Upload
vijaykataria1989
View
65
Download
1
Embed Size (px)
DESCRIPTION
Is Codes - Master List
Citation preview
SR. NO. IS NUMBER YEAR COMMITTEE
1 1982
2 1982
3 1982
4 IS 10080 1982
5 IS 10086 1982
6 IS 10262 2009
7 IS 10510 1983
8 IS 10850 1984
9 IS 10890 1984
10 IS 11262 1985
11 IS 11263 1985
12 IS 11578 1986
13 IS 1199 1959
14 IS 11993 1987
15 IS 12089 1987
16 IS 12119 1987
17 IS 12269 1987
18 IS 12269 1987
19 IS 12303 1987
20 IS 12330 1988
21 IS 12423 1988
22 IS 12600 1989
IS 10070 CED 02
IS 10078 CED 02
IS 10079 CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
23 IS 12803 1989
24 IS 12813 1989
25 IS 12870 1989
26 IS 13311-1 1992
27 IS 13311-2 1992
28 IS 1343 1980
29 IS 1344 1981
30 IS 14345 1996
31 IS 14687 1999
32 IS 14858 2000
33 IS 1489-1 1991
34 IS 1489-2 1991
35 IS 14959-1 2001
36 IS 14959-2 2001
37 IS 15388 2003
38 IS 1727 1967
39 IS 2386-1 1963
40 IS 2386-2 1963
41 IS 2386-3 1963
42 IS 2386-4 1963
43 IS 2386-5 1963
44 IS 2386-6 1963
45 IS 2386-7 1963
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
46 IS 2386-8 1963
47 IS 2430 1986
48 IS 2502 1963
49 IS 2645 2003
50 IS 269 1989
51 IS 2770-1 1967
52 IS 3085 1965
53 IS 3370-1 2009
54 IS 3370-2 2009
55 IS 3370-3 1967
56 IS 3370-4 1967
57 IS 3466 1988
58 IS 3466 (B) 1988
59 IS 3535 1986
60 IS 3558 1983
61 IS 3812-1 2003
62 IS 3812-2 2003
63 IS 383 1970
64 IS 4031-1 1996
65 IS 4031-10 1988
66 IS 4031-11 1988
67 IS 4031-12 1988
68 IS 4031-13 1988
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
69 IS 4031-14 1989
70 IS 4031-15 1991
71 IS 4031-2 1999
72 IS 4031-3 1988
73 IS 4031-4 1988
74 IS 4031-5 1988
75 IS 4031-6 1988
76 IS 4031-7 1988
77 IS 4031-8 1988
78 IS 4031-9 1988
79 IS 4032 1985
80 IS 4305 1967
81 IS 455 1989
82 IS 457 1957
83 IS 4634 1991
84 IS 4845 1968
85 IS 4926 2003
86 IS 516 1959
87 IS 5512 1983
88 IS 5513 1996
89 IS 5514 1996
90 IS 5515 1983
91 IS 5516 1996
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
92 IS 5525 1969
93 IS 5536 1969
94 IS 5816 1999
95 IS 6452 1989
96 IS 6452 (B) 1989
97 IS 6461-1 1972
98 IS 6461-10 1973
99 IS 6461-11 1973
100 IS 6461-12 1973
101 IS 6461-2 1972
102 IS 6461-3 1972
103 IS 6461-4 1972
104 IS 6461-5 1972
105 IS 6461-6 1972
106 IS 6461-7 1973
107 IS 6461-8 1973
108 IS 6461-9 1973
109 IS 6491 1972
110 IS 650 1991
111 IS 6909 1990
112 IS 6925 1973
113 IS 7246 1974
114 IS 7320 1974
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
115 IS 7325 1974
116 IS 7861-1 1975
117 IS 7861-2 1981
118 IS 8041 1990
119 IS 8042 1989
120 IS 8043 1991
121 IS 8112 1989
122 IS 8125 1976
123 IS 8142 1976
124 IS 8229 1986
125 IS 8425 1977
126 IS 9012 1978
127 IS 9013 1978
128 IS 9103 1999
129 IS 9142 1979
130 IS 9284 1979
131 IS 9376 1979
132 IS 9377 1979
133 IS 9399 1979
134 IS 9459 1980
135 IS 9799 1981
136 SP 16 1980
137 SP 23 1982
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
CED 02
138 SP 24 1983
139 SP 34 1987
140 2000
141 IS 11246 1992
142 IS 12234 1988
143 IS 12701 1996
144 IS 13049 1991
145 IS 13114 1991
146 IS 13349 1992
147 IS 13983 1994
148 IS 14399-1 1996
149 IS 14399-1 and 2 1996
150 IS 14845 2000
151 IS 14846 2000
152 IS 1701 1960
153 IS 1703 2000
154 IS 1711 1984
155 IS 1726 1991
156 IS 1795 1982
157 IS 2326 1987
158 IS 2373 1981
159 IS 2548-1 1996
160 IS 2548-2 1996
CED 02
CED 02
IS 456 CED 02
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
161 IS 2556-1 1994
162 IS 2556-14 1995
163 IS 2556-15 2004
164 IS 2556-16 2002
165 IS 2556-17 2001
166 IS 2556-2 2004
167 IS 2556-3 2004
168 IS 2556-4 2004
169 IS 2556-5 1994
170 IS 2556-6 1995
171 IS 2556-7 1995
172 IS 2556-8 2004
173 IS 2556-9 2004
174 IS 2685 1971
175 IS 2692 1989
176 IS 2963 1979
177 IS 3004 1979
178 IS 3006 1979
179 IS 3042 1965
180 IS 3311 1979
181 IS 3950 1979
182 IS 4038 1986
183 IS 4346 1982
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
184 IS 5219-1 1969
185 IS 5312-1 2004
186 IS 5312-2 1986
187 IS 5455 1969
188 IS 5961 1970
189 IS 6411 1985
190 IS 651 2007
191 IS 6784 1996
192 IS 7231 1994
193 IS 771-1 1979
194 IS 771-2 1985
195 IS 771-3-1 1979
196 IS 771-3-2 1985
197 IS 771-4 1979
198 IS 771-5 1979
199 IS 771-6 1979
200 IS 771-7 1981
201 IS 772 1973
202 IS 774 2004
203 IS 778 1984
204 IS 779 1994
205 IS 781 1984
206 IS 782 1978
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
207 IS 8931 1993
208 IS 9140 1996
209 IS 9338 1984
210 IS 9739 1981
211 IS 9758 1981
212 IS 9762 1994
213 IS 9763 2000
214 IS 10049 1981
215 IS 10359 1982
216 IS 10360 1982
217 IS 10772 1983
218 IS 12654 1989
219 IS 12679 1989
220 IS 12894 2002
221 IS 13001 1991
222 IS 14401 1996
223 IS 14860 2000
224 IS 15648 2006
225 IS 1624 1986
226 IS 1635 1992
227 IS 1849-1-1 1990
228 IS 1849-1-2 1991
229 IS 1861-1 1990
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 03
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
230 IS 2095-1 2011
231 IS 2095-2 2001
232 IS 2095-3 1996
233 IS 2469 1976
234 IS 2541 1991
235 IS 2542-1-1 to 12 1978
236 IS 2542-2-1 to 8 1981
237 IS 2547-1 1976
238 IS 2547-2 1976
239 IS 2686 1977
240 IS 2849 1983
241 IS 3068 1986
242 IS 3115 1992
243 IS 3182 1986
244 IS 4098 1983
245 IS 4139 1989
246 IS 5817 1992
247 IS 6508 1988
248 IS 6932-1 1973
249 IS 6932-10 1973
250 IS 6932-11 1983
251 IS 6932-2 1973
252 IS 6932-3 1973
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
253 IS 6932-4 1973
254 IS 6932-5 1973
255 IS 6932-6 1973
256 IS 6932-7 1973
257 IS 6932-8 1973
258 IS 6932-9 1973
259 IS 712 1984
260 IS 8272 1984
261 IS 9498 1980
262 IS 10132 1982 CED 05
263 IS 10403 1983 CED 05
264 IS 1195 2002 CED 05
265 IS 1196 1978 CED 05
266 IS 1197 1970 CED 05
267 IS 1198 1982 CED 05
268 IS 1237 2012 CED 05
269 IS 12583 1988 CED 05
270 IS 12866 1989 CED 05
271 IS 13026 1991 CED 05
272 IS 13074 1991 CED 05
273 IS 13630-1 2006 CED 05
274 IS 13630-1 to 15 2006 CED 05
275 IS 13630-10 2006 CED 05
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
CED 04
276 IS 13630-11 2006 CED 05
277 IS 13630-12 2006 CED 05
278 IS 13630-13 2006 CED 05
279 IS 13630-14 2006 CED 05
280 IS 13630-15 2006 CED 05
281 IS 13630-2 2006 CED 05
282 IS 13630-3 2006 CED 05
283 IS 13630-4 2006 CED 05
284 IS 13630-5 2006 CED 05
285 IS 13630-6 2006 CED 05
286 IS 13630-7 2006 CED 05
287 IS 13630-8 2006 CED 05
288 IS 13630-9 2006 CED 05
289 IS 13712 2006 CED 05
290 IS 13801 1993 CED 05
291 IS 1443 1972 CED 05
292 IS 15193 2002 CED 05
293 IS 15194 2002 CED 05
294 IS 15224 2002 CED 05
295 IS 15401 2003 CED 05
296 IS 15418 2003 CED 05
297 IS 1542 1992 CED 05
298 IS 15622 2006 CED 05
299 IS 15658 2006 CED 05
300 IS 1630 1984 CED 05
301 IS 1661 1972 CED 05
302 IS 2114 1984 CED 05
303 IS 2394 1984 CED 05
304 IS 2402 1963 CED 05
305 IS 2571 1970 CED 05
306 IS 3461 1980 CED 05
307 IS 3462 1986 CED 05
308 IS 3464 1986 CED 05
309 IS 4441 1980 CED 05
310 IS 4442 1980 CED 05
311 IS 4443 1980 CED 05
312 IS 4456-1 1967 CED 05
313 IS 4457 2007 CED 05
314 IS 4631 1986 CED 05
315 IS 4832-1 1969 CED 05
316 IS 4832-2 1969 CED 05
317 IS 4832-3 1968 CED 05
318 IS 4860 1968 CED 05
319 IS 4971 2007 CED 05
320 IS 5317 2002 CED 05
321 IS 5318 1969 CED 05
322 IS 5491 1969 CED 05
323 IS 5766 1970 CED 05
324 IS 6278 1971 CED 05
325 IS 653 1992 CED 05
326 IS 657 1982 CED 05
327 IS 658 1982 CED 05
328 IS 7956 1975 CED 05
329 IS 809 1992 CED 05
330 IS 8374 1977 CED 05
331 IS 9162 1979 CED 05
332 IS 9197 1979 CED 05
333 IS 9510 1980 CED 05
334 IS 9704 1980 CED 05
335 IS 4456-2 1967 CED 05
336 IS 1121-1 1974 CED 06
337 IS 1121-2 1974 CED 06
338 IS 1121-3 1974 CED 06
339 IS 1121-4 1974 CED 06
340 IS 1122 1974 CED 06
341 IS 1123 1975 CED 06
342 IS 1124 1974 CED 06
343 IS 1125 1974 CED 06
344 IS 1126 1974 CED 06
345 IS 1127 1970 CED 06
346 IS 1128 1974 CED 06
347 IS 1129 1972 CED 06
348 IS 1130 1969 CED 06
349 IS 14223-1 1995 CED 06
350 IS 1706 1972 CED 06
351 IS 1805 1973 CED 06
352 IS 3316 1974 CED 06
353 IS 3620 1979 CED 06
354 IS 3622 1977 CED 06
355 IS 4121 1967 CED 06
356 IS 4122 1967 CED 06
357 IS 4348 1973 CED 06
358 IS 5218 1969 CED 06
359 IS 5640 1970 CED 06
360 IS 6241 1971 CED 06
361 IS 6250 1981 CED 06
362 IS 6579 1981 CED 06
363 IS 7779-1-1 1975 CED 06
364 IS 7779-1-2 1975 CED 06
365 IS 7779-1-3 1975 CED 06
366 IS 7779-2-1 1979 CED 06
367 IS 7779-2-2 1979 CED 06
368 IS 7779-2-3 1979 CED 06
369 IS 7779-3-2 1980 CED 06
370 IS 7779-3-3 1980 CED 06
371 IS 7779-4-1 to 3 1996 CED 06
372 IS 7779-5-1 to 3 1997 CED 06
373 IS 8348 1977 CED 06
374 IS 8381 1977 CED 06
375 IS 8759 1977 CED 06
376 IS 9394 1979 CED 06
377 IS 10182-1 1982 CED 07
378 IS 10182-2 1985 CED 07
379 IS 10987 1992 CED 07
380 IS 1173 1978 CED 07
381 IS 1252 1991 CED 07
382 IS 12778 2004 CED 07
383 IS 12779 1989 CED 07
384 IS 12843 1989 CED 07
385 IS 15663-1 2006 CED 07
386 IS 15663-2 2006 CED 07
387 IS 15663-3 2006 CED 07
388 IS 1730 1989 CED 07
389 IS 1732 1989 CED 07
390 IS 1852 1985 CED 07
391 IS 1863 1979 CED 07
392 IS 1864 1979 CED 07
393 IS 2314 1986 CED 07
394 IS 2713-1 to 3 1980 CED 07
395 IS 2750 1964 CED 07
396 IS 3443 1980 CED 07
397 IS 3908 1986 CED 07
398 IS 3909 1986 CED 07
399 IS 3921 1985 CED 07
400 IS 3954 1991 CED 07
401 IS 3964 1980 CED 07
402 IS 4000 1992 CED 07
403 IS 4014-1 1967 CED 07
404 IS 5384 1985 CED 07
405 IS 5488 1987 CED 07
406 IS 6445 1985 CED 07
407 IS 6449 1987 CED 07
408 IS 6475 1987 CED 07
409 IS 6476 1987 CED 07
410 IS 6533-1 1989 CED 07
411 IS 6533-2 1989 CED 07
412 IS 7205 1974 CED 07
413 IS 7215 1974 CED 07
414 IS 7452 1990 CED 07
415 IS 800 2007 CED 07
416 IS 801 1975 CED 07
417 IS 802-1-1 1995 CED 07
418 IS 802-1-2 1992 CED 07
419 IS 802-2 1978 CED 07
420 IS 802-3 1978 CED 07
421 IS 803 1976 CED 07
422 IS 804 1967 CED 07
423 IS 805 1968 CED 07
424 IS 806 1968 CED 07
425 IS 808 1989 CED 07
426 IS 8081 1976 CED 07
427 IS 811 1987 CED 07
428 IS 8147 1976 CED 07
429 IS 8640 1977 CED 07
430 IS 9178-1 1979 CED 07
431 IS 9178-2 1979 CED 07
432 IS 9178-3 1980 CED 07
433 IS 9964-1 1981 CED 07
434 IS 9964-2 1981 CED 07
435 SP 6-1 1964 CED 07
436 SP 6-2 1962 CED 07
437 SP 6-3 1962 CED 07
438 SP 6-4 1969 CED 07
439 SP 6-5 1980 CED 07
440 SP 6-6 1972 CED 07
441 SP 6-7 1972 CED 07
442 IS 15456 2004 CED 09
443 IS 10013-1 1981 CED 09
444 IS 10013-2 1981 CED 09
445 IS 10013-3 1981 CED 09
446 IS 10-1 1990 CED 09
447 IS 10145 1982 CED 09
448 IS 10-2 1996 CED 09
449 IS 10-3 1974 CED 09
450 IS 10394 1982 CED 09
451 IS 10-4 1989 CED 09
452 IS 10402 1982 CED 09
453 IS 10420 1982 CED 09
454 IS 10499 1983 CED 09
455 IS 10-5 1976 CED 09
456 IS 10687 1983 CED 09
457 IS 10753 1983 CED 09
458 IS 10754 1983 CED 09
459 IS 11100 1984 CED 09
460 IS 11106 1984 CED 09
461 IS 11131 1984 CED 09
462 IS 11215 1991 CED 09
463 IS 11288 1985 CED 09
464 IS 1140 1988 CED 09
465 IS 1141 1993 CED 09
466 IS 1150 2000 CED 09
467 IS 12896 1990 CED 09
468 IS 1326 1992 CED 09
469 IS 1331 1971 CED 09
470 IS 13621 1993 CED 09
471 IS 13622 1993 CED 09
472 IS 14960 2001 CED 09
473 IS 1503 1988 CED 09
474 IS 15455 2004 CED 09
475 IS 15457 2004 CED 09
476 IS 15458 2004 CED 09
477 IS 15890 2010 CED 09
478 IS 1707 1979 CED 09
479 IS 1708-1 1986 CED 09
480 IS 1708-1 to 18 1986 CED 09
481 IS 1708-10 1986 CED 09
482 IS 1708-11 1986 CED 09
483 IS 1708-12 1986 CED 09
484 IS 1708-13 1986 CED 09
485 IS 1708-14 1986 CED 09
486 IS 1708-15 1986 CED 09
487 IS 1708-16 1986 CED 09
488 IS 1708-17 1986 CED 09
489 IS 1708-18 1986 CED 09
490 IS 1708-2 1986 CED 09
491 IS 1708-3 1986 CED 09
492 IS 1708-4 1986 CED 09
493 IS 1708-5 1986 CED 09
494 IS 1708-6 1986 CED 09
495 IS 1708-7 1986 CED 09
496 IS 1708-8 1986 CED 09
497 IS 1708-9 1986 CED 09
498 IS 1898 1990 CED 09
499 IS 190 1991 CED 09
500 IS 1900 1974 CED 09
501 IS 1902 2006 CED 09
502 IS 2133 1983 CED 09
503 IS 2179 1979 CED 09
504 IS 2203 1993 CED 09
505 IS 2372 2004 CED 09
506 IS 2377 1967 CED 09
507 IS 2408 1963 CED 09
508 IS 2455 1990 CED 09
509 IS 2674 1988 CED 09
510 IS 2683 1980 CED 09
511 IS 2753-1 1991 CED 09
512 IS 2753-2 1991 CED 09
513 IS 287 1993 CED 09
514 IS 2891 1975 CED 09
515 IS 2892 1993 CED 09
516 IS 2893 1992 CED 09
517 IS 2894 1987 CED 09
518 IS 2895 1990 CED 09
519 IS 2896 1978 CED 09
520 IS 2897 1983 CED 09
521 IS 2922 1975 CED 09
522 IS 3053 1977 CED 09
523 IS 3071 1981 CED 09
524 IS 3084 1989 CED 09
525 IS 3337 1978 CED 09
526 IS 3364-1 1976 CED 09
527 IS 3364-2 1976 CED 09
528 IS 3386 1979 CED 09
529 IS 3728 1985 CED 09
530 IS 3731 1985 CED 09
531 IS 3806 1966 CED 09
532 IS 399 1963 CED 09
533 IS 401 2001 CED 09
534 IS 4422 1985 CED 09
535 IS 4423 1999 CED 09
536 IS 4424 1967 CED 09
537 IS 4650 1968 CED 09
538 IS 4833 1993 CED 09
539 IS 4873-1 2008 CED 09
540 IS 4873-2 2008 CED 09
541 IS 4895 1985 CED 09
542 IS 4907 2004 CED 09
543 IS 4953 1989 CED 09
544 IS 4970 1973 CED 09
545 IS 5246 2000 CED 09
546 IS 5247-1 1982 CED 09
547 IS 5247-2 1982 CED 09
548 IS 5806 1970 CED 09
549 IS 5942 1989 CED 09
550 IS 5966 1993 CED 09
551 IS 5978 1970 CED 09
552 IS 6056 1970 CED 09
553 IS 620 1985 CED 09
554 IS 6341 1971 CED 09
555 IS 6346 1971 CED 09
556 IS 6497 1990 CED 09
557 IS 6534 1971 CED 09
558 IS 656 1988 CED 09
559 IS 6641 1985 CED 09
560 IS 6642 1986 CED 09
561 IS 6643 1987 CED 09
562 IS 6644 1986 CED 09
563 IS 6656 1986 CED 09
564 IS 6662 1993 CED 09
565 IS 6676 1986 CED 09
566 IS 6703 1972 CED 09
567 IS 6707 1972 CED 09
568 IS 6711 1972 CED 09
569 IS 6729 1972 CED 09
570 IS 6791 1973 CED 09
571 IS 6874 2008 CED 09
572 IS 707 2011 CED 09
573 IS 7308 1999 CED 09
574 IS 7315 1974 CED 09
575 IS 7344 1974 CED 09
576 IS 7548 1992 CED 09
577 IS 7549 1975 CED 09
578 IS 7698 1983 CED 09
579 IS 7850 1975 CED 09
580 IS 7992 1983 CED 09
581 IS 8001 1976 CED 09
582 IS 8242 1976 CED 09
583 IS 8292 1992 CED 09
584 IS 8295-1 1976 CED 09
585 IS 8295-2 1976 CED 09
586 IS 8720 1978 CED 09
587 IS 8725 1978 CED 09
588 IS 8726 1978 CED 09
589 IS 8745 1994 CED 09
590 IS 876 1992 CED 09
591 IS 9096 2006 CED 09
592 IS 9104 1979 CED 09
593 IS 9561 1985 CED 09
594 IS 9576 1980 CED 09
595 IS 9590 1980 CED 09
596 SP 33 1986 CED 09
597 IS 1003-1 2003 CED 11
598 IS 1003-2 1994 CED 11
599 IS 1038 1983 CED 11
600 IS 10428 1983 CED 11
601 IS 10451 1983 CED 11
602 IS 10521 1983 CED 11
603 IS 1081 1960 CED 11
604 IS 1361 1978 CED 11
605 IS 14856 2000 CED 11
606 IS 15380 2003 CED 11
607 IS 15931 2012 CED 11
608 IS 1948 1961 CED 11
609 IS 1949 1961 CED 11
610 IS 2191-1 1983 CED 11
611 IS 2191-2 1983 CED 11
612 IS 2202-1 1999 CED 11
613 IS 2202-2 1983 CED 11
614 IS 4020-1 to 16 1998 CED 11
615 IS 4020-8 1998 CED 11
616 IS 4021 1995 CED 11
617 IS 4043 1969 CED 11
618 IS 4351 2003 CED 11
619 IS 4913 1968 CED 11
620 IS 6198 1992 CED 11
621 IS 6248 1979 CED 11
622 IS 11050-1 1984 CED 12
623 IS 11050-2 1984 CED 12
624 IS 11050-3 1984 CED 12
625 IS 11907 1986 CED 12
626 IS 12332 1988 CED 12
627 IS 13735 1993 CED 12
628 IS 1950 1962 CED 12
629 IS 2440 1975 CED 12
630 IS 2526 1963 CED 12
631 IS 3103 1975 CED 12
632 IS 3362 1977 CED 12
633 IS 3483 1965 CED 12
634 IS 3792 1978 CED 12
635 IS 4954 1968 CED 12
636 IS 4963 1987 CED 12
637 IS 5499 1969 CED 12
638 IS 6060 1971 CED 12
639 IS 6074 1971 CED 12
640 IS 7662-1 1974 CED 12
641 IS 7942 1976 CED 12
642 IS 8827 1978 CED 12
643 IS 9736 1981 CED 12
644 SP 32 1986 CED 12
645 SP 38 1987 CED 12
646 SP 40 1987 CED 12
647 SP 41 1987 CED 12
648 SP 47 1988 CED 12
649 IS 10388 1982 CED 13
650 IS 10439 1983 CED 13
651 IS 10440 1983 CED 13
652 IS 10566 1983 CED 13
653 IS 10957 1999 CED 13
654 IS 10958 1984 CED 13
655 IS 10959 1984 CED 13
656 IS 11096 1984 CED 13
657 IS 11134 1984 CED 13
658 IS 11433-1 1985 CED 13
659 IS 11433-2 1986 CED 13
660 IS 11817 1986 CED 13
661 IS 11818 1986 CED 13
662 IS 12093 1987 CED 13
663 IS 12118-1 1987 CED 13
664 IS 12118-2 1987 CED 13
665 IS 12506 1988 CED 13
666 IS 12727 1989 CED 13
667 IS 13077 1991 CED 13
668 IS 1414 1989 CED 13
669 IS 14428 1997 CED 13
670 IS 1477-1 1971 CED 13
671 IS 1477-2 1971 CED 13
672 IS 15183-1 2002 CED 13
673 IS 15183-2 2002 CED 13
674 IS 15183-3 2002 CED 13
675 IS 15345 2003 CED 13
676 IS 15912 2012 CED 13
677 IS 1597-1 1992 CED 13
678 IS 1597-2 1992 CED 13
679 IS 1634 1992 CED 13
680 IS 1649 1962 CED 13
681 IS 1834 1984 CED 13
682 IS 1838-1 1983 CED 13
683 IS 1838-2 1984 CED 13
684 IS 1838-3 2011 CED 13
685 IS 1905 1987 CED 13
686 IS 1946 1961 CED 13
687 IS 2110 1980 CED 13
688 IS 2115 1980 CED 13
689 IS 2116 1980 CED 13
690 IS 2118 1980 CED 13
691 IS 2119 1980 CED 13
692 IS 2204 1962 CED 13
693 IS 2212 1991 CED 13
694 IS 2250 1981 CED 13
695 IS 2338-1 1967 CED 13
696 IS 2338-2 1967 CED 13
697 IS 2366 1983 CED 13
698 IS 2395-1 1994 CED 13
699 IS 2395-2 1994 CED 13
700 IS 2441 1984 CED 13
701 IS 2524-1 1968 CED 13
702 IS 2524-2 1968 CED 13
703 IS 2527 1984 CED 13
704 IS 2700 1987 CED 13
705 IS 2792 1964 CED 13
706 IS 2858 1984 CED 13
707 IS 3140 1965 CED 13
708 IS 3414 1968 CED 13
709 IS 3548 1988 CED 13
710 IS 3629 1986 CED 13
711 IS 3630 1992 CED 13
712 IS 3670 1989 CED 13
713 IS 4101-1 1967 CED 13
714 IS 4101-2 1967 CED 13
715 IS 4101-3 1985 CED 13
716 IS 4407 1967 CED 13
717 IS 4597 1968 CED 13
718 IS 4891 1988 CED 13
719 IS 4920 1968 CED 13
720 IS 4924-1 1968 CED 13
721 IS 4924-2 1968 CED 13
722 IS 4983 1968 CED 13
723 IS 5119-1 1968 CED 13
724 IS 5389 1969 CED 13
725 IS 5390 1984 CED 13
726 IS 5807-1 1975 CED 13
727 IS 5807-2 1975 CED 13
728 IS 5807-3 1971 CED 13
729 IS 5807-4 1975 CED 13
730 IS 5807-5 1975 CED 13
731 IS 5807-6 1978 CED 13
732 IS 6061-1 1971 CED 13
733 IS 6061-2 1981 CED 13
734 IS 6061-3 1981 CED 13
735 IS 6061-4 1981 CED 13
736 IS 6313-1 1981 CED 13
737 IS 6313-2 2001 CED 13
738 IS 6313-3 2001 CED 13
739 IS 6332 1984 CED 13
740 IS 6509 1985 CED 13
741 IS 7683 1975 CED 13
742 IS 883 1994 CED 13
743 IS 9472 1980 CED 13
744 IS 965 1963 CED 13
745 IS 9954 1981 CED 13
746 SP 1650 1973 CED 13
747 1973 CED 13
748 SP 20 1991 CED 13
749 SP 21 2005 CED 13
750 SP 25 1984 CED 13
751 SP 62 1997 CED 13
752 IS 10019 1981 CED 15
753 IS 10090 1982 CED 15
754 IS 1019 1974 CED 15
755 IS 10342 1982 CED 15
756 IS 12817 1997 CED 15
757 IS 12867 1989 CED 15
758 IS 1341 1992 CED 15
SP 1650 Supplement
759 IS 14912 2001 CED 15
760 IS 15833 2009 CED 15
761 IS 15834 2008 CED 15
762 IS 15834 2008 CED 15
763 IS 1823 1980 CED 15
764 IS 1837 1966 CED 15
765 IS 204-1 1991 CED 15
766 IS 204-2 1992 CED 15
767 IS 205 1992 CED 15
768 IS 206 2010 CED 15
769 IS 208 1996 CED 15
770 IS 2681 1993 CED 15
771 IS 281 2009 CED 15
772 IS 3564 1995 CED 15
773 IS 362 1991 CED 15
774 IS 363 1993 CED 15
775 IS 364 1993 CED 15
776 IS 3818 1992 CED 15
777 IS 3828 1966 CED 15
778 IS 3843 1995 CED 15
779 IS 452 1973 CED 15
780 IS 453 1993 CED 15
781 IS 4621 1975 CED 15
782 IS 4992 1975 CED 15
783 IS 5187 1972 CED 15
784 IS 5899 1970 CED 15
785 IS 6315 1992 CED 15
786 IS 6318 1971 CED 15
787 IS 6343 1982 CED 15
788 IS 7196 1974 CED 15
789 IS 7197 1974 CED 15
790 IS 7534 1985 CED 15
791 IS 8756 1978 CED 15
792 IS 9106 1979 CED 15
793 IS 9460 1980 CED 15
794 IS 9899 1981 CED 15
795 IS 10701 2012 CED 20
796 IS 12053 1987 CED 20
797 IS 12077 1987 CED 20
798 IS 12120 1987 CED 20
799 IS 12406 2003 CED 20
800 IS 12823 1990 CED 20
801 IS 1328 1996 CED 20
802 IS 13745 1993 CED 20
803 IS 13957 1994 CED 20
804 IS 13958 1994 CED 20
805 IS 14276 1995 CED 20
806 IS 14315 1995 CED 20
807 IS 14587 1998 CED 20
808 IS 14588 1999 CED 20
809 IS 14616 1999 CED 20
810 IS 14842 2000 CED 20
811 IS 1508 1972 CED 20
812 IS 15476 2004 CED 20
813 IS 15491 2004 CED 20
814 IS 15512 2004 CED 20
815 IS 15684 2006 CED 20
816 IS 15786 2008 CED 20
817 IS 15791 2007 CED 20
818 IS 15877 2010 CED 20
819 IS 15878 2010 CED 20
820 IS 15932-1 2012 CED 20
821 IS 15972 2012 CED 20
822 IS 1658 2006 CED 20
823 IS 1659 2004 CED 20
824 IS 1734-1 1983 CED 20
825 IS 1734-1 to 20 1983 CED 20
826 IS 1734-10 1983 CED 20
827 IS 1734-11 1983 CED 20
828 IS 1734-12 1983 CED 20
829 IS 1734-13 1983 CED 20
830 IS 1734-14 1983 CED 20
831 IS 1734-15 1983 CED 20
832 IS 1734-16 1983 CED 20
833 IS 1734-17 1983 CED 20
834 IS 1734-18 1983 CED 20
835 IS 1734-19 1983 CED 20
836 IS 1734-2 1983 CED 20
837 IS 1734-20 1983 CED 20
838 IS 1734-3 1983 CED 20
839 IS 1734-4 1983 CED 20
840 IS 1734-5 1983 CED 20
841 IS 1734-6 1983 CED 20
842 IS 1734-7 1983 CED 20
843 IS 1734-8 1983 CED 20
844 IS 1734-9 1983 CED 20
845 IS 2380-1 to 21 1977 CED 20
846 IS 2380-22 1981 CED 20
847 IS 2380-23 1981 CED 20
848 IS 303 1989 CED 20
849 IS 3087 2005 CED 20
850 IS 3097 2006 CED 20
851 IS 3129 1985 CED 20
852 IS 3308 1981 CED 20
853 IS 3348 1965 CED 20
854 IS 3478 1966 CED 20
855 IS 3513-1 1989 CED 20
856 IS 3513-2 1989 CED 20
857 IS 3513-3 1989 CED 20
858 IS 3513-4 1966 CED 20
859 IS 4834 1968 CED 20
860 IS 4835 1979 CED 20
861 IS 4859 1968 CED 20
862 IS 4990 2011 CED 20
863 IS 5509 2000 CED 20
864 IS 5539 1969 CED 20
865 IS 652 1960 CED 20
866 IS 709 1974 CED 20
867 IS 710 2010 CED 20
868 IS 7316 1974 CED 20
869 IS 7638 1999 CED 20
870 IS 848 2006 CED 20
871 IS 851 1978 CED 20
872 IS 852 1994 CED 20
873 IS 9188 1979 CED 20
874 IS 9307-1 to 8 1979 CED 20
875 IS 9307-2 1979 CED 20
876 IS 9307-3 1979 CED 20
877 IS 9307-4 1979 CED 20
878 IS 9307-5 1979 CED 20
879 IS 9307-6 1979 CED 20
880 IS 9307-7 1979 CED 20
881 IS 9307-8 1979 CED 20
882 IS 10204 2001 CED 22
883 IS 10460 1983 CED 22
884 IS 10658 1999 CED 22
885 IS 10993 1984 CED 22
886 IS 11101 1984 CED 22
887 IS 11108 1984 CED 22
888 IS 11360 1985 CED 22
889 IS 11833 1986 CED 22
890 IS 12717 1989 CED 22
891 IS 12796 1989 CED 22
892 IS 12805 1989 CED 22
893 IS 12835-1 1989 CED 22
894 IS 12853 1989 CED 22
895 IS 12859 1989 CED 22
896 IS 12861 1989 CED 22
897 IS 12862 1989 CED 22
898 IS 13039 1991 CED 22
899 IS 13385 1992 CED 22
900 IS 13386 1992 CED 22
901 IS 13849 1993 CED 22
902 IS 14609 1999 CED 22
903 IS 14851 2000 CED 22
904 IS 14933 2001 CED 22
905 IS 14951 2001 CED 22
906 IS 15051 2001 CED 22
907 IS 15105 2002 CED 22
908 IS 15220 2002 CED 22
909 IS 15221 2002 CED 22
910 IS 15222 2002 CED 22
911 IS 15301 2003 CED 22
912 IS 15325 2003 CED 22
913 IS 15397 2003 CED 22
914 IS 15493 2004 CED 22
915 IS 15496 2004 CED 22
916 IS 15497 2004 CED 22
917 IS 15501 2004 CED 22
918 IS 15505 2004 CED 22
919 IS 15506 2004 CED 22
920 IS 15517 2004 CED 22
921 IS 15519 2004 CED 22
922 IS 15525 2004 CED 22
923 IS 15528 2004 CED 22
924 IS 15682 2006 CED 22
925 IS 15683 2006 CED 22
926 IS 15811 2008 CED 22
927 IS 15821 2008 CED 22
928 IS 15835 2009 CED 22
929 IS 15908 2011 CED 22
930 IS 16018 2012 CED 22
931 IS 16088 2012 CED 22
932 IS 1941-1 1976 CED 22
933 IS 2097 2012 CED 22
934 IS 2171 1999 CED 22
935 IS 2175 1988 CED 22
936 IS 2189 2008 CED 22
937 IS 2190 2010 CED 22
938 IS 2298 1977 CED 22
939 IS 2546 1974 CED 22
940 IS 2696 1974 CED 22
941 IS 2745 1983 CED 22
942 IS 2871 1983 CED 22
943 IS 2871 2012 CED 22
944 IS 2878 2004 CED 22
945 IS 2925 1984 CED 22
946 IS 2925 1984 CED 22
947 IS 2930 1980 CED 22
948 IS 3582 1984 CED 22
949 IS 3744 1985 CED 22
950 IS 3844 1989 CED 22
951 IS 4151 1993 CED 22
952 IS 4308 2003 CED 22
953 IS 4571 1977 CED 22
954 IS 4643 1984 CED 22
955 IS 4861 1984 CED 22
956 IS 4862-1 1986 CED 22
957 IS 4927 1992 CED 22
958 IS 4928 1986 CED 22
959 IS 4947 2006 CED 22
960 IS 4989 2006 CED 22
961 IS 4989-4 2003 CED 22
962 IS 5131 2002 CED 22
963 IS 5290 1993 CED 22
964 IS 5486 1985 CED 22
965 IS 5505 1985 CED 22
966 IS 5612-1 1977 CED 22
967 IS 5612-2 1977 CED 22
968 IS 5714 1981 CED 22
969 IS 5888 1970 CED 22
970 IS 5896-1 1970 CED 22
971 IS 5896-3 1975 CED 22
972 IS 6026 1985 CED 22
973 IS 6067 1983 CED 22
974 IS 6070 1983 CED 22
975 IS 6234 2003 CED 22
976 IS 7673 2004 CED 22
977 IS 7692 1993 CED 22
978 IS 8090 1976 CED 22
979 IS 8096 1992 CED 22
980 IS 8149 1994 CED 22
981 IS 8423 1994 CED 22
982 IS 8442 2008 CED 22
983 IS 884 1985 CED 22
984 IS 901 1988 CED 22
985 IS 902 1992 CED 22
986 IS 903 1993 CED 22
987 IS 904 1983 CED 22
988 IS 905 1980 CED 22
989 IS 906 1988 CED 22
990 IS 907 1984 CED 22
991 IS 908 1975 CED 22
992 IS 909 1992 CED 22
993 IS 910 1980 CED 22
994 IS 926 1985 CED 22
995 IS 927 1981 CED 22
996 IS 928 1984 CED 22
997 IS 937 1981 CED 22
998 IS 939 1977 CED 22
999 IS 940 2003 CED 22
1000 IS 941 1985 CED 22
1001 IS 942 1982 CED 22
1002 IS 943 1979 CED 22
1003 IS 944 1979 CED 22
1004 IS 947 1985 CED 22
1005 IS 948 1983 CED 22
1006 IS 949 2012 CED 22
1007 IS 950 2012 CED 22
1008 IS 951 2003 CED 22
1009 IS 952 1986 CED 22
1010 IS 952 2012 CED 22
1011 IS 955 1980 CED 22
1012 IS 956 2004 CED 22
1013 IS 9562 1980 CED 22
1014 IS 957 1967 CED 22
1015 IS 9668 1990 CED 22
1016 IS 9695 1980 CED 22
1017 IS 9972 2002 CED 22
1018 IS 9973 1981 CED 22
1019 IS 9995 1981 CED 22
1020 IS 10037-1 1981 CED 24
1021 IS 10037-2 1983 CED 24
1022 IS 10037-3 1983 CED 24
1023 IS 10053 1981 CED 24
1024 IS 10261 1982 CED 24
1025 IS 10313 1982 CED 24
1026 IS 10446 1983 CED 24
1027 IS 10552 1983 CED 24
1028 IS 10553-1 1983 CED 24
1029 IS 10553-2 1983 CED 24
1030 IS 10553-4 1983 CED 24
1031 IS 10553-5 1987 CED 24
1032 IS 10595 1983 CED 24
1033 IS 11117 1984 CED 24
1034 IS 11208 1985 CED 24
1035 IS 11387 1985 CED 24
1036 IS 11397 1985 CED 24
1037 IS 11401-1 1985 CED 24
1038 IS 11401-2 1990 CED 24
1039 IS 1172 1993 CED 24
1040 IS 11906 1986 CED 24
1041 IS 11925 1986 CED 24
1042 IS 11931 1987 CED 24
1043 IS 11972 1987 CED 24
1044 IS 12183-1 1987 CED 24
1045 IS 12251 1987 CED 24
1046 IS 12288 1987 CED 24
1047 IS 12314 1987 CED 24
1048 IS 13166 1992 CED 24
1049 IS 13496 1992 CED 24
1050 IS 1742 1983 CED 24
1051 IS 2064 1993 CED 24
1052 IS 2065 1983 CED 24
1053 IS 2470-1 1985 CED 24
1054 IS 2470-2 1985 CED 24
1055 IS 3114 1994 CED 24
1056 IS 4111-1 1986 CED 24
1057 IS 4111-2 1985 CED 24
1058 IS 4111-3 1985 CED 24
1059 IS 4111-4 1968 CED 24
1060 IS 4111-5 1993 CED 24
1061 IS 4127 1983 CED 24
1062 IS 5329 1983 CED 24
1063 IS 5611 1987 CED 24
1064 IS 5822 1994 CED 24
1065 IS 6279 1971 CED 24
1066 IS 6280 1971 CED 24
1067 IS 6295 1986 CED 24
1068 IS 6924 1973 CED 24
1069 IS 7090 1985 CED 24
1070 IS 7208 1992 CED 24
1071 IS 7232 1974 CED 24
1072 IS 7558 1974 CED 24
1073 IS 7740 1985 CED 24
1074 IS 8413-1 1977 CED 24
1075 IS 8413-2 1982 CED 24
1076 IS 8419-1 1977 CED 24
1077 IS 8419-2 1984 CED 24
1078 IS 9110 1979 CED 24
1079 IS 9222-1 1990 CED 24
1080 SP 35 1987 CED 24
1081 IS 10067 1982 CED 29
1082 IS 10291 1982 CED 29
1083 IS 10302 1982 CED 29
1084 IS 13415 1992 CED 29
1085 IS 13416-1 1992 CED 29
1086 IS 13416-2 1992 CED 29
1087 IS 13416-3 1994 CED 29
1088 IS 13416-4 1994 CED 29
1089 IS 13416-5 1994 CED 29
1090 IS 13430 1992 CED 29
1091 IS 15883-1 2009 CED 29
1092 IS 15883-2 2013 CED 29
1093 IS 3696-1 1987 CED 29
1094 IS 3696-2 1991 CED 29
1095 IS 3764 1992 CED 29
1096 IS 4014-2 1967 CED 29
1097 IS 4081 1986 CED 29
1098 IS 4082 1996 CED 29
1099 IS 4130 1991 CED 29
1100 IS 4138 1977 CED 29
1101 IS 4756 1978 CED 29
1102 IS 4912 1978 CED 29
1103 IS 5121 1969 CED 29
1104 IS 5916 1970 CED 29
1105 IS 7272-1 1974 CED 29
1106 IS 7293 1974 CED 29
1107 IS 7969 1975 CED 29
1108 IS 8989 1978 CED 29
1109 SP 70 2001 CED 29
1110 IS 1077 1992 CED 30
1111 IS 11650 1991 CED 30
1112 IS 13317 1992 CED 30
1113 IS 13757 1993 CED 30
1114 IS 1464 1992 CED 30
1115 IS 1478 1992 CED 30
1116 IS 1725 1982 CED 30
1117 IS 2117 1991 CED 30
1118 IS 2180 1988 CED 30
1119 IS 2222 1991 CED 30
1120 IS 2248 1992 CED 30
1121 IS 2690-1 1993 CED 30
1122 IS 2690-2 1992 CED 30
1123 IS 2691 1988 CED 30
1124 IS 3367 1993 CED 30
1125 IS 3495-1 to 4 1992 CED 30
1126 IS 3583 1988 CED 30
1127 IS 3583 (B) 1988 CED 30
1128 IS 3951-1 2009 CED 30
1129 IS 3951-2 2009 CED 30
1130 IS 3952 1988 CED 30
1131 IS 3978 1967 CED 30
1132 IS 4805 1978 CED 30
1133 IS 4885 1988 CED 30
1134 IS 5454 1978 CED 30
1135 IS 5779 1986 CED 30
1136 IS 6165 1992 CED 30
1137 IS 654 1992 CED 30
1138 IS 7556 1988 CED 30
1139 IS 8920 1978 CED 30
1140 IS H3583 1988 CED 30
1141 IS 11525 1986 CED 35
1142 IS 11679 1986 CED 35
1143 IS 12674-1 1989 CED 35
1144 IS 12674-2 1989 CED 35
1145 IS 12680 1989 CED 35
1146 IS 13089 1991 CED 35
1147 IS 13713 1993 CED 35
1148 IS 13896 1994 CED 35
1149 IS 1829-1 1978 CED 35
1150 IS 1829-2 1993 CED 35
1151 IS 1883 1983 CED 35
1152 IS 2695 1993 CED 35
1153 IS 3312 1984 CED 35
1154 IS 3313 1983 CED 35
1155 IS 3314 1984 CED 35
1156 IS 3497 1992 CED 35
1157 IS 3498 1993 CED 35
1158 IS 3499-1 1985 CED 35
1159 IS 3499-2 1985 CED 35
1160 IS 3499-2 (B) 1985 CED 35
1161 IS 3663 1991 CED 35
1162 IS 3761 1983 CED 35
1163 IS 3762 1979 CED 35
1164 IS 3763 1983 CED 35
1165 IS 3791 1983 CED 35
1166 IS 3845 1966 CED 35
1167 IS 4103 1977 CED 35
1168 IS 4116 1988 CED 35
1169 IS 4126 1986 CED 35
1170 IS 4204 1974 CED 35
1171 IS 4205 1989 CED 35
1172 IS 4414 1990 CED 35
1173 IS 4415 1974 CED 35
1174 IS 4837 1990 CED 35
1175 IS 4837 (B) 1990 CED 35
1176 IS 4838 1990 CED 35
1177 IS 5391 1992 CED 35
1178 IS 5416-1 1988 CED 35
1179 IS 5416-2 1988 CED 35
1180 IS 5533 1969 CED 35
1181 IS 5823 1986 CED 35
1182 IS 5923 1986 CED 35
1183 IS 5967-1 1988 CED 35
1184 IS 5967-2 1988 CED 35
1185 IS 5974 1986 CED 35
1186 IS 6179 1971 CED 35
1187 IS 6184 1971 CED 35
1188 IS 6185 1971 CED 35
1189 IS 6188 1988 CED 35
1190 IS 6189 1985 CED 35
1191 IS 6632 1988 CED 35
1192 IS 7070 1988 CED 35
1193 IS 7076 1983 CED 35
1194 IS 7259-1 1988 CED 35
1195 IS 7760 1985 CED 35
1196 IS 7761 1983 CED 35
1197 IS 8126 1993 CED 35
1198 IS 8467 1977 CED 35
1199 IS 8761 1978 CED 35
1200 IS 9236 1993 CED 35
1201 IS 9715 1981 CED 35
1202 IS 12456 2004 CED 36
1203 IS 11457-1 1985 CED 36
1204 IS 11460 1985 CED 36
1205 IS 12349 1988 CED 36
1206 IS 12407 1988 CED 36
1207 IS 12458 1988 CED 36
1208 IS 12459 1988 CED 36
1209 IS 12777 1989 CED 36
1210 IS 13045 1991 CED 36
1211 IS 13694 1993 CED 36
1212 IS 13716 1993 CED 36
1213 IS 14435 1997 CED 36
1214 IS 14689 1999 CED 36
1215 IS 14850 2000 CED 36
1216 IS 15381 2003 CED 36
1217 IS 15394 2003 CED 36
1218 IS 1641 1988 CED 36
1219 IS 1642 1989 CED 36
1220 IS 1643 1988 CED 36
1221 IS 1644 1988 CED 36
1222 IS 1646 1997 CED 36
1223 IS 2726 1988 CED 36
1224 IS 3034 1993 CED 36
1225 IS 3058 1990 CED 36
1226 IS 3079 1990 CED 36
1227 IS 3594 1991 CED 36
1228 IS 3595 2002 CED 36
1229 IS 3614-1 1966 CED 36
1230 IS 3614-2 1992 CED 36
1231 IS 3808 1979 CED 36
1232 IS 3809 1979 CED 36
1233 IS 3836 2000 CED 36
1234 IS 4226 1988 CED 36
1235 IS 4886 1991 CED 36
1236 IS 6329 2000 CED 36
1237 IS 8757 1999 CED 36
1238 IS 8758 1993 CED 36
1239 IS 8758 (B) 1993 CED 36
1240 IS 9109 2000 CED 36
1241 IS 875-1 1987 CED 37
1242 IS 875-2 1987 CED 37
1243 IS 875-3 1987 CED 37
1244 IS 875-4 1987 CED 37
1245 IS 875-5 1987 CED 37
1246 SP 64 2001 CED 37
1247 IS 11384 1985 CED 38
1248 IS 11504 1985 CED 38
1249 IS 11682 1985 CED 38
1250 IS 2210 1988 CED 38
1251 IS 3935 1966 CED 38
1252 IS 4090 1967 CED 38
1253 IS 4995-1 1974 CED 38
1254 IS 4995-2 1974 CED 38
1255 IS 4998-1 1992 CED 38
1256 SP 43 1987 CED 38
1257 IS 13827 1993 CED 39
1258 IS 13828 1993 CED 39
1259 IS 13920 1993 CED 39
1260 IS 13935 2009 CED 39
1261 IS 15988 2013 CED 39
1262 IS 1893 1984 CED 39
1263 IS 1893-1 2002 CED 39
1264 IS 1893-4 2005 CED 39
1265 IS 4326 1993 CED 39
1266 IS 4967 1968 CED 39
1267 IS 4991 1968 CED 39
1268 IS 6922 1973 CED 39
1269 IS 12027 1987 CED 41
1270 IS 12054 1987 CED 41
1271 IS 13182 1991 CED 41
1272 IS 1322 1993 CED 41
1273 IS 13435-1 1992 CED 41
1274 IS 13435-2 1992 CED 41
1275 IS 13435-3 1992 CED 41
1276 IS 13435-4 1992 CED 41
1277 IS 13435-5 1992 CED 41
1278 IS 1346 1991 CED 41
1279 IS 13826-1 1993 CED 41
1280 IS 13826-2 1993 CED 41
1281 IS 13826-3 1993 CED 41
1282 IS 13826-4 1993 CED 41
1283 IS 13826-5 1994 CED 41
1284 IS 13826-6 1993 CED 41
1285 IS 13826-7 1983 CED 41
1286 IS 13826-7 1993 CED 41
1287 IS 14695 1999 CED 41
1288 IS 1580 1991 CED 41
1289 IS 1609 1991 CED 41
1290 IS 3036 1992 CED 41
1291 IS 3037 1986 CED 41
1292 IS 3067 1988 CED 41
1293 IS 3384 1986 CED 41
1294 IS 4365 1967 CED 41
1295 IS 4911 1986 CED 41
1296 IS 5871 1987 CED 41
1297 IS 6494 1988 CED 41
1298 IS 7193 1994 CED 41
1299 IS 7198 1974 CED 41
1300 IS 7290 1979 CED 41
1301 IS 9918 1981 CED 41
1302 IS 10042 1981 CED 43
1303 IS 10074 1982 CED 43
1304 IS 10077 1982 CED 43
1305 IS 10108 1982 CED 43
1306 IS 10270 1982 CED 43
1307 IS 10379 1982 CED 43
1308 IS 10442 1983 CED 43
1309 IS 10589 1983 CED 43
1310 IS 1080 1985 CED 43
1311 IS 10837 1984 CED 43
1312 IS 11089 1984 CED 43
1313 IS 11196 1985 CED 43
1314 IS 11209 1985 CED 43
1315 IS 11229 1985 CED 43
1316 IS 11233 1985 CED 43
1317 IS 11550 1985 CED 43
1318 IS 11593 1986 CED 43
1319 IS 11594 1985 CED 43
1320 IS 11629 1986 CED 43
1321 IS 12023 1987 CED 43
1322 IS 12175 1987 CED 43
1323 IS 12208 1987 CED 43
1324 IS 12287 1988 CED 43
1325 IS 12979 1990 CED 43
1326 IS 13094 1992 CED 43
1327 IS 13301 1992 CED 43
1328 IS 13468 1992 CED 43
1329 IS 14893 2001 CED 43
1330 IS 1498 1970 CED 43
1331 IS 15284-1 2003 CED 43
1332 IS 15284-2 2004 CED 43
1333 IS 1888 1982 CED 43
1334 IS 1892 1979 CED 43
1335 IS 1904 1986 CED 43
1336 IS 2131 1981 CED 43
1337 IS 2132 1986 CED 43
1338 IS 2720-1 1983 CED 43
1339 IS 2720-10 1991 CED 43
1340 IS 2720-11 1993 CED 43
1341 IS 2720-12 1981 CED 43
1342 IS 2720-13 1986 CED 43
1343 IS 2720-14 1983 CED 43
1344 IS 2720-15 1965 CED 43
1345 IS 2720-16 1987 CED 43
1346 IS 2720-17 1986 CED 43
1347 IS 2720-18 1992 CED 43
1348 IS 2720-19 1992 CED 43
1349 IS 2720-2 1973 CED 43
1350 IS 2720-20 1992 CED 43
1351 IS 2720-21 1977 CED 43
1352 IS 2720-22 1972 CED 43
1353 IS 2720-23 1976 CED 43
1354 IS 2720-24 1976 CED 43
1355 IS 2720-25 1982 CED 43
1356 IS 2720-26 1987 CED 43
1357 IS 2720-27 1977 CED 43
1358 IS 2720-28 1974 CED 43
1359 IS 2720-29 1975 CED 43
1360 IS 2720-30 1980 CED 43
1361 IS 2720-31 1990 CED 43
1362 IS 2720-3-1 1980 CED 43
1363 IS 2720-3-2 1980 CED 43
1364 IS 2720-33 1971 CED 43
1365 IS 2720-34 1972 CED 43
1366 IS 2720-35 1974 CED 43
1367 IS 2720-36 1987 CED 43
1368 IS 2720-37 1976 CED 43
1369 IS 2720-38 1976 CED 43
1370 IS 2720-39-1 1977 CED 43
1371 IS 2720-39-2 1979 CED 43
1372 IS 2720-4 1985 CED 43
1373 IS 2720-40 1977 CED 43
1374 IS 2720-41 1977 CED 43
1375 IS 2720-5 1985 CED 43
1376 IS 2720-6 1972 CED 43
1377 IS 2720-7 1980 CED 43
1378 IS 2720-8 1983 CED 43
1379 IS 2720-9 1992 CED 43
1380 IS 2809 1972 CED 43
1381 IS 2810 1979 CED 43
1382 IS 2911-1-1 2010 CED 43
1383 IS 2911-1-2 2010 CED 43
1384 IS 2911-1-3 2010 CED 43
1385 IS 2911-1-4 2010 CED 43
1386 IS 2911-2 1980 CED 43
1387 IS 2911-3 1980 CED 43
1388 IS 2911-4 1985 CED 43
1389 IS 2950-1 1981 CED 43
1390 IS 2974-1 1982 CED 43
1391 IS 2974-2 1980 CED 43
1392 IS 2974-3 1992 CED 43
1393 IS 2974-4 1979 CED 43
1394 IS 2974-5 1987 CED 43
1395 IS 4091 1979 CED 43
1396 IS 4332-1 1967 CED 43
1397 IS 4332-10 1969 CED 43
1398 IS 4332-2 1967 CED 43
1399 IS 4332-3 1967 CED 43
1400 IS 4332-4 1968 CED 43
1401 IS 4332-5 1970 CED 43
1402 IS 4332-6 1972 CED 43
1403 IS 4332-7 1973 CED 43
1404 IS 4332-8 1969 CED 43
1405 IS 4332-9 1970 CED 43
1406 IS 4434 1978 CED 43
1407 IS 4968-1 1976 CED 43
1408 IS 4968-2 1976 CED 43
1409 IS 4968-3 1976 CED 43
1410 IS 5249 1992 CED 43
1411 IS 6403 1981 CED 43
1412 IS 8009-1 1976 CED 43
1413 IS 8009-2 1980 CED 43
1414 IS 8763 1978 CED 43
1415 IS 9198 1979 CED 43
1416 IS 9214 1979 CED 43
1417 IS 9259 1979 CED 43
1418 IS 9456 1980 CED 43
1419 IS 9556 1980 CED 43
1420 IS 9640 1980 CED 43
1421 IS 9669 1980 CED 43
1422 IS 9716 1981 CED 43
1423 IS 9759 1981 CED 43
1424 SP 36-1 1987 CED 43
1425 SP 36-2 1988 CED 43
1426 IS 1200-1 1992 CED 44
1427 IS 1200-10 1973 CED 44
1428 IS 1200-11 1977 CED 44
1429 IS 1200-12 1976 CED 44
1430 IS 1200-13 1994 CED 44
1431 IS 1200-14 1984 CED 44
1432 IS 1200-15 1987 CED 44
1433 IS 1200-16 1979 CED 44
1434 IS 1200-18 1974 CED 44
1435 IS 1200-19 1981 CED 44
1436 IS 1200-2 1974 CED 44
1437 IS 1200-20 1981 CED 44
1438 IS 1200-21 1973 CED 44
1439 IS 1200-22 1982 CED 44
1440 IS 1200-23 1988 CED 44
1441 IS 1200-24 1983 CED 44
1442 IS 1200-25 1971 CED 44
1443 IS 1200-26 1987 CED 44
1444 IS 1200-27 1992 CED 44
1445 IS 1200-28 1992 CED 44
1446 IS 1200-3 1976 CED 44
1447 IS 1200-4 1976 CED 44
1448 IS 1200-5 1982 CED 44
1449 IS 1200-6 1974 CED 44
1450 IS 1200-7 1972 CED 44
1451 IS 1200-8 1993 CED 44
1452 IS 1200-9 1973 CED 44
1453 IS 3861 2002 CED 44
1454 SP 27 1987 CED 44
1455 SP 7 2005 CED 46
1456 SP 7 : Group 1 2005 CED 46
1457 SP 7 : Group 2 2005 CED 46
1458 SP 7 : Group 3 2005 CED 46
1459 SP 7 : Group 4 2005 CED 46
1460 SP 7 : Group 5 2005 CED 46
1461 IS 10020-4 1981 CED 47
1462 IS 4651-1 1974 CED 47
1463 IS 4651-2 1989 CED 47
1464 IS 4651-3 1974 CED 47
1465 IS 4651-4 1989 CED 47
1466 IS 4651-5 1980 CED 47
1467 IS 7314 1974 CED 47
1468 IS 9527-1 1981 CED 47
1469 IS 9527-3 1983 CED 47
1470 IS 9527-4 1980 CED 47
1471 IS 9527-6 1989 CED 47
1472 IS 10050 1981 CED 48
1473 IS 10082 1981 CED 48
1474 IS 10782 1983 CED 48
1475 IS 11309 1985 CED 48
1476 IS 11315-1 1987 CED 48
1477 IS 11315-10 1987 CED 48
1478 IS 11315-11 1985 CED 48
1479 IS 11315-12 1992 CED 48
1480 IS 11315-2 1987 CED 48
1481 IS 11315-3 1987 CED 48
1482 IS 11315-4 1987 CED 48
1483 IS 11315-5 1987 CED 48
1484 IS 11315-6 1987 CED 48
1485 IS 11315-7 1987 CED 48
1486 IS 11315-8 1987 CED 48
1487 IS 11315-9 1987 CED 48
1488 IS 11358 1987 CED 48
1489 IS 12070 1987 CED 48
1490 IS 12608 1989 CED 48
1491 IS 12634 1989 CED 48
1492 IS 12955-1 1990 CED 48
1493 IS 12955-2 1990 CED 48
1494 IS 13030 1991 CED 48
1495 IS 13047 1991 CED 48
1496 IS 13063 1991 CED 48
1497 IS 13365-1 1998 CED 48
1498 IS 13365-2 1992 CED 48
1499 IS 13365-3 1997 CED 48
1500 IS 13372-1 1992 CED 48
1501 IS 13372-2 1992 CED 48
1502 IS 13414 1992 CED 48
1503 IS 13946-1 1994 CED 48
1504 IS 13946-2 1994 CED 48
1505 IS 13946-3 1994 CED 48
1506 IS 13946-4 1994 CED 48
1507 IS 14243-1 1995 CED 48
1508 IS 14243-2 1995 CED 48
1509 IS 14395 1996 CED 48
1510 IS 14396-1 to 4 1996 CED 48
1511 IS 14436 1997 CED 48
1512 IS 14448 1997 CED 48
1513 IS 14593 1998 CED 48
1514 IS 14881 2001 CED 48
1515 IS 15026 2002 CED 48
1516 IS 15180 2002 CED 48
1517 IS 7317 1993 CED 48
1518 IS 7746 1991 CED 48
1519 IS 8764 1998 CED 48
1520 IS 9143 1979 CED 48
1521 IS 9179 1979 CED 48
1522 IS 9221 1979 CED 48
1523 IS 10124-1 2009 CED 50
1524 IS 10124-10 2009 CED 50
1525 IS 10124-11 2009 CED 50
1526 IS 10124-12 2009 CED 50
1527 IS 10124-13 2009 CED 50
1528 IS 10124-2 2009 CED 50
1529 IS 10124-3 2009 CED 50
1530 IS 10124-4 2009 CED 50
1531 IS 10124-5 2009 CED 50
1532 IS 10124-6 2009 CED 50
1533 IS 10124-7 2009 CED 50
1534 IS 10124-8 2009 CED 50
1535 IS 10124-9 2009 CED 50
1536 IS 12231 1987 CED 50
1537 IS 12235-1 to 19 2004 CED 50
1538 IS 12709 1994 CED 50
1539 IS 12818 2010 CED 50
1540 IS 13592 1992 CED 50
1541 IS 13593 1992 CED 50
1542 IS 13916 1994 CED 50
1543 IS 14333 1996 CED 50
1544 IS 14402 1996 CED 50
1545 IS 14735 1999 CED 50
1546 IS 14787 2000 CED 50
1547 IS 14885 2001 CED 50
1548 IS 15265 2003 CED 50
1549 IS 15328 2003 CED 50
1550 IS 15450 2004 CED 50
1551 IS 15778 2007 CED 50
1552 IS 15801 2008 CED 50
1553 IS 15927-1 2012 CED 50
1554 IS 15927-2 2012 CED 50
1555 IS 15927-3 2011 CED 50
1556 IS 16098-1 2013 CED 50
1557 IS 16098-2 2013 CED 50
1558 IS 4984 1995 CED 50
1559 IS 4985 2000 CED 50
1560 IS 7634-1 1975 CED 50
1561 IS 7634-2 2012 CED 50
1562 IS 7634-3 2003 CED 50
1563 IS 7834-1 1987 CED 50
1564 IS 7834-2 1987 CED 50
1565 IS 7834-3 1987 CED 50
1566 IS 7834-4 1987 CED 50
1567 IS 7834-5 1987 CED 50
1568 IS 7834-6 1987 CED 50
1569 IS 7834-7 1987 CED 50
1570 IS 7834-8 1987 CED 50
1571 IS 8008-1 2003 CED 50
1572 IS 8008-2 2003 CED 50
1573 IS 8008-3 2003 CED 50
1574 IS 8008-4 2003 CED 50
1575 IS 8008-5 2003 CED 50
1576 IS 8008-6 2003 CED 50
1577 IS 8008-7 2003 CED 50
1578 IS 8008-8 2003 CED 50
1579 IS 8008-9 2003 CED 50
1580 IS 8360-1 1977 CED 50
1581 IS 8360-2 1977 CED 50
1582 IS 8360-3 1977 CED 50
1583 IS 9271 2004 CED 50
1584 SP 57 1993 CED 50
1585 IS 10297 1982 CED 51
1586 IS 10316 1986 CED 51
1587 IS 10505 1983 CED 51
1588 IS 10600 1983 CED 51
1589 IS 11447 1985 CED 51
1590 IS 11775 1986 CED 51
1591 IS 12073 1987 CED 51
1592 IS 13612-1 1993 CED 51
1593 IS 13613 1992 CED 51
1594 IS 13727 1993 CED 51
1595 IS 13990 1994 CED 51
1596 IS 13994 1994 CED 51
1597 IS 14142 1994 CED 51
1598 IS 14143 1994 CED 51
1599 IS 14201 1994 CED 51
1600 IS 14213 1994 CED 51
1601 IS 14215 1994 CED 51
1602 IS 14241 1995 CED 51
1603 IS 14242 1995 CED 51
1604 IS 1553 1989 CED 51
1605 IS 15916 2011 CED 51
1606 IS 15917 2010 CED 51
1607 IS 2661 1978 CED 51
1608 IS 2662 1978 CED 51
1609 IS 2663 1989 CED 51
1610 IS 3201 1988 CED 51
1611 IS 4878 1986 CED 51
1612 IS 4919 1981 CED 51
1613 IS 4993 1983 CED 51
1614 IS 5197 1987 CED 51
1615 IS 6072 1971 CED 51
1616 IS 6073 2006 CED 51
1617 IS 6408-1 1990 CED 51
1618 IS 6408-2 1992 CED 51
1619 IS 6820 1987 CED 51
1620 IS 7564-1 1974 CED 51
1621 IS 7564-2 1974 CED 51
1622 IS 7564-3 1974 CED 51
1623 IS 7564-4 1975 CED 51
1624 IS 7564-5 1974 CED 51
1625 IS 7921 1987 CED 51
1626 IS 7922 1987 CED 51
1627 IS 7973 1976 CED 51
1628 IS 8338 1976 CED 51
1629 IS 8888-1 1993 CED 51
1630 IS 962 1989 CED 51
1631 IS 11267 1985 CED 53
1632 IS 11275 1985 CED 53
1633 IS 11276 1985 CED 53
1634 IS 11450 2006 CED 53
1635 IS 11451 1986 CED 53
1636 IS 11707 1986 CED 53
1637 IS 11767 2005 CED 53
1638 IS 11768 1986 CED 53
1639 IS 11769-1 1987 CED 53
1640 IS 11769-2 2005 CED 53
1641 IS 11769-3 1986 CED 53
1642 IS 11770-1 1987 CED 53
1643 IS 11770-2 2006 CED 53
1644 IS 11770-3 1987 CED 53
1645 IS 12078 1987 CED 53
1646 IS 12079 1987 CED 53
1647 IS 12080 1987 CED 53
1648 IS 12081-1 1987 CED 53
1649 IS 12081-2 1987 CED 53
1650 IS 12082-1 2006 CED 53
1651 IS 12082-2 2006 CED 53
1652 IS 12440 1988 CED 53
1653 IS 12592 2002 CED 53
1654 IS 13000 1990 CED 53
1655 IS 13008 1990 CED 53
1656 IS 13158 1991 CED 53
1657 IS 1332 1986 CED 53
1658 IS 13356 1992 CED 53
1659 IS 14862 2000 CED 53
1660 IS 14871 2000 CED 53
1661 IS 15155 2002 CED 53
1662 IS 1592 2003 CED 53
1663 IS 1626-1 1994 CED 53
1664 IS 1626-2 1994 CED 53
1665 IS 1626-3 1994 CED 53
1666 IS 1678 1998 CED 53
1667 IS 1916 1989 CED 53
1668 IS 2096 1992 CED 53
1669 IS 2098 1997 CED 53
1670 IS 2174 1962 CED 53
1671 IS 2185-1 2005 CED 53
1672 IS 2185-2 1983 CED 53
1673 IS 2185-3 1984 CED 53
1674 IS 2185-4 2008 CED 53
1675 IS 2193 1986 CED 53
1676 IS 2572 2005 CED 53
1677 IS 2905 1989 CED 53
1678 IS 3007-1 1999 CED 53
1679 IS 3007-2 1999 CED 53
1680 IS 3597 1966 CED 53
1681 IS 3597 1998 CED 53
1682 IS 3632 1969 CED 53
1683 IS 4350 1967 CED 53
1684 IS 458 2003 CED 53
1685 IS 459 1992 CED 53
1686 IS 4844 1968 CED 53
1687 IS 4996 1984 CED 53
1688 IS 5328 1969 CED 53
1689 IS 5748 1969 CED 53
1690 IS 5751 1984 CED 53
1691 IS 5758 1984 CED 53
1692 IS 5820 1970 CED 53
1693 IS 5913 2003 CED 53
1694 IS 6041 1985 CED 53
1695 IS 6042 1969 CED 53
1696 IS 6441-1 1972 CED 53
1697 IS 6441-2 1972 CED 53
1698 IS 6441-4 1972 CED 53
1699 IS 6441-5 1972 CED 53
1700 IS 6441-6 1973 CED 53
1701 IS 6441-7 1973 CED 53
1702 IS 6441-8 1973 CED 53
1703 IS 6441-9 1973 CED 53
1704 IS 6523 1983 CED 53
1705 IS 6530 1972 CED 53
1706 IS 6908 1991 CED 53
1707 IS 7319 1974 CED 53
1708 IS 7321 1974 CED 53
1709 IS 7322 1985 CED 53
1710 IS 7639 1975 CED 53
1711 IS 783 1985 CED 53
1712 IS 784 2001 CED 53
1713 IS 785 1998 CED 53
1714 IS 8870 1978 CED 53
1715 IS 9375 1979 CED 53
1716 IS 9627 1980 CED 53
1717 IS 9690 1980 CED 53
1718 IS 9691 1980 CED 53
1719 IS 9745 1981 CED 53
1720 IS 9872 1981 CED 53
1721 IS 9893 1981 CED 53
1722 IS 10790-1 1984 CED 54
1723 IS 10790-2 1984 CED 54
1724 IS 13620 1993 CED 54
1725 IS 14268 1995 CED 54
1726 IS 1566 1982 CED 54
1727 IS 1785-1 1983 CED 54
1728 IS 1785-2 1983 CED 54
1729 IS 1786 2008 CED 54
1730 IS 2090 1983 CED 54
1731 IS 432-1 1982 CED 54
1732 IS 432-2 1982 CED 54
1733 IS 6003 2010 CED 54
1734 IS 6006 1983 CED 54
1735 IS 9417 1989 CED 54
1736 IS 10483 1983 CED 55
1737 IS 1568 1970 CED 55
1738 IS 1607 1977 CED 55
1739 IS 2405-1 1980 CED 55
1740 IS 2405-2 1980 CED 55
1741 IS 3150 1982 CED 55
1742 IS 4124 1981 CED 55
1743 IS 460-1 1985 CED 55
1744 IS 460-2 1985 CED 55
1745 IS 460-3 1985 CED 55
1746 IS 4879 1968 CED 55
1747 IS 4961 1968 CED 55
1748 IS 5257 1969 CED 55
1749 IS 5258 1969 CED 55
1750 IS 5282 1969 CED 55
1751 IS 5421 1981 CED 55
1752 IS 5742-1 1970 CED 55
1753 IS 5742-2 1970 CED 55
1754 IS 14458-1 1998 CED 56
1755 IS 14458-2 1997 CED 56
1756 IS 14458-3 1998 CED 56
1757 IS 14496-2 1998 CED 56
1758 IS 14680 1999 CED 56
1759 IS 14804 2000 CED 56
1760 IS 14961 2001 CED 56
1761 IS 15498 2004 CED 57
1762 IS 15499 2004 CED 57
COMMITTEE2
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Cement and Concrete
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Sanitary Appliances and Water Fittings
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Building Limes and Gypsum Products
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Flooring, Wall Finishing and Roofing
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Stones
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Structural Engineering and structural sections
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Timber and Timber Stores
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Doors, Windows and Shutter
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Functional Requirements in Buildings
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Building Construction Practices including Painting, Varnishing and Allied Finishing
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Builder Hardware
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Wood and other Lignocellulosic products
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Fire Fighting
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Public Health Engineering.
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Construction Management including safety in Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Clay and Stabilized Soil Products for Construction
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Furniture
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Fire Safety
Structural Safety
Structural Safety
Structural Safety
Structural Safety
Structural Safety
Structural Safety
Special Structures
Special Structures
Special Structures
Special Structures
Special Structures
Special Structures
Special Structures
Special Structures
Special Structures
Special Structures
Earthquake Engineering
Earthquake Engineering
Earthquake Engineering
Earthquake Engineering
Earthquake Engineering
Earthquake Engineering
Earthquake Engineering
Earthquake Engineering
Earthquake Engineering
Earthquake Engineering
Earthquake Engineering
Earthquake Engineering
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Waterproofing and Damp-Proofing
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Soil and Foundation Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
National Building Code
National Building Code
National Building Code
National Building Code
National Building Code
National Building Code
Ports and Harbours
Ports and Harbours
Ports and Harbours
Ports and Harbours
Ports and Harbours
Ports and Harbours
Ports and Harbours
Ports and Harbours
Ports and Harbours
Ports and Harbours
Ports and Harbours
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Methods of Measurement of Works of Civil Engineering
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Rock Mechanics
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Plastic Piping System
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Cement Matrix Products
Cement Matrix Products
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Planning, Housing and pre-fabricated construction
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Cement Matrix Products
Concrete Reinforcement
Concrete Reinforcement
Concrete Reinforcement
Concrete Reinforcement
Concrete Reinforcement
Concrete Reinforcement
Concrete Reinforcement
Concrete Reinforcement
Concrete Reinforcement
Concrete Reinforcement
Concrete Reinforcement
Concrete Reinforcement
Concrete Reinforcement
Concrete Reinforcement
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Sieves, Sieving and other Sizing Methods
Hill Area Development Engineering
Hill Area Development Engineering
Hill Area Development Engineering
Hill Area Development Engineering
Hill Area Development Engineering
Hill Area Development Engineering
Hill Area Development Engineering
Cyclone Resistant Structure
Cyclone Resistant Structure
IS TITLE
Specification for machine for abrasion testing of coarse aggregates
Specification for jolting apparatus for testing cement
Specification for cylindrical metal measures for use in tests of aggregates and concrete
Specification for vibration machine for standard cement mortar cubes
Specification for moulds for use in tests of cement and concrete
Guidelines for concrete mix design proportioning
Specification for vee-bee consistometer
Specification for apparatus for measurement of water retentivity of masonry cement
Specification for planetary mixer used in tests of cement and pozzolana
Specification for calorimeter for determination of heat of hydration of hydraulic cement
Specification for cylinder measures for determination of air content of hydraulic cement mortar
Method for determination of specific surface area of powder and porous particle using low temperature gas adsorption techniques
Methods of sampling and analysis of concrete
Code of practice for use of screed board concrete vibrators
Specification for granulated slag for the manufacture of Portland slag cement
General requirements for pan mixers for concrete
53 grade ordinary Portland cement
Specification for 53 grade ordinary Portland cement (BI-LINGUAL)
Criteria for design of RCC hinges
Specificatioon for sulphate resisting Portland cement
Method for colorimetric analysis of hydraulic cement
Specification for low heat Portland cement
Methods of analysis of hydraulic cement by X-ray fluorescence spectrometer
Method of analysis of hydraulic cement by atomic absorption spectrophotometer
Method of Spmpling Calcined Clay Pozzalana-
Method of Non-destructive testing of concret, Part 1: Ultrasonic pulse velocity
Method of non-destructive testing of concret-methods of test, Part 2: Rebound hammer
Code of Practice for Prestressed Concrete
Specification for calcined clay pozzolana
Specification for autoclave apparatus
Guidelines for falsework for concrete structures
Requirements for compression testing machine used for testing of concrete and mortar
Specification for Portland pozzolana cement, Part 1: Flyash based
Specification for Portland-pozzolana cement, Part 2: calcined clay based
Method of Test determination of water soluble and acid soluble chlorides in mortar and concrete, Part 1: Fresh mortar and concrete
Method of Test determination of water soluble and acid soluble chlorides in mortar and concrete, Part 2: Hardened mortar and concrete
Specification for Silica Fume
Methods of test for pozzolanic materials
Methods of Test for Aggregates for Concrete, Part I: Particle Size and Shape
Methods of test for aggregates for concrete, Part 2: Estimation of deleterious materials and organic impurities
Methods of test for aggregates for concrete, Part 3: Specific gravity, density, voids, absorption and bulking
Methods of test for aggregates for concrete, Part 4: Mechanical properties
Methods of Test for Aggregates for Concrete, Part V: Soundness
Methods of test for aggregates for concrete, Part 6: Measuring mortar making properties of fine aggregates
Methods of Test for Aggregates for Concrete, Part VII: Alkali Aggregate Reactivity
Methods of Test for Aggregates for Concrete, Part VIII: Petrographic Examination
Methods for Sampling of Aggregates for Concrete
Code of Practice for Bending and Fixing of Bars for Concrete Reinforcement
Integral Waterproofing Compounds for Cement Mortar and Concrete -Specification
Specification for Ordinary Portland Cement, 33 Grade
Methods of testing bond in reinforced concrete, Part 1: Pull-out test
Method of Test for Permeability of Cement Mortar and Concrete
Code of practice Concrete structures for the storage of liquids, Part 1: General requirements
Code of Practice Concrete structures for the storage of liquids, Part 2: Reinforced concrete structures
Code of Practice Concrete structures for the storage of liquids, Part 3: Prestressed concrete structures
Code of practice for concrete structures for the storage of liquids, Part 4: Design tables
Specification for masonry cement
SPECIFICATION FOR MASONRY CEMENT
Methods of sampling hydraulic cement
Code of practice for use of immersion vibrators for consolidating concrete
Specification for Pulverized Fuel Ash, Part 1: For Use as Pozzolana in Cement, Cement Mortar and Concrete
Specification for Pulverized Fuel Ash, Part 2: For Use as Admixture in Cement Mortar and Concrete
Specification for Coarse and Fine Aggregates From Natural Sources For Concrete
Methods of physical tests for hydraulic cement, Part 1: Determination of fineness by dry sieving
Methods of physical tests for hydraulic cement, Part 10: Determination of drying shrinkage
Methods of physical tests for hydraulic cement, Part 11: Determination of density
Methods of physical tests for hydraulic cement, Part 12: Determination of air content of hydraulic cement mortar
Methods of Physical Tests for Hydraulic Cement, Part 13: Measurement of Water Retentivity of Masonry Cement
Methods of physical test for hydraulic cement, Part 14: Determination of false set
Methods of physical test for hydraulic cement, Part 15: Determination of fineness by wet sieving
Methods of physical tests for hydraulic cement, Part 2: Determination of fineness by specific surface by Blaine air permeability method
Methods of physical tests for hydraulic cement, Part 3: Determination of soundness
Methods of physical tests for hydraulic cement, Part 4: Determination of consistency of standard cement paste
Methods of physical tests for hydraulic cement, Part 5: Determination of initial and final setting times
Methods of physical tests for hydraulic cement, Part 6: Determination of compressive strength of hydraulic cement (other than masonry cement)
Methods of physical tests for hydraulic cement, Part 7: Determination of compressive strength of masonry cement
Methods of physical tests for hydraulic cement, Part 8: Determination of transverse and compressive strength of plastic mortar using prism
Methods of physical tests for hydraulic cement, Part 9: Determination of heat of hydration
Method of chemical analysis of hydraulic cement
Glossary of terms relating to Pozzolana
Portland Slag Cement - Specification
Code of Practice for General Construction of Plain and Reinforced Concrete for Dams and Other Massive Structures
Methods for testing performance of batch-type concrete mixers
Definitions and terminology relating to hydraulic cement
Code of Practice Ready-Mixed Concrete
Method of Tests for Strength of Concrete
Specification for flow table for use in tests of hydraulic cements and pozzolanic materials
Specification for vicat apparatus
Specification Apparatus Used in 'Le-chatelier' Test
Specification compacting factor apparatus
Specification variable flow type air-permeability apparatus (Blaine type)
Recommendations for detailing of reinforcement in reinforced concrete works
Specification for constant flow type air-permeability apparatus (Lea and Nurse type)
Method of Test Splitting Tensile Strength of Concrete
Specification for high alumina cement for structural use
high alumina cement for structural use(BI-LINGUAL)
Glossary of terms relating to cement concrete, Part I: Concrete aggregates
Glossary of Terms Relating to Cement Concrete, Part 10: Tests and Testing Apparatus
Glossary of terms relating to cement concrete, Part 11: Prestressed concrete
Glossary of terms relating to cement concrete, Part 12: Miscellaneous
Glossary of terms relating to cement concrete, Part II: Materials (Other than Cement and Aggregate)
Glossary of terms relating to cement concrete, Part III: concrete reinforcement
Glossary of terms relating to cement concrete, Part 4: Types of concrete
Glossary of terms relating to cement concrete, Part 5: Formwork for concrete
Glossary of terms relating to cement concrete, Part 6: Equipment, tools and plant
Glossary of Terms Relating to Cement Concrete, Part 7: Mixing, Laying, Compaction, Curing and Other Construction Aspects
Glossary of terms relating to cement concrete, Part 8: Properties of concrete
Glossary of terms relating of cement concrete, Part 9: Structural aspects
Methods of sampling fly ash
Specification for Standard Sand for Testing of Cement
Specification for supersulphated cement
Specification for Methods of Test for Determination of Water Soluble Chlorides in Concrete Admixtures
Recommendations for use of table vibrators for consolidating concrete
Specification for concrete slump test apparatus
Specification for apparatus for determining constituents of fresh concrete
Code of practice for extreme weather concreting, Part 1: Recommended practice for hot weather concreting
Code of practice for extreme weather concreting, Part 2: Recommended practice for cold weather concreting
Specification for rapid hardening Portland cement
White Portland Cement -
Specification for hydrophobic Portland cement
Specification for 43 grade ordinary Portland cement
Dimensions and materials of cement rotary kilns, components and auxiliaries (dry process with suspension preheater)
Method of test for determining setting time of concrete by penetration resistance
Specification for Oil-well Cement
Code of practice for determination of specific surface area of powders by air permeability methods
Recommended practice for shotcreting
Method of making, curing and determining compressive strength of accelerated cured concrete test specimens
Specification for Concrete Admixtures -
Specification for Artificial Lightweight Aggregates for Concrete Masonry Units
Method of test for abrasion resistance of concrete
Specification for apparatus for measuring aggregate crushing value and ten percent fines value
Specification for apparatus for aggregate impact value
Specification for apparatus for flexural testing of concrete
Specification for apparatus for use in measurement of length change of hardened cement paste, mortar and concrete
Specification for pressure meter for determination of air content of freshly mixed concrete
Design Aids for Reinforced Concrete to IS 456:1978
Handbook on Concrete Mixes
Explanatory Handbook on Indian Standard Code of Practice for Plain and Reinforced Concrete (IS 456:1978)
Handbook on Concrete Reinforcement and Detailing
Plain and Reinforced Concrete - Code of Practice
glass fibre reinforced polyester resins (GRP) squatting pans
plastic equilibrium float valve for cold water services
rotational moulded polyethylene water storage tanks
diaphragm type (plastic body) float operated valves for cold water services
forged brass gate, globe and check valves for water works purposes
Cast iron single faced thimble mounted sluice gates
stainless steel sinks for domestic purposes
Resilient Seated Cast Iron Air Relief Valves for Water Works Purposes -
Sluice Valve for Water Works Purposes (50 to 1200 mm Size) -
mixing valves for ablutionary and domestic purposes
Water Fittings - Copper Alloy Float Valves (Horizontal Plunger Type) -
self-closing taps for water supply purposes
cast iron manhole covers and frames
Pillar Taps for Water Supply Purposes
Automatic Flushing Cisterns for Urinals (Other than Plastic Cisterns)
Water Meters (Bulk Type)
plastic seats and covers for water-closets, Part 1: Thermoset seats and covers
plastic seats and covers for water-closets, Part 2: Thermo plastic seats and covers
Hot Press Moulded Thermosetting Glass Fibre Reinforced Polyester Resin (GRP) Sectional Water Storage Tanks-1 SPECIFICATION FOR PANELS
Hot Press Moulded Thermosetting Glass Fibre Reinforced Polyester Resin (GRP) Sectional Water Storage Tanks, Part 1: palels, Part 2 Guidelines for assembly, installation and test
vitreous sanitary appliances (vitreous china): Part 1 General requirements
vitreous sanitary appliances (vitreous china): Part 14 Specific requirements of integrated squatting pans
Vitreous Sanitary Appliances (Vitreous China) - , Part 15: Specific Requirements of Universal Water Closets
Vitreous Sanitary Appliances (Vitreous China) - , Part 16: Specific Requirements of Wash Down Wall Mounted Water Closets
Vitreous Sanitary Appliances (Vitreous China) - , Part 17: Specific Requirements of Wall Mounted Bidets
Vitreous Sanitary Appliances (Vitreous China) - - Part 2: Specific Requirements of Washdown Water Closets
Vitreous Sanitary Appliances (Vitreous China) - - Part 3: Specific Requirements of Squatting Pans
Vitreous Sanitary Appliances (Vitreous China) - - Part 4: Specific Requirements of Wash Basins
vitreous sanitary appliances (vitreous china): Part 5 Specific requirements of laboratory sinks
Vitreous Sanitary Appliances (Vitreous China), Part 6: Specific Requirements of Urinals and Partition Plates
Vitreous Sanitary Appliances (vitreous china) - , Part 7: Specific Requirements of Accessories for Sanitary Appliances
Vitreous Sanitary Appliances (Vitreous China) - - Part 9: Specific Requirements of Pedestal Type Bidets
Code of practice for selection, installation and maintenance of sluice valves
ferrules for water services
copper alloy waste-fittings for wash basins and sinks
plug cocks for water supply purposes
chemically resistant glazed stoneware pipes and fittings
single faced sluice gates (200 to 1200 mm size)
waste plug and its accessories for sinks and wash-basins
surface boxes for sluice valves
foot valves for water works purposes
washers for use with fittings for water services
Vitreous Sanitary Appliances (Vitreous China) - , Part 8: Specific Requirements of Pedestal Close Coupled Washdown and Syphonic Water Closets
cast copper alloys traps: Part 1 'P' and 'S' traps
Swing Check Type Reflux (Non-Return] Valves for Water Works Purposes, Part 1: Single-Door Pattern
Swing Check Type Reflux (non-return) Valves for Water Works Purpose, Part 2: Multi-Door Pattern
cast-iron steps for manholes
cast iron gratings for drainage purposes
gel-coated glass fibre reinforced polyester resin bath tubs
Glazed Stoneware Pipe and Fittings -
Method for performance testing of water meters (domestic type)
plastic flushing cisterns for waterclosets and urinals
Glazed Fire-Clay Sanitary Appliances: Part-1 General Requirements
Glazed Fire-Clay Sanitary Appliances: Part-2 Specific Requirements of Kitchen And Laboratory Sinks
Glazed Fire Clay Sanitary Appliances : Part-3 Specific Requirements of Urinals, Section 1: Slab Urinals
Glazed Fire-Clay Sanitary Appliances, Part 3: Specific Requirements of Urinals: Section 2 Stall Urinals
Glazed Fire-Clay Sanitary Appliances, Part 4: Specific Requirements of Postmortom Slabs
Glazed Fire-clay Sanitary Appliances, Part V: Specific Requirements of Shower Trays
Glazed Fire-clay Sanitary Appliances, Part VI: Specific Requirements of Bed Pan Sinks
Glazed Fire-Clay Sanitary Appliances, Part 7: Specific Requirements of Slop Sinks
General Requirements for Enamelled Cast Iron Sanitary Appliances
Flushing Cistern for Water Closets and Urinals (Other Than Plastic Cisterns) -
Copper Alloy Gate, Globe and Check Valves for Waterworks Purposes
Water Meters (Domestic Type)
Cast Copper Alloy Screw Down Bib Taps And Stop Valves for Water Services
Specification for Caulking Lead
copper alloy fancy single taps, combination tap assembly and stop valves for water services
Method for sampling of vitrous and fire clay sanitary appliances
cast iron screw-down stop valves and stop and check valves for water works purposes
pressure reducing valves for domestic water supply systems
flush valves and fittings for water closets and urinals
polyethylene floats (spherical) for float valves
Plastics Bib Taps, Pillar Taps, Angle Valves and Stop Valves for Hot and Cold Water Services -
Code of practice for manufacture of lime based blocks
Code of practice for manufacture and use of lime-pozzolana concrete blocks for paving
lime-pozzolana concrete blocks for paving
quick setting lime pozzolana mixture
Low grade gypsum-use in building industry-code of practice
By-product gypsum for use in plaster, blocks and boards
Pulverized Fuel Ash-Lime Bricks -
Guidelines for manufacture of gypsum plaster in Mechanized pan system
Guidelines for handling and storage of building limes
Guidelines on Fuel Saving in Vertical Mixed-feed Lime Shaft Kilns
Pulverized fuel ash for lime-pozzolana mixture applications -
Method of field testing of building lime
Code of practice for field slaking of building lime and preparation of putty
Design and installation of vertical mixed-feed lime kiln guide, Part 1: Lime stone, Section 1: Masonry type shaft
Design and installation of vertical mixed feed type lime kiln guide, Part 1: For limestone, Section 2: RCC type shaft
Guide for manufacture of lime in vertical mixed-feed type kiln, Part 1: From lime-stone
Gypsum Plaster Boards, Part 1: Plain Gypsum Plaster Boards
Gypsum Plaster Boards, Part 2: Coated/Laminated Sypsum Plaster Boards
gypsum plaster boards, Part 3: Reinforced Gypsum plaster boards
Glossary of terms relating to gypsum
Code of practice for preparation and use of lime concrete
Methods of Test for Gypsum Plaster, Concrete and Products, Part I: Plaster and Concrete
Methods of Test for Gypsum Plaster, Concrete and Products, Part II: Gypsum Products
gypsum building plaster, Part 1: Excluding premixed lightweight plaster
gypsum building plaster, Part 2: Premixed lightweight plaster
Cinder as Fine Aggregates for use in Lime Concrete
non-load bearing gypsum partition blocks (solid and hollow types)
broken brick (burnt clay) coarse aggregates for use in lime concrete
lime based blocks
broken brick (burnt clay) fine aggregates for use in lime mortar
lime-pozzolana mixture
calcium silicate bricks
Code of practice for preparation and use of lime-pozzolana mixture concrete in buildings and roads
Glossary of terms relating to building lime
Methods of Tests for Building Limes, Part X: Determination of Popping and Pitting of Hydrated Lime
Methods of Tests for Building Limes, Part 11: Determination of Setting Time of Hydrated Lime
Method of test for building limes Determination of carbon dioxide content
Method of test for building limes Determination of residue on slaking of quicklime
Method of test for building limes, Part 1: Determination of insoluble residue, loss on ignition, insoluble matter, silicone dioxide, ferric and aluminium oxide, calcium oxide and magnesium oxide
Method of test for building limes Determination of fineness of hydrated lime
Method of test for building limes Determination of unhydrated oxide, Part v: Determination of unhydrated oxide
Method of test for building limes, Part VI: Determination of volume yield of quicklime
Method of test for building limes, Part VII: Determination of compressive and transverse strength
Method of test for building limes, Part VIII: Determination of workability
Method of test for building limes Determination of soundness
Specification for Building Limes
gypsum plaster for use in the manufacture of fibrous plaster boards
inorganic aggregates for use in gypsum plaster
Method of Test for Materials for Use in the Preparation of Magnesium Oxychloride Flooring Compositions
Glossary of terms relating to building finishes
Bitumen-Mastic for Flooring -
Code of practice for laying bitumen mastic flooring
Code of practice for laying of rubber floors
Code of practice for laying, fixing and maintenance of linoleum floor
Cement Concrete Flooring Tiles - Specification
corrugated bitumen roofing sheets
plastic translucent sheets made from thermosetting polyester resin (glass fibre reinforced)
bitumen mastic for flooring for industries handling LPG and other light hydrocarbon products
Code of practice for laying of bitumen mastic flooring for industries handling LPG and other light hydrocarbon products
Ceramic Tiles-Methods of Test, Sampling and Basis of Acceptance, Part 1: Determination of Dimensions and Surface Quality
Ceramic Tiles - Methods of Test, Sampling and Basis for Acceptance
Ceramic Tiles - Methods of test, Sampling and Basis of Acceptance, Part 10: Determination of frost resistance (see IS 13630 : Parts 1 to 15)
Ceramic Tiles - Methods of test, Sampling and Basis of Acceptance, Part 14: Impact resistance
Ceramic Tiles - Methods of test Part, Sampling and Basis of Acceptance 15 sampling and basis of acceptance
Ceramic Tiles-Methods of test, Sampling and Basis of Acceptance, Part 2: Determination of water absorption (see IS 13630 : Parts 1 to 15)
Ceramic Tiles - Methods of test, Sampling and Basis of Acceptance, Part 6: Determination of modulus of rupture (see IS 13630 : Parts 1 to 15)
Ceramic Tiles - Methods of test, Part 7: Determination of chemical resistance - Unglazed tiles(see IS 13630 : Parts 1 to 15)
Ceramic tiles - Definitions, classifications, characteristics and marking
Checkered cement concrete tiles -
Code of practice for laying and finishing of cement concrete flooring tiles
Laying of Pitch-Mastic Flooring for Industries Handling Heavy Hydrocoarbon Products Like Kerosene, Diesel and Furnace Oil - Code of Practice
Pitch-Mastic Flooring for Industries Handling Heavy Hydrocarbon Products Like Kerosene, Diesel and Furnace Oil -
Wall Coverings in Roll Form - Vocabulary and Symbols
Wall Coverings in Roll form for Finished Wall Papers, Wall Vinyls and Plastic Wall Coverings -
sand for plaster
Pressed ceramic tiles
Ceramic Tiles - methods of test, Sampling and Basis of Acceptance, Part 11: Determination of resistance to surface abrasion - Glazed tiles [see IS 13630 (Parts 1 to 15)]
Ceramic Tiles - Methods of test, Sampling and Basis of Acceptance, Part 12: Determination of resistance to deep abrasion - Unglazed tiles (see IS 13630 : Parts 1 to 15)
Ceramic Tiles - Methods of test, Sampling and Basis of Acceptance, Part 13: Determination of scratch hardness of surface according to MOHS (see IS 13630 : Parts 1 to 15)
Ceramic Tiles - Methods of Test Part, Sampling and Basis of Acceptance 3 Determination of moisture expansion using boiling water - Unglazed tiles (see IS 13630 : Parts 1 to 15)
Ceramic Tiles - Methods of Test, Sampling and Basis of Acceptance, Part 4: Determination of linear thermal expansion (see IS 13630 : Parts 1 to 15)
Ceramic Tiles - Methods of Test, Sampling and Basis of Acceptance, Part 5: Determination of resistance to thermal shock (see IS 13630 : Parts 1 to 15)
Ceramic Tiles - Methods of test, Sampling and Basis of Acceptance, Part 8: Determination of chemical resistance - Glazed tiles (see IS 13630 : Parts 1 to 15)
Ceramic Tiles - Methods of test, Sampling and Basis of Acceptance, Part 9: Determination of crazing resistance - Glazed tiles (see IS 13630 : Parts 1 to 15)
Laying of Plastic Translucent Sheets Made from Thermosetting Polyester Resin (Glass Fibre Reinforced) Alone or in Conjunction with Asbestos Cement Sheets/Steel Sheets/Aluminium Sheets - Code of Practice
Precast concrete blocks for paving -
mason's tools for plaster work and pointing work
Code of practice for application of cement and cement-lime plaster finishes
Code of practice for laying in-situ terrazzo floor finish
Code of practice for application of lime plaster finish
Code of Practice for External Rendered Finishes
Code of practice for laying in-situ cement concrete flooring
PVC-asbestos floor tiles
unbacked flexible PVC flooring
Methods of Test for Plastic Flooring and Wall Tiles
Code of practice for use of silicate type chemical resistant mortars
Code of practice for use of sulphur type chemical resistant mortars
Code of practice for use of resin type chemical resistant mortars
Methods of Test for Chemical Resistant Mortars, Part I: Silicate Type and Resin Type
Ceramic unglazed vitreous acid resisting tile -
Code of practice for laying of epoxy resin floor toppings
chemical resistant mortars, Part I: Silicate type
Chemical Resistant Mortars, Part II: Resin type
chemical resistant mortars, Part III: Sulphur type
acid-resistant bricks
Recommendations for selection of industrial floor finishes
Pitch-Mastic for Bridge Decking and Roads -
Code of practice for laying of flexible PVC sheet and tile flooring
Code of practice for laying of in-situ granolithic concrete floor topping
Code of practice for laying of burnt clay brick flooring
Code of Practice for Whitewashing and Colour-washing
Linoleum Sheets And Tiles
Materials for Use In The Manufacture of Magnesium Oxychloride Flooring Compositions
Code of Practice for Magnesium Oxychloride Composition Floors
Recommendations for selection of dairy floor finishes
Rubber Flooring Materials For General Purposes
Bitumen Mastic, Anti-Static and Electrically Conducting Grade
Methods of Tests for Epoxy Resins, Hardeners and Epoxy Resin Compositions for Floor Topping
epoxy resin, hardeners and epoxy resin compositions for floor topping
bitumen mastic acid-resisting grade
Methods of tests for linoleum sheets and tiles
Methods of test for chemical resistant mortars, Part II: Sulphur type
Methods of test for determination of strength properties of natural building stones, Part I: Compressive strength
Methods of Test for Determination of Strength Properties of Natural Building Stones, Part II: Transverse Strength
Methods of Test for Determination of Strength Properties of Natural Building Stones, Part III: Tensile Strength
Methods of test for determination of strength properties of natural building stones, Part IV: Shear strength
Method of test for determination of true specific gravity of natural building stones
Method of identification of natural building stones
Method of test for determination of water absorption, apparent specific gravity and porosity of natural building stones
Method of test for determination of weathering of natural building stones
Method of test for determination of durability of natural building stones
Recommendations for dimensions and workmanship of natural building stones for masonry work
Limestone (Slab and Tiles)
Recommendation of dressing of natural building stones
marble (blocks, slabs and tiles)
polished building stones, Part 1: Granite
Method for determination of resistance to wear by abrasion of natural building stones
Glossary of terms relating to stones, quarrying and dressing
structural granite
laterite stone block for masonry
sandstone (slabs and tiles)
Method of test for determination of water transmission rate by capillary action through natural building stones
Method of test for surface softening of natural building stones by exposure to acidic atmospheres
Methods of test for determination of permeability of natural building stones
Method of Test for Toughness of Natural Building Stones
Method of test for determining aggregate impact value of soft coarse aggregates
Method of Test for Determination of Stripping Value of Road Aggregates
Roofing Slate Tiles
Coarse Aggregate for Water Bound Macadam
Schedule for properties and availability of stones for construction purposes, Part I: Gujarat state, Section 1: Availability of stones
Schedule for properties and availability of stones for construction purposes, Part II: Maharashtra state, Section 1: Availability of stones
Schedule for properties and availability of stones for construction purposes, Part I: Gujarat state: Section 2 Engineering properties of building stones
Schedule for properties and availability of stones for construction purposes, Part I: Gujarat state: Section 3 Engineering properties of stone aggregates
Schedule of properties and availability of stones for construction purposes, Part II: Maharashtra state, Section 2: Engineering properties of building stones
Schedule of properties and availability of stones for construction purposes, Part IV: Karnataka states Sections (1 to 3)
Schedule for Properties and Availability of Stones for Construction Purposes, Part 5: Andhra Pradesh State - Sections 1 to 3
Code of practice for stacking and packing of stone slabs for transportation
Recommended practice for quarrying stones for construction purposes
Code of practice for maintenance and preservation of stones in building
stone lintels
Dimensions and Tolerances for Hot Rolled Track Shoe Sections, Part I: Section TS-L1
Dimensions and tolerances for hot-rolled track shoe sections, Part 2: Section TS-H1
Hot rolled and slit steel tee bars
Hot rolled steel bulb angles Dimensions
Hot Rolled Parallel Flange Steel Sections for Beams, Columns and Bearing Piles - Dimensions and Section Properties
Rolling and cutting tolerances for hot rolled parallel flange beam and column sections
Tolerances for erection of steel structures
Design and installation of natural gas pipelines - Code of Practice, Part 1: Laying of pipelines
Design and installation of natural gas pipelines - Code of Practice, Part 2: Laying of pipelines in crossings
Design and installation of natural gas pipelines - Code of Practice : Part 3 Pre-commissioning and commissioning of pipelines
Dimensions for steel plates,sheets strips and flats for general engineering purposes
Steel Bars round and square for structural and general engineering purposes
Rolling and cutting tolerances for hot rolled steel products
Schedule for Properties and Availability of Stones for Construction Purposes, Part II: Maharashtra State, Section 3: Engineering Properties of Stone Aggregates
Schedule for Properties and Availability of Stones for Construction Purposes, Part III: Tamil Nadu State, Section 2: Engineering Properties of Building Stones
Schedule for Properties and Availability of Stones for Construction Purposes, Part III: Tamil Nadu State, Section 3: Engineering Properties of Stone Aggregates
Code of practice for design, fabrication, testing and installation of underground/above ground horizontal cylindrical storage tanks for petroleum products
rolled steel bulb flats -
Hot-rolled steel L-sections for shipbuilding -
Steel Sheet Piling Sections
Tubular Steel Poles for Overhead Power Lines
Steel Scaffoldings
Crane rail sections -
Aluminium equal leg angles
Aluminium Unequal Leg Angles
Aluminium channels -
Hot Rolled Steel Channel Sections for General Engineering Purposes - Dimensions
Light rails -
Code of practice for high strength bolts in steel structures
Code of practice for steel tubular scaffolding, Part 1: Definitions and materials
Aluminium I-beam -
Dimensions and dimensional tolerances for hot rolled steel plates for ship's hull structure
Aluminium tee-sections -
Aluminium bulb angles for marine application -
Aluminium tee bars for marine application -
Aluminium bulb plates for marine application -
Code of practice for design and construction of steel chimneys, Part 1: Mechanical aspects
Code of practice for design and construction of steel chimneys, Part 2: Structural aspects
Safety code for erection of Structural Steelwork
Tolerances for fabrication of steel structures
Specification for hot-rolled steel sections for doors, windows and ventilators
General Construction In Steel - Code of Practice
Code of Practice for Use of Cold Formed Light Gauge Steel Structural Members In General Building Construction
Code of Practice for Use of Structural Steel in Overhead Transmission Line Towers, Part 2: Fabrication, Galvanizing, Inspection and Packing
Code of Practice for Use of Structural Steel In Overhead Transmission Line Towers, Part 3 Testing
Code of Practice for Design Fabrication and Erection of Vertical Mild Steel Cylindrical Welded Oil Storage Tanks
Rectangular Pressed Steel Tanks -
Code of Practice for Use of Steel in Gravity Water Tanks
Code of Practice for Use of Steel Tubes In General Building Construction
Dimensions for Hot Rolled Steel Beam, Column, Channel and Angle Sections
slotted sections
Cold Formed Light Gauge Structural Steel Sections -
Code of Practice for Use of Aluminium Alloys in Structures
Recommendations for dimensional parameters for industrial building
Criteria for Design of Steel Bins for Storage of Bulk Materials, Part 1: General Requirements and Assessment of Loads
Criteria for Design of Steel Bins for Storage of Bulk Materials, Part 2: Design Criteria
Criteria for Design of Steel Bins for Storage of Bulk Materials, Part 3: Bins Designed for Mass Flow and Funnel Flow
Recommendations for maintenance and operation of petroleum storage tanks, Part 1: Preparation of tanks for safe entry and work
Recommendations for Maintenance and Operation of Petroleum Storage Tanks, Part 2: Inspection
ISI Handbook for Structural Engineers -Part- 1 Structural Steel Sections
ISI Handbook for Structural Engineers -Part- 2 Steal Beams and Plate Girders
Code of Practice for Use of Structural Steel In Overhead Transmission Line Towers, Part 1 Materials, Loads and Permissible Stresses, Section 1: Materials and Loads
Code of Practice for Use of Structural Steel In Overhead Transmission Line Towers, Part 1: Material, Loads and Permissible Stress, Section 2: Permissible Stress
ISI Handbook for Structural Engineers -Part- 3 Steel Columns and Struts
ISI Handbook for Structural Engineers -Part- 4 Use of High Strength Friction Grip Bolts
Handbook for Structural Engineers -Part- 5 Cold-Formed, Light-Gauge Steel Structures
Handbook for Structural Engineers -Part- 6 Application of Plastic Theory In Design of Steel Structures
Handbook for Structural Engineers -Part- 7: Simple Welded Girders
Grading rules for unsplit canes
water soluble type wood preservatives, Part 1: Acid-copper-chrome (ACC) preservative
water soluble type wood preservatives, Part 2: Copper-chrome-arsenic (CCA) wood preservative
water soluble type wood preservatives, Part 3: Copper-chrome-boron (CCB) wood preservative
Plywood Tea-Chests: Part-1 General
bamboo supports for camouflaging equipment
Plywood Tea-Chests: Part-2 Plywood
Plywood Tea-Chests: Part-3 Battens
wooden sleepers for railway track
Plywood Tea-Chests: Part-4 Metal Fittings
pin-needle hardboard boxes for packaging of apples
Method of determination of sound absorption coefficient of timber by standing wave method
wooden toggles
Plywood Tea-Chests, Part 5: Assembly and Packing
Guidelines for nailing of large framed wooden containers
Code of practice for preservation of wooden sleepers for railway track by pressure treatment
Method of determination of thermal conductivity of timber
sweeping brooms
carpenter's mallets
wooden casks and barrels
Moisture content of timber and timber products- Methods for determination
Recommendations for off-road transportation of timber
logs for matches
Seasoning of timber- Code of practice
Trade names and abbreviated symbols for timber species
Indian timbers for door and window shutters and frames- Classification
Non-coniferous sawn timber (Baulks and scantlings) -
cut sizes of timber
Determination of dielectric constant of wood under microwave frequencies- Method of test
Indian timbers for furnitures and cabinets- Classification
Preservative treated and seasoned sawn timber from rubber wood (Hevea Brasiliensis) -
wooden packing cases
Grading rules for split canes
Logs for production of sliced veneers -
Classification of Indian canes and their zonal distribution
Design, Installation and Testing of Solar Timber Seasoning Kiln - Guidelines
wood wool for general packaging purposes
Determination of moisture content (See IS 1708-1 TO 18)
Methods of testing of small clear specimens of timber
Determination of hardness under static indentation (See IS 1708-1 TO 18)
Determination of shear strength parallel to grain (See IS 1708-1 TO 18)
Determination of tensile strength parallel to grain (See IS 1708-1 TO 18)
Determination of tensile strength perpendicular to grain (See IS 1708-1 TO 18)
Determination of cleavage strength parallel to grain (See IS 1708-1 TO 18)
Determination of nail and screw holding power (See IS 1708-1 TO 18)
Determination of brittleness by Izod impact (See IS 1708-1 TO 18)
Determination of brittleness by Charpy impact (See IS 1708-1 TO 18)
Determination of torsional strength (See IS 1708-1 TO 18)
Determination of specific gravity (See IS 1708-1 TO 18)
Determination of volumetric shrinkage (See IS 1708-1 TO 18)
Determination of radial and tangential shrinkage and fibre saturation point (See IS 1708-1 TO 18)
Determination of static bending strength (See IS 1708-1 TO 18)
Determination of static bending strength under two point loading (See IS 1708-1 TO 18)
Determination of impact bending strength (See IS 1708-1 TO 18)
Determination of compressive strength parallel to grain (See IS 1708-1 TO 18)
Determination of compressive strength perpendicular to grain (See IS 1708-1 TO 18)
Timber for aircraft construction in converted form (finished form) -
Coniferous Sawn Timber (Baulks and Scantlings)
Methods of tests for wood poles
Preservation of bamboo and cane for non-structural purposes - Code of practice
wooden tent pins
converted timber for lorry bodies
Wooden cross arms -
Timber for cooling towers -
Tables for volumes of cut sizes of timber
Methods of static tests of timber in structural sizes
Method of sampling of model trees and logs and their conversion for timber testing
battened plywood cases
Guide for installation of impregnation plants for timber
Permissible Moisture Content For Timber Used For Different Purposes - Recommendations
wooden handles for felling axes and hand axes
Wooden handles for picks and beaters -
Wooden handles for adzes -
wooden handles for wood working chisels and gouges
Wooden handles for rasps, engineers' file and engineers' scrapers-
wooden handles for carpenters' augers
wooden handles for shovels
wooden tent mallets
cane baskets for general purposes
wooden crates
Pencil slats-
ballies for general purposes
Methods of measurement and evaluation of defects in timber, Part 1: Logs
Methods of measurement and evaluation of defects in timber, Part 2: Converted timber
wooden fence posts
Methods for estimation of preservatives in treated timber and in treating solutions, Part 1: Deterrmination of copper, arsenic, chromium, zinc, boron, creosote and fuel oil
Methods for estimation of preservatives in treated timber and in treating solutions, Part 2: Determination of copper (in copper organic preservative salt) and pentachlorophenol
wooden boxes for packaging of apples
teak squares
wooden beaters
Classification of Commercial Timbers and Their Zonal Distribution
Preservation of Timber - Code of Practice
willow clefts for cricket bats
Hand-sawing of timber - Guide
timber for use in coal mines
wooden anvil blocks
Methods for field testing of preservatives in wood
teak logs
Method of testing timber connector joints
Wooden handles for hand hammers-
Key for identification of commercial timbers
Coniferous logs -
converted timber (coniferous) : Part 1 Light furniture
converted timber (coniferous) : Part 2 Packing cases and crates
non-coniferous timber in converted form for ammunition/explosives boxes
Wooden handles for POWRAHS-
Non-coniferous timber in converted form for general purposes-
Code of practice for design of wood poles for overhead power and telecommunication lines
Methods of laboratory testing of wood preservatives against fungi and borers (powder post beetles) : Part 1 Determination of threshold values of wood preservatives against fungi
Methods of laboratory testing of wood preservatives against fungi and borers (powder post beetles) : Part 2 Determination of threshold values of wood preservatives against borers (powder post bettles)
jointed wood poles for overhead power and telecommunication lines
Wooden Tool Handles General Requirements
Method of laboratory test for efficacy of wood preservatives against soft rot
Method of tests for timber props for mines
Method of test for the efficacy of preservatives and evaluating the natural durability of timbers used in cooling towers
Guiding principles for grading and inspection of timber
Logs for Plywood
wooden disc for tents
mason's mallets
wooden pins for bivouac tents
tinman's mallets
caulking mallets
Timber species suitable for wooden packaging -
bossing (plumbers), mallets
Glossary of wooden packaging terms
willow logs for artificial limbs
Code of practice for maintenance of wood poles for overhead power and telecommunication lines
wooden paddles
Method of testing natural durability of timber and efficacy of the wood preservatives against marine borers
Method of tests for bamboo
Timber Technology And Utilization of Wood, Bamboo and Cane - Glossary of Terms
Non-coniferous logs -
Guidelines for design, installation and testing of timber seasoning kilns (Compartment type with cross-forced air circulation)
bamboo tent poles
Vase for store tent-
timber half wrought for sporting rifles
returnable wooden crates for vegetables
wooden box for microscope slides
plywood cases for packing tobacco for export
packaging of plywood, blockboards and flush doors for export
Methods of tests for split bamboos
Evaluation of working quality of timber under different wood working operations- Method of test
bamboo chicks, Part 1: Fine
bamboo chicks, Part 2: Coarse
Methods of sampling of timber scantlings from depots and their conversion for testing
wirebound wooden boxes
wirebound wooden crates
Methods of presentation of data of physical and mechanical properties of timber
Wood Poles for Overhead Power And Telecommunication Lines
Preservation of bamboo for structural purposes - Code of practice
Guide for storage and protection of logs and sawn timber
Code of practice for felling and conversion of trees into logs
Guide for mill sawing of timber
non-returnable wooden boxes for horticulture produce
Handbook on Timber Engineering
Timber Panelled and Glazed Shutters, Part 1: Door shutters -
Timber Panelled And Glazed Shutters, Part 2: Windows and Ventilator Shutters
Specification For Steel Doors, Windows And Ventilators
Glossary of terms relating to doors
steel sliding shutters (top hung type)
collapsible gates
Code of practice for fixing and glazing of metal (steel and aluminium) doors, windows and ventilators
Specification for steel windows for industrial buildings
Glass Fibre Reinforced Plastic (GRP) Panel Type Door Shutters for Internal Use -
Moulded Raised High Density Fibre (HDF) Panel Doors -
Solid Panel Foam UPVC Door Shutters - Specification
Specification for aluminium doors, windows and ventilators
Specification for Aluminium Windows for Industrial Buildings
Wooden Flush Door Shutters (Cellular and Hollow Core Type), Part 1: Plywood Face Panels
wooden flush door shutters (cellular and hollow core type): Part 2 Particle board and hardboard face panels
wooden flush door shutters (solid core type): Part 1 Plywood face panels
wooden flush door shutters (solid core type): Part 2 Particle board and hardboard face panels
Door Shutters - Methods of Tests
Door Shutters - Methods of Tests
Timber Door, Window and Ventilator Frames -
Recommendations for Symbolic Designation of Direction of Closing and Faces of Doors, Windows and Shutters
Steel Door Frames -
Code of Practice for Selection, Installation and Maintenance of Timber Doors and Windows
ledged, braced and battened timber door shutters
Metal Rolling Shutters and Rolling Grills
Rating of sound insulation in buildings and of building elements, Part 1: Airborne sound insulation in buildings and of interior building elements
Rating of sound insulation in buildings and of building elements, Part 2: Impact sound insulation
Rating of sound insulation in buildings and of building elements, Part 3: Airborne sound insulation of facade elements and facades
Recommendations for calculation of solar radiation on buildings
Code of practice for ventilation in petro-chemical plants and refineries
Audible emergency evacuation signal
Code of practice for sound insulation of non-industrial buildings
Guide for Daylighting of Buildings
Code of practice for acoustical design of auditoriums and conference halls
Code of Practice for Industrial Ventilation
Code of practice for natural ventilation of residential buildings
Code of practice for noise reduction in industrial buildings
Guide for heat insulation of non industrial buildings
Recommendations for noise abatement in town planning
Recommendations for Buildings and Facilities for the Physically Handicapped
Code of practice for construction of underground air-raid shelters in natural soil
Code of Practice for Daylighting of Factory Buildings
Code of Practice for Functional Requirements of hotels, restaurants and other food service establishmentsDaylighting of Factory Buildings
Recommendations for orientation of buildings, Part 1: Non-industrial buildings
Code of practice for daylighting of educational buildings
Recommendations for basic requirements of school buildings
Glossary of terms applicable to acoustics in buildings
Handbook on Functional Requirements of Industrial Buildings (Lighting and Ventilation)
Handbook of Typified Designs for Structures with Steel Roof Trusses (With and Without Cranes) (Based on IS Codes)
Handbook on Structures with Steel Portal Frames (Without Cranes)
Handbook on Functional Requirements of Buildings (Other than Industrial Buildings)
Handbook on Structures with Steel Lattice Portal Frames (Without Cranes)
Corrugated coir wood wool cement roofing sheets-Specification
Code of practice for patent glazing
Code of practice for construction of rb and rbc floors and roofs
Methods of test for preformed fillers for expansion joints in concrete paving and structural construction
Joints in Buildings - Vocabulary
General check list of functions of joints in building (ISO 3447-1975)
Glossary of terms for sealants for building purposes (ISO 6927-1981)
Code of practice for design and construction of bolt-jointed timber construction
Code of practice for setting out of buildings
Specification for one part gun-grade polysulphide- based joints sealants, Part 1: General requirements
Specification for one part gun-grade polysulphide- based joint sealants, Part 2: Methods of test
Classification of joints in buildings for accommodation of dimensional deviations during construction (ISO 7727-1984)
Method of test for laboratory determination of air permeability of joints in buildings
Code of practice for laying and fixing of sloped roof coverings using plain and corrugated galvanized steel sheets
Two-part polysulphide- based sealants - Specification, Part 1: General requirements
Two parts polysulphide based sealants - Specification, Part 2: Methods of test
Code of Practice for Improved Thatching of Roof with Rot and Fire Retardant Treatment
Code of practice for no-fines cast in situ cement concrete
Guide for preparation and use of mud mortar in masonry
Code of practice for fixing of wall coverings
Guidelines for painting of structures in aggressive chemical environment
Code of Practice for Painting of Ferrous Metals in Buildings, Part 1: Pretreatment
Code of practice for painting of ferrous metals in buildings, Part 2: Painting
Guidelines for Maintenance Management of Buildings, Part 1: General
Guidelines for Maintenance Management of Buildings, Part 2: Finance
Guidelines for Maintenance Management of Buildings, Part 3: Labour
Installation of Frameless Door and Window Shutters - Code of Practice
Structural Design using Bamboo - Code of Practice
Construction of Stone Masonry - Code of Practice, Part 1: Rubble Stone Masonry
Code of practice for construction of stone masonry, Part 2: Ashlar masonry
Code of practice for design and construction of wood stairs for houses
Code of practice for design and construction of flues and chimneys for domestic heating appliances
Hot Applied Sealing Compounds for Joints in Concrete- Specification
Preformed Fillers for Expansion Joints in Concrete Pavements and Structures(non-extruding and resilient type) Part 3 Polymer Based
Code of Practice for Structural use of Unreinforced Masonry
Code of practice for use of fixing devices in walls, ceilings and floors of solid construction
Code of practice for in-situ construction of walls, in buildings with soil-cement
Code of practice for flat-roof finish: mud phuska
Sand for masonry mortars - Specification
preformed fillers for expansion joint in concrete pavement and structures (non extruding and resilient type): Part 1 Bitumen impregnated fibre - Specification
preformed fillers for expansion joint in concrete pavement and structure (non extruding and resilient type) Part 2 CNSL Aldehyde resin and coconut pith - Specification
Code of Practice for Construction of Jack-Arch Type of Bult-up Floor or Roof
Code of practice for construction of brick-cum-concrete composite (madras terrace) floor and roof
Code of practice for construction of reinforced concrete shell roof
Code of practice for brickworks
Code of Practice for Preparation and Use of Masonry Mortars
Code of practice for finishing of wood and wood based materials, Part 1: Operations and workmanship
Code of practice for finishing of wood and wood based materials, Part 2: Schedules
Code of practice for nail-jointed timber construction
Painting of Concrete, Masonry and Plaster Surfaces - Code of Practice, Part 1: Operations and Workmanship
Code of practice for painting concrete, masonry and plaster surfaces, Part 2: Schedules
Code of practice for fixing ceiling covering
Code of practice for painting of nonferrous metals in buildings, Part 1: Pretreatment
Code of practice for painting of non-ferrous metals in buildings, Part 2: Painting
Code of practice for fixing rainwater gutters and downpipes for roof drainage
Code of practice for roofing with wooden shingles
Code of practice for design and construction of stone slab over joist floor
Code of practice for roofing with mangalore tiles
Code of practice for painting asbestos cement building products
Code of Practice for Design and Installation of Joints in Buildings
Code of Practice for Glazing in Buildings
structural timber in building - Specification
Construction of Non-load Bearing Gypsum Block Partitions - Code of Practice
Code of practice for construction of timber floors
Code of practice for external facings and veneers, Part I: Stone facing
Code of Practice for External Facings and Veneers, Part II: Cement Concrete Facing
Code of Practice for External Cladding, Part 3: Wall Tiling and Mosaics
Code of practice for reed walling
Code of practice for finishing of wood and wood based products with nitrocellulose and cold catalyzed materials
preferred cut sizes of structural timber - Specification
Glossary of terms applicable to roof coverings
Method of test for nail-jointed timber trusses, Part I: Destructive test
Method of Test for Nail-jointed Timber Trusses, Part II: Proof Test
Code of Practice for Design and Construction of Nailed Laminated Timber Beams
Code of Practice for Laying and Fixing of Sloped Roof Covering, Part I: Slating
Code of practice for laying of hardwood parquet and wood block floors
Code of practice for construction of timber ceilings
Methods of test for clear finishes for wooden furniture, Part 1: Resistance to dry heat
Methods of test for clear finishes for wooden furniture, Part 2: Resistance to wet heat
Methods of test for clear finishes for wooden furniture, Part 3: Resistance to marking by oils and fats
Methods of test for clear finishes for wooden furniture, Part 4: Resistance to marking by liquids
Methods of test for clear finishes for wooden furniture, Part 5: Test for low angle glare
Methods of Test for Clear Finishes for Wooden Furniture, Part VI: Resistance to Mechanical Damage
Code of Practice for Construction of Floor and Roof with Joists and Filler Blocks, Part 1: With Hollow Concrete Filler Blocks
Code of practice for construction of floor and roof with joists and filler blocks, Part 2: With hollow clay filler blocks
Code of Practice for Construction of Floor and Roof with Joists and Filler Blocks, Part IV: With Precast Hollow Clay Block Slab Panels
Code of Practice for Construction of Floor and Roof with Joists and Filler Blocks, Part 3: With Precast Hollow Clay Block Joists and Hollow Clay Filler Blocks
Code of practice for anti-termite measures in buildings, Part 1: Constructional measures
Code of Practice for Anti-Termite Measures in Buildings, Part 2: Pre-constructional Chemical Treatment Measures
Code of Practice for Anti-termite Measures in Buildings, Part 3: Treatment for Existing Buildings
Code of practice for construction of floor and roofs using precast doubly-curved shell units
Code of practice for installation of joints in concrete pavements
Design of Structural Timber In Building -Code of Practice
Code of practice for laying mosaic parquet flooring
Equivalent Metric Units For Scales Dimensions And Quantities In General Construction Work
Pictorial Surface Preparation Standards for Painting of Steel Surfaces
Standard colours for building and decorative finishes (with supplement)
Standard colours for building and decorative finishes- supplement ONLY
Handbook on Masonry Design and Construction
Summaries of Indian Standards for Building Materials
Handbook on Causes and Prevention of Cracks in Building
Handbook on Building Construction Practices (Excluding Electrical Work)
Specification for mild steel stays and fasteners
Specification for numericals
Specification For Rim Latches
Specification for curtain rail system
Stainless steel butt hinges - Specification
PVC Handrail Covers - Specification
Steel butt hinges -
Code of practice for design, fabrication and maintenance of nail-jointed timber posts from small dimensional timber for overhead electric distribution lines for low voltage
Door Closers, Concealed Type (Hydraulically Regulated) -
Stainless steel tower bolts -Specification
Stainless Steel Sliding Door Bolts for use with Padlocks - Specification
Stainless steel sliding door bolts for use with padlocks -Specification Bilingual)
Specification for floor door stoppers
Specification for fanlight pivots
Tower Bolts - Specification: Part-1 Ferrous Metals
Tower Bolts - Specification Part-2 Non-Ferrous Metals
Non-Ferrous Metal Butt Hinges -Specification
Tee and Strap Hinges - Specification
Door Handles -Specification
Non-ferrous metal sliding door bolts (aldrops) for with padlocks -Specification
Mild Steel Sliding Door Bolts for Use With Padlocks -Specification
Hydraulically Regulated Door Closers -Specification
Parliament Hinges -Specification
Hasps and Staples -Specification
Fanlight Catch -Specification
Continuous (Piano) hinges -Specification
Specification for ventilator chains
Steel back flap hinges -Specification
Door Spring, Rat-Tail Type - Specification
Double Acting Spring Hinges -Specification
Specification for indicating bolts for use in public baths and lavatories
Specification for door handles for mortice lock (vertical type)
Specification for flush bolts
Specification - bath-room latches
Floor springs (hydraulically regulated) for heavy doors -
Specification -plastic window stays and fasteners
Specification for Door Closers (Pneumatically Regulated) for Light Doors Weighing up to 40 kg
Specification for hold fast
Specification for double action floor springs (without oil check) heavy door
Specification for sliding locking bolts for use with padlocks
Specification for mortice ball catches for use in wooden almirah
Specification for rising butt hinges
Specification for Flush Drop Handle for Drawers
Specification for hat, coat and wardrobe hooks
Specification for Structural Plywood - Specification
Code of practice for the preparation and application of putty for repairing plywood and other wood based panels
Code of practice for testing of timbers for plywood manufacture
Code of practice for preservation of plywood and other panel products
Medium Density Fibre Boards for General Purpose -Specification
Wood Products - Prelaminated Particle Boards -Specification
Veneered Decorative Plywood -Specification
Method for determination of formaldehyde content in particle board by extraction method called perforator method
Metal faced plywood -Specification
Bamboo mat board for general purposes -Specification
Cement bonded particle boards -Specification
Commercial veneers -Specification
Prelaminated medium density fibre board -Specification
Bamboo mat veneer composite for general purposes -Specification
Laminated veneer lumber - Specification
Coir Veneer Board for General Purposes -Specification
Extenders for Use in Synthetic Resin Adhesives (Urea-formaldehyde) for Plywood- Code of Practice
Bamboo Mat Corrugated Sheets -Specification
Medium Density Coirboards for General Purposes -
Selection and Use of Various Types of Medium Density Fibre Boards - Code of Practice
Extenders for use in synthetic resin adhesives (Urea-Formaldehyde) for plywood - Code of practice
Prelaminated cement bonded particle board -Specification
Museum plywood -Specifiction
Coir Faced Block Boards -Specification
Coir Hardboard for General Purposes -Specification
Selection and Use of various types of Lignocellulosic Panel Products - Code of Practice, Part 1: Medium Density Particle Boards
Bamboo-Jute Composite Corrugated and Semi-Corrugated Sheets - Specification
Fibre hardboards -Specification
Block Boards -Specification
Methods of test for plywood, Part 1: DETERMINATION OF DENSITY AND MOISTURE CONTENT
Methods of test for plywood
Methods of test for plywood, Part 10: DETERMINATION OF COMPRESSIVE STRENGTH
Methods of test for plywood, Part 11: DETERMINATION OF STATIC BENDING Strength
Methods of test for plywood, Part 12: DETERMINATION OF SCARF JOINT STRENGTH
Methods of test for plywood, Part 13: DETERMINATION OF PANEL SHEAR STRENGTH
Methods of test for plywood, Part 14: DETERMINATION OF PLATE SHEAR STRENGTH
Methods of test for plywood, Part 15: CENTRAL LOADING OF PLATE TEST
Methods of test for plywood, Part 16: VIBRATION OF PLYWOOD PLATE TEST
Methods of test for plywood, Part 17: LONG TIME LOADING TEST OF PLYWOOD STRIPS
Methods of test for plywood, Part 18: IMPACT RESISTANCE TEST on the surface of plywood
Methods of test for plywood, Part 19: DETERMINATION OF NAILS AND SCREW HOLDING POWER
Methods of test for plywood, Part 2: DETERMINATION OF RESISTANCE TO DRY HEAT
Methods of test for plywood, Part 20: ACIDITY AND ALKALINITY RESISTANCE TEST
Methods of test for plywood, Part 3: DETERMINATION OF FIRE RESISTANCE
Methods of test for plywood, Part 4: DETERMINATION OF GLUE SHEAR STRENGTH
Methods of test for plywood, Part 5: TEST FOR ADHESION OF PLIES
Methods of test for plywood, Part 6: DETERMINATION OF WATER RESISTANCE
Methods of test for plywood, Part 7: MYCOLOGICAL TEST
Methods of test for plywood, Part 8: DETERMINATION OF pH VALUE
Methods of test for plywood, Part 9: DETERMINATION OF TENSILE STRENGTH
Methods of Test for Wood Particle Boards and Boards from Other Lignocellulosic Materials
Method of test for wood particle boards and boards from other lignocellulosic materials, Part 22: Determination of surface glueability test
Method of test for wood particle boards and boards from other lignocellulosic materials, Part 23: Vibration tests for particle boards
Plywood for General Purposes -
Partical boards of wood and other lingnocellulosic materials (medium density) for general purposes -Specification
Veneered Particle Boards -Specification
Specification for low density particle boards
Specification for wood wool building slabs
Specification for fibre insulation boards
Specification for High Density Wood Particle Boards
Resin treated compressed wood laminates (compregs) - Specification, Part 1: For electrical purposes
Resin treated compressed wood laminates (compregs) - Specification, Part 2: For chemical purposes
Resin Treated Compressed Wood Laminates (Compregs) - Specification, Part 3: For General Purposes
Resin Treated Compressed Wood Laminates (Compregs) - Specification, Part 4: Sampling and tests
Specification veneered wood boards for packing cases
Specification Polyvinyl Acetate Dispersion Based Adhesives for Wood
high strength aircraft plywood
Plywood for concrete shuttering work - Specification
Fire Retardant Plywood -Specification
Specification for preservative treated plywood
Wooden Separators for Lead-Acid Storage Batteries
Specification for Medium Atrength Aircraft Plywood
Marine Plywood -Specification
Specification for decorative plywood using plurality of veneers for decorative faces
Wood/Lignocellulosic Based Panel Products - Methods of Sampling
Specification for Synthetic Resin Adhesives for Plywood (Phenolic And Aminoplastic) -
Specification for Synthetic Resin Adhesives For Construction Work (Non-Structural) in Wood
Animal Glue For General Wood-Working Purposes -Specification
Performance requirements for adhesive for structural laminated wood products for use under exterior exposure condition
Methods of Test for Wood-based Structural Sandwich Construction
Methods of Tet for wood based Structural sandwich construction, Part 2: Edgewise compression test - (see IS 9307 : Parts 1 to 8)
Methods of Tet for wood based Structural sandwich construction, Part 3: Flat wise compression test - (see IS 9307 : Parts 1 to 8)
Methods of Tet for wood based Structural sandwich construction, Part 4: Shear test - (see IS 9307 : Parts 1 to 8)
Methods of Tet for wood based Structural sandwich construction, Part 5: Flatwise tension test - (see IS 9307 : Parts 1 to 8)
Methods of Tet for wood based Structural sandwich construction, Part 6: Flexure creep test - (see IS 9307 : Parts 1 to 8)
Methods of Tet for wood based Structural sandwich construction, Part 7: cantilever vibration test - (see IS 9307 : Parts 1 to 8)
Methods of Tet for wood based Structural sandwich construction, Part 8: Weathering test - (see IS 9307 : Parts 1 to 8)
Specification for portable fire extinguisher mechanical foam type
Functional requirements for small foam tender for fire brigade use
Specification for Higher Capacity Dry Powder Fire Extinguisher (Trolley Mounted)
Functional requirements for 2000 kg dry powder tender for fire brigade use
Extended Branch Pipe for Fire Brigade Use
Specification for Portable Fire Extinguishers - Halon 1211 Type
Specification for smoke detectors for use in automatic electrical fire alarm system
Specification for dry powder fire extinguisher for metal fires
Functional requirements of fire fighting equipment - High capacity portable pumpset (1100-1600 1/min)
Specification for fire rake
Tool Mcleod for fighting forest fires
Design and installation of fixed foam fire extinguishing system - Code of Practice, Part 1: Low expansion foam
Specification pulaski tool for forest fire
Fire Fighting - Brush Hook for Forest Fires -Specification
Specification for double bit axe for forest fire
Specification for fire fighting shovel for forest fires
External hydrant systems - provision and maintenance - Code of practice
Specification for fire extinguisher 50 litre capacity wheel mounted water type (Gas Cartridge)
Specification for fire extinguisher 50 litre capacity , mechanical foam type
Specification for portable fire extinguisher dry powder type (constant pressure)
Dry Chemical Powder for Fighting A,B,C, Class Fires -Specification
Maintenance of Fire Hose - Code of Practice
High Pressure Fire Fighting Hose -Specification
Fire Extinguisher - 135 Litres Capacity Mechanical Foam Type -
High Pressure Fire Hose Delivery Couplings -Specification
Design and Installation of Fixed Automatic Sprinkler Fire Extinguishing Systems - Code of Practice
Specification for Halogented hydrocarbons - halon 1211 and halon 1301 - fire extinguishing media -
Safe Handling and Transfer Procedures of Halon 1211 and Halon 1301 (Halogenated Hydrocarbons) - Fire Extinguishing Media -
Carbon Dioxide as Fire Extinguishing Media for Fire Protection -Specification
Installation and Maintenance of Fire Fighting Pumps - Code of Practice
Design and Installation of Fixed Automatic High and Medium Velocity Water Spray System - Code of Practice
Portable Fire Extinguisher Mechanical Foam Type (Stored Pressure) -Specification
Gaseous Fire Extinguishing Systems - General Requirements
Inspection and Maintenance of Gaseous Fire Extinguishing Systems - Code of Practice
Gaseous Fire Extinguishing Systems - IG 01 Extinguishing Systems
Gaseous Fire Extinguishing Systems - IG 541 Extinguishing Systems
Gaseous Fire Extinguishing Systems - HCFC Blend A Extinguishing Systems
Gaseous Fire Extinguishing Systems - IG 55 Extinguishing Systems
Gaseous Fire Extinguishing Systems - HFC 227ea (Hepta Fluoro Propane) Extinguishing Systems
Water mist fire protection systems - Systems design, installation and commissioning - Code of practice
Gaseous Fire Extinguishing Systems - IG 100 Extinguishing Systems
Fire fighting vehicles and equipment - symbols for operator controls and other display
Portable fire extinguishers - Performance and construction -
Long-range water-cum-foam monitor with self-inducting, aspirating and non-aspirating jet and spray/fog nozzle for fire fighting -Specification
Gaseous fire extinguishing systems - Physical properties and system design - CF3I extinguishant
Gaseous Fire Extinguishing Systems - HCFC-125 Extinguishing Systems
Selection, Installation and Maintenance of Control and Indicating Equipments for Fire Detection and Alarm System - Code of Practice
Wheeled Fire Extinguishers â Performance and Construction â Specification�� ��
Chrlorinated Polyvinyl Chrloride (CPVC) Pipes for Automatic Sprinkler Fire Extinguishing System - Specification
Functional requirements for electric motor sirens, Part 1: ac 3 phase 50 hz, 415 volts type
Foam Making Branch Pipe and Foam Inductor- Specification
Specification for portable fire extinguishers,dry powder (cartridge type)
Specification for heat sensitive fire detectors for use in automatic fire alarm system
Selection, Installation and Maintenance of Automatic Fire Detection and Alarm System Code of Practice
SELECTION, INSTALLATION AND MAINTENANCE OF FIRST-AID FIRE EXTINGUISHERS â CODE OF PRACTICE��
Specification for Single Barrel Stirrup Pump for Fire Fighting Purposes
Specification for galvanized mild steel fire bucket
Functional Requirements for 1 125-1/min Light Fire Engine
Specification for Non-Metal Helmet for Firemen and Civil Defense Personnel
Branch Pipe, Universal For Fire fighting Purpose- Specification
Gaseous Fire Extinguishing Systems - Carbon Dioxide Total Flooding and Local Application ( Sub-Floor and In-Cabinet), High and Low Pressure (Refrigerated) Systems
Branch Pipe, Universal For Fire fighting Purpose- Specification
Fire Extinguisher, Carbon Dioxide Type (Portable and Trolley Mounted) -Specification
Specification for Industrial Safety Helmets(Bi-Lingual)
Specification for Industrial Safety Helmets (Bilingual)
Functional requirements for hose laying tender for fire brigade use
basket strainers for fire fighting purposes (cylindrical type)
Specification hose binding machine
Code of practice for installation and maintenance of internal fire hydrants and hose reels on premises
Specification for protective helmets for scooter and motorcycle riders
Specification for Dry Chemical Powder for Fighting B and C Class Fires -
Specification Aluminium Extension Ladders for Fire Brigade use
Specification for suction wrenches for fire brigade use
Specification for dry powder for fighting fires in burning metals
Specification for portable fire extinguishers for aircraft, Part 1: Halon 1211 Type
Specification for Unlined Flax Canvas Hose for Fire Fighting
delivery valve for centrifugal fire pump outlets
Specification for Gas cartridges for use in fire extinguishers -
multipurpose aqueous film forming foam liquid concentrate for extinguishing hydrocarbon and polar solvent fires
Dividing Breeching with Control for Fire Brigade Use -Specification
Specification for landing valves
Specification for quick release knife
Specification for multi-edged rescue axe (non-wedging)
Foam Concentrate for producing mechanical foam for fire fighting - Specification (Amalgamating IS 4989 (Part 1):1985, (Part 2) : 1984, (Part 3):1987
Specification for hose-clamps and hose-bandages for fire brigade use, Part 1: Hose-clamps
Specification for hose-clamps and hose bandages for fire brigade use, Part 2: Hose bandages
Specification for Hydrant Stand-Pipe for Fire Fighting
Code of practice for design and construction of fire service drill-tower
Code of Practice for Selection, Operation and Maintenance of Special Fire Fighting Appliance, Part I: Combined Foam and Co Crash Tender
Code of practice for selection, operation and maintenance of fire fighting appliances, Part 3: Turntable ladders
Specification - hand operated sirens
Functional Requirements for Water Tender Type 'X' for Fire Brigade Use
Code of practice for selection, operation and maintenance of trailer fire pumps, portable pumps, water tenders and motor fire engines
Portable Fire Extinguishers Water Type (Stored Pressure) -Specification
Fire Fighting Equipment - Glossary of Terms
Specification for headforms for testing of helmets
Specification for Couplings, Branch Pipe, Nozzle Used in Hose Reel Tubing for Fire Fighting
Specification for fire beaters
Functional requirements for twin co2 fire extinguishers (trolley mounted)
Specification for controlled percolating hose for fire fighting
Stand post type water and foam monitor for fire fighting -Specification
Specification for First-Aid Hose-Reel For Fire Fighting
Specification for Couplings, Double Male And Double Female, Instantaneous Pattern For Fire Fighting
Specification for Suction Hose Couplings For Fire Fighting Purposes
Specification for Fire Hose Delivery Couplings, Branch Pipe, Nozzles And Nozzle Spanner - Specification
Specification for 2-Way And 3-Way Suction Collecting Heads For Fire Fighting Purposes
Specification for Delivery Breechings, Dividing And Collecting Instantaneous Pattern For Fire Fighting Purposes
Specification for Revolving Branch Pipe For Fire Fighting
Specification for Suction Strainers, Cylindrical Type For Fire Fighting Purposes
Specification for Fire Hydrant, Stand Post Type
Specification for Underground Fire Hydrant, Sluice Valve Type
Specification for Combined Key For Hydrant, Hydrant Cover And Lower Valve
Specification For Fireman's Axe
Specification For Fire Hooks
Specification For Fire Bells
Specification for Washers For Water Fittings For Fire Fighting Purposes
Specification for Snatch Block for Use with Fibre Rope for Fire Brigade Use
Specification for Portable Fire Extinguisher, Water Type (Gas Cartridge) -
Specification for Blower and Exhauster for Fire Fighting
Functional Requirements for 275 1/Min Portable Pump Set for Fire Fighting
Functional Requirements for 680-1/Min Trailer Pump For Fire Brigade Use
Functional Requirements of 1800-1/Min Trailer Pump For Fire Brigade Use
Functional Requirements for Towing Tender for Trailer Fire Pump for Fire Brigade Use
Functional Requirements for Water Tender Type 'A' for Fire Brigade Use
Emergency (Rescue) Tender - Functional Requirements
Functional Requirements for Water Tender, Type B for Fire Brigade Use
Functional Requirements for Crash Fire Tender for Air Fields
Fognozzle for Fire Brigade Use - Specification
Fognozzle for Fire Brigade Use - Specification
Functional Requirements for Dry Powder Tender for Fire Brigade Use
Functional Requirements for Rescue Tender for Air Fields
Specification for non-metal helmet for police force
Specification for Control Van for Fire Brigade Use
Code of practice for provision and maintenance of water supplies and fire fighting
Methods of sampling of helmets
Specification for Automatic Sprinkler Heads for Fire Protection Service
Specification for visor for scooter helmets
Specification for visor for non-metal police and firemen's helmets
Requirements for sludge dewatering equipment, Part I: Sludge drying beds-sand, gravel and underdrains
Requirements for sludge de-watering equipment, Part 2: Vacuum filtration equipment
Requirements for sludge de-watering equipment, Part 3: Centrifugal equipment (Solid bowl type)
Requirements for equipment for jackson candle turbiditimeter and determination of turbidity
Requirements for settling tank (clarifier equipment) for waste water treatment
Requirements for settling tank (clarifier equipment) for water treatment plant
Glossary of terms relating to water supply and sanitation
buckets to be used in power driven bucket type sewer cleaning machine
Requirements for chlorination equipment, Part 2: Vacuum feed type chlorinators
Requirements for chlorination equipment, Part 4: Gravity feed type gaseous chlorinators
Requirements of chlorination equipment, Part 5: Bleaching powder solution feeder displacement type chlorinator
Requirements for power driven bucket-type sewer cleaning machine
Requirements for power driven rodding machine for sewers
Guidelines for registration of plumbers
Requirements for chlorination equipment, Part I: General guidelines for chlorination plants including handling, storage and safety of chlorine cylinders and drums
Requirements for high pressure jetting machine for sewer cleaning
attachment tools for power driven rodding machine for sewers
Requirements for slow sand filters, Part 1: General guidelines
General requirements for slow sand filters, Part 2: Design, construction, operation and maintenance
Code of Basic Requirements for Water Supply, Drainage and Sanitation
Recommendations for cement mortar lining for cast iron mild steel and ductile-iron pipes and fittings for transportation of water
pitch-impregnated fibre pipes and fittings for drainage purposes
sewer cleaning metal rods
Code of practice for safety precautions to be taken when entering a sewerage system
Code of practice for plumbing in multi-storied buildings, Part 1: Water supply
Code of practice for drainage of building basements
Code of Practice for Use and Laying of Ductile Iron Pipes
Code of practice for sanitation with leaching pits for rural community
mechanical surface aerators-cuidlines for evaluation and testing
Code of practice for building drainage
Code of practice for selection, installation and maintenance of sanitary appliances
Code of practice for water supply in buildings
Code of practice for installation of septic tanks, Part I: design, criteria and construction
Code of practice for installation of septic tanks, Part II: Secondary treatment and disposal of septic tank effluent
Code of practice for laying of cast iron pipes
Code of practice for ancillary structures in sewerage system, Part I: Manholes
Code of practice for ancillary structures in sewerage system, Part II: Flusing tanks
General requirements of suction machine for cleaning sewers, manholes and ancillary structures provided on sewer line and closed storm water drains
Code of practice for ancillary structures in sewerage system, Part III: Inverted syphon
Code of Practice for Ancillary Structures in Sewerage System, Part IV: Pumping Stations and Pumping Mains (Rising mains)
Code of practice for ancillary structures in sewerage system, Part 5: Tidal outfalls
Code of practice for laying of glazed stoneware pipes
Code of practice for sanitary pipe work above ground for buildings
Code of Practice for Construction of Waste Stabilization Ponds (Faculative Type)
Code of Practice for Laying of Electrically Welded Steel Pipes for Water Supply
equipment for grit removal devices
sewage screens
Code of practice for water supply and drainage in high altitudes and/or sub-zero temperature regions
Code of Practice for the Construction of Refuse Chutes in Multistoreyed Buildings
Guidelines for rapid mixing devices
Guidelines for flocculator devices
Method for imhoff cone test
Code of practice for domestic hot water installations
Code of practice for construction and maintenance of road gullies
Requirements for biological treatment equipment, Part 1: Trickling filters
Requirements for biological treatment end equipment, Part 2: Activated sludge process and its modifications
Requirements for filtration equipment, Part 1: Filtration media - sand and gravel
Requirements for rapid sand gravity filtration equipment, Part 2: Under drainage system
Hand Operated Augers for Cleaning Water-closets, Pipes and Sewers
Recommendations for handling and dosing devices for chemicals for water treatment, Part I: Coagulants
Handbook on Water Supply and Drainage (with Special Emphasis on Plumbing)
Material constants in building works
Safety code for dress divers in civil engineering works
Unified Nomenclature of Workmen for Civil Engineering
Protective Barriers in and Around Buildings - Code of Safety
Recommendations for preventive measures against hazards at workplaces, Part 1: Falling material hazards prevention
Recommendations for preventive measures against hazards at workplaces, Part 2: Fall prevention
Recommendations for preventive measures against hazards at workplaces, Part 3: Disposal of debris
Recommendations for preventive measures against hazards at workplaces, Part 4: Timber structures
Recommendations for preventive measures against hazards at workplaces, Part 5: Fire protection
Code of practice for safety during additional construction and alteration to existing buildings
Construction project management - Guidelines, Part 1: General
Construction project management - Guidelines, Part 2: Time Management
Safety code of scaffolds and ladders, Part 1: Scaffolds
Scaffolds and Ladders - Code of Safety, Part 2: Ladders
Code of safety for excavation work
Code of Practice for Steel Tubular Scaffolding, Part II: Safety Regulations for Scaffolding
Safety code for blasting and related drilling operations
Recommendations on stacking and storage of construction materials and components at site
Safety code for demolition of buildings
Safety code for working in compressed air
Safety code for tunneling work
Safety Requirements for Floor and Wall Openings, Railings and Toe Boards
Safety code for piling and other deep foundations
Safety code for construction involving use of hot bituminous materials
Recommendation for Labour Output Constants for Building Work, Part I: North Zone
Safety code for working with construction machinery
Safety code for handling and storage of building materials
Safety code for erection of concrete framed structures
Handbook on Construction Safety Practices
Common Burnt Clay Building Bricks -Specification
Guide for manufacture of common burnt clay building bricks by semi-mechanized process
Clay roofing country tiles, half round and flat tiles -Specification
Burnt clay fly ash building bricks-Specification
Clay ridge and ceiling tiles-Specification
Clay flooring tiles-
soil based blocks used in general building construction
Guide for manufacture of hand-made common burnt-clay building bricks
Specification for heavy duty burnt clay building bricks
Specification for burnt clay perforated building bricks
Glossary of terms relating to clay products for buildings
Burnt clay flat terracing tiles- Specification, Part 1: Machine made
Burnt clay flat terracing tiles- Specification, Part 2: Hand made
burnt clay facing bricks-Specification
Burnt clay tiles for use in lining irrigation and drainage works-Specification
burnt clay paving bricks
Methods of tests of burnt clay building bricks: Part 1 Determination of compressive strength Part 2 Determination of water absorption Part 3 Determination of efflorescence, Part 4: Determination of warpage
burnt clay paving bricks (BI-LINGUAL)
Hollow clay tiles for floors and roofs, Part 1: Filler type -
Hollow clay tiles for floors and roofs, Part 2: Structural type
burnt clay hollow bricks for walls and partitions - Specification
Manufacture of burnt clay Mangalore pattern roofing tiles- Code of practice
Guide for construction of brick kiln
sewer bricks - Specification
Methods of sampling of clay building bricks
burnt clay soling bricks - Specification
Dimensions for special shapes of clay bricks
Clay Roofing Tiles, Mangalore Pattern-Specification
burnt clay jallies
Methods for sampling of burnt clay tiles
burnt clay paving bricks (HINDI)
wooden chairs for office purposes
wooden tables for office use
Methods of test for strength and stability of settees and benches, Part 1: Strength
Methods of test for strength and stability of settees and benches, Part 2: Stability
Wooden sofa-cum-bed-
Furniture - Storage units - Determination of stability
Plastic chairs for general office purposes-
Machine operators table and visual display unit (VDU) table-
library furniture and fittings, Part 1: Timber
Library furniture and fittings, Part 2: Steel-
metal shelving racks (adjustable type) - Specification
drawing filing equipment - Specification
steel shelving cabinets (adjustable type) -Specification
Steel Filing Cabinets for General Office Purposes - Specification
steel clothes lockers - Specification
Steel wardrobes (adjustable type)-Specification
Metal table (office type)-Specification
metal chairs for office purposes Specification, Part 1: Non-revolving and non-tilting
metal chairs for office purposes Specification, Part 2: Revolving and tilting
metal chairs for office purposes Specification, Part 2: Revolving and tilting (BI-LINGUAL)
Dimensions of tables and chairs for office purposes
Metal Side Racks (Adjustable Type) - Specification
metal waste paper bins - Specification
metal folding chairs - Specification
metal paper trays - Specification
Code of practice for joints used in wooden furniture
metal nesting chairs- Specification
wooden shelving cabinets (adjustable type) -Specification
wooden wardrobes (Adjustable and non-adjustable type) - Specification
Functional requirements for drafting chairs
Drafting stools-Specification
Wooden table tops -Specification
Glossary of terms relating to wooden furniture and fixtures
School furniture, classroom chairs and tables - Recommendations
School furniture, Classroom Chairs and Tables - Recommendations
Anthropometric dimensions for school children age group 5-17 years
Adjustable metal chairs for use of typists and operators in telephone exchanges-Specification
Methods of test for strength and stability of chairs and stools, Part 1: Strength
Methods of test for strength and stability of chairs and stools, Part 2: Determination of stability of chairs and stools
Recommendations for dimensions for spaces for human activities
dining tables
wooden clothes' lockers - Specification
Methods of test for strength and stability of tables and trolleys, Part 1: Strength
Methods of test for strength and stability of tables and trolleys, Part 2: Stability
divans and easy chairs
Specification and safety requirements for rigid sided playpens
Dimensions for furniture mirrors
Specification and safety requirements for high chairs
wooden bedside table
metal stationary cupboards
wooden folding chairs
Wooden shelving racks, adjustable and non-adjustable type -
metal book ends
wooden beds, Part 1: For use with mattresses
steel glass-front cabinets
steel book cases
composite office tables
steel card-index cabinets
steel folding cots
Metal letter-rests-
steel visible indexing system cabinets
Fire Protection of Electronic Data Processing Installation - Code of Practice
Code of practice for fire safety of chemical industries, Part 1: Rubber and plastic
Code of Practice for Fire Safety of Libraries and Archives
Fire protection-safety signs
Graphic symbols for fire protection plans
Method of fire resistance test of firestops
Code of Practice for Fire Safety in Cable Runs
Method for Classification of Flame Spread of Products
Code of Practice for Fire Safety of Industrial Buildings : Flour Mills
Code of practice for fire safety in iron and steel industries
Code of practice for fire safety of hotels
Code of practice for fire safety in educational institutions
Code of Practice for Fire Safety in Industrial Buildings (Printing and Publishing Industry)
Fire Safety of Museums - Code of Practice
Fire Blanket -
Fire Safety in Petroleum Refineries and Fertilizer Plants - Code of Practice
Code of practice for fire safety of buildings (general): General principles of fire grading and classification
Code of practice for fire safety of buildings (general): Details of construction
Code of practice for fire safety of buildings (general): Exposure hazard
Code of practice for fire safety of buildings (general): Exit requirements and personal hazard
Code of practice for fire safety of buildings (general): Electrical installations
Code of practice for fire safety of industrial buildings: Cotton ginning and pressing (including cotton seed delintering)factories
Fire Safety of Industrial Buildings: Electrical Generating and Distributing Stations - Code of Practice
Code of practice for fire safety of industrial buildings: Viscose rayon yarn and/or staple fibre plants
Code of practice for fire safety of industrial buildings: Cotton textile mills
Code of practice for fire safety of industrial buildings:General storage and warehousing including cold storage
Code of Practice for Fire Safety of Industrial Buildings : Coal Pulverizers and Associated Equipments
Fire-check Doors, Part I: Plate, Metal Covered and Rolling Type
Metallic and non-metallic fire check doors - Resistance test and performance criteria
Method of test for non-combustibility of building materials
Fire resistance test for structures
Fire Safety of Industrial Buildings - Jute Mills - Code of Practice
Code of practice for fire safety of industrial building: Aluminium/Magnesium powder factories
Code of practice for fire safety of industrial buildings: Tea factories
Code of Practice for Fire Safety of Industrial Buildings - Saw Mills and Wood Works
Glossary of Terms Associated with Fire Safety
Recommendations for fire precautionary measures in the construction of temporary structures and pandals
Recommendations for fire precautionary measures in the construction of temporary structures and pandals (BI-LINGUAL)
Fire Safety of Industrial Buildings - Paint and Varnish Factories - Code of Practice
Code of Practice For Design Loads (Other Than Earthquake)For Buildings And Structures, Part 1: Dead Loads - Unit Weights of Building Material And Stored Materials (Incorporating IS 1911 : 1967)
Code of Practice for Design Loads (Other Than Earthquake) For Buildings And Structures, Part 2: Imposed Loads
Code of Practice for Design Loads (Other than Earthquake) for Buildings and Structures, Part 3: Wind Loads
Code of Practice For Design Loads (Other Than Earthquake) For Buildings And Structures, Part 4: Snow Loads
Code of Practice For Design Loads (Other Than Earthquake) For Buildings And Structures, Part 5: Special Loads And Combinations
Explanatory Handbook on Indian Standard Code of Practice for Design Loads (Other than Earthquake) for Buildings and Structures
Code of Practice for Composite Construction in Structural Steel and Concrete
Criteria for structural design of reinforced concrete natural draught cooling towers
Criteria for design of RCC staging for overhead water tanks
Criteria for design of reinforced concrete shell structures and folded plates
Code of practice for composite construction
Criteria for design of reinforced concrete arches
Criteria for Design of Reinforced Concrete Bins for Storage of Granular and Powdery Materials, Part II: Design Criteria
Criteria for design of reinforced concrete chimneys, Part 1: Assessment of loads
Handbook on Structures with Reinforced Concrete Portal Frames (Without Cranes)
Improving earthquake resistance of earthen buildings - Guidelines
Improving earthquake resistance of low strength masonry buildings - Guidelines
Ductile detailing of reinforced concrete structures subjected to seismic forces - Code of practice
Seismic Evaluation, Repair and Strengthening of Masonry Buildings - Guidelines
Seismic Evaluation and Strengthening of Existing Reinforced Concrete Buildings - Guidelines
Criteria for earthquake resistant design of structures
Criteria for Earthquake Resistant Design of Structures, Part 1: General Provisions and Buildings
Criteria for earthquake resistant design of structure, Part 4: Industrial structures including stack-like structures )
Criteria for design of reinforced concrete bins for storage of granular and powdery materials, Part 1: General requirements and assessment of bin loads
Code of practice for earthquake resistant design and construction of buildings
Recommendations for seismic instrumentation for river valley projects
Criteria for blast resistant design of structures for explosions above ground
Criteria for safety and design of structures subject to underground blasts
silicone-based water repellents
Code of practice for application of silicone based water repellents
Waterproofing and Damp-Proofing of Wet Areas in Building - Recommendations
bitumen felts for water proofing and damp-proofing
Acrylic based polymer waterproofing material - Method of tests, Part 1: Determination of solid content
Acrylic based Polymer waterproofing Materials - Methods of Test, Part 2: Determination of Coarse Particles
Acrylic based polymer waterproofing material - Methods of test, Part 3: Determination of capillary water take-up
Acrylic based polymer waterproofing material - Methods of test, Part 4: Determination of pH value
Acrylic based polymer waterproofing material - Methods of test, Part 4: Determination of Minimum Film Forming Termperature and White Point
Code of Practice for Waterproofing of Roofs with Bitumen Felts
Bitumen based felts - Method of test, Part 1: Breaking strength test
Bitumen based felts - Methods of test, Part 2: Pliability test
Bitumen based felts - Methods of test, Part 3: Storage sticking test
Bitumen based felts - Method of test, Part 4: Pressure head test
Bitumen based felts - Methods of test, Part 5: Heat resistance test
Bitumen based felts - Methods of test, Part 6: Water absorption test
Bitumen based felts - Methods of test, Part 7: Determination of binder content
Bitumen based felts - Methods of test, Part 7: Determination of binder content
Glass Fibre Base Coal Tar Pitch Outerwrap -
bituminous compound for water-proofing and caulking purposes
Code of practice for laying damp-proofing treatment using bitumen felts
Code of practice for laying lime concrete for a waterproofed roof finish
bitumen mastic for use in water-proofing of roofs
Code of practice for general design details and preparatory work for damp-proofing and water-proofing of buildings
bitumen primer for use in waterproofing and damp-proofing
Code of practice for application of bitumen mastic for waterproofing of roofs
Glossary of terms relating to bituminous waterproofing and damp-proofing of buildings
bitumen mastic for tanking and damp-proofing_
Code of practice for water-proofing of underground water reservoirs and swimming pools
glass fibre base bitumen felts
Code of practice for damp-proofing using bitumen mastic
Recommendations for use of polyethylene film for water-proofing of roofs
Code of practice for in-situ waterproofing and damp-proofing treatments with glass fibre tissue reinforced bitumen
Code of practice for site investigations for foundation in gravel-boulder deposit
compaction mould assembly for light and heavy compaction test for soils
equipment for determination of shrinkage factors
Code of practice for sampling of soils by thin wall sampler with stationary piston
Guidelines for design and construction of prestressed rock anchors
Code of practice for field control of moisture and compaction of soils for embankment and subgrade
earth augers (Spiral type)
equipment for subsurface sounding of soils
Code of Practice For Design And Construction Of Shallow Foundations In Soils (Other Than Raft, Ring And Shell)
moulds and accessories for determination of density index (relative density) of cohesionless soils
Code of practice for design and construction of ring foundation
equipment for determination of liquid limit of soils cone penetration method
mould assembly for determination of permeability of soils
shear box for testing of soils
Code of practice for design and construction of radar antenna, microwave and TV tower foundations
Code of practice for field instrumentation of swelling pressure in expansive soils
shear box (large) for testing of soils
mild steel thin walled sampling tubes and sampler heads
Code of practice for installation and operation of single point hydraulic over-flow setting gauge
Code of practice for field monitoring of movement of structures using tape extensometer
rapid moisture meter for rapid determination of water content for soil
Method for measurement of earth pressure by hydraulic pressure cell
consolidometer for determination of consolidation properties
Mould for determination of linear shrinkage -
Selection of ground improvement techniques for foundation in weak soils -Guidelines
Vibration isolation for machine foundations - Guidelines
Apparatus for determination of dry density of soil by core cutter method-
Non-destructive integrity testing of piles (NDT) - Guidelines
Classification and identification of soils for general engineering purposes
Design and construction for ground improvement - Guidelines, Part 1: Stone columns
Design and construction for ground improvement - Guidelines, Part 2: Preconsolidation using vertical drains
Method of load test on soils
Code of practice for subsurface investigation for foundations
Code of practice for design and construction of foundations in soils: General requirements
Method for standard penetration test for soils
Code of practice for thin-walled tube sampling of soils
Methods of test for soils, Part 1: Preparation of dry soil samples for various tests
Methods of test for soils, Part 10: Determination of unconfined compressive strength
Methods of test for soils, Part 13: Direct shear test
Methods of test for soils, Part 14: Determination of density index (relative density) of cohesionless soils
Methods of Test for Soils, Part XV: Determination of Consolidation Properties
Methods of test for soils, Part 16: Laboratory determination of CBR
Methods of test for soils, Part 17: Laboratory determination of permeability
Methods of test for soils, Part 18: Determination of field moisture equivalent
Methods of test for soils, Part 19: Determination of centrifuge moisture equivalent
Methods of test for soils, Part 2: Determination of water content
Methods of test for soils, Part 20: Determination of linear shrinkage
Methods of Test for Soils, Part XXI: Determination of Total Soluble Solids
Methods of test for soils, Part 22: Determination of organic matter
Methods of test for soils, Part 23: Determination of calcium carbonate
Methods of Test for Soils, Part XXIV: Determination of Cation Exchange Capacity
Methods of test for soils, Part 25: Determination silica sesquioxide ratio
Method of test for soils, Part 26: Determination of pH value
Methods of test for soils, Part 11: Determination of the shear strength parameters of a specimen tested in unconsolidated undrained triaxial compression without the measurement of pore water pressure
Methods of test for soils, Part 12: Determination of shear strength parameters of soil from consolidated undrained triaxial compression test with measurement of pore water pressure
Methods of test for soils, Part 27: Determination of total soluble sulphates
Methods of test for soils, Part 28: Determination of dry density of soils, in-place, by the sand replacement method
Methods of Test for Soils, Part 29: Determination of Dry Density of Soils In-place by the Core-cutter Method
Methods of test for soils, Part 30: Laboratory vane shear test
Methods of test for soils, Part 31: Field determination of California Bearing Ratio
Methods of test for soils, Part 3: Determination of specific gravity, Section 1: Fine grained soils
Methods of test for soils, Part 3: Determination of specific gravity, Section 2: Fine, medium and coarse grained soils
Methods of test for soils, Part 33: Determination of the density in-place by the ring and water replacement method
Methods of test for soils, Part 34: Determination of density of soil in-place by rubber-balloon method
Methods of test for soils, Part 35: Measurement of negative pore water pressure
Methods of test for soils, Part 36: Laboratory determination of permeability of granular soils (Constant head)
Methods of test for soils, Part 37: Determination of sand equivalent values of soils and fine aggregates
Methods of test for soils, Part 38: Compaction control test (Hilf method)
Methods of test for soils, Part 39: Direct shear test for soils containing gravel, Section 1: Laboratory test
Methods of test for soils, Part 39: Direct shear test for soils containing gravel, Section 2: In-situ shear test
Methods of test for soils, Part 4: Grain size analysis
Methods of test for soils, Part 40: Determination of free swell index of soils
Methods of test for soils, Part 41: Measurement of swelling pressure of soils
Methods of test for soils, Part 5: Determination of liquid and plastic limit
Methods of test for soils, Part 6: Determination of shrinkage factors
Methods of test for soils, Part 7: Determination of water content-dry density relation using light compaction
Methods of test for soils, Part 8: Determination of water content-dry density relation using heavy compaction
Methods of test for soils, Part 9: Determination of dry density- moisture content relation by constant mass of soil method
Glossary of terms and symbols relating to soil engineering
Glossary of terms relating to soil dynamics
Code of practice for design and construction of pile foundations, Part 1: Concrete piles, Section 4: Bored precast concrete piles
Code of practice for design and construction of pile foundations, Part 2: Timber piles
Code of practice for design and construction of pile foundations, Part 3: Under-reamed piles
Code of practice for design and construction of pile foundations, Part 4: Load test on piles
Code of practice for design and construction of raft foundations, Part 1: Design
Code of practice for design and construction of machine foundations, Part 1: Foundation for reciprocating type machines
Code of practice for design and construction of machine foundations, Part 2: Foundations for impact type machines (hammer foundations)
Code of practice for design and construction of machine foundations, Part 3: Foundations for rotary type machines (Medium and high frequency)
Code of practice for design and construction of machine foundations, Part 4: Foundations for rotary type machines of low frequency
Code of practice for design and construction of foundations for transmission line towers and poles
Methods of test for stabilized soils, Part 1: Method of sampling and preparation of stabilized soils for testing
Methods of test for stabilized soils, Part 10: Test for soil-bituminous mixtures
Methods of test for stabilized soils, Part 2: Determination of moisture content of stabilized soil mixtures
Methods of test for stabilized soils, Part 3: Test for determination of moisture content-dry density relation for stabilized soil mixtures
Methods of test for stabilized soils, Part 4: Wetting and drying, and freezing and thawing tests for compacted soil-cement mixtures
Methods of test for stabilized soils, Part 5: Determination of unconfined compressive strength of stabilized soils
Methods of test for stabilized soils, Part 6: Flexural strength of soil-cement using simple beam with third-point loading
DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS â CODE OF PRACTICE, Part 1: CONCRETE PILES, Section 1: Driven Cast In-situ ��Concrete Piles
DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS â CODE OF PRACTICE, Part 1: CONCRETE PILES, Section 2: Bored Cast In-situ ��Concrete Piles
DESIGN AND CONSTRUCTION OF PILE FOUNDATIONS â CODE OF PRACTICE, Part 1: CONCRETE PILES, Section 3: Driven Precast ��Concrete Piles
Code of practice for design and construction of machine foundations, Part 5: Foundations for impact machines other than hammer (forging and stamping press, pig breaker, drop crusher and jolter)
Methods of test for stabilized soils, Part 7: Determination of cement content of cement stabilized soils
Methods of test for stabilized soils, Part 8: Determination of lime content of lime stabilized soils
Methods of test for stabilized soils, Part 9: Determination of the bituminous stabilizer content of bitumen and tar stabilized soils
Code of practice for in-situ vane shear test for soils
Method for subsurface sounding for soils, Part 1: Dynamic method using 50 mm cone without bentonite slurry
Method for subsurface sounding for soils, Part 2: Dynamic method using cone and bentonite slurry
Method for subsurface sounding for soils, Part 3: Static cone penetration test
Determination of dynamic properties of soil - Method of test
Code of practice for determination of bearing capacity of shallow foundations
Code of practice for calculation of settlements of foundations, Part 1: Shallow foundations subjected to symmetrical static vertical loads
Code of practice for calculation of settlement of foundations, Part 2: Deep foundations subjected to symmetrical static vertical loading
Guide for undisturbed sampling of sands
compaction rammer for soil testing
Method of determination of modulus of subgrade reaction (K-value) of soils in field
liquid limit apparatus for soils
Code of practice for design and construction of conical and hyperbolic paraboloidal types of shell foundations
Code of practice for design and construction of diaphragm walls
split spoon sampler
CBR moulds and its accessories
Guide for lateral dynamic load test on piles
Guidelines for dewatering during construction
Compendium of Indian Standards on Soil Engineering: Part-1 LaboratoryTesting of Soils for civil Engineering Purposes
Compendium of Indian Standards on Soil Engineering: Part-2 Field Testing of Soils For Civil Engineering Purposes
Methods of measurement of building and civil engineering works, Part 1: Earthwork
Method of measurement of building and civil engineering works, Part 10: ceiling and linings
Method of measurement of building and civil engineering works: Part11 paving, floor finishes dado and skirting
Method of Measurement of Building and Civil Engineering Works, Part XII: Plastering and Pointing
Method of measurement of building and civil engineering works, Part 14: glazing
Method of measurement of building and civil engineering works, Part 15: painting, polishing, varnishing etc
Method of measurement of building and civil engineering works, Part 16: laying of water and sewer lines including appurtenant items
Method of measurement of building and civil engineering works, Part 18: demolition and dismantling
Method of Measurement of Building and Civil Engineering Works, Part XIX: Water Supply, Plumbing and Drains
Method of measurement of building and civil engineering works, Part 2: concrete works
Method of measurement of building and civil engineering works, Part 20: laying of gas and oil pipelines
Method of measurement of building and civil engineering works, Part 21: wood-work and joinery
Method of measurement of building and civil engineering works, Part 22: materials
Method of measurement of building and civil engineering works, Part 23: piling
Method of measurement of building and civil engineering works, Part 24: well foundations
Method of measurement of building and civil engineering works, Part 25: tunneling
Method of measurement of building and civil engineering work, Part 26: Acid resistant lining
Method of measurement of building and civil engineering works, Part 27: Earthwork done by mechanical appliances
Methods of building and civil engineering works, Part 28: Sound insulation works
Method of Measurement of Building and Civil Engineering Works, Part III: Brickwork
Method of measurement of building and civil engineering works, Part 4: stone masonry
Method of measurement of building and civil engineering works, Part 5: form work
Method of measurement of building and civil engineering works, Part 13: Whitewashing, colour washing, distempering and painting of building surfaces
Method of measurement of building and civil engineering works, Part 6: refractory work
Method of measurement of building and civil engineering works, Part 7: hardware
Method of measurement of building and civil engineering works, Part 8: steel work and iron work
Method of measurement of building and civil engineering works, Part 9: roof covering (including cladding)
Method of Measurement of Plinth, Carpet and Rentable Area of Buildings
Handbook of Method of Measurement of Buildings Works
NATIONAL BUILDING CODE OF INDIA 2005(GROUP 1 TO 5)
NATIONAL BUILDING CODE OF INDIA 2005 GROUP 1
NATIONAL BUILDING CODE OF INDIA 2005 GROUP 2
NATIONAL BUILDING CODE OF INDIA 2005 GROUP 3
NATIONAL BUILDING CODE OF INDIA 2005 GROUP 4
NATIONAL BUILDING CODE OF INDIA 2005 GROUP 5
Recommendations for design and construction of port and harbour components, Part 4: Slipways
Code of practice for planning and design of ports and harbours, Part 1: Site investigation
Code of practice for planning and design of ports and harbours, Part 2: Earth pressure
Code of Practice for Planning and Design of Ports and Harbours, Part III: Loading
Code of practice for planning and design of ports and harbours, Part 4: General design consideration
Code of practice for planning and design of ports and harbours, Part 5: Layout and functional requirements
Glossary of terms relating to port and harbour engineering
Code of practice for design and construction of port and harbour structures, Part 1: Concrete monoliths
Code of practice for design and construction of port and harbour structures, Part 3: Sheet pile walls
Code of practice for design and construction of port and harbour structures, Part 4: Cellular sheet pile structures
Code of practice for design and construction of port and harbour structures, Part 6: Block work
Method for determination of slake durability index of rocks
Method of test for the determination of tensile strength by indirect tests on rock specimens
Method for laboratory determination of dynamic modulus of rock core specimens
Method of conducting pull-out test on anchor bars and rock bolts
Method for the quantitative description of discontinuities in rock masses, Part 1: Orientation
Method for the quantitative description of discontinuities in rock masses, Part 10: Block size
Method for the quantitative description of discontinuities in rock masses, Part 11: Core recovery and rock quality
Method for the quantitative description of discontinuities in rock mass, Part 12: Drillcore study
Method for the quantitative description of discontinuities in rock mass, Part 2: Spacing
Method for the quantitative description of discontinuities in rock mass, Part 3: Persistence
Method for the quantitative description of discontinuities in rock mass, Part 4: Roughness
Method for the quantitative description of discontinuities in rock masses, Part 5: Wall strength
Method for the quantitative description of discontinuities in rock masses, Part 6: Aperture
Method for the quantitative description of discontinuities in rock mass, Part 7: Filling
Method for the quantitative description of discontinuities in rock mass, Part 8: Seepage
Method for the quantitative description of discontinuities in rock mass, Part 9: Number of sets
Glossary of terms and symbols relating to rock mechanics
Code of Practice for Design and Construction of Shallow Foundations on Rocks
rock joints-direct shear strength-laboratory method of determination
Method of determination for direct shear strength of rock joints
Code of practice for in-situ determination of rock mass deformability using a flexible dilatometer, Part 1: volume change
Code of practice for in-siitu determination of rock mass deformability using flexible dilatometer, Part 2: Radial displacement
Method of test for laboratory determination of water content, porosity, density and related properties of rock material
Method for determination of strength of rock materials in triaxial compression
Code of practice for structural safety of buildings on shallow foundations on rocks
Quantitative classification system of rock mass - Guidelines, Part 1: RMR for predicting of engineering properties
Quantitative classification systems of rock mass-Guidelines, Part 2: Rock mass quality for prediction of support pressure in underground openings
Quantitative classification system of rock mass-Guidelines, Part 3: Determination of slope mass rating
Code of practice for seismic testing of rock mass, Part 1: within a borehole
Code of practice for seismic testing of rock mass, Part 2: Between the borehole
monitoring of rock movement using multi-point borehole extensometers-Guidelines
Determination of rock stress- Code of practice, Part 1: Using hydraulic fracturing technique
Determination of rock stress-Code of practice, Part 2: Using USBM type drill hole deformation gauge
Determination of rock stress- Code of practice, Part 3: Using a CSIR or CSIRO type cell with 9 or 12 strain gauges
Determination of rock stress-Code of practice, Part 4: Using flat jack technique
Guidelines for selection and development of site for building in hill areas, Part 1: Microzonation of urban centres
Guidelines for selection and development of site for building in hill areas, Part 2: Selection and development
Guidelines for monitoring of rock movements using probe inclinometer
Argillaceous Swelling Rocks - Methods for Laboratory Testing
Method of test for laboratory determination of resistivity on rock specimen
Code of practice for reinforcement of rock slopes with plane wedge failure
Design and construction of bored cast-in-situ piles founded on rocks - Guidelines
Method for Blast Vibration Monitoring - Guidelines
Tunneling Methods in Rock Masses -- Guidelines
Guidelines for Use in Prediction of Subsidence and Associated Parameters in Coal Mines Having Nearly Horizontal Single Seam Workings
Code of practice for uniaxial jacking test for deformation modulus of rock
Code of practice for in-situ shear test on rock
Method of determination of point load strength index of rocks
Method for the determination of unconfined compressive strength of rock materials
Method for the preparation of rock specimen for laboratory testing
Method for the determination of modulus of elasticity and Poisson's ratio of rock materials in uniaxial compression
Fabricated PVC-U Fittings for Potable Water Supplies - Specification, Part 1: General Requirements
Fabricated PVC-U Fittings for Potable Water Supplies - Specification, Part 10: Specific Requirements for 45o Bends
Fabricated PVC-U fittings for Potable Water Supplies, Part 11: Specific Requirements for 30 degree Bends
Fabricated PVC-U Fittings for Potable Water Supplies - Specification, Part 12: Specific Requirements for 22 ½o Bends
Fabricated PVC-U Fittings for Potable Water Supplies - Specification, Part 2: Specific Requirements for Sockets
Fabricated PVC-U Fittings for Potable Water Supplies - Specification, Part 3: Specific Requirements for Straight Reducers
Fabricated PVC- U Fittings for Potable Water Supplies - Specification, Part 4: Specific Requirements for Caps
Fabricated PVC-U Fittings for Potable Water Supplies - Specification, Part 5: Specific Requirements for Equal Tees
Fabricated PVC-U Fittings for Potable Water Supplies - Specification, Part 6: Specific Requirements for Flanged Tail Pieces with Metallic Flanges
Fabricated PVC-U Fittings for Potable Water Supplies - Specification, Part 7: Specific Requirements for Threaded Adaptors
Fabricated PVC-U fittings for Potable Water Supplies, Part 8: Specific Requirements for 90 degree Bends
Fabricated PVC-U Fittings for Potable Water Supplies - Specification, Part 9: Specific Requirements for 60 o Bends
Unplasticized PVC Pipes for Use in Suction and Delivery Lines of Agricultural Pump Sets
Thermoplastics Pipes and Fittings - Methods of Test
glass-fibre reinforced plastic (GRP) pipes joints and fittings for use for potable water supply
unplasticized polyvinyl chloride (PVC-U)screen and casing pipes for bore/tubewell
UPVC pipes for soil and waste discharge systems inside buildings including ventilation and rainwater system
Fabricated PVC-U Fittings for Potable Water Supplies - Specification Part 13 Specific Requirements for 11¼oBends, Part 12: SPECIFIC REQUIREMENTS FOR 22 ½o BENDS
UPVC pipe fittings to be used with the UPVC pipes in the suction and delivery lines of agricultural pumps
Code of practice for installation of glass fibre reinforced plastic (GRP) piping system
High density polyethylene pipe for sewerage -
GRP pipes joints and fittings for use sewerage, industrial waste and water (other than potable)
Unplasticized PVC Pipes (Ducts) and Fittings for Underground Telecommunications Cable Installation -
Polyethylene Pipes for the Supply of Gaseous Fuels -
Flexible PVC Pipes or Polymer Reinforced Thermoplastic Hoses for Suction and Delivery Lines of Agricultural Pumps - Specification
Unplasticized Non-Pressure Polyvinyl Chloride ( PVC -U ) Pipes for use in Underground Drainage and Sewerage Systems -
Polyethylene/ Aluminium/ Polyethylene Composite Pressure Pipes for Hot and Cold Water Supplies -
Chlorinated polyvinyl chloride (CPVC) pipes for potabvle hot and cold water distribution supplies -
Polypropylene-random copolymer pipes for hot and cold water supplies -
Polyethylene Fittings for use with Polyethylene Pipes for the Supply of Gaseous Fuels, Part 3: Electro Fusion Fittings
high density polyethylene pipes for potable water supplies
Unplasticized PVC Pipes for Potable Water Supplies -
Code of practice for plastic pipes work for potable water supplies, Part 1: Choice of materials and general recommendations
injection moulded PVC socket fittings with solvent cement joints for water supplies, Part 1: General requirements
Unplasticized Polyvinyl Chloride (UPVC) Injection Moulded Fittings for Soil and Waste Discharge System for Inside and Outside Buildings Including Ventilation and Rain Water System -
Polyethylene Fittings for use with Polyethylene Pipes for the Supply of Gaseous Fuels â Specification, Part 1: Fittings for Socket Fusion using ��Heated Tools
Polyethylene Fittings for use with Polyethylene Pipes for the supply of Gaseous Fuels â Specification, Part 2: Spigot Fittings for Butt Fusion for ��Socket Fusion using Heated Tools and for use with Electro Fusion Fittings
Structured-Wall Plastics Piping Systems for Non-Pressure Drainage and Sewarage - Specification, Part 1: Pipes and Fittings with Smooth External Surface, Type A
Structured-Wall Plastics Piping Systems for Non-Pressure Drainage and Sewarage - Specification, Part 2: Pipes and Fittings with Non-Smooth External Surface, Type B
Plastics Pipes Selection, Handling, Storage and Installation for Potable Water Supplies - Code of Practice, Part 2: Laying and jointing of polyethylene (PE) pipes
Plastics Pipe Selection, Handling, Storage and Installation for Potable Water Supplies - Code of Practice : Part 3 - Laying and Jointing of UPVC Pipes
injection moulded PVC socket fittings with solvent cement joints for water supplies, Part 2: Specific requirements for 45 degrees elbows
injection moulded PVC socket fittings with solvent cement joints for water supplies, Part 3: Specific requirements for 90 degree elbows
injection moulded PVC socket fittings with solvent cement joints for water supplies, Part 4: Specific requirements for 90 degree tees
Injection Moulded PVC Socket Fittings With Solvent Cement Joints for Water Supplies, Part 5: Specific Requirements for 45 degree Tees
injection moulded PVC socket fittings with solvent cement joints for water supplies, Part 6: Specific requirements for sockets
injection moulded PVC socket fittings with solvent cement joints for water supplies, Part 7: Specific requirements for unions
injection moulded PVC socket fittings with solvent cement joints for water supplies, Part 8: Specific requirements for caps
Injection Moulded/Machined High Density Polyethylene (HDPE) Fittings for Potable Water Supplies, Part 1: General Requirements for Fittings
Injection Moulded/Machined High Density Polyethylene (HDPE) Fittings for Potable Water Supplies, Part 2: Specific Requirements for 90° Bends
Injection Moulded/Machined High Density Polyethylene (HDPE) Fittings for Potable Water Supplies, Part 3: Specific Requirements for 90° TEES
Injection Moulded/Machined High Density Polyethylene (HDPE) Fittings for Potable Water Supplies, Part 4: Specific Requirements for Reducers
Injection Moulded/Machined High Density Polyethylene (HDPE) Fittings for Potable Water Supplies, Part 6: Specific Requirements for Pipe Ends
Injection Moulded/Machined High Density Polyethylene (HDPE) Fittings for Potable Water Supplies, Part 9: Specific Requirements for Ends Caps
fabricated high density polyethylene (HDPE) fittings for potable water supplies, Part 1: General requirements
fabricated high density polyethylene (MDPE) fittings for potable water supplies, Part 2 Specific requirements for 90 degree tees
fabricated high density polyethylene (HDPE) fittings for potable water supplies, Part 3 Specifc requirements for 90 degree bends
Unplasticized Polyvinyl Chloride (UPVC) Single Wall Corrugated Pipes for Drainage -
Handbook on Pipes and Fittings for Drinking Water Supply
Code of practice for design and construction of floors and roofs using precast reinforced/prestressed concrete ribbed or cored slab unit
Recommendations for modular co-ordination : basic module and submodular increments (Equivalent to ISO 1006 and ISO 6514 : 1982)
Injection Moulded/Machined High Density Polyethylene (HDPE) Fittings for Potable Water Supplies, Part 5: Specific Requirements for Ferrule Reducers
Injection Moulded/Machined High Density Polyethylene (HDPE) Fittings for Potable Water Supplies, Part 7: Specific Requirements for Sandwich Flanges
Injection Moulded/Machined High Density Polyethylene (HDPE) Fittings for Potable Water Supplies, Part 8: Specific Requirements for Reducing Tees
Code of practice for construction of floors and roofs using precast concrete waffle units
Recommendations for modular co-ordination - principles and rules
Code of practice for construction with large panel prefabricates
Recommendations for modular co-ordination: notations and symbols for modular drawings
Recommendations for modular co-ordination: Co-ordinating sizes for doorsets and window sets
Modular co-ordination for normal brickwork - Recommendations, Part 1: Burnt clay bricks
Recommendations for modular co-ordination in building industry: Location of structural walls and floor slabs
Guide for requirements of cluster planning for housing
precast reinforced concrete planks and joist for roofing and flooring
Design and Construction of Floor and Roof with Precast Reinforced Concrete Planks and Joists - Code of Practice
Code of practice for design and construction of floors and roofs with prefabricated brick panel
prefabricated brick panel and partially precast concrete joist for flooring and roofing
precast reinforced concrete channel units for construction of floors and roofs
Code of practice for construction of walls using precast concrete stone masonry blocks
Design and Construction of Floors and Roofs with Precast Reinforced Concrete Channel Units - Code of Practice
Precast Reinforced Concrete L-panel for Roofing -
Code of practice for design and construction of roof with L-Panel units
Design of Library Buildings - Recommendations Relating to its Primary Elements
Building Design and Erection Using Prefabricated Concrete - Code of Practice
Building Design and Erection Using Mixed/Composite Construction - Code of practice
mobile library van
packages for use of libraries
Design of buildings for archives - Recommendations relating to its primary elements
Criteria for design and construction of precast-trusses and purlins
Byelaws for construction of cinema buildings
Glossary of terms applicable to landscape and horticulture work
Glossary of terms relating to modular co-ordination
Recommendations for layout and planning of drawings offices
autoclaved reinforced cellular concrete wall slabs
Autoclaved reinforced cellular concrete floor and roof slabs -
Recommendations for Modular Co-ordination in Building Industry : Tolerances, Part 1: Glossary of Terms
Recommendations for modular co-ordination in building industry: Tolerances, Part 2: Principles and applications
Recommendations for modular co-ordination in building industry: Applications
Recommendations for modular co-ordination in building industry : Horizontal co-ordination
Recommendations for modular co-ordination in building industry: Vertical co-ordination
Code of practice for architectural and building working drawings
Recommendations relating to primary elements in the design of school library buildings
Guide for requirements of low income housing, Part 1: Urban areas
Code of practice for architectural and building drawings
Method of test for length distribution (wet classification of fibre length) of chrysotile asbestos fibre using Turner and Newall classifier
Method of test for determination of crudiness and grit content of asbestos fibre
Recommendations for co-ordination of dimensions in buildings-Arrangements of building components and assemblies, Part 1: Functional group 1 Structures
Recommendations for co-ordination of dimensions in buildings-Arrangement of building components and assemblies, Part 2: Functional group 2 External envelope
Recommendations for co-ordination of dimensions in buildings-Arrangements of building components and assemblies, Part 3: Functional group 3 internal subdivision
Recommendations for co-ordination of dimensions in buildings-Arrangements of building components and assemblies, Part 4: Functional group 4 services and drainage
Recommendations for co-ordination of dimensions in buildings-Arrangements of building components and assemblies, Part 5: Functional group 5 Fixtures, furniture and equipment
Method for Determination of Airborne Asbestos Fibre Concentration in Work Environment by Light Microscopy (Membrane Filter Method)
Recommendations for Safety and Health Requirements Relating to Occupational Exposure to Asbestos
Glossary of terms relating to asbestos
Recommendations for cleaning of premises and plants using asbestos fibres
Recommendations for disposal of asbestos waste material
Guidelines for safe use of products containing asbestos, Part 1: Asbestos cement products
Guidelines for safe use of products containing asbestos, Part 2: Friction materials
Guidelines for safe use of products containing asbestos, Part 3: Non-cement asbestos products other than friction materials
Recommendations for control of emission of asbestos dust in premises manufacturing products containing asbestos, Part 2: Friction materials
Recommendations for personal protection of workers engaged in handling asbestos
Recommendations for packaging, transport and storage of asbestos
Recommendations for local exhaust ventilation systems in premises manufacturing products containing asbestos
Recommendations for pictorial warning signs and precautionary notices for asbestos and products containing asbestos, Part 1: Workplaces
Control of asbestos emission - Recommendations, Part 1: Mining of asbestos ore
Control of Asbestos Emission - Recommendations, Part 2: Milling of Asbestos Ore
precast concrete stone masonry blocks
Precast Concrete Manhole Cover and Frame -
Silica-asbestos-cement Flat Sheets -
Shallow corrugated asbestos cement sheets -
Method of test for determination of openness or fiberization of chrysotile asbestos fibre by air permeability method using rapid surface area apparatus
Recommendations for control of emission of asbestos dust in premises manufacturing products containing asbestos, Part 1: Asbestos cement products
Recommendations for control of emission of asbestos dust in premises manufacturing products containing asbestos, Part 3: Non-cement asbestos products other than friction materials
Recommendations for Pictorial Warning Signs and Precautionary Notices for Asbestos and Products Containing Asbestos, Part 2: Asbestos and its Products
Prestressed concrete circular spun poles for overhead power, traction and telecommunication lines -
precast reinforced concrete street lighting poles
Precast ferrocement water tanks up to 10000 litres capacity -
Fibre Cement Flat Sheets -
Products in Fibre Reinforced Cement - Long Corrugated or Asymmetrical Section Sheets and Fittings for Roofing and Cladding -
Bar/Wire Wrapped Steel Cylinder Pipes With Mortar lining and Coating (Including Specials) --
Asbestos Cement Pressure Pipes and Joints -
Asbestos cement building pipes and pipe fittings, gutters and gutter fittings and roofing fittings, Part 1: Pipe and pipe fittings
Asbestos cement building pipes and pipe fittings, gutters and gutter fittings and roofing fittings, Part 2: Gutter and gutter fittings )
Asbestos Cement Building types and Pipe Fittings, Gutters and Gutter Fittings and Roofing Fittings, Part 3: Roofing Fittings
Prestressed concrete poles for overhead power, traction and telecommunication lines -
Steel cylinder pipe with concrete lining and coating -
Asbestos cement flat sheets -
Asbestos cement building boards -
reinforced concrete dust bins
Concrete masonry units, Part 1: Hollow and solid concrete blocks
concrete masonry units, Part 2: Hollow and solid light weight concrete blocks
concrete masonry units, Part 3: Autoclaved cellular Aerated concrete blocks
Concrete masonry units, Part 4: Preformed foam cellular concrete blocks
Precast Prestressed Concrete Street Lighting Poles
Construction of hollow and solid concrete block masonry - Code of practice
Concrete poles for overhead power and telecommunication lines - Methods of test
Laying of Asbestos Cement Sheets - Code of Practice, Part 1: Corrugated Sheets
Laying of Asbestos Cement Sheets Code of practice, Part II: Semi-Corrugated Sheets
Concrete pipes - Methods of test
Concrete pipes - Methods of test
Method of test for determination of wet volume of asbestos fibre
concrete porous pipes for under-drainage
Precast Concrete Pipes (with and without Reinforcement) -
Corrugated and semi-Corrugated Asbestos Cement Sheets -
Method of sampling and preparation of asbestos fibre for laboratory test purposes
reinforced concrete fence posts
Method of test for determination of chemical composition of asbestos fibre
Methods of test for tensile strength of asbestos fibre
Precast Concrete Coping Blocks
Precast Concrete Kerbs, Channels, Edgings, Quadrants and Gutter Aprons
precast concrete cable covers
Asbestos Cement Products - Methods of Test
Code of practice for construction of autoclaved cellular concrete block masonry
Code of practice for construction of lightweight concrete block masonry
Methods of test for autoclaved cellular concrete products, Part I: Determination of unit weight or bulk density and moisture content
Methods of Test for Autoclaved Cellular Concrete Products, Part II: Determination of Drying Shrinkage
Methods of Test for Autoclaved Cellular Concrete Products, Part IV: Corrosion Protection of Steel Reinforcement in Autoclave Cellular Concrete
Methods of Test for Autoclaved Cellular Concrete Products, Part V: Determination of Compressive Strength
Methods of test for autoclaved cellular concrete products, Part VI: Strength, deformation and cracking of flexural members subjects to bending, short duration loading test
Methods of test for autoclaved cellular concrete products, Part VII: Strength, deformation and cracking of flexural members subject to bending sustained loading test
Methods of Tests for Autoclave Cellular Concrete Products, Part VIII: Loading Tests for Flexural Members in Diagonal Tension
Methods of test for autoclaved cellular concrete products, Part IX: Jointing of autoclaved cellular concrete elements
Precast Reinforced Concrete Door and Window Frames
Code of practice for laying of asbestos cement pressure pipes
asbestos cement pipes and fittings for sewerage and drainage
perforated concrete pipes
Code of practice for selection, handling and erection of concrete poles for overhead power and telecommunication lines
specials for steel cylinder reinforced concrete pipes
Methods of sampling of asbestos cement products
Code of Practice for Laying of Concrete Pipes
Prestressed Concrete Pipes (Including Fittings) -
Reinforced Concrete Poles for Overhead Power and Telecommunication Lines -
Asbestos Cement Cable Conduits and Troughs
precast reinforced concrete plant guards
asbestos cement pressure pipes (light duty)
Method of test for determination of openness or fibrization of chrysotile asbestos fibre by air permeability method using Dyckerhoff apparatus
Method of test for length distribution (wet classification of fibre length) of chrysotile asbestos fibre using Bauer Mcnett classifier
Method for determining strength giving properties of asbestos fibre
precast concrete septic tanks
precast concrete blocks for lintels and sills
Methods of sampling of steel for prestressed and reinforced concrete, Part 1: Prestressing steel
Methods of sampling of steel for prestressed and reinforced concrete, Part 2: Reinforcing steel
Fusion bonded epoxy coated reinforcing bars -
Uncoated stress relieved low relaxation seven-ply strand for prestressed concrete -
hard-drawn steel wire fabric for concrete reinforcement
plain hard-drawn steel wire for prestressed concrete, Part 1: Cold drawn stress-relieved wire
plain hard-drawn steel wire for prestressed concrete, Part 2: As drawn wire
High strength deformed steel bars and wires for concrete reinforcement-
high tensile steel bars used in prestressed concrete
Mild Steel and Medium Tensile Steel Bars and Hard-Drawn Steel Wire for Concrete Reinforcement, Part 2: Hard-Drawn Steel Wire
INDENTED WIRE FOR PRESTRESSED CONCRETE â ��
uncoated stress relieved strand for prestressed concrete
Recommendations for welding cold worked bars for reinforced concrete construction
Code for designating perforations of industrial plate sieves (identical with ISO/DIS 7806)
wire cloth for general purposes
Methods for test sieving
industrial sieves, Part 1: Wire cloth sieves
Industrial Sieves, Part II: Perforated Plates
Hexagonal Wire Netting for General Purposes
Glossary of terms relating to powders
Test Sieves: Part-I Wire Cloth Test Sieves
Test Sieves: Part-II Perforated Plate Test Sieves
Test Sieves: Part-III Methods of Examination of Apertures of Test Sieves
Method of sub-division of gross sample of powder used for determination of particle size
Determination of particle size of powders by air elutriatioin methods
Mild Steel and Medium Tensile Steel Bars and Hard-Drawn Steel Wire for Concrete Reinforcement, Part 1: Mild Steel and Medium Tensile Steel Bars
eyepiece and screen graticules for determination of particle size of powders
Determination of particle size of powders by optical microscope method
Liquid sedimentation methods for determination of particle size of powders
Glossary of terms relating to test sieves and test sieving
Terms and symbols for sieve bottoms, Part I: Woven and welded wire screens
Terms and symbols for sieve bottoms, Part II: Perforated plates
Guidelines for retaining wall for hill area, Part 1: Selection of type of wall
Guidelines for retaining wall for hill area, Part 2: Design of retaining/breast walls
Guidelines for retaining wall for hill area, Part 3: Construction of dry stone walls
Guidelines for preparation of landslide - Hazard zonation maps in mountainous terrains, Part 2: Macro-zonation
Landslide Control - Guidelines
Siting, Design and Selection of Materials for Residential Buildings in Hilly Areas - Guidelines
Guidelines for Rain Water Harvesting in Hilly Areas by Roof Water Collection System
Guidelines for Improving the Cyclonic Resistance of Low Rise Houses and Other Buildings/Structures
Guidelines for Survey of Housing and Building Typology in Cyclone Prone Areas for Assessment of Vulnerability of Regions and Post Cyclone Damage Estimation