42
FIGURE-4 FIGURE-5 PIPING INSTR. VESSEL 25 VESSEL INSTR. PIPING FIGURE-6 27 VESSEL INSTR. PIPING 25mm MIN. OVERLAP STAND PIPE ARRANGEMENT 30 CLOSE COUPLED ARRANGEMENT CLOSE COUPLED ARRANGEMENT 26 42 LEVEL INSTRUMENT GAUGE GLASS REV. DESCRIPTION A B C SHT REV. DRAWING No. IRANIAN PETROLEUM STANDARDS DATE DATE NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION IPS-D-IN-104 42 25 3/4" GATE VALVE MATERIAL QTY. UNION NIPPLE 3/4" NOTES: 3/4" 3/4" 28 26 27 ITEM SIZE DESCRIPTION PLUG 28 2" 2" 24 SWAGE NIPPLE 2"x3/4" 24 24 29 3/4" TEE EQUAL LINE PIPE 3/4" 30 MIN. SCHEDULE 40 2" 2" 2" 2"

IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

FIGURE-4

FIGURE-5

PIPING

INSTR.

VESS

EL

25

VESS

EL

INSTR.

PIPING

FIGURE-6

27

VESS

EL

INSTR.

PIPING

25mm M

IN.

OVE

RLA

P

STAND PIPE ARRANGEMENT

30

CLOSE COUPLED ARRANGEMENT

CLOSE COUPLED ARRANGEMENT

26

42

LEVEL INSTRUMENTGAUGE GLASSREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 42

25 3/4" GATE VALVE

MATERIALQTY.

UNIONNIPPLE3/4"

NOTES:

3/4"3/4"

28

2627

ITEM SIZE DESCRIPTION

PLUG

28

2"

2"

24 SWAGE NIPPLE2"x3/4"

24

24

29 3/4" TEE EQUALLINE PIPE3/4"30 MIN. SCHEDULE 40

2"

2"

2"

2"

Page 2: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

FIGURE-1

PIPING

INSTR.

VESS

EL

2524

PIPING

INSTR.

VESS

EL

FIGURE-2

FIGURE-3

PIPING

INSTR.

VESS

EL

26

29

MATERIALQTY. NOTES:

2"13

ITEM SIZE DESCRIPTION

42

LEVEL INSTRUMENTGAUGE GLASSREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-10441

FLANGE WITH GASKET, NUT & BOLT

28

2"

2"

24 2"x3/4"SWAGE NIPPLE

27

GATE VALVE3/4"2526 PLUG3/4"

3/4" UNION273/4" NIPPLE283/4" TEE EQUAL29

2"

2" 2"

2"

Page 3: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

40

ALTERNATIVE INSTALLATION

FIG.2

WITH TUBING

INSTR.

PIPING

FIG.1(ATMOSPHERIC TANK)

OPEN TANK

PIPING

INSTR.

1

11

12

3

IRANIAN PETROLEUM STANDARDS

DATE

SCALE REV.SHT

IPS-D-IN-104DESCRIPTIONREV.

ABC

DRAWING No.DIFFERENTIAL PRESSURE INSTRUMENTWET GAS SERVICE METER

8

42

107

7 1/2" NIPPLE

MATERIALQTY.

GATE VALVE

NOTES:

1/2"

1/2"1/2"

1/2"1/2"1/2"2

34

810

12

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUAL

UNION

TEE EQUAL COMPR. TYPE

TUBE1 1/2"

11 1/2" CONNECTOR, MALE COMPR. TYPE

MIN. SCHEDULE 40

WHEN SPECIFIED.BE USED, TUBING MAY ONLY BE USED

2- FOR IMPULSE PIPING 1/2" PIPE SHOULD

1- KEEP IMPULSE LINE TO MINIMUM LENGTH.

42

Page 4: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

FIGURE-2

DRY LEG

82

4

10

INSTR.

PIPING

FIGURE-1

15

PRESSURIZED TANK

WET LEG

PIPING

INSTR.

5

VESSEL VESSEL

PRESSURIZED TANK

18

42REV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 39

7 1/2" NIPPLE1"x1/2"

MATERIALQTY.

GATE VALVE

POT1/2"

NOTES:

1/2"1/2"1/2"1/2"

1/2"1/2"

18

245

891015

ITEM SIZE DESCRIPTION

LINE PIPETEE EQUALSWAGE NIPPLE

UNIONGLOBE VALVE

MANIFOLD

ATMOSPHERIC & PRESSURIZED TYPELEVEL INSTRUMENT

7

MIN. SCHEDULE 40 1- KEEP IMPULSE LINE TO MINIMUM LENGTH.

Page 5: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

PULSATIONDAMPENERWHEN REQD

INSTR.PIPING

2

8

4

INSTR.PIPING

15

PIPINGINSTR.

3

5

PRESSURE REGULATOR VALVE

FIGURE-1

DIFFERENTIAL PRESSURE REGULATOR

VALVE WITH POT

NIPPLE IS THREAD ON ONE END.

10

FIGURE-2

1-KEEP IMPULSE LEADS TO MINIMUM LENGTH

18

22

7 1/2" NIPPLE1"x1/2"

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"1/2"

1/2"1/2"1/2"

18

2345

810

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUALSWAGE NIPPLE

UNION

42REV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 38PRESSURE REGULATOR VALVEPRESSURE & DIFFERENTIAL

15 1/2" POT

22 SWAGE NIPPLE

2-FOR SOCKET WELD INSTALLATION SWAGE

7

1/2"x1/4"

MIN. SCHEDULE 40

Page 6: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

10

2

GATE VALVEGLOBE VALVEUNION

TEE EQUALLINE PIPE

1098

42

FIGURE-1

1/2"1/2"

1/2"1/2"1/2"

TANK PIPING

INSTR.

8

DIFFERENTIAL PRESSURE TYPE

ON OPEN TANK

4

9

1/2"11

1/2" TUBE1

15

15 POT1/2"

LEVEL INSTRUMENTDIFFERENTIAL PRESSURETYPE ON OPEN TANK

18

1/2" PLUG18

5

7

42REV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 37

MATERIALQTY. NOTES:ITEM SIZE DESCRIPTION

CONNECTOR, MALE COMPR. TYPE

1/2"7 NIPPLE

1- KEEP IMPULSE LINE TO MINIMUM LENGTH.

WITH MANIFOLD

ALTERNATIVE INSTALLATION

INSTR.

PIPING

TANK

FIGURE-2

SWAGE NIPPLE5 1"x1/2"

Page 7: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

10

2

FIGURE-1

TANK PIPING

INSTR.

8

4

9

DIFFERENTIAL PRESSURETYPE ON OPEN TANK

LEVEL INSTRUMENTS

18

7 1/2" NIPPLE

MATERIALQTY.

GATE VALVEPLUG1/2"

NOTES:

1/2"1/2"1/2"

1/2"1/2"

18

24

8910

ITEM SIZE DESCRIPTION

LINE PIPETEE EQUAL

UNIONGLOBE VALVE

1-KEEP IMPULSE LINES TO MINIMUM LENGTH

42REV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 36

7

INSTR.

PIPING

TANK

FIGURE-2

ALTERNATIVE INSTALLATION WITH MANIFOLD

MIN. SCHEDULE 40

Page 8: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

4

2

FIGURE-1

VESS

EL

PIPING

INSTR.

DIFFERENTIAL PRESSURE WITH SEAL LIQUIDWITH MANIFOLD

15

9

14

18

7 1/2" NIPPLE

1- KEEP IMPULSE LINE TO MINIMUM LENGTH

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"1/2"1/2"1/2"

1/2"1/2"

18

24

891014

ITEM SIZE DESCRIPTION

LINE PIPETEE EQUAL

UNIONGLOBE VALVE

MANIFOLD

42

LEVEL INSTRUMENTLIQUID SERVICEREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARD

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 35

108

7

MIN. SCHEDULE 40

42REV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104

Page 9: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

98

10

4

2

PIPING

INSTR.

FIGURE-1FIGURE-2

INSTR.

PIPING

VESS

EL

VESS

EL

3

5

14

DRY LEGDRY LEG

WITH MANIFOLD18

7 1/2" NIPPLE1"x1/2"

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"1/2"1/2"1/2"

1/2"1/2"1/2"

18

2345

891014

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUALSWAGE NIPPLE

UNIONGLOBE VALVE

MANIFOLD

42

LEVEL INSTRUMENTDIFFERENTIAL PRESSUREREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 34TYPE

7

MIN. SCHEDULE 40 1- KEEP IMPULSE LINE TO MINIMUM LENGTH.

Page 10: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

4

2

FIGURE-1

DIFFERENTIAL PRESSURE WITH DRY LEG

FIGURE-2

INSTR.

PIPING

VESS

EL

VESS

EL

PIPING

INSTR.

DIFFERENTIAL PRESSURE WITH WET LEG

15

8

5

10

14

18

7 1/2" NIPPLE1"x1/2"

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"1/2"1/2"

1/2"1/2"

18

245

81014

ITEM SIZE DESCRIPTION

LINE PIPETEE EQUALSWAGE NIPPLE

UNION

MANIFOLD

1- KEEP IMPULSE LINE TO MINIMUM LENGTH.

42

LEVEL INSTRUMENTREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 33

CONDENSATE POT15 1/2"

LIQUID SERVICE

7

MIN. SCHEDULE 40

Page 11: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

FIGURE-1FIGURE-2PRESSUREIZED TANK

PIPING

INSTR.

PURGEROTAMETER

PIPING

INSTR.

50 OR 80mm

OFF BOTTOM

OPEN TANK

PIPING

INSTR.

PURGEROTAMETER

MIN.

PIPING

INSTR.

50 OR 80mm

OFF BOTTOM

3

4

10

2

9

ALTERNATE INSTALLATION

14

LEVEL INSTRUMENTSDIFFERENTIAL PRESSURETYPE AIR BUBBLER

18

17

7 1/2" NIPPLE

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"1/2"1/2"1/2"

1/2"1/2"1/2"

18

234

891014

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUAL

UNIONGLOBE VALVE

MANIFOLD

42REV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 32

1-KEEP IMPULSE LINE TO MINIMUM LENGTH

17 1/2" CHECK VALVE

8

7

FI

FI FI

MIN. SCHEDULE 40

FIGURE-3

Page 12: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

4

10

2

FIGURE-1

H

L

PIPING INSTR.

METER ABOVE LINE

98

PURGE ROTAMETER

317

PIPING

INSTR.

18

7 1/2" NIPPLE

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"1/2"1/2"

1/2"1/2"1/2"

18

234

8910

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUAL

UNIONGLOBE VALVE

3-USE SWAGE NIPPLE 1/2"x1/4" FOR PURGE

PLATE SEE STANDARD DWG. No. IPS-D-IN-102

ROTAMETER.

PIPE REQUIRED ON EACH SIDE OF ORIFICE 1-FOR MINIMUM LENGTH OF STRAIGHT RUN OF

2-KEEP IMPULSE LEADS TO MINIMUM LENGTH

42

FLOW INSTRUMENTLIQUID SERVICE WITHREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 31PURGING

17 1/2" CHECK VALVE

7

FI

FI

MIN. SCHEDULE 40

Page 13: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

2-KEEP IMPULSE LEADS TO MINIMUM LENGTH

1-FOR MINIMUM LENGTH OF STRAIGHT RUN OF PIPE REQUIRED ON EACH SIDE OF ORIFICE

9

PIPING INSTR.

2

10

4

FIGURE-I

3 PUREG ROTAMETER

INSTR.

PIPING

8

PURGE FLUID

METER BELOW LINE

17

ROTAMETER.

18

7

7 1/2" NIPPLE

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"1/2"1/2"

1/2"1/2"1/2"

18

234

8910

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUAL

UNIONGLOBE VALVE

CHECK VALVE17 1/2"

PLATE SEE STANDARD DWG. No. IPS-D-IN-102

3-USE SWAGE NIPPLE 1/2"x1/4" FOR PURGE

H

L

42

FLOW INSTRUMENTLIQUID SERVICEREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 30WITH PURGING

FI

FI

MIN. SCHEDULE 40

Page 14: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

FIGURE-1

METER BELOW LINEWITH TUBING

11

1

L

H14

PIPING INSTR.

12

INSTR. PIPING

17PURGE ROTAMETER

4

18

42

FLOW INSTRUMENTLIQUID SERVICEREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 29WITH PURGE

7 1/2" NIPPLE

MATERIALQTY.

TEE EQUAL, COMPR. TYPE

PLUG1/2"

NOTES:

1/2"

1/2"1/2"

1/2"

18

4

12

17

ITEM SIZE DESCRIPTION

TEE EQUAL

CHECK VALVE

PURGE ROTAMETER.

2-KEEP IMPULSE LEADS TO MINIMUM LENGTH

PLATE SEE STANDARD DRAWING NUMBER IPS-D-IN-102

1-FOR MINIMUM LENGTH OF STRAIGHT RUN OFPIPE REQUIRED ON EACH SIDE OF ORIFICE

TUBE1 1/2"

11 CONNECTOR, MALE COMPR. TYPE

MANIFOLD14 1/2"

3-USE REDUCING CONNECTOR 1/2"x1/4" FOR

7

FI

FI

Page 15: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

42

FLOW INSTRUMENTGAS SERVICEREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-10428

7 1/2" NIPPLE

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"1/2"1/2"1/2"

1/2"1/2"1/2"

18

234

891014

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUAL

UNIONGLOBE VALVE

MANIFOLD

PIPE REQUIRED ON EACH SIDE OF ORIFICE1-FOR MINIMUM LENGTH OF STRAIGHT RUN OF

IPS-D-IN-102PLATE SEE STANDARD DRAWING NUMBER

2-METER LEADS SHOULD BE AS SHORT AS POSSIBLE,PREFERABLY NOT EXCEEDING THAN 6 METERS.

MIN. SCHEDULE 40

9

H

MAX. 600

INSTR.

PIPING

500 m

m

L

INSTR.

PIPING

8

600mm

. MAX.

INSTR.

PIPING

L

H

PIPING

INSTR.

MAX. 600mm

600

mm M

AX.

3 4

10

FIGURE-1GAS SERVICE

FIGURE-2

FIGURE-3 FIGURE-4

2

18

7

ALTERNATE INSTALLATION ALTERNATE INSTALLATION

14

H

L

Page 16: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

2

ALTERNATEIVE INSTALLATIONLIQUIDGAS SERVICE WITH SEAL

HEAVY SEAL LIQUIDLIQUID SERVICE WITH

FIGURE-2

FIGURE-1

INSTR.PIPING

9

10

WITH TUBING

15

2 INSTR.

PIPING

1

11

H

L

L

H

DETAIL-1WITHOUT MANIFOLD

14

H

L 34

8

18

42

FLOW INSTRUMENTFLOWING LIQUID LIGHTER

REV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 27THAN SEALING LIQUID

7 1/2" NIPPLE

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"

1/2"1/2"1/2"

1/2"1/2"1/2"

18

234

8910

14

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUAL

UNIONGLOBE VALVE

MANIFOLD PREFERABLY NOT EXCEEDING THAN 6 METERS3-METER LEADS SHOULD BE AS SHORT AS POSSIBLE,

TUBE1 1/2"

11 CONNECTOR, MALE COMPR. TYPE1/2"

SEAL POT15 1/2"

7

MIN. SCHEDULE 40

WHEN SPECIFIED.BE USED, TUBING MAY ONLY BE USED

2- FOR IMPULSE PIPING 1/2" PIPE SHOULD

IPS-D-IN-102

1-FOR MINIMUM LENGTH OF STRAIGHT RUN OFPIPE REQUIRED ON EACH SIDE OF ORIFICEPLATE SEE STANDARD DWG. No.

Page 17: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

2

LIQUID SERVICE DETAIL - 1FIGURE-1

INSTR.PIPINGPIPING INSTR.

FIGURE-2ALTERNATIVE INSTALLATION

WITH TUBING

11

1

9

15

4

10

WITHOUT MANIFOLD

HL

HL

14L

H

3

8

18

42

FLOWING LIQUID HEAVIERTHAN SEALING LIQUIDREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 26

7

7 1/2" NIPPLE

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"

1/2"1/2"1/2"

1/2"1/2"1/2"

18

234

8910

14

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUAL

UNIONGLOBE VALVE

MANIFOLDPREFERABLY NOT EXCEEDING THAN 6 METERS3-METER LEADS SHOULD BE AS SHORT AS POSSIBLE,

PLATE SEE STANDARD DRAWING NUMBER IPS-D-IN-102

1-FOR MINIMUM LENGTH OF STRAIGHT RUN OFPIPE REQUIRED ON EACH SIDE OF ORIFICE

4-METER COULD BE INSTALLED ABOVE ORIFICE TAPS.

TUBE1/2"1

11 1/2" CONNECTOR, MALE COMPR. TYPE

15 1/2" SEAL POT

MIN. SCHEDULE 40

WHEN SPECIFIED.BE USED, TUBING MAY ONLY BE USED

2- FOR IMPULSE PIPING 1/2" PIPE SHOULD

Page 18: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

MIN. 60

0mm M

AX.

INSTR.

PIPING

600mm MAX.

PIPING

INSTR.

INSTR.

PIPING

FIGURE-2

ALTERNATIVE INSTALLATIONWITH MANIFOLD

ALTERNATIVE INSTALLATION

FIGURE-3

WITH TUBING

FIGURE-1

HL

9

8

11

1

14

2

4

10

3H

L L

H18

42

LIQUID, STEAM ORCONDENSATE VAPOR

REV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 25

7 1/2" NIPPLE

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"

1/2"1/2"1/2"

1/2"1/2"1/2"

18

234

8910

14

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUAL

UNIONGLOBE VALVE

MANIFOLD

SERVICE

TUBE1 1/2"

11 1/2" CONNECTOR, MALE COMPR. TYPE

7

PREFERABLY NOT EXCEEDING THAN 6 METERS3-METER LEADS SHOULD BE AS SHORT AS POSSIBLE,

PLATE SEE STANDARD DRAWING NUMBER IPS-D-IN-102

1-FOR MINIMUM LENGTH OF STRAIGHT RUN OFPIPE REQUIRED ON EACH SIDE OF ORIFICEMIN. SCHEDULE 40

WHEN SPECIFIED.BE USED, TUBING MAY ONLY BE USED

2- FOR IMPULSE PIPING 1/2" PIPE SHOULD

Page 19: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

10

2

3

FIGURE-1ALTERNATIVE INSTALLATIN

INSTR.PIPING

PIPING

INSTR.

PIPING

INSTR.

FIGURE-2

14

11

FIGURE-3ALTERNATIVE INSTALLATION

WITH TUBING

1

89

4

12

DRY GAS SERVICE

8

8

FLOW INSTRUMENT

18

GAS SERVICE

7 1/2" NIPPLE

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"

1/2"1/2"1/2"

1/2"1/2"1/2"

18

234

8910

14

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUAL

UNIONGLOBE VALVE

MANIFOLD

42REV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 24

TUBE1 1/2"

11 1/2"12 1/2" TEE EQUAL, COMPR. TYPE

CONNECTOR, MALE COMPR. TYPE

PIPE REQUIRED ON EACH SIDE OF ORIFICE1-FOR MINIMUM LENGTH OF STRAIGHT RUN OF

IPS-D-IN-102PLATE SEE STANDARD DRAWING NUMBER

3-METER LEADS SHOULD BE AS SHORT AS POSSIBLE,PREFERABLY NOT EXCEEDING THAN 6 METERS

7

MIN. SCHEDULE 40

WHEN SPECIFIED.BE USED, TUBING MAY ONLY BE USED

2-FOR IMPULSE PIPING 1/2" PIPE SHOULD

Page 20: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

DETAIL-1

ALTERNATIVE INSTALLATION

10

2

4

PIPING INSTR.

PIPING INSTR.

3

FIGURE-1

FIGURE-2ALTERNATIVE INSTALLATION FOR

WITH TUBING

FOR GAS

9

PIPINGINSTR.

H

L

H

L

14

11

1

8

GAS SERVICE

18

GAS SERVICE

42

FLOW INSTRUMENTGAS SERVICEREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-10423

7 1/2" NIPPLE

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"

1/2"1/2"1/2"

1/2"1/2"1/2"

18

234

8910

14

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUAL

UNIONGLOBE VALVE

MANIFOLD

TUBE1 1/2"

11 1/2" CONNECTOR, MALE COMPR. TYPE

PIPE REQUIRED ON EACH SIDE OF ORIFICE1-FOR MINIMUM LENGTH OF STRAIGHT RUN OF

IPD-D-IN-102PLATE SEE STANDARD DRAWING NUMBER

3-METER LEADS SHOULD BE AS SHORT AS POSSIBLE,PREFERABLY NOT EXCEEDING THAN 6 METERS.

7

MIN. SCHEDULE 40

WHEN SPECIFIED.BE USED, TUBING MAY ONLY BE USED

2- FOR IMPULSE PIPING 1/2" PIPE SHOULD

Page 21: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

FIGURE-1

INSTR.PIPING

600

MAX.

ALTERNATIVE INSTALLAION

FOR LIQUID SERVICE

MAX. 600

10

PIPINGINSTR.

8

18

LIQUID SERVICE

DETAIL 1

H

42

FLOW INSTRUMENTLIQUID, STEAM ORREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 22

7 1/2" NIPPLE

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"1/2"1/2"

1/2"1/2"1/2"

18

234

81014

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUAL

UNION

MANIFOLD

7

L

4

2

3

18

14

PIPE REQUIRED ON EACH SIDE OF ORIFICE1-FOR MINIMUM LENGTH OF STRAIGHT RUN OF

IPS-D-IN-102PLATE SEE STANDARD DRAWING NUMBER

CONDENSATE SERVICE

MIN. SCHEDULE 40

Page 22: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

2

FIGURE-1

9

PIPING

INSTR.

4

x

x

x

xxx

x

xx

xx

xx

x

x

x

x

x

x

600m

m M

AX.

600mm

MAX.

16

WAFER TYPE

x

DIAPHRAGM SEAL

8

20

18

10

42

FLOW INSTRUMENTLIQUID, STEAM ORREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-10421

CONDENSATE SERVICE

7 1/2" NIPPLE

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

3"1/2"1/2"1/2"

1/2"1/2"

18

24

891016

ITEM SIZE DESCRIPTION

LINE PIPETEE EQUAL

UNIONGLOBE VALVE

PIPE REQUIRED ON EACH SIDE OF ORIFICE1-FOR MINIMUM LENGTH OF STRAIGHT RUN OF

IPS-D-IN-102PLATE SEE STANDARD DRAWING NUMBER

BLIND FLANGE WITH ABOVES(NOTE-7,8)

20 1/2" CAPILLARY TUBE

7

MIN. SCHEDULE 40

Page 23: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

FIGURE-1

WAFER TYPE DIAPHRAGM SEAL

2

9

PIPING

INSTR.

10

4

x

x

x

xx

x

x

x

x

x

x

x

x

x

600m

m M

AX.

600mm

MAX.

16

x

8

20

18

PLATE SEE STANDARD DRAWING NUMBER IPS-D-IN-102

42

FLOW INSTRUMENTGAS SERVICEREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 20REMOTE SEAL TYPE

7 1/2" NIPPLE

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"1/2"1/2"

1/2"1/2"

18

24

8910

ITEM SIZE DESCRIPTION

LINE PIPETEE EQUAL

UNIONGLOBE VALVE

3"16 DIAPHRAGM SEAL WITH FITTINGS

20 CAPILLARY TUBE

1-FOR MINIMUM LENGTH OF STRAIGHT RUN OFPIPE REQUIRED ON EACH SIDE OF ORIFICE

7

x

x

x

x

MIN. SCHEDULE 40

Page 24: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

PIPINGINS

TR.

INSTR.PIP

ING

x

x

x

x

x

x

xx

x

x

x

x

x x

x

x

x

x

x

x

PIPINGINSTR.

FIGURE-3

FIGURE-2FIGURE-1

xxx

x

x

x

x

x

x

x

INSTR.

PIPING

PIPING

INSTR.

x

x20

10

18

3

2

16

5

4

42

DIFFERENTIAL PRESSURE INSTRUMENTLIQUID,STEAM & GAS SERVICEREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 19REMOTE SEAL TYPE

1"x1/2"

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

3"1/2"

1/2"

1/2"1/2"1/2"

18

2345

8

1016

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUALSWAGE NIPPLE

UNION

DIAPHRAGM SEAL WITH FITTINGS

20 CAPILLARY TUBE

STEAM & GAS SERVICE

STEAM & GAS SERVICE

LIQUID SERVICE

8 9

9 1/2" GLOBE VALVE

NIPPLE1/2"7

7

MIN. SCHEDULE 40

Page 25: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

98

10

4

2

PIPING

INSTR.

3

PIPING

INSTR.

LIQUID SERVICE GAS SERVICE

FIGURE-2FIGURE-1

8

14

5

18

42

DIFFERENTIAL PRESSURE INSTRUMENTLIQUID & GAS SERVICEREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 18

7 1/2" NIPPLE1"x1/2"

1- KEEP IMPULSE LINE TO MINIMUM LENGTH

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"1/2"1/2"1/2"

1/2"1/2"1/2"

18

2345

891014

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUALSWAGE NIPPLE

UNIONGLOBE VALVE

MANIFOLD

23 1/4" NIPPLE

7

MIN. SCHEDULE 40

23

Page 26: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

INSTR.

PIPING

98

10

4

2

1

14PIPING

INSTR.

3

PIPING

INSTR.

LIQUID &STEAM SERVICE GAS SERVICE

FIGURE-3GAS SERVICEWITH TUBING

5

FIGURE-2FIGURE-1 18

11

42

DIFFERENTIAL PRESSURE INSTRUMENTLIQUID,STEAM & GAS SERVICEREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 17

7 1/2" NIPPLE1"x1/2"

1- KEEP IMPULSE LINE TO MINIMUM LENGTH

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"

1/2"1/2"1/2"

1/2"1/2"1/2"

18

2345

8910

14

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUALSWAGE NIPPLE

UNIONGLOBE VALVE

MANIFOLD

TUBE1 1/2"

1/2"11 CONNECTOR, MALE COMPR. TYPE

7

MIN. SCHEDULE 40

WHEN SPECIFIED.BE USED, TUBING MAY ONLY BE USED

2- FOR IMPULSE PIPING 1/2" PIPE SHOULD

Page 27: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

98

10

15

4

2

1

14

ALTERNATIVE INSTALLATION ALTERNATIVE INSTALLATIONFIGURE-3

WITH TUBING

5INS

TR.

PIPING

PIPINGINS

TR.

INSTR.

PIPING

LIQUID SERVICE WITH SEAL LIQUID

FIGURE-2FIGURE-1

3

WITH MANIFOLD

18

11

7

42

DIFFERENTIAL PRESSURE INSTRUMENTLIQUID SERVICES WITH SEAL LIQUIDREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-10416

7 1/2" NIPPLE1"x1/2"

1- KEEP IMPULSE LINE TO MINIMUM LENGTH

MATERIALQTY.

GATE VALVE

POT1/2"

NOTES:

1/2"

1/2"1/2"1/2"

1/2"1/2"1/2"

15

2345

8910

14

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUALSWAGE NIPPLE

UNIONGLOBE VALVE

MANIFOLD

TUBE1 1/2"

11 1/2" CONNECTOR, MALE COMPR. TYPE

18 1/2" PLUG

MIN. SCHEDULE 40

WHEN SPECIFIED.BE USED, TUBING MAY ONLY BE USED

2- FOR IMPULSE PIPING 1/2" PIPE SHOULD

Page 28: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

INSTR.

PIPING

9 8

10

15

4

2

11

1

12 14

ALTERNATIVE INSTALLATION ALTERNATIVE INSTALLATIONFIGURE-3

WITH TUBING

3

FIGURE-2FIGURE-1

WITH MANIFOLD

18

INSTR.

PIPING

5 5

7

7 1/2" NIPPLE1"x1/2"

1- KEEP IMPULSE LINE TO MINIMUM LENGTH

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"

1/2"1/2"1/2"

1/2"1/2"1/2"

18

2345

8910

14

ITEM SIZE DESCRIPTION

ELBOWTEE EQUALSWAGE NIPPLE

UNIONGLOBE VALVE

MANIFOLD

11 1/2" CONNECTOR, MALE COMPR. TYPETEE EQUAL COMPR. TYPE12 1/2"

15 1/2" CONDENSATE POT

2- FOR IMPULSE PIPING 1/2" PIPE SHOULDBE USED, TUBING MAY ONLY BE USEDWHEN SPECIFIED.

MIN. SCHEDULE 40LINE PIPETUBE1 1/2"

15IPS-D-IN-104

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

DATE

DATE

IRANIAN PETROLEUM STANDARDS

DRAWING No. REV.SHT

C

B

A

DESCRIPTIONREV.GAS SERVICE

42

Page 29: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

4

INSTR.

PIPING

14

23

5

18

218

42

PRESSURE INSTRUMENTSUBJECT TO EXTREMEREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 14VIBRATION

7 1/2" NIPPLE1"x1/2"

1- KEEP IMPULSE LINE TO MINIMUM LENGTH

MATERIALQTY.

PLUG1/2"

NOTES:

1/2"1/2"

1/2"

18

45

814

ITEM SIZE DESCRIPTION

TEE EQUALSWAGE NIPPLE

UNIONMANIFOLD

21 FLEXIBLE HOSENIPPLE1/4"23

1/2"x500

7

Page 30: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

PIPING INSTR.

4

10

8

5 14

FIGURE-1FIGURE-2

ALTERNATIVE INSTALLATIONWITH MANIFOLD

PIPING

INSTR. PURGE

INSTR.

PIPING 173

111

INSTR.

PIPING

PIPING

INSTR.

PURGE

WITH TUBINGALTERNATIVE INSTALLATION

FIGURE-3

PURGE ROTAMETER

PURGE

18 PIPING

INSTR.

PRESSURE GAUGEWITH PURGING

22

NIPPLE1/2"7

LENGTH1- KEEP IMPULSE LINE TO MINIMUM

QTY. MATERIAL

18 PLUG1/2"1/2" CHECK VALVE

CONNECTOR, MALE, COMPR. TYPE

17MANIFOLDTEE EQUAL COMPR.TYPE

141211

1/2"1/2"

TUBE1/2"1NOTES:

1"x1/2"

1/2"1/2"1/2"

1/2"1/2"1/2"2

345

810

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUALSWAGE NIPPLE

UNIONGATE VALVE

2

7

42

PRESSURE GAUGEWITH PURGINGREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 13CONNECTED TO VESSEL

FI

FI

FI

MIN. SCHEDULE 40

WHEN SPECIFIED.BE USED, TUBING MAY ONLY BE USED

2- FOR IMPULSE PIPING 1/2" PIPE SHOULD

23

NIPPLE1/4"23

Page 31: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

PIPING INSTR.

INSTR.PIPING

PIPINGINSTR.

4

18

8

14

5

INSTR.PIPING

3

INSTR.PIPING

DAMPENER

FIGURE-1

ALTERNATIVE INSTALLATION

WITH SYPHON

FIGURE-2

WITH MANIFOLD AND SYPHON

ALTERNATIVE INSTALLATION

PULSATION

FIGURE-3

WITH PULSATION DAMPENERALTERNATIVE INSTALLATION ALTERNATIVE INSTALLATION

9

FIGURE-4

FOR HIGH PRESSURE SERVICE

150mm DIA.

10

42PRESSURE GAUGES

REV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 12

7 1/2" NIPPLE1"x1/2"

1- KEEP IMPULSE LINE TO MINIMUM LENGTH

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"1/2"1/2"1/2"

1/2"1/2"1/2"

18

2345

891014

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUALSWAGE NIPPLE

UNIONGLOBE VALVE

MANIFOLD

2

7

MIN. SCHEDULE 40

NIPPLE1/4"23

23

Page 32: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

PIPING INSTR.

PIPINGINSTR.

PIPINGINSTR.

INSTR.PIPING

4

10

8

25

14

FIGURE-1

GENERAL SERVICE

FIGURE-3

FIGURE-2

ALTERNATIVE INSTALLATION

WITH MANIFOLD

ALTERNATIVE INSTALLATION

FIGURE-5

WITH DIAPHRAGM SEAL AND MANIFOLD

18

ALTERNATIVE INSTALLATION

42PRESSURE GAUGEREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 11

7

7 1/2" NIPPLE1"x1/2"

1- KEEP IMPULSE LINE TO MINIMUM LENGTH

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"1/2"1/2"

1/2"1/2"

18

245

81014

ITEM SIZE DESCRIPTION

LINE PIPETEE EQUALSWAGE NIPPLE

UNION

MANIFOLD

MIN. SCHEDULE 40

23

NIPPLE1/4"23

Page 33: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

GATE VALVEUNION

SWAGE NIPPLETEE EQUALELBOWLINE PIPE

DESCRIPTIONSIZEITEM

108

5432 1/2"

1/2"1/2"

1/2"1/2"1/2"

1"x1/2"

NOTES:

PURGE

11

INSTR.

PIPING

1

14

12

ROTAMETER

FIGURE-2

ROTAMETERPURGE

3

8

2

4

PIPING

INSTR.

INSTR.

PIPING

FIGURE-1

5

17

1 1/2" TUBE

1/2"1/2"

111214

TEE EQUAL COMPR.TYPEMANIFOLD

17

CONNECTOR, MALE, COMPR. TYPE

CHECK VALVE1/2"

10

PIPING

INSTR.

18

1/2" PLUG18

LIQUID SERVICEWITH PURGING

ALTERNATIVE INSTALLATIONWITH TUBING

22

42

PRESSURE INSTRUMENTLIQUID SERVICE

REV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 10WITH PURGING

MATERIAL

1/2"x1/4"22 SWAGE NIPPLE

QTY.

1- KEEP IMPULSE LINE TO MINIMUMLENGTH

7

7 1/2" NIPPLE

FI

FI

MIN. SCHEDULE 40

WHEN SPECIFIED.BE USED, TUBING MAY ONLY BE USED

2- FOR IMPULSE PIPING 1/2" PIPE SHOULD

23

NIPPLE1/4"23

Page 34: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

INSTR.

PIPING

18x

x

x

x

FIGURE-1

x

x

x

x

x

47

16

20

LIQUID AND STEAM SERVICE

105

42

PRESSURE INSTRUMENTLIQUID,STEAM & GAS SERVICEREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 9

x

GAS SERVICE

FIGURE-2

4 1/2" TEE EQUAL

1/2"18 PLUGCAPILLARY TUBE

1/2" GATE VALVE

20

10BLIND FLANGE WITH GASKET,NUT&BOLT3"16

NOTES:

5

ITEM SIZE DESCRIPTION

SWAGE NIPPLE1"x1/2"7 1/2" NIPPLE

REMOTE SEAL TYPE

QTY. MATERIAL

INSTR.

PIPING

Page 35: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

MIN. SCHEDULE 40

WHEN SPECIFIED.BE USED, TUBING MAY ONLY BE USED

2- FOR IMPULSE PIPING 1/2" PIPE SHOULD

INSTR.PIPING

4

9

2

8

PIPING INSTR.

LIQUID SERVICE

10

INSTR.

PIPING

WITH TUBING

11

12

14

FIGURE-3

DETAIL-1ALTERNATIVE INSTALLATIONALTERNATIVE INSTALLATION

FOR LIQUID & STEAM SERVICE

DETAIL-2

FOR GAS SERVICE

PIPING

INSTR.

GAS SERVICE GAS SERVICEWITH MANIFOLD

FIGURE-2FIGURE-1

3

5

18

7

19

42

PRESSURE INSTRUMENT-LIQUIDSTEAM & GAS SERVICE

REV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 8(TRANSMITTER & GAGE)

7 1/2" NIPPLE1"x1/2"

1- KEEP IMPULSE LINE TO MINIMUM LENGTH

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"

1/2"1/2"1/2"

1/2"1/2"1/2"

18

2345

8910

14

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUALSWAGE NIPPLE

UNIONGLOBE VALVE

MANIFOLD

11 1/2" CONNECTOR, MALE COMPR. TYPETEE EQUAL COMPR. TYPE1/2"12

19 1/2" CONNECTOR, FEMALE COMPR. TYPE

INSTR.

PIPING

TUBE1 1/2"

NIPPLE1/4"23

23

Page 36: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

INSTR.

PIPING

4

9

2

3

15

10

PIPINGINS

TR.

ALTERNATIVE INSTALLATIONFIGURE-2

5

WET GASFIGURE-1

8

18

WITH MANIFOLD

7

42

PRESSURE INSTRUMENT-WETGASSERVICE, METER BELOW LINEREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 7

7 1/2" NIPPLE1"x1/2"

1- KEEP IMPULSE LINE TO MINIMUM LENGTH

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"1/2"1/2"1/2"

1/2"1/2"1/2"

18

2345

891014

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUALSWAGE NIPPLE

UNIONGLOBE VALVE

MANIFOLDPOT15 1/2"

148

11

MIN. SCHEDULE 40

23

NIPPLE1/4"23

Page 37: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

LIQUID ALTERNATIVE TO FIGURE 1

PIPING

INSTR.

FIGURE-2

14

8

WITH MANIFOLDWITH MANIFOLD

FIGURE-1

INSTR.PIP

ING

LIQUID SERVICE

18

2

4

5

42

PRESSURE INSTRUMENTLIQUID,STEAM & GAS SERVICEREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 6

7 1/2" NIPPLE1"x1/2"

1- KEEP IMPULSE LINE TO MINIMUM LENGTH

MATERIALQTY.

PLUG1/2"

NOTES:

1/2"1/2"

1/2"1/2"

18

245

814

ITEM SIZE DESCRIPTION

LINE PIPETEE EQUALSWAGE NIPPLE

UNIONMANIFOLD

7

MIN. SCHEDULE 40

23

NIPPLE1/4"23

Page 38: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

INSTR.PIPING

4

9

2

10

PIPING

INSTR.

18

LIQUID SERVICEWITH HEAVYSEAL LIQUID

SEAL LIQUIDWITH LIGHT

LIQUID SERVICE

LIQUID SERVICEWITH LIGHTSEAL LIQUID

INSTR.PIPING

3

5

FIGURE-2

FIGURE-3

FIGURE-1

15

8

14

AND MANIFOLD

42

PRESSURE INSTRUMENT-LIQUIDSERVICE WITH HEAVY/LIGHT

REV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 5SEAL LIQUID

7 1/2" NIPPLE1"x1/2"

1- KEEP IMPULSE LINE TO MINIMUM LENGTH

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"1/2"1/2"1/2"

1/2"1/2"1/2"

18

2345

891014

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUALSWAGE NIPPLE

UNIONGLOBE VALVE

MANIFOLD15 1/2" POT

7

MIN. SCHEDULE 40

23

NIPPLE1/4"23

Page 39: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

MIN. SCHEDULE 40

INSTR.PIPING

4

9

2

8

LIQUID SERVICE

10

GAS SERVICEWITH MANIFOLD

FIGURE-4

FIGURE-1 3

5

18

7

42

PRESSURE INSTRUMENTLIQUID AND GAS SERVICEREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 4

7 1/2" NIPPLE1"x1/2"

1- KEEP IMPULSE LINE TO MINIMUM LENGTH

MATERIALQTY.

GATE VALVE

PLUG1/2"

NOTES:

1/2"1/2"1/2"1/2"

1/2"1/2"1/2"

18

2345

891014

ITEM SIZE DESCRIPTION

LINE PIPEELBOWTEE EQUALSWAGE NIPPLE

UNIONGLOBE VALVE

MANIFOLD

PIPINGINS

TR.

INSTR.

PIPING

FIGURE-3GAS SERVICE

FIGURE-2LIQUID SERVICE

PIPING

INSTR.

WITH MANIFOLD

14

23

23 1/4" NIPPLE

Page 40: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

1 - ORIFICE ELEMENT VERTICAL LINE

2 - ORIFICE ELEMENT HORIZONTAL LINE

3 - PRESSURE GAUGE

4-TRANSMITTER

5-TWO WAY MANIFOLD

6-THREE WAY MANIFOLD

42

INSTRUMENTATION

SYMBOLS FOR PRESSURE PIPING DETAILSREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-104 3INSTALLATION OF PRESSURE PIPING

Page 41: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

GENERAL NOTES

1-USE FLANGE IN PLACE OF UNION FOR SOCKET WELD PIPING.

2-USE CAP IN PLACE OF PLUG FOR HIGH PRESSURE AND

3- SEAL WELD ALL FITTINGS THREADS FOR HIGH PRESSURE AND CORROSIVE

4- WHEN PROCESS CONNECTION IS 3/4", USE SWAGE NIPPLE 3/4"x1/2"IN PLACE OF 1"x1/2".FOR VESSELS 1" PROCESS CONNECTION .IS RECOMMENDED

5- ALL SIZES OF PIPES AND FITTINGS ARE IN INCHES,THREADS ARE IN NPT,

CORROSIVE SERVICES.

OTHER DIMENSIONS ARE IN mm.

FOR HIGH PRESSURE AND CORROSIVE SERVICES.

SERVICES EXCEPT SCREWED CONNECTION AT INSTRUMENTS.

6- 5 WAY MANIFOLD MAY BE USED FOR PLACES WHERE PROCESS CONDITIONNECESSITATES INSTEAD OF 3 WAY MANIFOLD.

7- ALL HORIZONTAL IMPULSE LINES SHOULD HAVE A SLOPE OF 8% TOWARD THE METER FOR LIQUID AND AWAY FROM THE METER FOR GAS SERVICE

8- IMPULSE LINE SHALL BE 1/2" PIPE , 1/2" TUBE MAY BE USEDONLY WHERE SPECIFIED.

2IPS-D-IN-104

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

DATE

DATE

IRANIAN PETROLEUM STANDARDS

DRAWING No. REV.SHT

C

B

A

DESCRIPTIONREV. INSTALLATION OF PRESSURE PIPINGINSTRUMENTATION

42

Page 42: IRANIAN PETROLEUM STANDARDS...30 3/4"LINE PIPE MIN. SCHEDULE 40 2" 2" 2" 2" FIGURE-1 PIPING INSTR. VESSEL 25 24 PIPING INSTR. VESSEL FIGURE-2 FIGURE-3 PIPING INSTR. VESSEL 26 29 …

INSTRUMENTATIONINSTALLATION OF PRESSURE PIPING

42

INSTRUMENTATIONINSTALLATION OF PRESSURE PIPINGREV. DESCRIPTION

A

B

C

SHT REV.DRAWING No.

IRANIAN PETROLEUM STANDARDS

DATE

DATE

NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION

IPS-D-IN-1041