Upload
michael-castro
View
215
Download
3
Embed Size (px)
DESCRIPTION
in1236
Citation preview
15/01/2015Mrs. SAROJ MOHAN KUMAR SHARMA1501, IMPERIAL RESIDENCY,PLOT NO. 20, GULMOHAR CROSS ROAD NO. 12,J V P D SCHEME, VILE PARLE (W),MUMBAI - 400049.
Sub: Bill for Job done for Heavy and Net Curtain, Mattresses and Head Board.Bill No. (Page No.)Amount (Rs.)
Page No. 244,300.00
Page No. 394,000.00
Page No. 437,750.00
Sum1,75,850
Less: Job not done for Dresser Area, Heavy and Net Curtain3,850.00
Total172,000.00 (One Lakh Seventy Two Thousand Rupees Only).
Thank You.Pritam Rajput(PAN No. AADPR7788P)
DescriptionQuantityAmount (Rs.)
Heavy Curtain Stitching Charge (A)16,800 (Rs. 300 per panel)
Living Room14 panels
Master Bed room7 panels
Dressing Room7 panels
Childrens Room7 panels
Guest Bed room7 panels
Mr. Gautams Room7 panels
Parents Room7 panels
Share Curtain Stitching Charge for all of the above mentioned areas (B)56 Panels14,000 (Rs. 250 per panel)
Heavy and Share Curtain Brass Hooks Packets (C)No.of packets = 102800 (Rs. 280 per packet)
Heavy and Share Curtain Runner Packets (D)No.of packets = 103500 (Rs. 350 per packet)
Transportation Charges (E) 1200
Stitching charge of king size beds (F)No. of king size beds = 56000 (Rs. 1200 per bed)
Grand Total (A+B+C+D+E+F)44,300
DescriptionQuantityAmount (Rs.)
Bed Mattresses Making for King Size Beds with 6*6(1/2)*5 with coir foam of 100 density, U foam with cashmint material fixed (A)No. of King Size beds = 5(Childrens Room, Guest Bed room, Master Bed room, Mr. Gautams Room and Parents Room)92,500 (Rs. 18500 per bed)
Delivery Charges (B)1500
Grand Total (A + B)94,000 (Ninty Four Thousand Only)
DescriptionQuantityAmount (Rs.)
Height Increased from 5 inches to 6 inches for 4 King Size Beds, new U foam material, Bostic and Labour charges (A)No. of King Size beds = 4
12,000 (Rs. 3000 per bed)
Height Increased from 5 inches to 8 inches for 1 King Size Master Bedroom, new U foam material, Bostic and Labour charges (B)No. of King Size Bed = 15500 (Rs. 5500 per bed)
4 Head Board making, new U foam material and Labour charges for 55 sq. feet (C)Total sq. feet = 55 sq. feet19250 (Rs. 350 per sq. feet)
Transportation charges (D)1000
Grand Total (A + B + C +D)37,750 (Thirty Seven Thousand Seven Hundred and Fifty Only)