ISE4 Alternate Demo Scenario. Incorporates suggestions B. Kassel, S. Gordon, & B. Gischner with input from: T. Briggs and S. Moore May 23, 2005. Initial ASSET Arrangement + Requirements (LEAPS). Design Agent. Revised Arrangements Demo Scenario. AP 216 Hull. Initial Arrangement. - PowerPoint PPT Presentation
Citation preview
ISE4 Alternate Demo Scenario
Incorporates suggestions B. Kassel, S. Gordon, & B. Gischner
with input from: T. Briggs and S. Moore
May 23, 2005
May 23, 2005
ISE4 Future Ship Acquisition Demo Proposal 2
Revised Arrangements Demo Scenario
Initial ASSETArrangement
+ Requirements(LEAPS)
Build Yards
Design Agent
AP 216 Hull
Initial Arrangement
Complete Arrangement + Equipment
Vulnerability Analysis(LEAPS)
Vulnerability Report
Engineering Analysis Steel
Processing
May 23, 2005
ISE4 Future Ship Acquisition Demo Proposal 3
ISE4 Revised Future Ship Acquisition Demo Scenario
• Mission Requirements and Initial Arrangements provided by the Navy via ASSET – TWR 841 will be used as input
• TWR 841 Model Captured in FORAN to be treated as Concept Design – Send AP216 file to Navy (ASSET) for Analysis
• ASSET will pose new mission requirements and generates an initial Arrangement (AP215 Model)– List of Compartments with Requirements plus possibly some minimal Geometry
• Arrangement returned to Design Agent (FORAN) which sets up compartmentation and generates updated AP215 file (Part 21)
• Demonstrate Initial Electrical System design (KSSI)– Electronic System in Pilot House
• Navy selects Diesel Engine which fulfills base requirements and incorporates into ship contract
May 23, 2005
ISE4 Future Ship Acquisition Demo Proposal 4
ISE4 Revised Future Ship Acquisition Demo Scenario cont’d.
• Two build yards (CAD Systems: ISDP and TRIBON) will be doing a collaborative design and are awarded a preliminary/detailed design contract– TRIBON will design Topside– ISDP will design below Decks
• Shipyards add Diesel to CPC Catalog and receive AP203 file
• Arrangements Model is transferred to TRIBON (P28) via AP215 exchange– Transfer requires Mediators between Part 28 and Part 21 files
• Designs are created in ISDP, and TRIBON– Arrangements transferred via AP218 to LEAPS and COMMANDS for Analysis
– COMMANDS creates mesh and sends to Analysis tools (e.g. PATRAN, ABACUS)
– FEM Analysis performed on revised model of Engine Room
– Analysis report generated
• Design Agent sends Arrangements Model to LEAPS for Vulnerability Analysis
May 23, 2005
ISE4 Future Ship Acquisition Demo Proposal 5
ISE4 Revised Future Ship Acquisition Demo Scenario cont’d.
• Extract Structure for Manufacturing (Intergraph)
• Develop neutral structural manufacturing model (ISPE)
• Generate yard-specific manufacturing data (EB, Avondale)– Compare EB and Avondale manufacturing outputs
• Ship check existing TWR design– Provide scanned shots of Engine Room from Ship Check Data Capture Project
– Emphasize synergy between these NSRP funded projects, even though Demo is separate and not part of Ship Check Data Capture
May 23, 2005
ISE4 Future Ship Acquisition Demo Proposal 6
Concept Design(ASSET/LEAPS)
Preliminary Design(FORAN)
Collaborative Detailed Design(ISDP)
(TRIBON)(Electrical – KSSI)
Production(Steel Processing)
Operations & Maintenance(Ship Check Results)
Navy Analysis(LEAPS)
Engineering Analysis(COMMANDS)
Flowchart of Revised New Design Demo Scenario
May 23, 2005
ISE4 Future Ship Acquisition Demo Proposal 7
ISE4 Alternate Demo Proposal
Initial Arrangement
FORAN
LEAPSBelow Decks Arrangement ISDP – Des. 1
Topside Arrangement
TRIBON – Des. 2
Analysis ToolsPATRANABACUS
etc.
COMMANDS
ResultsDes. 1
ResultsDes. 2
NAVSEA Proposes
Concept Design
Alternative Proposals Analyzed
STEP Description of Selected Model
Transferred for Steel Processing
See EAD
S
See EAD
S
May 23, 2005
ISE4 Future Ship Acquisition Demo Proposal 8
Engineering Analysis Demo Scenario
AP 203P21
Shipyard(Add to CPC, CAD)
Vendor
Equip arrangement
Ship ProductModel(ISDP)
AP 227P28
Equip arrangement
AP 215P28
Compartmentation
AP 216P21
AP 218P28
AP 209P28
CPCCAD Parts
Analysis
(COG, weight,location)
AP 209 /218P28 GUID, doc URL
Feedback
AP 209P28
EADS Note: Feedback loop only for winner (ISDP)Equipment exchange precedes competition
May 23, 2005
ISE4 Future Ship Acquisition Demo Proposal 9
Mediators Required
209 218 216 215227 203/PLM
ARM
AIM
P28 P28
P28
P28 P28 P28
P21 P21 P21
P28
P21
P28
P21 Processing Capability Currently Available
P28 Higher Priority(Needed as Soon as Possible)P28 Lower Priority
(Possibly Optional)
May 23, 2005
ISE4 Future Ship Acquisition Demo Proposal 11
TWR Propulsion Engine (Caterpillar 3512) Model
May 23, 2005
ISE4 Future Ship Acquisition Demo Proposal 13
Demo Scenario Issues
• Scenario has analysis software used to discriminate among three proposed designs– More realistic than usual Demo Scenarios
• Must find way to work Electrical and ISPE (Steel Processing) more smoothly into Demo
• Steel Processing should be easily integrated with the Arrangements and Analysis scenarios, but we must determine what can be exchanged from this task