BPL applicant
Type of ID card submitted ID card No.
BPL Card Card No.
Site Details:
7 Name of Electricity Consumer of UPCL
Address of the site for Installation
PIN:
8 Nearest land mark 9 Name of DISTRICT
12
Shadow free area available (approximately 100 m2 required for
installation of Solar Power Plant )
Available area ………………………m2
Annexure-1 (Page-1)
UREDA Suryouday Swarozgar Yozna
Annexure-1 (Page-2)
13 Proposed Capacity of the Project in KW
Electricity connection/ consumption details:
15 Electrical connection consumer no.
16 Sanctioned load by UPCL (as per
electricity bill)
17 Average monthly consumption of
electricity
………………………..units
18 Remittance details of non refundable application fee of Rs . ………………../-
Name of Bank DD. NO. Date
Declaration
I ..................................................................................................................... Son/Daughter of
......................................................................................, have read and hereby agree with the
terms and conditions and specifications stipulated by UREDA for the selection and
installation of roof-top solar power plant. If allotted a plant, I agree to complete the
installation within the time allowed and submit the details to UREDA for release of subsidy.
I hereby also declare that all the information given in the application form and
enclosures are true to the best of my knowledge. I agree to the condition that if any
information or any statement is found to be incorrect, my registration (if registered by
UREDA) would be cancelled. I also abide by the conditions as mentioned in the scheme.
Place :
Date :
Signature :
Name:
CHECK LIST:
1. Copy of photo ID card/BPL Card (YES/NO): ……….
2. Copy of recent electricity bill (YES/NO): ……….
3. DD for Application Fee (As applicable) (YES/NO): ……….
4. Self-addressed Rs.25/- stamped envelope (YES/NO): ……….
5. Filled in acknowledgment slip (YES/NO): ……….
UREDA Suryouday Swarozgar Yozna
ACKNOWLEDGEMENT SLIP
Your application for the roof-top solar power plant under the “Grid Interacted Rooftop and Small
SPV Power Plants” has been received along with the registration fee with the following
details:
Proposed Project Location
Proposed Capacity in KW
DD No.
DD Date
Issuing Bank
Application Fee Amount Rs. ………….. (To be filled in by the applicant)
The following Registration Number has been allotted to your application. Please quote this
Registration Number in all your future correspondences.
Registration Number
Date of Registration
(To be filled in by UREDA district level officer)
Authorized Signatory
District Level Office of UREDA
To
PIN
(Applicant has to write the full postal address with PIN in BLOCK letters in the box above)
Annexure-1 (Page-3)
Ministry of New and Renewable Energy
(Jawaharlal Nehru National Solar Mission)
Format for Detailed Project Report for
Grid Connected Rooftop and Small SPV Power Plants
1. Introduction
2. Rooftop Solar Power Generation System description
3. System Description and Specifications of the Components
(a) Solar PV module
(b) Grid Tie inverter
(c) Module mounting structure
(d) Array Junction Box
(e) AC Distribution Board
(f) Cable (All type)
(g) Earthing Kit (maintenance free)
(h) Installation Kit
(i) Meters
(j) Online monitoring system
(k) Any other component
4. Bill of material/ system (no. /quantities)
(For above components)
5. Calculation for unit cost of power generation
6. Cost benefit analysis, pay back period
7. Expected output
8. Respective drawings for layout, connection, components etc.
9. Connectivity details with grid and metering arrangement (with sketch diagram)
10. Agreement with distribution licensee/ DISCOMs
11. Any other information
Photo of
beneficiary
Annexure-2
UREDA Suryouday Swarozgar Yozna
Page | 14
Contact Details of District Project Officers
Sl District Name of Officer Address Ph.&
Fax
Mobile
1 Dehradun Mr. Y.S. Bisht
(PO)
Uttarakhand Renewable Energy
Development Agency (UREDA), 25th
Mehant Road, Laxman Chowk, Dehradun.
0135-
2729676
9412912732
2 Haridwar Miss. Vandana
Jauhari (PO)
Uttarakhand Renewable Energy
Development Agency (UREDA), Vikas
Bhawan, Haridwar
01334-
239010
9412864765
3 Tehri Mr. Vijay Rawat
(PO)
Uttarakhand Renewable Energy
Development Agency (UREDA), Civil
Lines, Narendra Nagar, Tehri
01378-
227260
9412077205
4 Uttarkahi Mr. Manoj Kumar
(SPO)
Uttarakhand Renewable Energy
Development Agency (UREDA), 107,
Vikas Bhawan, Uttarkashi
01374-
222538
9411079047
5 Pauri Mr. Ajay Kumar
(SPO)
Uttarakhand Renewable Energy
Development Agency (UREDA), Vikas
Bhawan, Pauri
- 9412364903
6 Chamoli Mr. Pramod
Kumar (SPO)
Uttarakhand Renewable Energy
Development Agency (UREDA), Near
Petrol Pump, Gopeshwar, Chamoli
01372-
252423
9412045119
7 Rudraprayag Mr. Neeraj Kumar
Garg (SPO)
Uttarakhand Renewable Energy
Development Agency (UREDA), Vikas
Bhawan, Rudraprayag
01364-
233039
9412054823
8 Pithoragarh Mr. A. K. Sharma
(PO)
Uttarakhand Renewable Energy
Development Agency (UREDA), Near
Primary School, Takana Road, Pithoragarh
05964-
225872
9411113247
9 Champawat Mr. Rauky Kumar
(PO)
Uttarakhand Renewable Energy
Development Agency (UREDA), Pandey
Bhawan, Talli Madali, Champawat.
05965-
230794
9997865403
10 Almora Mr. R.C. Pandey
(SPO)
Uttarakhand Renewable Energy
Development Agency (UREDA), District
Panchyat Bhawan, Dharanola, Almora
05962-
234016
9412038927
11 Bageshwar Mr. OM Kumar
(PO)
Uttarakhand Renewable Energy
Development Agency (UREDA), Room no
81, Vikash Bhawan, Bageshwar
05963-
221325
9627554494
12 Nainital Mr. Sandeep Bhatt
(PO)
Uttarakhand Renewable Energy
Development Agency (UREDA), 3/83,
Pant State Marg, Bhotiya Parav, Haldwani,
Nainital
05946-
221537
9412127981
13 U.S. Nagar Mr. G.C. Mehrotra
(PO)
Uttarakhand Renewable Energy
Development Agency (UREDA), District
Panchyat Bhawan, U.S.Nagar
05944-
247086
9412079436
Annexure-3